Professional Documents
Culture Documents
E700gd R01
E700gd R01
120
700
100
BACKFILL BACKFILL (WELL COMPACTED)
(WELL COMPACTED)
240
240
CONCRETE TILE COVER CONCRETE TILE COVER
120
130
130
UPVC CONDUIT UPVC CONDUIT
110
110
Ø110mm SPARE (TYP.) Ø110mm SPARE (TYP.) UPVC CONDUIT
30
30
Ø110mm SPARE (TYP.)
1000
1000
2 2 2 2 2 2 2 2
2 2 2 2
UPVC CONDUIT UPVC CONDUIT
110
110
1000
800
Ø110mm (TYP.) Ø110mm (TYP.) UPVC CONDUIT
30
30
Ø110mm (TYP.)
1 1 1 1 1 1 1 1
1 1 1 1
110
110
CONCRETE BACKFILL
30
30
CONCRETE
1 1 1 1 1C 150mm2 1 1 1 1 1C 150mm2
CU/PVC(E) CU/PVC(E) 1 1 1 1
4C 300mm2 4C 300mm2
110
110
(TYP.) (TYP.) 4C 300mm2
CU/XLPE/PVC CABLE CU/XLPE/PVC CABLE
(TYP.) (TYP.) CU/XLPE/PVC CABLE
(TYP.)
100
100
1" DRAIN
110 190 190 190 110 110 190 190 190 110 WELL COMPACTED
100
FOUNDATION SOIL
1 M-GEN. M-ATS (E-CASE) 8//4C 300mm² CU,XLPE/PVC+1C 150mm2 CU/PVC 8 NO.110mm 1 M-GEN. M-ATS (E-CASE) 8//4C 300mm² CU,XLPE/PVC+1C 150mm2 CU/PVC 8 NO.110mm
ITEM
2 H-GEN. H-ATS 4//4C 300mm² CU,XLPE/PVC+1C 150mm2 CU/PVC 4 NO.110mm 2 H-GEN. H-ATS 4//4C 300mm² CU,XLPE/PVC+1C 150mm2 CU/PVC 4 NO.110mm NO. FROM TO CABLE C.S.A (mm²) CONDUIT SIZE
700
100
BACKFILL BACKFILL
(WELL COMPACTED) (WELL COMPACTED)
280
280
CONCRETE TILE COVER CONCRETE TILE COVER
480
480
540
200
200
UPVC CONDUIT
Ø150mm SPARE (TYP.) KEY PLAN
1000
1000
60
60
1000
800
3 4 3 4
UPVC CONDUIT UPVC CONDUIT 3 4
150
150
UPVC CONDUIT Ø150mm SPARE (TYP.) UPVC CONDUIT Ø150mm SPARE (TYP.) X01 X02 X03 X04 X05 X06 X07 X08 X09 X10 X11 X12 X13 X14 X15 X16 X17 X18 X19 X20 X21 X22 X23 X24 X25 X26 X27 X28 X29
150
X01 X02 X03 X04 X05 X06 X07 X08 X09 X10 X11 X12 X13 X14 X15 X16 X17 X18 X19 X20 X21 X22 X23 X24 X25 X26 X27 X28 X29
UPVC CONDUIT
Ø150mm (TYP.) Ø150mm (TYP.)
Ø150mm (TYP.) Y21
Y20
Y21
Y20
A01
A01
A02A02
A03
A03
A
FRESH AIR ROOM
LC ROOM
L.V. ROOM
B S.C.L = -7.10
FRESH AIR ROOM
C A04 A04
A05 A05
A06 A06
A07 A07
Y21
Y21
Y20
Y20
60
60
EXIT TO BLDG.
