Assa North – Ohaji South Project: Engineering,

Procurement and Construction; Site Preparation


and I.A Infrastructure

30-Sep-21
REVISION 00
Assa North – Ohaji South Project: Engineering,
Procurement and Construction; Site Preparation
and I.A Infrastructure

Pump Nomenclature
Pump Size Nomenclature
For easy identification, HPX nomenclature is set up as follows:

6 HPX 12 A
CASING PATTERN TYPE OR OPTIONS :
# TOP = Top suction, Top discharge casing (1)
# SL = Open impeller (1)
DISCHARGE NOZZLE
DIAMETER (inches) NOMINAL IMPELLER
PUMP TYPE DIAMETER (inches)

Example : The 6 HPX 12 pump size has three different casing patterns as indicated in the
last letter (6 HPX 12A, 6 HPX 12B, 6 HPX 12C).
Assa North – Ohaji South Project: Engineering,
Procurement and Construction; Site Preparation
and I.A Infrastructure

Pump Write Up
Pump Division
Flowserve Pumps

HPX – TECHNICAL WRITE UP

MODEL : HPX

TYPE : End Suction, Top Discharge, Single Stage


Overhung, Horizontal, Heavy Duty Process Pump
Designed and manufactured as per API 610, 8/9/10th Edition.

RANGE : Flow upto 2000 m3/hr


Head upto 275 m

SIZE : Maximum 14’’ inlet, 10” Discharge and Impeller diameter upto 25”.
Minimum 2” Inlet, 1” Discharge and 7” Impeller

SERVICE : Hydrocarbons, Chemicals, Water and other Liquids

Please refer attached HPX History and design Philosophy, HPX Design and Construction
features, Pump size Nomenclature and HPX Hydraulic Performance

HPX Pump Design Philosophy

The pump pedigree is derived from four donor product lines: Ingersoll Rand's A-line,
Worthington's HNN, Pacific's SVCN7 and Byron Jackson's SCE. The range consists of the
selection and rationalization of the performance available from these lines, combined with an
updated mechanical design to ensure full compliance with the API 610 8/9/10th edition and
API 682 2/3rd edition.

The re-designation to HPX ensures identical machines and the same high design
specifications are available from all participating FPD manufacturing locations.

Basic Construction Features

The type HPX pump is a single stage, horizontal, end suction process pump with overhung
impeller and radially split casing, fully compliant to API 610 8/9/10th edition.

The range is designed for continuous service in all process applications including oil
exploration and production, oil refining, petrochemical, chemical and general industrial
usage.

Flowserve India Controls Private Limited Regd.Office: Coimbatore Plant:


A Subsidiary of Flowserve Corporation Plot no 4, 1A, Road No8, EPIP, S.F.No.136/3 & 137,Myleripalayam Post,
USA., www.flowserve.com Whitefield, Bangalore – 560066. Coimbatore – 641 032.
Karnataka India Phone Nos. : +91-422-2612001 - 99
Fax No. : +91-422-2612002
Pump Division
Flowserve Pumps

HPX – TECHNICAL WRITE UP

Casing
The casing is of single or dual volute design that reduces forces on the rotating element
thereby minimizing vibration and shaft deflection.
Dual volute is standard on many 3-inch discharge pumps and on all pumps above 3-inch
discharge. Single volute is standard on some 3-inch discharge pumps and on all smaller
sizes.
On all pumps up to 4", except 3 HPX17A, 4 HPX 17A and 4 HPX 18A, the discharge
configuration is centerline. On larger sizes, the discharge nozzle is tangential.
The fluid passages are designed to prevent turbulence and emphasize streamline flow.
The casing has mounting feet integrally cast on the centerline of the pump thus giving a
rigid construction and preventing distortion in high temperature applications.
The design incorporates a back pull out feature. This enables the complete rotating
assembly - including the cartridge mechanical seal - to be removed from the pump without
disturbing the main pipe work connections and the driver.

Casing Cover
The casing cover is either fabricated from plate or cast, depending on the material of
construction. Designed to the dimensional standards within the API 682 specification 'Table
1', the seal chamber can accommodate a wide variety of single or dual seal arrangements as
standard.

Stationary Wear Parts


Renewable wear parts are provided on the casing adjacent to the impeller wear parts to
prevent wear on the cast components. Casing front and back wear rings are fitted on all
models. Throat bushing is stationary on larger sizes, while on centerline discharge pumps a
patented rotating bushing assure a higher seal chamber pressure level. Back wear rings are
standard on all sizes, to minimize axial loads and provide an optimum seal chamber
environment.

Rotating Wear Parts


Renewable wear parts are provided on the impeller, running against stationary wear parts to
prevent wear to the casing and impeller. These are assembled to the impeller with and
interference fit to maintain accuracy, and are set screwed axially through both ring and
impeller hub to positively secure against movement.

Flowserve India Controls Private Limited Regd.Office: Coimbatore Plant:


A Subsidiary of Flowserve Corporation Plot no 4, 1A, Road No8, EPIP, S.F.No.136/3 & 137,Myleripalayam Post,
USA., www.flowserve.com Whitefield, Bangalore – 560066. Coimbatore – 641 032.
Karnataka India Phone Nos. : +91-422-2612001 - 99
Fax No. : +91-422-2612002
Pump Division
Flowserve Pumps

HPX – TECHNICAL WRITE UP

Impeller
The impeller is a fully shrouded, radial flow, single entry design. All sizes are precision cast
to assure the highest attainable efficiency. All impellers are dynamically balanced with
rotating wear rings fitted as standard to API 610 requirements.

Inducer
Inducers are available on several sizes as an option for low NPSHA applications.

Shaft
The shaft is of ample strength and rigidity. It is precision machined over its entire length
and has generous fillet radii at each change of section to reduce stress concentrations. Shaft
deflections at the seal chamber are minimal and fall within the guidelines stated in API 610
8th edition. An optional extra heavy-duty shaft design, with very low l3/d4 values, is
available on most centerline discharge pump sizes.

Bearings
The anti-friction bearing arrangement consists of a single row deep groove ball bearing to
carry the pump radial loads and duplex angular contact single row ball bearings mounted
back to back to carry partial radial and all thrust loads. Bearings are in full compliance with
API 610 requirements.

Bearing Housing
The bearing housing is fitted with an end cover on the outboard end for ease of inspection
and maintenance. Each end of the housing is fitted with a labyrinth type shaft seal (made
from non-sparking materials) too effectively retain the oil and prevent entry of any foreign
matter. Flowserve bearing isolators are available as an option.
A shaft mounted metal slinger that transfers oil to bearing feed galleries within the housing
wall provides the standard bearing lubrication.
Ring oil lubrication is optional. Two metal slingers are positively locked on the shaft with
setscrews and a heavy-duty oil ring provides bearing lubrication. A plugged port on the top
of the bearing housing is positioned to allow visual inspection of the oil ring.
Oil mist lubrication is optional; "Purge" oil mist provisions are available on either slinger or
ring oil designs. "Pure" oil mist (no slinger, no oil ring) is also available. Constant level oiler
is supplied as standard. For purge oil mist, a balanced type oiler is used. No oiler is supplied
for pure oil mist.

Flowserve India Controls Private Limited Regd.Office: Coimbatore Plant:


A Subsidiary of Flowserve Corporation Plot no 4, 1A, Road No8, EPIP, S.F.No.136/3 & 137,Myleripalayam Post,
USA., www.flowserve.com Whitefield, Bangalore – 560066. Coimbatore – 641 032.
Karnataka India Phone Nos. : +91-422-2612001 - 99
Fax No. : +91-422-2612002
Pump Division
Flowserve Pumps

HPX – TECHNICAL WRITE UP

When application requires, the standard cooling system is a fan, either with slinger or oil
ring lubrication. Optional water-cooling is available, should this be a customer preference.

Base plates
Base plates are of welded steel construction either drain rim or drain pan to suit customer
preference. Standard designs are intended for grouting with ungrouted versions also
available. The base plates are provided with rounded corners, continuous welds, and leveling
screws as standard per API 610. Base plates will be to API 610 dimensional standard unless
customer's specifications (or large drivers sizes) require non-API dimensions. This provides
optimum plot sizes for the unit and lower customer installation costs.Lateral and transverse
driver alignment screws are available as standard when prescribed by API criteria, or as an
option when not required.

Instrumentation
A full range of instrumentation for monitoring pump condition can be supplied. The
parameters able to be monitored include: suction and discharge temperature, casing
temperature, bearing vibration, bearing / oil temperature, seal chamber pressure.

Testing
All pumps are subjected to a hydrostatic and non-witnessed performance tests in
accordance with API 610 requirements. Witnessed and optional tests can also be provided.

Auxiliary Piping
All applicable API 610 seal and cooling piping plans are available in materials and options to
suit application requirements.

