NICMAR

Project Engineering Workshop P'ractice/PW


Group: - - - - - - - - . Team: ---o----o.. Date: ---

I. Aim: 1To cast Solid Conerete Blocks


by Egg laying Machine
2. Plan: To cast (say 6 No.) numbers
- - - - - - -

of Solid Conerete Blocks


3. Dimcnsion: -
a) Dimension: 0.30 0.20 x 0.15 = 0.009cum

4. Total Volume = Say P -


CUm.

Considering shrinkage & wastage 54°%

Therefore required volume = 1.54 x P = -


cum.

5. Mis proportion (Mortar- Cement: F.A: C.A) =


1:3:6 (M10)
a) requirement of Cement: - -- Cum

b) Requirement of Cement in kg: - . Kg


c) Requirement ofsand: --- cum

d) Requirement of sand in kg: -


Kg.
b) Requirement of C.A = - -- Cum

) Requirement of C.A in kg -.
K
6. Water cement ratio - Say 0.40

So requirement of water: - - ----- lits

7. Tools & Equipments required: -


) Trowels -. ---- numbers
--- numbers
m) Spade - -

---- numbers
n) Tagari - -

o) Bucket - ------ -- numbers


p) Tikam----- numbers
g) Pawda. --numbers
r)Weighing M/c----- 1 No.
s) Block casting M/c (With vibrator) -1 No.
t) Measuring Jar _--- numbers
u Wheel Barrow - 1 No numbers
v) Releasing oil -------

8. Work distribution
Sr. No.
Roll No. Name Work Assigned
'rocedure: -

a) Collect all the materials as per design proportion.


b) Min the proportion.
o) Take Slump test and record it
p) Fill the mould by concrete mix mass
q Put on Vibrator for 10 seconds
r)Releasethe Mould
s)Change the position of the M/c
)Repeat the procedure till the end of the last produet
10. Bills of materials: -
Sr. No. Particulars Quantity Unit Rate Amount
1
250/- per Bag
Cement
Fine Aggregate 4200/- per Br
3
Course Aggregate 1800/- per Br
4
Labourcharge
Male Labour
30/-perHr.
Female Labour 25/-per lr.
5
Equipments
Block making M/c

11. Overhead charges


a) Electricity
c) Supervision etc.
d) Construction Profit