LEVEL 651.493
CONCRETE
Y19 Y19
Y19
Y19
UP
RAMP
520
GF
TO
Y18 Y18
60
B09
Y18 Y18
B09
S.C.L = -7.10
BACKFILL Y17
Y16
Y17
Y16
B01
B01
ENT FACILITY
SERVICE
ROOM
ROOM
LC ROOM
SUMPIT
ROOM
LOADING/
UNLOADING
AREA
2
VIA-LGF-FINE DINING (2)
SUMPIT ROOM
ENT FACILITY
MALL
ROOM
LC ROOM
STORAGE
B12 B12
B14
B14
Y17
Y17
Y16
Y16
J
F.F.L = -7.00 S.C.L = -7.10
J
SERVICE ROOM
1 2 1 2
D E F G
NCE MATERIAL
B02
B02
15
B16
J
MAINTENA
Y15 Y15
J
Y15 MALL B16 Y15
J
VIA-LGF-CIGAR LOUNGE
LOADING/
OUTDOOR UNLOADING LOADING/
AREA UNLOADING
EL ROOM LC ROOM AREA
PUMP ROOM
J
B03 WF-1
B03
Y14 Y14
B18 B18 Y14
Y14
1 2
WATER FEATURE
STORAGE
(5) UP
FEMALE WF-5
ABLUTION TOILET
FEMALE
B04
B04
PRAYER
LOCKER
ROOM B20
B20
Y13 Y13
FEMALE
Y13 Y13
OUTDOO
ABLUTION
MALE LOADING/ /
OPEN ABOVE TOILET LOADING/ LOADINGNG
HALLWAY
LIFT LOBBY
150
150
R
UNLOADING UNLOADING
UNLOADI
ROOM
MALE SECURITY AREA AREA AREA MALE'S PRAYER RM.
LOCKER FEMALE TOILET FEMALE'S PRAYER RM. MALE TOILET
SERVICE
ROOM MALL
PRAYER
SUMPIT ROOM WF-3 STAIR
SUMPIT
SERVERY STAFF
B05 DN
B05
DINING STAFF LOCKER ROOM
AREA UNIFORM STAFF SECURITY LOCKER ROOM
B22
J
MALE
UP ARCHIVE SERVICE ROOM UPS
FROM B22
J
MAIN TELECOM. ROOM
Y12 S HALLWAY LC ROOM
Y12
3C 240mm2 3C 240mm2
J
Y12
TESTING FEMALE ND Y12
J
PRAYER METER ROOM 19 2 GROU
HR DIRECTOR M.V. ROOM 9 FAHU SERVICE HALLWAY
NURSE INTERVIEW MALE
SERVICE HALLWAY
STATION 'S OFFICE SEC./ PRAYER VIA-LGF-RETAIL (14) VIA-LGF-POP-UP (2)
J
ADMIN S TRAINING VIA-LGF-CAFE (1) 11 I.T. ROOM
3 FEMALE SUMPIT ROOM
MANAGE TOILET L.V. ROOM
GOV'T. R ABLUTION VIA-LGF-CAFE (3) JAN. RM. 8 STAFF UNIFORM ROOM
ABLUTION
B06 VIA-LGF-FINE DINING (3)
150
RELATION
B24
B06
OUTDO
'S TRAINING VIA-LGF-RETAIL (3) STAFF DINING B24
ROOM MALE MCR
TOILET
OR
MALE TOILET FEMALE TOILET STORAGE
Y11
AREA
Y11
UP
TO B25B25
Y11
Y11
WF-4
HALLWAY
18 LIFT LOBBY SER LIFT LOBBY ND
GROU
3C 240mm2
16 VIA-LGF-RETAIL (13) OUTDOOR AREA
SERVICE
B07
B07
VIA-LGF-RETAIL (11) F.F.L = -7.00 GALLERY AREA ( Richard Orlanski )
STAIR
OUTDOOR AREA
Y10 Y10
SUMPIT
ROOM
SERVERY
B27
B27 Y10
Y10
WATER FEATURE
GROU
UP/DN WATER FEATURE
(4) OUTDOOR
23
Y09 TO OPEN BELOW
B29 Y09
J
Y09 Y09
J
B29
GROUND
J
J
VIA-LGF-RETAIL (18)
J
J
B10
B10
CU/XLPE/PVC 15KV
J
J
J
22 OR AREA
J
J
DROP-OFF
B11
B11
J
Y08 Y08
VIA-LGF-RETAIL (17)
OUTDO
B31
B31
Y08
Y08
J
OUTDOOR AREA (1) HAIR DRESSER OPEN ABOVE
MANAGER OFFICE 13 F.F.L = -7.00 1
OP-UP FEMALE SPA OUTDOOR
J
VIA-LGF-P
B13
B13
12 VIA-LGF-FINE DINING (1)
H I J K
VIA-LGF-RETAIL (8) 1 WATER FEATURE
J
J
VIA-LGF-RETAIL (7) UP
J
MAIN KITCHEN
Y07
SPA LOBBY
1 B33
B33
Y07
J
Y07 OFFICE ROOM T/W
Y07
J
MEETING ROOM OFFICE-2 CINEMA (7)
GENERAL MANAGER OFFICE
J
FEMALE TOILET GENERAL OFFICES 10
OFFICE-4 LIFT LOBBY
B15
B15
J
CASHIER OFFICE-3 RESERVATIONS
LOBBY
SER LIFT
COUNTING ROOM MALE TOILET VIA-LGF-CAFE (2) LIFT LOBBY
FROM FILE ROOM FILE ROOM
DN
SER LIFT
ND
LOBBY
ADMINISTRATION
GROU 2 F.F.L = -7.10 B35
CABLE (TYP.)