Flowserve India Controls Private Limited Regd.Office: Coimbatore Plant:


A Subsidiary of Flowserve Corporation Plot no 4, 1A, Road No8, EPIP, S.F.No.136/3 & 137,Myleripalayam Post,
USA., www.flowserve.com Whitefield, Bangalore – 560066. Coimbatore – 641 032.
Karnataka India Phone Nos. : +91-422-2612001 - 99
Fax No. : +91-422-2612002
Assa North – Ohaji South Project: Engineering,
Procurement and Construction; Site Preparation
and I.A Infrastructure

Pump Cross Sectional Drawing


HPX Sectional Dwg - Double Volute, Back Wear Rings,
Slinger Lubrication

REF. NAME OF PARTS REF. NAME OF PARTS

00100 Thrust bearings 20500 Casing Cover


00200 Line bearing 21700 Bearing housing
00300 Spiral wound gasket 21800 Bearing housing cover
00400 Flat gasket 22100 Neck bush
00900 Impeller key 22300 Casing wear ring
01000 Coupling key 22301 Cover wear ring
01200 Bearing lock nut 22400 Impeller wear ring
01300 Bearing lock washer 22401 Impeller wear ring
01400 Constant level oiler 22900 Impeller
01700 O-ring 23100 Pump shaft
01800 O-ring 23200 Slinger
04700 Mechanical Seal 23500 Impeller nut
04900 Main Studs 23600 Inboard flinger
05100 Nut 23601 Outboard flinger
05500 Impeller Nut Set Screw 93200 Labyrinth end seal (NDE)
06700 Breather plug 93201 Labyrinth end seal (DE)
20200 Pump casing
Assa North – Ohaji South Project: Engineering,
Procurement and Construction; Site Preparation
and I.A Infrastructure

Technical Summary Sheet


Technical Summary
Cust / Proj Ref: NG01021764 Date: Aug 26, 2021

Primary Selection Summary - Centrifugal


Item number Qty Rated capacity Max temp Max suct pres Speed Rated dia Power rated Cap. BEP Dia ratio
Product Mat'l Rated head Rated viscosity NPSHa Eff'y Max dia Power max % Cap BEP Max head cut
Pump / Stages SG Vapor pres NPSH3 Nss Min dia Power motor MCSF Head rise
0-P-6501A/B 2 15.0 m³/h 45 °C 1.1 bara 2,950 rpm 195 mm 5.31 kW 16.9 m³/h 72.2 %
HPX Centerline Mtd. S6 48.97 m 2.91 cP 11.3 m 32.4 % 270 mm 7.05 kW 88.6 % 53.25 m
1HPX11A / 1 0.862 1.01 bara 1.4 m 7310 US 190 mm 7.50 kW 3.0 m³/h 8.7 %

Copyright © 2016 Flowserve. All rights reserved. Affinity v2.19.0


Assa North – Ohaji South Project: Engineering,
Procurement and Construction; Site Preparation
and I.A Infrastructure

Scope of Supply
SCOPE OF SUPPLY- HPX Pump

PUMP TYPE : OH2 API 610 11th edition


ORIENTATION : END SUCTION- TOP DISCHARGE
FLANGE RATING : 300# RF / 300# RF
PUMP BEARING : BALL / BALL WITH SLINGER OIL LUBRICATION

PARTS S6
Casing A 216 GR WCB
Impeller A 487 CA6NM/CL B
Shaft A 434 TYPE 4140 BB
Casing Wear A 276 TY SS410(350-400
ring BHN)
Impeller Wear A 276 TY SS410(250-300
ring BHN)

 Flowserve SANMAR bearing isolator


 Flowserve Standard make Constant Level Oiler on bearing housing
 Bearing housing with flat surface.
 Drain connection in Casing MOC, socket welded connections, up to edge of base plate.
 NON DESTRUCTIVE TESTING:
- MP on casing, cover & impeller
- UT on shaft.
- LP & RT on Connection welds
- RT on critical areas of Casing & Impeller
 3.1 Material Certification for Casing, Impeller, & Shaft
 2.2 Material Certification for other compoents
 Witnessed Hydrostatic test
 Witnessed Performance test
 Witness 4 Hr Mechanical Run test
 Witnessed NPSH test
 Witnessed Sound Level Test
 Non Witnessed Impeller Balancing Test(Dynamic Balancing)

Baseplate :

 Grouted drain Pan type common baseplate with mounting screws to accommodate pump
and driver. Full top decking . Baseplate MOC: MS IS 2062 Gr Br
 Piping activities within the baseplate periphery.

Mechanical Seal :

 Seal Plan 11 61 as per attached seal recommendation.


Electric Motor :

 Ex n Motor.
 Area Classification: Zone 2, IIB.
 Ingress protection: IP55
 DOL starting method
 Motor as in the attached motor recommendation

Couplings & Coupling Guards:

 Coupling make shall be JC/Equivalent.


 Non Sparking type Aluminium couling guard is considered

Instrumentation:

 No instruments are included in our scope of supply, except for seal system instruments
applicable if any.

Commissioning & Start up spare:

 One set of pump Gasket and Oring is considered as start up and commissioning spare. The
same is included in base price

Mandatory spare:

 No Mandatory spares as Customer has not provided any list

Special Tool :

 Special tools and tackles are not required for the offered pump model.

Others
 Delivery Ex Works FPD Coimbatore with Export boxing as per FPD standard.
 Painting as per Flowserve standard
 QA/QC inspections as per Flowserve standard.
 Documentation in English language only

Exclusions:
THE FOLLOWING ARE SPECIFICALLY EXCLUDED FROM OUR SCOPE OF SUPPLY: -

 CONTROL VALVES
 INSTRUMENTS FOR PUMPS
 Heat tracing, Jacketing, Heating coils, winterization etc
 3D Modeling
 Junction Boxes, cabling, control panel
 Witness of pouring of casting
 VFD
 PLC
 STEAM TURBINE
 MMS SYSTEM
 ARC VALVE
 FIRST FILL OF LUBRICANTS
 INSTRUMENT CABLES & WIRING OF THE SAME IN THE FIELD
 ERECTION
 ANY INSTALLATION, COMMISSIONING OR OTHER SITE WORK
 ANY SPECIAL TOOLING, SPARES & INSTUMENTATION THAT ARE NOT MENTIONED ABOVE
 WHAT NOT SPECIFICALLY MENTIONED IN THE PRESENT OFFER
Assa North – Ohaji South Project: Engineering,
Procurement and Construction; Site Preparation
and I.A Infrastructure

Technical Details

Pump Performance Curve


Pump Data Sheet
Typical GA drawing
Item number : 0-P-6501A/B Capacity : 15.0 m³/h
Service : Diesel Offloading / Distributi Head : 48.97 m
Flowserve reference Pump : 3585694352 Density / Specific gravity : - / 0.862
size & type / Stages Based : 1HPX11A /1 Pump speed : 2,950 rpm
on curve no. Impeller : 1HPX11A-3-3 Ns / Nss : 420 / 7,310 (US units)
diameter : 195 mm Test tolerance : API 610 11th Edition

Date : August 26, 2021


CURVES ARE APPROXIMATE, PUMP IS GUARANTEED FOR ONE SET OF CONDITIONS; CAPACITY, HEAD, AND POWER.

Copyright © 2016 Flowserve. All rights reserved. Affinity v2.19.0


Hydraulic Datasheet

Customer reference : NG01021764 Pump / Stages : 1HPX11A /1


Item number : 0-P-6501A/B Based on curve no. : 1HPX11A-3-3
Service : Diesel Offloading / Distributi Flowserve reference : 3585694352
Date : August 26, 2021
Operating Conditions Materials / Specification
Capacity (rated/normal) : 15.0 m³/h / - Material column code : S6
Water capacity (CQ=1.00) : 15.0 m³/h Pump specification :-
Total developed head : 48.97 m Other Requirements
Water head (CH=1.00) : 49.07 m Hydraulic selection : API 610 11th Edition
NPSHa/NPSHa less margin : 11.3 m / - Construction : API 610 11th Edition
Maximum suction pressure : 1.1 bara Test tolerance : API 610 11th Edition
Liquid Driver Sizing : Max Power(MCSF to EOC) using SF
Liquid type : Other Performance data based on standard impeller
Liquid description : Diesel
Temperature : 45 °C
Density / Specific gravity : - / 0.862
Solid Size - Actual / Limit : - / 7.010 mm
Viscosity / Vapor pressure : 2.91 cP / 1.01 bara
Performance
Hydraulic power : 1.72 kW Impeller diameter
Pump speed : 2,950 rpm Rated : 195 mm
Pump overall efficiency (CE=0.95) : 32.4 % Maximum : 270 mm
NPSH required (NPSH3) : 1.4 m Minimum : 190 mm
Rated brake power : 5.31 kW Ns / Nss : 420 / 7,310 (US units)
Minimum continuous flow : 3.0 m³/h
Maximum brake power : 7.05 kW Maximum head at rated diameter : 53.25 m
Driver power rating : 7.50 kW / 10.1 hp Flow at BEP : 16.9 m³/h
Casing working pressure : 5.6 bara Flow as % of BEP : 88.6 %
(based on shut off @ cut dia/rated SG) Efficiency at normal flow :-
Impeller diameter ratio (rated/max) : 72.2 %
Head rise to shut off : 8.7 %
Total head ratio (rated / max) / (max / rated) : 49.6 % / 201.6 %
CURVES ARE APPROXIMATE, PUMP IS GUARANTEED FOR ONE SET OF CONDITIONS; CAPACITY, HEAD, AND POWER.

Copyright © 2016 Flowserve. All rights reserved. Affinity v2.19.0


Full Page GA Drawing

-
Item number : 0-P-6501A/B Pump size & type : 1HPX11A Drawing number :-
Service : Diesel Offloading / Distributi Pump speed / Stages : 2,950 rpm / 1 Date : August 26, 2021
Customer PO # :- Flow / Head : 15.0 m³/h / 48.97 m Certified by / Date : :-
Flowserve reference : 3585694352 Driver power / Frame : 7.50 kW / 10.1 hp / 132S Seal type :-
Volts / Phase / Hz : 380-415 / 3 PHASE / 50 Hz Seal flush plan : Plan 11

Copyright © 2016 Flowserve. All rights reserved. Affinity v2.19.0


Assa North – Ohaji South Project: Engineering,
Procurement and Construction; Site Preparation
and I.A Infrastructure

Seal Offer
Quotation Number : CBE208IND-21-R0 Customer Name: FPD India
Project Number : Attn: Lalkrishna. R
Assa North – Ohaji South Project: Engineering, Procurement and
Project Description : Singapore Customer Ref. CBE210615
Construction; Site Preparation and I.A Infrastructure
End-User Name / Location : SHELL in Nigeria Flow Solutions Group FSG End-User Sales Engr:
33 Changi South Ave 2, FSG OEM Sales Engr:
Prepared by : R.Muruganantham Singapore 486445, Singapore Lead EPC contact:
Date : 18-Sep-2021 Tel: +65 6544 6800 Fax: +65 6214 0541 Lead Appl. Engineer:
Last Modified By: Rajendran,Muruganantham 19 Sep 2021 01:55p OEM Sales Office SE:

As per RFQ ADDITIONAL DETAILS

OPERATING CONDITIONS PUMP DETAILS MECHANICAL SEALS SYSTEMS PUMP DESIGN SYSTEMS

Barrier Fluid
API 610 Type Discharge Seal Chamber
PRODUCT Temperature Suction Pressure Temperature Pressure

Specific Gravity
FLOWSERVE

Viscosity
Pressure Pressure Total Heat load
(Brief description. Please Vapor Shaft Shaft Seal Type (If required can be shown) BRIEF AUXILIARY
ITEM NO.
Customer Equip. model Qty. of
SERVICE refer to related Tech Notes MAWP (If required can be Assumed Barrier /
Type Pumps Pr. Speed Dia. Seal Size [Inch] API 682 Code SYSTEM DESCRIPTION
Datasheet for further Seal Arrangement
API plan shown) Buffer Fluid SPECIAL REQUIREMENT
(For detailed description please refer to
Rtd Rtd Rtd Rtd Material Code
info) (for Material Coding refer to for calculation related description attached to the quote)
API 610 MoC class Min Min Min Min Min Max Alarm Refill Design
Max Max Max Max the related sheet)

cP °C barA barA barA Barg rpm mm barA °C kW barA

Diesel
OH2 45.00 1.01 4.80 1.57 QBQ
Hazardous: Category to
1 0-P-6501A/B 1HPX11A 2 Diesel Offloading pump 0.862 2.91 1.01 2,950 49.500 2.625 21A-LFN-050-11/61 11/61 39.00
be confirmed by
S6 45.00 4.88 1.57 5U4X 1CW-FL
customer
2

GENERAL Description
NOTES
A Ambient temperature: Min : 18 °C, Max : 41°C ; Pump location :
B Cooling Water Temperature: Supply : °C, Return : °C
C Nitrogen Supply Pressure: N/S.
D LP Steam: Temperature: N/S. , Pressure: N/S.
E Flowserve standard terms & conditions apply. Please refer to attached tab "Terms & Conditions" for details.
G Proper seal performance relies on correct sizing, design, and installation of the auxiliary support system. If the auxiliary system is independently sourced, care should be taken to ensure proper sizing, design, and installation. Inadequate support system can result in poor performance or seal failure.

TECHNICAL Description
NOTES
1 Pumps shall be in accordance with DEP 31.29.12.30-Gen.

Revision Date Changes

0 19-9-2021 Initial Offer

Technical Survey v2012.06.26 Flowserve Confidential Page 1


Nomenclature A Digit Material Code
> metal parts 5 = 316 SS DB
> rotating face U = Antimony Carbon RY
> gaskets J = Perfluoroelastomer (FFKM) General Purpose Compounds GG
> stationary face X = Reaction Bonded SiC SL

1st DIGIT 2nd DIGIT 3rd DIGIT 4th DIGIT


METAL PARTS ROTATING FACE GASKETS STATIONARY FACE

Digit Material Mat'l Code Digit Material Mat'l Code Digit Material Mat'l Code Digit Material Mat'l Code
1 Parkerized Carbon Steel EU 3 Diamond-coated DSSiC K30 1 Nitrile (NBR) GS/ GW / 3 Diamond-coated DSSiC K30
2 Bronze FJ A Resin Carbon GE 2 Neoprene (CR) QM
GY A Resin Carbon GE
3 416 SS CB C Aluminum Oxide JU 4 Fluoroelastomer (FKM) GU C Aluminum Oxide JU
4 18-8 SS CK D Resin Carbon (No. 21) AE 5 Ethylene Propylene (EPDM) MG D Resin Carbon (No. 21) AE
5 316 SS DB E Resin Carbon X426 6 Fluoroelastomer Composite LP H Resin Carbon (No. 22) LM
6 Alloy 20 or Alloy 20 CB-3 DY N Nickel Tungsten Carbide LV 7 PTFE GT M Cobalt Tungsten Carbide RI
7 Alloy 400 HU P Resin Carbon KI 8 Glass Filled PTFE HD N Nickel Tungsten Carbide LV
8 Alloy B2 or Alloy B3 ED Q Chemical Resin Carbon or Graphite NA Perfluoroelastomer (FFKM) Q Resin Carbon KI
9 AD
9 Alloy C-276 NL T Resin Carbon (No. 5) KR3 Chemraz® 605 R Chemical Resin Carbon or Graphite NA
A Alloy C-276 / 316 SS / Ni-Fe Alloy 42 AK U Antimony Carbon RY A TFE-Propylene (FEPM) AF T Resin Carbon (No. 5) KR3
B Alloy 718 / 316 SS / Duplex 2205 X585 V Resin Carbon (No. 22) OH C Flexible Graphite QF U Antimony Carbon RY
C Alloy 718 / 316 SS / Flex. Graphite / FI W Cobalt Tungsten Carbide RI Perfluoroelastomer (FFKM) V Resin Carbon (No. 22) OH
D TW
D SiSiC 255 (CD4MCuN)
Duplex ZB X Reaction Bonded SiC SL Kalrez® 4079 W Antimony Carbon AP
E High-Chrome Iron DN Y Miscellaneous E Bortex-1 OW X Reaction Bonded SiC SL
F Duplex 2205 DX Z Direct Sintered SiC YO G Carbon Filled PTFE / Elgiloy TG Y Miscellaneous
G Alloy 718 / 316 SS / Ni-Fe Alloy 42 AM Perfluoroelastomer (FFKM) Z Direct Sintered SiC YO
J GG
H Alloy 718 / 316 SS / High-Chrome Alloy AT General Purpose Compounds
J Alloy 718 NH Perfluoroelastomer (FFKM)
K X675
K Alloy C-276 / 316 SS / Duplex 2205 CX Kalrez® 6375
Y Miscellaneous M Fluoroelastomer (FKM) Low X537
Temp.
Fluoroelastomer (FKM) Extreme
N VX
Low Temp.
Perfluoroelastomer (FFKM)
P FP
Parker Ultra
Y Miscellaneous
Customer: FPD India Vendor Ref: CBE210615
Project: Assa North   Ohaji South Project: Rev. 0
End User: Shell Nigeria

Flowserve Clarification Form

CL / DEV
Row # Specification Reference Rev. Page/Para. Spec Requirement Vendor Comment Comment to ? Date CUSTOMER Comment Date Final Disposition Date
/EXC

Customer to confirm the hazardous category of


pumping fluid (whether pumping fluid is
hazardous Category 1 or 2 or 3) so that seal
DEP 31.29.02.30-Gen. vendor will confirm the seal and API Plan. FINAL
1 Clause 3.66 Hazardous service CL 18/09/2021
CUSTOMER
Right now seal vendor recommended single
seal.Based on customer confirmation, seal
vendor will confirm seal selection.

Page 1 of 1
Flowserve Mechanical Seal and
Seal Support System Storage

Mechanical Seals
1 General Note
Mechanical seals are precision products and therefore While the packaging is suitable to protect the seal
require careful handling and storage to ensure reliable from damage due to normal handling, it is not
operation. If the mechanical seals are stored for an extended designed to protect the seal from handling abuse
period of time before installation or commissioning, the or poor storage conditions. The seal must also be
storage conditions may adversely affect the performance stored in an environment which will prevent dam-
of the seal once it is put into operation. For this reason age to the seal.
the user must ensure the storage conditions will meet the Environmental guidelines for seal support
recommendations stated below. systems:
This guideline applies to Flowserve mechanical seals • Temperature range 4°C to 37°C
for centrifugal pumps, mixers, and reactors. Flowserve (40°F to 100°F)
mechanical seals from the Gaspac product line should use
Gaspac Guideline No. 39. • Low humidity, less than 65% RH

Flowserve will not accept any warranty claims for failures as • Atmosphere free from rain, dust, steam,
a result of inadequate storage. chemicals, oils, radiation and ozone
• Storage surface free from impact and
vibrations
2 Storage of Mechanical Seals in Their
Any loose gaskets should remain in their original
Original Packaging packaging during storage.
Flowserve mechanical seals are shipped in packaging which If the seals will be stored in an outside location
is intended to protect the seal from damage due to shipping and exposed to more extreme environmental
and handling. This packaging is also suitable for long term conditions or humidity/moisture, special packag-
storage. If the packaging is opened and the seal removed for ing and seal preparation will be required.
inspection, the seal should be repackaged and resealed in its
original packaging material and container.
3 Storage of Mechanical Seals Installed 4 Expected Storage Life
in Equipment which is Not Commissioned For storage periods longer than two years, environmental
conditions may influence the flatness of rotating and stationary
seal faces and cause deterioration of some gasket materials.
Some centrifugal pumps will be stored for months or years
After two years of storage, Flowserve recommends onsite
prior to installation and final commissioning. The purchaser
professional inspection and static testing of product assemblies
needs to consider the long-term storage requirements of the
prior to commissioning by a Flowserve representative. After
pump, bearings, and motors and resolve conflicts with stor-
three years of storage, Flowserve recommends that mechanical
age of the mechanical seals and seal support system. The
seals are returned to a Flowserve facility for inspection and air
storage requirements of the pump may not be compatible
testing.
with seal requirements and the seals may need to be stored
separately from the pump. In this case, the mechanical seals Damage and contamination of internal mechanical seal
should be stored in accordance with, Storage of Mechanical components may not be readily apparent. The condition of the
Seals in Their Original Packaging. packaging or pump in which the seal was stored may provide
indicators of corrosion, physical damage, water damage, or a
If a mechanical seal is stored installed in a centrifugal pump,
dusty storage environment. If the mechanical seals have been
the preparation and storage conditions for both components
stored in conditions not meeting the recommendations above
must be considered together. In many cases, the centrifugal
or if the storage life history is unknown, the user should return
pumps are performance tested or hydrostatic tested on
the seals to a Flowserve facility for inspection and air test-
water prior to storage. The pump and seals must be dried
ing prior to use. Failure to confirm the integrity of improperly
before storage. This will require completely draining the
stored mechanical seals could lead to excess leakage and seal
pump, seal, and seal support system. Blowing dry air or
damage during commissioning.
nitrogen through the seal chamber and seal support system
can aid in drying out these cavities.
Some pump storage procedures require that oils or liquid 5 Air Testing of Pump Assemblies
phase corrosion inhibitors are used inside the pump casing
to prevent corrosion. These products can potentially damage Users should consider air testing the complete pump and seal
the mechanicals seals if they come into contact with the seal package prior to final installation. This procedure commonly
components. Vapor phase inhibitors which do not leave a consists of blocking in the pump, pressurizing the pump to a
film or residue on the surfaces present less hazards to the low pressure (typically 1.7 bar or 25 psi), and measuring the
seals. The use of desiccants or drying agents to absorb pressure decay over a defined period of time (typically 30 min-
water vapors in the pump casing is the best solution for utes). Pump assemblies which have excessive pressure decay
mechanical seals. should be examined to determine the source of the leakage and
take corrective actions. If the seal is determined to be leaking,
All openings on the pump, seals, and seal support systems it is recommended that the seal be inspected by a Flowserve
must be flanged or plugged to isolate the pump casing from specialist.
the environment. Blank flanges should be gasketed and
threaded connections should be plugged with a suitable In dual seals, the static air test should be repeated on the buf-
plug and sealant. The clearance between the seal gland and fer/barrier/containment seal chamber to confirm the integrity
shaft (in the area of the drive collar) should be masked off of the outboard seal. Non-contacting seals designed to run on
to prevent atmospheric contamination, debris or water from nitrogen should be statically tested with nitrogen.
entering the seal gland.
Many pump storage procedures require that the shaft be 6 Additional Information
rotated several revolutions by hand at regular intervals. This
may serve the function of lubricating the bearings, prevent- The requirements and recommendations in this document are
ing brinelling in the bearings, or minimizing shaft sag. applicable to a wide range of mechanical seals and products.
The mechanical seals can tolerate this procedure without For additional information or for a review of special storage
damage. Any masking between the seal gland and shaft that requirements, please contact your Flowserve representative.
is removed during shaft rotation must be reapplied when
complete.