OUTDOOR B35
Y06 Y06
EL ROOM RESERVATIONS
FREEZER PANTRY SUMPIT ROOM
B17 BUSINESS CENTER MEETING ROOM
OFFICE-5
B17
PREPRATION LC ROOM
SERVICE
VEGETABLE RECEPTION
F.F.L = -7.00 FREEZER LC ROOM
WATER FEATURE
B37
HALLWAY
SOILED
BALLROO
(8) CHUTE
STORAGE MALE SPA ROOM B37
PREPARATION
OPEN ABOVE SEA FOOD FREEZER F.F.L = -7.00 SERVICE
LINEN
Y05 PART OF HOTEL
Y05
M STORAGE
Y05 1 Y05
JAN. RM.
\ & SORTING
PREPARATION PRE FUNCTION AREA
CHICKEN SERVICE ROOM CINEMA (6)
B19 FREEZER
B19
G AREA
UNLOADIN
BALLROO
AREA MEAT PREPARATION CINEMA HALLWAY LOADING/
STAGE 8
SERVICE HALLWAY
TO
100
100
M STORAGE
Stair ST16 VIA-LGF-FINE DINING (8) OUT
DRY STORE LOUNGE AREA
IN AND GROUND
Y04 Y04
LOWE
R Y04
Y04
B21
B21
SERVICE HALLWAY
WF -8 PUMP RM.
SERVICE HALLWAY LANDSCAPE
LOADING/ G N DIRECTOR
PREVENTIO AREA
UNLOADIN LOSS 1
WATER FEATURE
SERVICE
AREA I.T. ROOM
SERVER CINEMA (1)
Y03 Y03 PROPERTY LOUNGE AREA (6)
Y03
Y03
100
1
HALLWAY
BALLROOM
AIRLOCK
SERVERY PRE FUNCTION AREA
B23
B23
SERVICE
ECOM 1 1
SERVICE
MAIN BALLROOM KITCHEN
(HOTEL) PUBLIC/TEL AIRLOCK 1
MER ROOM CINEMA (2) CINEMA (4)
HALLWAY
UPS ROOM
HALLWAY
TRANSFOR AREA CINEMA (3)
CENTRAL RECEIVING
Y02 Y02
& SANITIZE
ROOM
STORE
ROOM Y02
Y02
B26
B26
DEBOXING ROOM SIDE WALK AREA
PART OF
AREA
LOADING ROOM
( GARBAGE
DROP-OFF
HOTEL )
LOADING/ G RECEIVING
UNLOADIN
SERVICE
AREA
ROOM ENT-HALL
SECURITY SUMPIT
Y01 Y01
Y01
Y01
1" DRAIN
GARBAGE S.C.L = -7.10 A07
B28
B28
HALLWAY
SERVICE JAN. RM. DROP-OFF
LANDSCAPE A06 A07
ENT-HALL
LOADING/ G S.C.L = -7.10
BUFFET COUNTER AREA
S.C.L = -7.10
UNLOADIN
AREA CLEAN
LINEN
BALLROOM STORAGE
STAFF SERVERY
A05 A06
LINEN WATER FEATURE
A05
REPAIR STAFF
L M N
ELEC'L ROOM
A04
MAINTENA
DINING
B30
B30
STO. TRAINING LAUDRY HALLWAY STAFF
STO. EXPRESS SERVICE WATER FEATURE
STO. TOILET
MANAGER STAFF ( 10 )
NCE
STO. MALE'S
TRAINING
P RM.
M&E WORKSHO DRAWING NURSE
STATION
ENT-HALL
DIRECTOR NG OFFICE ENT-HALL TESTING TOILET
STAFF
B32
B32
ENGINEER ENGINEERI ADMIN MALE'S
SEC./ RM.