2
Seal Support Systems • No storage in the vicinity of where steel is processed
or other dust/grit raising activities such as sandblast-
ing are performed

1 General Note General instructions for long term storage:

Seal support systems require careful handling and storage to ensure • Before storage, the unit shall be thoroughly drained,
reliable operation. If systems are stored for an extended period of dried and cleaned internally and externally.
time before installation or commissioning, the storage conditions
• All openings shall be closed using appropriate non-
may adversely affect performance once it is put into operation. For
corroding closures.
this reason, the user must ensure the storage conditions will meet the
recommendations stated below. • All valves shall be closed, but not too tight for gate
and globe valves.
This guideline applies to Flowserve seal support systems that are not
being installed upon receipt. Flowserve will not accept any warranty • All paint damage shall be repaired.
claims for failures as a result of inadequate storage. • All unprotected/uncoated external carbon steel
surfaces shall be treated with corrosion-preventing
grease; repaired paint damage shall receive extra
2 Storage of Systems in Their Original Packaging attention.
Plan 52, 53A, 53B and related equipment must be transported and • If the unit contains a bladder type accumulator,
stored in the unopened, original shipping container. The shipping the bladder of the accumulator shall be nitrogen
container is also intended for use in long term storage. Upon receiv- charged. If storage is expected to exceed 6 months,
ing the seal support system, the user is responsible for inspecting the the nitrogen pressure shall be brought to a minimum
container for any signs of damage, and the corrosion indicator. If the of 0.2 barg (3 psig) and a maximum of 0.5 barg
container has been damaged or the corrosion indicator shows signs of (7 psig).
rust, the container should be opened and inner poly layer inspected for
penetration. The container and desiccant should also be replaced. This • If the equipment is to be preserved with the system
process should be repeated every three months during time of storage. installed, the preserving medium must not impair
the function of the system. For example, avoid fouling
If the container is opened and the system is removed for inspection, and/or attacking elastomers and other components.
the system should be repackaged and resealed in its original pack-
ing material and container. Systems that have been dropped or have
otherwise been subjected to impacts during transport must not be 3 Expected Storage Life
installed. An inspection by Flowserve or its appointed representative is
strongly advised. After two years of storage, the seal support system must be in-
spected for its “as new” properties. This applies in particular to
While the container is suitable to protect the system from damage due the instrumentation. An inspection by Flowserve is mandatory.
to normal handling, it is not designed to protect from handling abuse
or poor storage conditions. The system must also be stored in a clean, If the container has been stored in conditions not meeting the
dry stable environment. The preservation instructions of OEM equip- recommendations above, the user should return the equipment
ment used in these systems must also be considered and the more to a Flowserve facility for inspection and air testing prior to use
stringent requirements shall apply. regardless of time in storage.

Environmental guidelines for seal support systems:


• Indoor storage only 4 Storage after Pump Performance Test
• Temperature range 4°C to 37°C (40°F to 100°F). Avoid large If used in a pump performance test, the seal support system
fluctuations. should be drained and dried completely with air or nitrogen
following the test. Once dry, carbon steel systems should be
• Low humidity, less than 65% RH
treated by filling and draining the pipe work with corrosion-
• Atmosphere free from rain, dust, steam, chemicals, oils, preventing, non-toxic, non-sticky oil that is harmless to the
radiation and ozone elastomers. When the system internals are dry from flushing,
• Storage surface free from impact and vibrations all open connections to atmosphere should be closed off with
caps or plugs. The seal support system should not be stored
• No threat of water reaching above container bottom support connected to the mechanical seal. 3
(typically 3 ½ in)
5 Start-Up Operation
Before putting any seal support system into service, a
Flowserve representative shall supervise the following
activities:
• Cleansing flush of seal support systems.
• Validate that accumulators are charged properly with-
out damage to the bladder.
• Full air leakage test on all connections.

6 Additional Information
The requirements and recommendations in this document
are applicable to a wide range of seal support systems. For
additional information or for a review of special storage
requirements, please contact your Flowserve representative.

FTA106eng REV 03/13 Printed in USA


USA and Canada
To find your local Flowserve representative Kalamazoo, Michigan USA
and find out more about Flowserve Corporation Telephone: 1 269 381 2650
visit www.flowserve.com Telefax: 1 269 382 8726

Europe, Middle East, Africa


Roosendaal, The Netherlands
Telephone: 31 165 581400
Telefax: 31 165 554590
Flowserve Corporation has established industry leadership in the design and manufacture of its products. When properly selected, this Flowserve
product is designed to perform its intended function safely during its useful life. However, the purchaser or user of Flowserve products should be Asia Pacific
aware that Flowserve products might be used in numerous applications under a wide variety of industrial service conditions. Although Flowserve
can provide general guidelines, it cannot provide specific data and warnings for all possible applications. The purchaser/user must therefore assume Singapore
the ultimate responsibility for the proper sizing and selection, installation, operation, and maintenance of Flowserve products. The purchaser/user
should read and understand the Installation Instructions included with the product, and train its employees and contractors in the safe use of
Telephone: 65 6544 6800
Flowserve products in connection with the specific application. Telefax: 65 6214 0541
While the information and specifications contained in this literature are believed to be accurate, they are supplied for informative purposes only and
should not be considered certified or as a guarantee of satisfactory results by reliance thereon. Nothing contained herein is to be construed as a warranty
or guarantee, express or implied, regarding any matter with respect to this product. Because Flowserve is continually improving and upgrading its
Latin America
product design, the specifications, dimensions and information contained herein are subject to change without notice. Should any question arise Mexico City
concerning these provisions, the purchaser/user should contact Flowserve Corporation at any one of its worldwide operations or offices.
Telephone: 52 55 5567 7170
Telefax: 52 55 5567 4224

4
Assa North – Ohaji South Project: Engineering,
Procurement and Construction; Site Preparation
and I.A Infrastructure

Motor Offer
1
Sr No

Motor Power (kW)

7.5
Speed (Max)

3000
Voltage

400
Frequency

50
MOTOR

Mounting
B3

IP
55

Cooling Type
411
Y

Thermistor
2

Quantity
MCC

Circuit type
DOL
Frame Prod Code
M3GP 132SMG 2 3GGP 131 270-BDK

VC002- Restamping for voltage


Yes

variation

VC209 Non-standard voltage or


Yes

frequency, (special winding).

VC115 Painting system C4M acc. to


Yes

ISO 12944-2: 2007

VC381 Frame agreement betw.


ABB and Shell according to Shell
Yes

DEP 33.66.05.31-GEN February


2018

VC448 Draining holes with metal


NA

plugs.

VC425 Corrosion protected stator


Yes

and rotor core.

VC114- special paint shade RAL


Yes

6035

531-sea frieght packing


Yes

145 - Type test report from a


Yes

catalogue motor, 400V 50Hz.

Variant code -+204 - Jacking bolts


NA

for foot mounted motors.

VC 148 Routine test report.


Yes
TECHNICAL DEVIATION / CLARIFICATION LIST
Page 1 of 3
CLIENT: Shell - Nigeria ABBR : ABBREVIATION
PROJECT TITLE: CLR : CLARIFICATION
Project reference: DEV : DEVIATION
EQUIPMENT: LV INDUCTION MOTORS
VENDOR NAME: ABB
Rev.0 AnKa 27.7.2021

REFERENCED DETAIL SUPPLIERS REFE Options/Comments FOR CLIENT USE


DOCUMENT REQUIRE- DEVIATION / CLARIFICATION - Regarding Deviations
RM-OGP-002- MENT OF
EA-7771-0005
REN-
THE REF. CED
Rev.02 DOCU-
MENT
ABB
R
1.4+2 Codes and LV motors are quoted according to certificates and standards valid during date of delivery: IEC, ISO, DEV/
standards EN 50014, 50018, ATEX 2014/34/EU, EN/IEC 60079-series. API/ IEEE standards are not followed CLR
unless requirements are opened in the specifications. Local statutory regulation that are not
harmonized to above quoted standards are not known and are not quoted. Only specifications
received and mentioned in the first column of this document are considered applicable.
Shell DEP Our quotation is made following only the newest revision 2018. The following is Shell approval CLR Variant code description:
Agreement 33.66.05.31- regarding revision 2018. The enclosed documents form a part of our deviation list.
2018 Gen.
3GZF500930-1115_D.
February pdf
2018 Shell DEP2018_ABB Engineering note Engineering Note ABB Approval letter
LV IEC Motors_Rev 04DEC2018.xlsx
1_Rev 09MAY2018.pdf
2_Rev 25OCT2018.pdf
LV Motors 2018.pdf
However, below
comments either cancel or add text or modify above deviations as indicated.
3.4 Drain hole Drain holes and plugs are according to manufacturer standard, brass in Ex de motors. Drain holes CLR
are not included in smallest Ex d(e) frame sizes 132 and smaller
3.5 Method of Cooling shall be standard IC411. CLR
cooling
4.1.2+4.5+4.6 Number of The load curves or load inertia values are not available at bidding stage. Starting capabilities and CLR
starts, ART, number of starts need to be checked after receipt of mentioned data. However as we are always able
Stalling time to quote larger ratings when needed, no deviation is needed.
4.2.1 Starting Conflicting requirements. Starting current shall not exceed 7.5 times the rated current according to DEV/
current Shell and ABB agreement. Also specification Electrical design basis specifies 7.5 instead of 7.0. CLR
Earlier requirement was 7.5, but when efficiency requirement changed from IE2 to IE3 also starting
current requirement was changed. Quoted motors are according to latest agreement with Shell 7.5
times rated current.
4.9 Vibration Vibration at one point and manufacturer standard speed will be included on routine test, which is CLR
testing included for all motors. Vibration level test quoted optional.
4.9.4 Vibration Motors with frame sizes 160 and above can equipped with one SPM nipple for shock pulse CLR
monitoring measurement of the bearings when specified.
4.9.5 Vibration Vibration will be grade A (IEC60034-14) as standard. Grade B can be quoted separately if needed. CLR
4.10.1 SPL 85 dB(A) Sound pressure levels are defined according to IEC and ISO 1680/3744. The sound pressure levels CLR
are according to separate technical data, a tolerance of + 3 dB(A) to be added for getting the
Printed 23.9.2021
ABB Clarification Deviation - Shell Nigeria Project.doc
TECHNICAL DEVIATION / CLARIFICATION LIST
Page 2 of 3
CLIENT: Shell - Nigeria ABBR : ABBREVIATION
PROJECT TITLE: CLR : CLARIFICATION
Project reference: DEV : DEVIATION
EQUIPMENT: LV INDUCTION MOTORS
VENDOR NAME: ABB
Rev.0 AnKa 27.7.2021

guaranteed value.
5.1 Earthing Earthing bolt diameter sizes vary (M6-M10) depending on the frame size. DEV/
conductor size CLR
5.4.1+5.4.2 Terminal box Manufacturer standard terminal boxes are quoted. Cable glands are not included, however they can CLR
be quoted on request after type, number, cable dimensions/ entry thread sizes of main and auxiliary
entries have been agreed. Quoted main terminal boxes are top mounted in horizontal foot mounted
motors as specified. The first auxiliary terminal box when applicable, will be mounted on RHS seen
from D end.
5.3.1 Indication HK Half key balanced rotors will be marked with an H. DEV
5.6.2 Direction of LV motors are quoted typically bidirectional and marked according to IEC with two ended arrow on DEV
rotation the rating plate only.
In case of motors with uni directional fans, the motors are marked by an arrow on adhesive sticker at
N end.
5.6.3 Coupling Coupling is outside of LV motor vendor scope. DEV
5.7.1 Winding Quoted motors are provided with manufacturer standard PTC-thermistors in each winding, CLR
temperature connected in main terminal box as standard. Auxiliary terminal box is quoted optionally for frame
detectors sizes 160 and above. Alternative winding temperature detectors (PT100 etc.) are quoted on separate
request.
5.8 Bearings Motors sizes 80-132 have ball bearings greased for life. Motors sizes 160-355 have re-greasable ball CLR
bearings. Quoted deep groove ball bearings are designed to take some axial thrust – loading force
limits of manufacturer catalogue must be followed. Other bearing types or solutions for heavy Bearings_load_limits_
loading must be calculated and quoted case by case. LV motors are preliminarily quoted for L10 greasing_intervals.pdf
bearing lifetime of 40 000 h assuming manufacturer catalogue stated maximum loading force values.
Insulated bearings are only needed and quoted for VSD driven motors frames 280 and above. VSD
motors can be quoted separately after load data are known.
5.10 Rating plates Labels and rating plates will be according to manufacturer standard and IEC. Tag number plate, CLR
additional plate for extra information and lubrication information plate can be quoted on request.
Rating plate material will be stainless steel, fixed with rivets. Warning labels will be on stickers. Rating_plates.pdf

5.12 Painting Quoted painting, materials, inspection, documentation, quality assurance and warranty shall be CLR
according to manufacturer standard, having preliminary manufacturer standard surface colour
Munsell Blue 8B 4.5/3.25. Quoted painting is, special painting category C4 M according to ISO M3_M4_Paint_system
12944-2 1998 (VC +115) and enclosed document. Customer selected RAL shade is quoted s_Rev_H.pdf
optionally. Following alternative paint systems can be quoted on request: -C5 M- ( VC +754), NDFT
200 microns, -C5 M- durability class High ( VC+ 711), NDFT 320 microns

6.2 Fan material Fan material is polyamide reinforced with glass fibre or polypropylene reinforced with glass fibre, CLR
depending on frame size. Used also in non-sparking motors.
9+Appendix A+ Testing Type test report and a non-witnessed routine testing according to IEC and manufacturer standards, is CLR
Appendix B
Printed 23.9.2021
ABB Clarification Deviation - Shell Nigeria Project.doc
TECHNICAL DEVIATION / CLARIFICATION LIST
Page 3 of 3
CLIENT: Shell - Nigeria ABBR : ABBREVIATION
PROJECT TITLE: CLR : CLARIFICATION
Project reference: DEV : DEVIATION
EQUIPMENT: LV INDUCTION MOTORS
VENDOR NAME: ABB
Rev.0 AnKa 27.7.2021

included for all motors (variant code +148) according to document “Final testing procedures”-
testing with 50 Hz and manufacturer standard voltage. All other tests/ test reports and inspections are
quoted on request and agreed separately – to be agreed and ordered according to enclosed final Final testing
testing document. Test reports will be according to IEC and includes manufacturer standard data procedure for VSD Rev D.pdf
only. Schedule for witnessed inspections has to be agreed separately. Customer audits are very
welcome but have to be agreed and scheduled separately. All inspections will be made according to
manufacturer’s ISO 9001 certified QA program.

Final Testing
Procedure Rev AA

Quality plan for


Ex-motors Rev. R.pdf
Appendix C. Efficiency Efficiency shall be IE3 for quoted motors. Some values might be slightly lower than values on the DEV/
table on Appendix C. CLR
9AKK107319 EN
05-2018_20848_ABB_Technical_note_IEC_60034_30_1.pdf
Appendix D. Power factor Quoted power factors will be acc. to separately submitted technical data. CLR
General Documentatio Only documentation described here is included in English, other documentation must be agreed CLR
n separately. Included: datasheets/curves/ drawings of motor and terminal box/records of ordered tests,
will be acc. to manufacturer standard form and format (Word, PDF, Excel etc.) data content and size.
Example of
Standard ABB O&M manuals, spare part lists and relevant ATEX or IECEx certificates and datasheet & curves
manufacturer standard forwarding documentation are also included.

Example of outline
drawing

Printed 23.9.2021
ABB Clarification Deviation - Shell Nigeria Project.doc
Assa North – Ohaji South Project: Engineering,
Procurement and Construction; Site Preparation
and I.A Infrastructure

Technical Comments
Quotation Number CBE210615
EXCEPTION
DEVIATION
CLARIFICATION Project Description Assa North – Ohaji South Project: Engineering, Procurement and Construction; Site Preparation and I.A Infrastructure
Date 30-09-2021
S/N Type Specification Name and Doc No. Clause Specification Requirement Bidder Comments

Suction: 2 Inc/ 300#/ RF/ END


1 CLA Diesel Pump Datasheet Suction and discharge nozzles ANSI Class 150
Discharge: 1 Inch/ 300#/ RF/ TOP

Material of construction is taken as S6. The detailed MOC


2 CLA Diesel Pump Datasheet MOC MATERIAL SPECIFICATION: Not specified grades for each component is specified in Scope of supply
sheet. Customer to confirm the MOC requirement.

Pulsation damper is not considered. Please confirm the exact


3 CLA Diesel Pump Datasheet ACCESSORIES Pulsation damper: YES
requirement.

Nigeria national standards (Regulatory requirements,


Statutory law and regulations) are not considered. Customer
4 CLA MECHANICAL DESIGN BASIS 3.4 Order of preference / Conflicting requirements
to specify the Nigeria standards to be followed for this
requisition.
Pump is offered as per SPEP 31.95.02.47-Gen Feb 2018
subject to comments mentioned in this deviation, no other
5 CLA General General SPEP Agreement
pump specifications has been considered. We request the
customer to accept the same.

Kindly note that any other Piping out side the Skid limit,
Cable, Wirings, Junction Box, VFD/VSD/Soft starter,
Monitoring sytems (Vibration & Temperature), Vibration
probes, RTDs, Steam Jacketing, Control Valves, analysers,
6 CLA General Out of Scope General Alarm Shut down and Interlock system,Field Mounted
Pneumatic instruments, Control Board, panels, Cabinets, DCS,
insulation, Safety Valves, Rupture disk, Motor Operated
Valvesa and shut off valves, Flow meters, Level Transmitters
are not in Flowserve Scope

Please note that we have considered Flowserve/Equivalent


for seal and seal system and ABB/Equivalent for motors. For
the Rest of the accessories/bulk items like Pipes, Fittings,
Flanges, Vlaves, Fasteners, Gaskets, Coupling guard, Junction
Box, Cables, Cable gland, Instruments and other Pump
7 CLA Approved Vendor List Approved Vendor List Complete document
accessories shall be as per Flowerve approved sub suppliers
list and sub vendor choice of make only. We request the
customer to accept the same. Please refer our sub vendor list
attached along with with the submittal, the same shall be
followed.

SEAL AND SEAL SYSTEM-FLOWSERVE

Customer to confirm the hazardous category of


pumping fluid (whether pumping fluid is
hazardous Category 1 or 2 or 3) so that seal
8 CLA DEP 31.29.02.30-Gen. Clause 3.66 Hazardous service vendor will confirm the seal and API Plan.
Right now seal vendor recommended single
seal.Based on customer confirmation, seal
vendor will confirm seal selection.