TOILET S PRAYER
AL ROOM STAFF INTERVIEW S OFFICE ROOM MALE'S
FEMALE'S LOCKER
MECHANIC HR DIRECTOR' MALE
RELATION'S
GOV'T. FILE RM.
LOCKER
UP
OUT
GRD
(9) ROO
IN AND GROUND
TO
)
,7,10
R PUMP
( WF-6
LOWE
B37
B37
DN
GRD
100
FROM WATER FEATURE
( 11 )
,9,11 M
( WF-2 P ROO
)
FOUNDATION SOIL
PUM
X01 X02 X03 X04 X05 X06 X07 X08 X09 X10 X11 X12 X13 X14 X15 X16 X17 X18 X19 X20 X21 X22 X23 X24 X25 X26 X27 X28 X29
X01 X02 X03 X04 X05 X06 X07 X08 X09 X10 X11 X12 X13 X14 X15 X16 X17 X18 X19 X20 X21 X22 X23 X24 X25 X26 X27 X28 X29
TO
P-UP
RAM UND
GRO
A03
A02 A03
A01 A02
A01
UND FROM
GRO DN.
P
RAM
O WORK
SHOP
WORK
LC ROOM
LC ROOM
SHOP
CENTRAL
HEATER
WORK
MER ROOM
SHOP
WORK
SHOP
WORK
SHOP
CHILLED
PUMP
CHILLED
TRANSFOR
ROOM
PUMP
ROOM
MER ROOM
P EXIT
1
A100-p
Q ENTRA
LOWER
NCE
TO
GROUN
D
IN AND
LOWER
OUT TO
GROUND
GENERATO
TRANSFOR
CELLS
MVSG
R ROOM
ROOM HOTEL
BATTERY TANK FOR EACH
3 LPG
CAPACITY
4000 LTR. ABOVE GROUND
FOR MALL
GENERATO
4 LPG TANK EACH HORIZONTAL
CAPACITY
4000 LTR. ABOVE GROUND
SEC ROOM
HORIZONTAL
R ROOM
ITEM ITEM 250 200 200 250
NO. FROM TO CABLE C.S.A (mm²) CONDUIT SIZE NO. FROM TO CABLE C.S.A (mm²) CONDUIT SIZE IN AND
LOWER
OUT TO
GROUND
R
1 MVSG (O/G-1) M-RMU-1 3C 240mm2 CU/XLPE/PVC 15KV 1 NO.150mm 1 MVSG (O/G-1) M-RMU-1 3C 240mm2 CU/XLPE/PVC 15KV 1 NO.150mm ITEM NORTH DIRECTION
NO. FROM TO CABLE C.S.A (mm²) CONDUIT SIZE
2 MVSG (O/G-2) H-RMU 3C 240mm2 CU/XLPE/PVC 15KV 1 NO.150mm 2 MVSG (O/G-2) H-RMU 3C 240mm2 CU/XLPE/PVC 15KV 1 NO.150mm
3 H-RMU SER-H-RMU 3C 240mm2 CU/XLPE/PVC 15KV 1 NO.150mm 3 H-RMU SER-H-RMU 3C 240mm2 CU/XLPE/PVC 15KV 1 NO.150mm 1 MVSG (O/G-1) M-RMU-1 3C 240mm2 CU/XLPE/PVC 15KV 1 NO.150mm
4 M-RMU3 SER-M-RMU1 3C 240mm2 CU/XLPE/PVC 15KV 1 NO.150mm 4 M-RMU3 SER-M-RMU1 3C 240mm2 CU/XLPE/PVC 15KV 1 NO.150mm 2 MVSG (O/G-2) H-RMU 3C 240mm2 CU/XLPE/PVC 15KV 1 NO.150mm
01 ISSUED FOR APPROVAL 23/8/2021
3 H-RMU SER-H-RMU 3C 240mm2 CU/XLPE/PVC 15KV 1 NO.150mm 00 ISSUED FOR APPROVAL 16/8/2021
1 4
300
75 150 75
100
MV CABLES
INSTALLED ON CABLE TRAY
AT HIGH LEVEL IN LOWER GROUND FLOOR ELEC. DUCT BANK
GENERAL DETAILS
E700-GD
M.V SECTION-04
PRYD-21004
N.T.S
A0
VIA-FFX-EE-SD-EXT-700-GD
01