MOTOR-ABB
Please refer to the attached Motor Deviation list to the
specifications

9 DEV General

ABB Clarification
Deviation - Shell
Nigeria Project.doc
TECHNICAL DEVIATION / CLARIFICATION LIST
Page 1 of 3
CLIENT: Shell - Nigeria ABBR : ABBREVIATION
PROJECT TITLE: CLR : CLARIFICATION
Project reference: DEV : DEVIATION
EQUIPMENT: LV INDUCTION MOTORS
VENDOR NAME: ABB
Rev.0 AnKa 27.7.2021

REFERENCED DETAIL SUPPLIERS REFE Options/Comments FOR CLIENT USE


DOCUMENT REQUIRE- DEVIATION / CLARIFICATION - Regarding Deviations
RM-OGP-002- MENT OF
EA-7771-0005
REN-
THE REF. CED
Rev.02 DOCU-
MENT
ABB
R
1.4+2 Codes and LV motors are quoted according to certificates and standards valid during date of delivery: IEC, ISO, DEV/
standards EN 50014, 50018, ATEX 2014/34/EU, EN/IEC 60079-series. API/ IEEE standards are not followed CLR
unless requirements are opened in the specifications. Local statutory regulation that are not
harmonized to above quoted standards are not known and are not quoted. Only specifications
received and mentioned in the first column of this document are considered applicable.
Shell DEP Our quotation is made following only the newest revision 2018. The following is Shell approval CLR Variant code description:
Agreement 33.66.05.31- regarding revision 2018. The enclosed documents form a part of our deviation list.
2018 Gen.
3GZF500930-1115_D.
February pdf
2018 Shell DEP2018_ABB Engineering note Engineering Note ABB Approval letter
LV IEC Motors_Rev 04DEC2018.xlsx
1_Rev 09MAY2018.pdf
2_Rev 25OCT2018.pdf
LV Motors 2018.pdf
However, below
comments either cancel or add text or modify above deviations as indicated.
3.4 Drain hole Drain holes and plugs are according to manufacturer standard, brass in Ex de motors. Drain holes CLR
are not included in smallest Ex d(e) frame sizes 132 and smaller
3.5 Method of Cooling shall be standard IC411. CLR
cooling
4.1.2+4.5+4.6 Number of The load curves or load inertia values are not available at bidding stage. Starting capabilities and CLR
starts, ART, number of starts need to be checked after receipt of mentioned data. However as we are always able
Stalling time to quote larger ratings when needed, no deviation is needed.
4.2.1 Starting Conflicting requirements. Starting current shall not exceed 7.5 times the rated current according to DEV/
current Shell and ABB agreement. Also specification Electrical design basis specifies 7.5 instead of 7.0. CLR
Earlier requirement was 7.5, but when efficiency requirement changed from IE2 to IE3 also starting
current requirement was changed. Quoted motors are according to latest agreement with Shell 7.5
times rated current.
4.9 Vibration Vibration at one point and manufacturer standard speed will be included on routine test, which is CLR
testing included for all motors. Vibration level test quoted optional.
4.9.4 Vibration Motors with frame sizes 160 and above can equipped with one SPM nipple for shock pulse CLR
monitoring measurement of the bearings when specified.
4.9.5 Vibration Vibration will be grade A (IEC60034-14) as standard. Grade B can be quoted separately if needed. CLR
4.10.1 SPL 85 dB(A) Sound pressure levels are defined according to IEC and ISO 1680/3744. The sound pressure levels CLR
are according to separate technical data, a tolerance of + 3 dB(A) to be added for getting the
Printed 23.9.2021
ABB Clarification Deviation - Shell Nigeria Project.doc
TECHNICAL DEVIATION / CLARIFICATION LIST
Page 2 of 3
CLIENT: Shell - Nigeria ABBR : ABBREVIATION
PROJECT TITLE: CLR : CLARIFICATION
Project reference: DEV : DEVIATION
EQUIPMENT: LV INDUCTION MOTORS
VENDOR NAME: ABB
Rev.0 AnKa 27.7.2021

guaranteed value.
5.1 Earthing Earthing bolt diameter sizes vary (M6-M10) depending on the frame size. DEV/
conductor size CLR
5.4.1+5.4.2 Terminal box Manufacturer standard terminal boxes are quoted. Cable glands are not included, however they can CLR
be quoted on request after type, number, cable dimensions/ entry thread sizes of main and auxiliary
entries have been agreed. Quoted main terminal boxes are top mounted in horizontal foot mounted
motors as specified. The first auxiliary terminal box when applicable, will be mounted on RHS seen
from D end.
5.3.1 Indication HK Half key balanced rotors will be marked with an H. DEV
5.6.2 Direction of LV motors are quoted typically bidirectional and marked according to IEC with two ended arrow on DEV
rotation the rating plate only.
In case of motors with uni directional fans, the motors are marked by an arrow on adhesive sticker at
N end.
5.6.3 Coupling Coupling is outside of LV motor vendor scope. DEV
5.7.1 Winding Quoted motors are provided with manufacturer standard PTC-thermistors in each winding, CLR
temperature connected in main terminal box as standard. Auxiliary terminal box is quoted optionally for frame
detectors sizes 160 and above. Alternative winding temperature detectors (PT100 etc.) are quoted on separate
request.
5.8 Bearings Motors sizes 80-132 have ball bearings greased for life. Motors sizes 160-355 have re-greasable ball CLR
bearings. Quoted deep groove ball bearings are designed to take some axial thrust – loading force
limits of manufacturer catalogue must be followed. Other bearing types or solutions for heavy Bearings_load_limits_
loading must be calculated and quoted case by case. LV motors are preliminarily quoted for L10 greasing_intervals.pdf
bearing lifetime of 40 000 h assuming manufacturer catalogue stated maximum loading force values.
Insulated bearings are only needed and quoted for VSD driven motors frames 280 and above. VSD
motors can be quoted separately after load data are known.
5.10 Rating plates Labels and rating plates will be according to manufacturer standard and IEC. Tag number plate, CLR
additional plate for extra information and lubrication information plate can be quoted on request.
Rating plate material will be stainless steel, fixed with rivets. Warning labels will be on stickers. Rating_plates.pdf

5.12 Painting Quoted painting, materials, inspection, documentation, quality assurance and warranty shall be CLR
according to manufacturer standard, having preliminary manufacturer standard surface colour
Munsell Blue 8B 4.5/3.25. Quoted painting is, special painting category C4 M according to ISO M3_M4_Paint_system
12944-2 1998 (VC +115) and enclosed document. Customer selected RAL shade is quoted s_Rev_H.pdf
optionally. Following alternative paint systems can be quoted on request: -C5 M- ( VC +754), NDFT
200 microns, -C5 M- durability class High ( VC+ 711), NDFT 320 microns

6.2 Fan material Fan material is polyamide reinforced with glass fibre or polypropylene reinforced with glass fibre, CLR
depending on frame size. Used also in non-sparking motors.
9+Appendix A+ Testing Type test report and a non-witnessed routine testing according to IEC and manufacturer standards, is CLR
Appendix B
Printed 23.9.2021
ABB Clarification Deviation - Shell Nigeria Project.doc
TECHNICAL DEVIATION / CLARIFICATION LIST
Page 3 of 3
CLIENT: Shell - Nigeria ABBR : ABBREVIATION
PROJECT TITLE: CLR : CLARIFICATION
Project reference: DEV : DEVIATION
EQUIPMENT: LV INDUCTION MOTORS
VENDOR NAME: ABB
Rev.0 AnKa 27.7.2021

included for all motors (variant code +148) according to document “Final testing procedures”-
testing with 50 Hz and manufacturer standard voltage. All other tests/ test reports and inspections are
quoted on request and agreed separately – to be agreed and ordered according to enclosed final Final testing
testing document. Test reports will be according to IEC and includes manufacturer standard data procedure for VSD Rev D.pdf
only. Schedule for witnessed inspections has to be agreed separately. Customer audits are very
welcome but have to be agreed and scheduled separately. All inspections will be made according to
manufacturer’s ISO 9001 certified QA program.

Final Testing
Procedure Rev AA

Quality plan for


Ex-motors Rev. R.pdf
Appendix C. Efficiency Efficiency shall be IE3 for quoted motors. Some values might be slightly lower than values on the DEV/
table on Appendix C. CLR
9AKK107319 EN
05-2018_20848_ABB_Technical_note_IEC_60034_30_1.pdf
Appendix D. Power factor Quoted power factors will be acc. to separately submitted technical data. CLR
General Documentatio Only documentation described here is included in English, other documentation must be agreed CLR
n separately. Included: datasheets/curves/ drawings of motor and terminal box/records of ordered tests,
will be acc. to manufacturer standard form and format (Word, PDF, Excel etc.) data content and size.
Example of
Standard ABB O&M manuals, spare part lists and relevant ATEX or IECEx certificates and datasheet & curves
manufacturer standard forwarding documentation are also included.

Example of outline
drawing

Printed 23.9.2021
ABB Clarification Deviation - Shell Nigeria Project.doc
Assa North – Ohaji South Project: Engineering,
Procurement and Construction; Site Preparation
and I.A Infrastructure

Flowserve Term's &


Condition's
WORLDWIDE TERMS AND CONDITIONS OF SALE
1. APPLICABILITY: These Worldwide Terms and Conditions of Sale ("Terms") shall govern all sales of said data and information or otherwise appropriate them without the written authorization of the Seller. Buyer
Seller's Equipment or Services to Buyer ("Contract of Purchase” or “Order"). These Terms supersede any prior agrees that it will not disclose or make available to any third party any of Seller’s data or other information
written or oral agreement, understanding, representation or promise, and any pre-printed or standard terms and pertaining to this Order which is proprietary to Seller without obtaining Seller’s prior written consent.
conditions contained in Buyer's request for quote, purchase order, invoice, order acknowledgement, or similar
11. SPECIAL TOOLING AND DATA: Unless otherwise agreed in writing, all material, software, data
document. These Terms may not be amended, supplemented, changed or modified except by concurrent or
processes, equipment, facilities and special tooling, which term includes but is not limited to jigs, dies, fixtures,
subsequent written agreement, signed by an authorized representative of Seller and Buyer. Seller's
molds, patterns, special taps, special gages, special test equipment, other special equipment and manufacturing
acknowledgement of Buyer’s purchase order shall not constitute acceptance of any terms and conditions
aids and replacements thereof, used in the manufacture of the Equipment covered by an Order shall be and
contained therein, regardless of how such terms and conditions may be prefaced or described.
remains the property of Seller. Seller retains all rights, title and interest in drawings, engineering instructions,
2. DEFINITIONS: specifications, and all other written data, if any, furnished and/or specified to be supplied with the Equipment.
“Buyer” means the company who accepted Seller's offer or is named in the Order. 12. EXPORT / IMPORT: Buyer agrees that it will comply with all applicable import and export control laws
and/or regulations, including without limitation those of the United States and/or other jurisdictions from which the
"Equipment" means all equipment and parts manufactured and sold by Seller.
Equipment and/or technology may be supplied or to which the Equipment and/or technology may be shipped. In
“Seller" means the company named on the Order for Equipment or Services. no event shall Buyer use, transfer, release, import, export or re-export the Equipment and/or technology in
violation of such applicable laws and/or regulations.
“Service(s)" means work, direction of work, technical information or technical consulting and advice or other services
furnished by Seller to Buyer. 13. TAXES: Seller’s price, unless otherwise agreed, shall be fixed and does not include, and Seller is not
responsible for, payment of any tax levied for sales, use, excise, value-added, goods and services, business
3. DELIVERY / SUSPENSION / FORCE MAJEURE: For the delivery of Equipment within the United States, (franchise or privilege) or any duties, charges or other such taxes. Seller is only responsible for any tax imposed
delivery shall be made EXW (in accordance with INCOTERMS 2010, as amended) Seller's plant. For the delivery on Seller, by taxing authorities in Seller’s jurisdiction, which are based on Seller’s revenue, income, net income,
of Equipment outside the United States, delivery shall be made FCA Seller's plant. Title to Equipment shall net assets, net worth, or capital or any taxes imposed in lieu thereof. If Seller is required to pay any taxes or other
transfer to Buyer simultaneously with transfer of risk of loss pursuant to the applicable INCOTERMS. Shipping charges that are the responsibility of the Buyer, then Buyer shall promptly reimburse Seller those amounts.
dates are approximate and are based on prompt receipt of all necessary information. In case of delay in furnishing
complete information, dates of shipment may be extended for a reasonable time. In the event Seller provides 14. ASSIGNMENT: Neither party shall assign an Order or any portion thereof without the advance, written
transport services these will be quoted as a lump sum price based on destination and shipping mode. consent of the other party, which consent shall not be unreasonably withheld.
In the event Buyer requests a delay or suspension in completion and/or shipment of the Equipment or any part 15. WAIVER / SEVERABILITY: Failure by Seller to assert all or any of its rights upon any breach of an Order
thereof for any reason, the parties shall agree upon any cost and/or scheduling impact of such delay and all such shall not be deemed a waiver of such rights either with respect to such breach or any subsequent breach, nor
costs to Buyer's account. Any delay period beyond thirty (30) days after original scheduled shipment date shall shall any waiver be implied from the acceptance of any payment of service. No waiver of any right shall extend
require Buyer to (i) take title and risk of loss of such Equipment, and (ii) make arrangements for storage of such to or affect any other right Seller may possess, nor shall such waiver extend to any subsequent similar or dissimilar
Equipment with the Seller or other party. Seller's invoice, which is contractually based on shipment, shall be issued breach.
upon Seller's readiness to ship the Equipment. In the event any suspension or delay in completion and/or
If any portion of these Terms are determined to be illegal, invalid, or unenforceable, for any reason, then such
shipment of the Equipment requested by Buyer should exceed 60 days in the aggregate, Seller may cancel this
provision shall be deemed stricken for purposes of the dispute in question and all other provisions shall remain
Order and Buyer shall pay reasonable and proper cancellation charges in accordance with Article 7 hereto.
in full force and effect.
Seller shall not be liable for delay in delivery due to causes beyond its reasonable control including, but not limited to,
16. APPLICABLE LAW / DISPUTES: This Order shall be interpreted in accordance with the laws of the
acts of God, acts of government, acts of Buyer, fires, labor disputes, boycotts, floods, epidemics, quarantine
jurisdiction in which the Seller’s facility accepting the Order hereunder is located, exclusive of any choice of law
restrictions, war, insurrection, terrorism, riot, civil or military authority, freight embargoes, transportation shortages
provisions. The Seller and Buyer expressly agree to exclude from this Order the United Nations Convention on
or delays, unusually severe weather or inability to obtain necessary labor, materials or manufacturing facilities due to
Contracts for the International Sale of Goods, 1980, and any successor thereto and the Contracts (Rights of Third
such causes. In the event of any such delay, the date of delivery shall be extended for a length of time equal to the
Parties) Act of 1999.
period of the delay.
Except as otherwise specifically agreed in writing by Buyer and Seller, any dispute relating to an Order placed by
4. WARRANTY: Subject to the limitations in Section 18 herein, Seller warrants that the Equipment shall be
a Buyer incorporated in the United States which is not resolved by the parties shall be adjudicated by a court of
free from defects in material, workmanship, and title. If it appears within twelve (12) months from the initial
competent jurisdiction in the state of Texas. All disputes arising out of or in connection with an Order placed by
Equipment startup or until eighteen (18) months after shipment, whichever occurs first, that the Equipment or any
a Buyer incorporated outside the United States that shall be finally settled by binding arbitration in London
part thereof does not conform to this warranty, and Buyer so notifies Seller within a reasonable time after
England, under the Rules of Arbitration of the International Chamber of Commerce then in effect by one or more
discovery, Seller shall thereupon promptly correct such nonconformity by repair or replacement EXW Seller’s
arbitrators appointed in accordance with said Rules.
factory or service center. Seller's sole obligation and Buyer's sole remedy under this warranty is repair or
replacement at Seller's election. Seller's warranty obligation for Services shall be the earlier of either ninety (90) 17. COMPLIANCE WITH LAWS / ANTI-BRIBERY: Seller and Buyer agree to comply with all applicable
days from the date of initial startup or six (6) months after completion of the Service work. Seller shall not be laws, regulations, codes and standards, including but not limited to those of the United States and other
responsible for any on-site costs, including removal and reinstallation of any warranted Equipment. Buyer agrees jurisdictions where the parties conduct business. Additionally, Buyer has not and will not offer, promise, authorize
to provide Seller reasonable and clear access to its Equipment which may include removal of materials or or make, directly or indirectly, any payments (in money or any other item of value, including meals, entertainment
structures as well as supplying any equipment, materials or structures which are necessary to provide reasonable and travel), contributions or gifts to any individual, entity or government agency, department, official or
access to the Equipment being repaired or replaced. All Equipment repaired or replaced will be re-warranted only government owned or controlled entity in order to obtain or retain business, or secure any other improper business
for the remainder of the original warranty period. THE EXPRESS WARRANTY SET FORTH HEREIN IS THE advantage, which would violate the U.S. Foreign Corrupt Practices Act and/or any other applicable anti-bribery
EXCLUSIVE WARRANTY OF SELLER, AND NO OTHER WARRANTY, EITHER EXPRESSED OR IMPLIED, laws.
INCLUDING WARRANTY OF MERCHANTABILITY OR FITNESS FOR PURPOSE, SHALL APPLY. Seller is
18. LIMITATION OF LIABILITY / EXCLUSION OF CONSEQUENTIAL LOSS: The remedies set forth herein
not responsible for repairs or alterations made by others without mutual written agreement between Seller and
are exclusive, and the total liability of the Seller with respect to this Order, or any breach thereof, whether based on
Buyer. Seller does not warrant the Equipment or any repair/replacement part against the effects of erosion,
contract, warranty, tort (including negligence), indemnity, strict liability or otherwise, shall not exceed the Order price
corrosion, or normal wear and tear due to operation or the environment. The warranty and remedies set forth
of the specific Equipment or Service which gives rise to the claim.
herein are conditioned upon proper storage, installation, use and maintenance of the Equipment in all material
respects, and in accordance with Seller’s written recommendations. Replacement parts or repairs furnished under In all cases where Buyer claims damages allegedly arising out of defective or nonconforming Equipment or Services,
this warranty shall be subject to the warranty provisions herein for the remaining original warranty period. Buyer's exclusive remedies and Seller's sole liability shall be those specifically provided for under Section 4 "Warranty".
5. PAYMENT: All prices are net cash thirty (30) days from date of Seller's invoice, unless otherwise stated in IN NO EVENT, WHETHER ARISING BEFORE OR AFTER COMPLETION OF ITS OBLIGATIONS UNDER THE
Seller’s proposal, quotation, or offer. Should Buyer for any reason default in the payment of the contract of purchase, CONTRACT, SHALL SELLER BE LIABLE FOR SPECIAL, INDIRECT, CONSEQUENTIAL, INCIDENTAL OR
Buyer agrees to pay all collection costs, attorney fees and expenses incurred in collecting payment, including interest PUNITIVE DAMAGES OF ANY KIND (INCLUDING BUT NOT LIMITED TO LOSS OF USE, REVENUE OR
on the amount due at the maximum legal rate. All transportation, insurance and similar charges incident to delivery PROFITS, INVENTORY OR USE CHARGES, OVERHEAD, COST OF CAPITAL, OR CLAIMS OF CUSTOMERS)
shall be paid by Buyer. Seller shall issue its invoice upon shipment, or upon notice to Buyer that Seller is ready to ship, INCURRED BY THE BUYER OR ANY THIRD PARTY.
whichever is earlier. Depending on the value of the order, Seller may at its sole discretion require progress payments.
19. GENERAL PROVISIONS: (a) No Action, regardless of form, arising out of transactions under the Order,
If Buyer’s financial condition is or becomes unsatisfactory to Seller, Seller reserves the right to: (a) require may be brought by the Buyer more than one (1) year after the cause of action has accrued. (b) Any modification
payment from Buyer on a Cash In Advance (CIA) basis; (b) require a letter of credit or other acceptable security to these Terms must be set forth in a written instrument signed by a duly authorized representative of Seller. (c)
before shipment; or (c) cancel shipment at any time prior to delivery of the Equipment without further obligation In the event Buyer has reason to believe the Equipment could be subject to a claim for damages or personal
or liability on the Seller's part. injury, Buyer shall immediately provide Seller with written notice of such claim, and shall provide Seller reasonable
opportunity to inspect said Equipment and/or investigate the basis for such potential claim. (d) UNLESS
6. CHANGES: Buyer may request modifications as to the amount, scope and/or nature of the Equipment
OTHERWISE SPECIFICALLY PROVIDED IN SELLER'S QUOTATION, EQUIPMENT AND SERVICES
to be supplied by a written change request. If, in the opinion of Seller, any modification will affect the agreed fixed
HEREUNDER ARE NOT INTENDED FOR USE IN ANY NUCLEAR OR NUCLEAR RELATED APPLICATIONS.
price and/or time of delivery, Seller will notify Buyer thereof in writing and will not be obligated to perform any
IF SELLER'S QUOTATION EXPRESSLY STATE THAT THE EQUIPMENT AND SERVICES ARE INTENDED
modification unless agreed to by Seller. Buyer shall confirm that such change is authorized and accepted by
FOR NUCLEAR OR NUCLEAR RELATED APPLICATIONS, SELLER'S ADDENDUM (P-62) FOR NUCLEAR
issuing an Order revision.
LIABILITY PROTECTION IS HEREBY INCORPORATED. Buyer (i) accepts the Equipment and Services in
7. CANCELLATION: Buyer may cancel this Order only upon written notice and payment to Seller of accordance with the restriction set forth in the immediately preceding sentences, (ii) agrees to communicate such
reasonable and proper cancellation charges. Notwithstanding the foregoing, Buyer and Seller reserve the right to restriction in writing to any and all subsequent purchasers or users, and (iii) agrees to defend, indemnify and hold
cancel all or any portion of an Order affected by any insolvency or suspension of either party’s operations or any harmless Seller from any and all claims, losses, liability, suits, judgments and damages, including incidental and
petition filed or proceeding commenced by or against a party under any law relating to bankruptcy, arrangement, consequential damages, arising from the use of the Equipment or Services in any nuclear or nuclear related
reorganization, receivership or assignment for the benefit of creditors. Should Seller cancel all or any portion of applications, whether the cause of action be based in tort, contract or otherwise, including allegations that the
an Order per this provision, Seller shall be entitled to all reasonable and proper costs and charges incurred and Seller's liability is based on negligence or strict liability.
Buyer waives any right of recourse against Seller for Seller’s cancellation.
20. TRANSLATIONS / GOVERNING LANGUAGE: English shall be the legal language of this Order, and all
8. TERMINATION: Seller may terminate this Order upon prior written notice to Buyer, in case Buyer parties waive any right to use and/or rely upon any other language, translation or interpretation. The parties
breaches any of its material obligations under the Order, to the extent such breach is not remedied within a specifically agree that in the case of any inconsistencies or interpretation disputes, the English language version
reasonable time period as agreed by the Parties. shall control.
9. SET-OFF: All amounts that Buyer owes Seller under an Order shall be due and payable according to the 21. ENTIRE AGREEMENT: The Contract of Purchase, consisting of these Terms, Seller’s quotation, and
terms of an Order. Buyer is prohibited from, and shall not set-off such amounts or any portion thereof, whether or subject to Section 1 of these Terms, Buyer’s order if accepted in writing by Seller, constitutes the entire agreement
not liquidated, against sums which Buyer asserts are due it, its parent affiliates, subsidiaries or other divisions or between Buyer and Seller. The contract of purchase supersedes any prior written or oral agreement, understanding,
units under other transactions with Seller, its parent affiliates, subsidiaries or other divisions or units. representation, warranty, promise, or condition. Buyer expressly represents and warrants that it is not relying upon
any agreement, understanding, promise, representation, warranty, or condition not expressly contained in the
10. NON-DISCLOSURE AND NON-USE OF SELLERS’ INFORMATION: Buyer agrees that it will not use
contract of purchase.
Seller’s data for the manufacture or procurement of Equipment which are the subject of an Order or any similar
Equipment, or cause said Equipment to be manufactured by, or procured from, any other source or reproduce

WORLDWIDE TERMS AND CONDITIONS OF SALE - Rev.6b April 2018 Page 1 of 1


CANCELLATION CURVE

100

90

80
PERCENT OF CONTRACT PRICE

70

60

50

40

30

20

10

0
0 10 20 30 40 50 60 70 80 90 100
PERCENT OF CONTRACT TIME

1. Any cancellation after acceptance is subject to a cancellation charge


determined by reference to above graph.

2. The graph shall be applied only to services provided by and goods


manufactured or modified by Flowserve Corporation.

3. All other goods or services provided in a final condition (buy out items such
as drivers, systems, couplings, seals, etc.) shall billable to the buyer at the
buyout supplier’s charges to Flowserve Corporation plus 20% administration
and handling charges.

4. In the event of cancellation, this pre-determined graph shall prevail and


shall not be subject to audit.
Flowserve Export Compliance

You are not permitted to re-export any Flowserve products for end-use
in Iran, North Korea or Syria without express written permission from
Flowserve.It is your obligation to comply with all applicable national and
international export, re-export, and/or economic sanctions laws and
regulations and to obtain necessary government approval prior to the
export and/or re-export of Flowserve products and/or technology. Please
be aware that diversion of Flowserve products is strictly prohibited.
Failure to comply with all applicable export, re-export and/or economic
sanctions laws and regulations may result in serious consequences
including, without limitation, monetary fines, loss of export privileges,
imprisonment and/or blacklisting by government bodies. For more
information, contact your local Flowserve Customer Service
Representative.Flowserve reserves the right to withdraw any offer or to
terminate an ensuing contract with immediate effect in case any
sanctions are issued against the Buyer and/or end-customer by US,
European or any other governmental agencies. Any sanctions issued by
US, European or any other governmental agencies which have an
impact on either Party´s performance under an ensuing contract shall be
deemed to be an event of Force Majeure for the purpose of such
contract.
Assa North – Ohaji South Project: Engineering,
Procurement and Construction; Site Preparation
and I.A Infrastructure

Pump Catalogue
Assa North – Ohaji South Project: Engineering,
Procurement and Construction; Site Preparation
and I.A Infrastructure

Reference List
REFERENCE LIST FOR 1HPX11A
Year of Speed
Customer Name End User Name Country Qty Pump Type Pump Model MOC Liquid Temp ° C Flow (m3/hr) Head (m) Driver Kw
Supply (rpm)

IOTL ONGC, ASSAM INDIA 26-Feb-06 2 HPX 1HPX11A S6 CRUDE OIL RECIRCULATION 65.00 10.00 75.00 11.00 2900

IOTL ONGC, ASSAM INDIA 26-Feb-06 2 HPX 1HPX11A S6 FLARE KOD 65.00 5.00 65.00 7.50 2900

CTCI TAIWAN CTCI TAIWAN TAIWAN - 2 HPX 1HPX11A S6 SLOPE OIL 140.00 11.00 87.10 11.00 3535

IOCL VADODARA IOCL VADODARA INDIA 2 HPX 1HPX11A S6 SLOPS 40.00 7.00 92.64 11.00 2950

INDIAN OIL TANKING LTD ONGC,RUDRASAGAR INDIA 2 HPX 1HPX11A S6 CRUDE OIL 65.00 10.00 75.00 11.00 2910

INDIAN OIL TANKING LTD ONGC,RUDRASAGAR INDIA 2 HPX 1HPX11A S6 FLARE KOD 65.00 5.00 65.00 7.50 2900

BHARAT PETROLEUM CORPORATION LIMITED BHARAT PETROLEUM CORPORATION LIMITED INDIA 21-Aug-07 2 HPX 1HPX11A S6 HC 380.00 10.80 82.50 15.00 2900

UHDE INDIAN OIL CORPORATION LIMITED, PANIPATH INDIA 03-Sep-08 1 HPX 1HPX11A S6 HEXANE & BY PRODUCTS 180.00 5.00 55.00 5.50 2900

JACOBS IOCL, VADODARA INDIA 29-Nov-08 2 HPX 1HPX11A S6 CONDENSATE 100.00 11.00 60.76 11.00 2900

TOYO ENGINEERING CORPORATION TOYO ENGINEERING CORPORATION INDIA 16-Nov-08 2 HPX 1HPX11A S6 AMINE REGENERATOR DRUM HC PUMP 145.00 5.60 74.80 9.30 2900

IOCL, DELHI IOCL VADODARA INDIA 30-Apr-09 2 HPX 1HPX11A S6 NAPTHA 45.00 8.50 51.50 5.50 2900

IOCL DELHI IOCL MATHURA REFINERY INDIA 07-Mar-09 2 HPX 1HPX11A S6 STABILIZER REFLUX 150.00 15.10 73.00 11.00 2950

IOCL, DELHI IOCL, VADODARA INDIA 22-May-09 2 HPX 1HPX11A S6 HYDROCARBON 263.00 19.80 88.00 15.00 2950

ESSAR CONSTRUCTIONS LTD ESSAR CONSTRUCTIONS LTD INDIA 30-May-09 2 HPX 1HPX11A ALLOY20 41.00 13.50 82.60 30.00 2950

ESSAR CONSTRUCTIONS LTD ESSAR CONSTRUCTIONS LTD INDIA 06-Jul-09 1 HPX 1HPX11A S8 SLOP OIL 39.00 5.00 68.00 7.50 2900

ESSAR CONSTRUCTIONS LTD ESSAR CONSTRUCTIONS LTD INDIA 06-Jul-09 1 HPX 1HPX11A S6 SKIMMED OIL 48.00 6.30 88.60 11.00 2920

ESSAR CONSTRUCTIONS LTD ESSAR CONSTRUCTIONS LTD INDIA 06-Jul-09 2 HPX 1HPX11A S8 FRESH AMINE 120.00 8.80 19.90 3.70 1475

ESSAR CONSTRUCTIONS LTD ESSAR CONSTRUCTIONS LTD INDIA 06-Jul-09 2 HPX 1HPX11A S6 WATER 250.00 6.00 64.70 11.00 2900

ESSAR CONSTRUCTIONS LTD ESSAR CONSTRUCTIONS LTD INDIA 06-Jul-09 2 HPX 1HPX11A A8 SOUR WATER 198.00 19.00 52.10 11.00 2950

ESSAR CONSTRUCTIONS LTD ESSAR CONSTRUCTIONS LTD INDIA 06-Jul-09 1 HPX 1HPX11A S8 SLOP OIL 39.00 5.00 68.00 7.50 2900

ESSAR CONSTRUCTIONS LTD ESSAR CONSTRUCTIONS LTD INDIA 06-Jul-09 1 HPX 1HPX11A S6 SKIMMED OIL 48.00 6.30 88.60 11.00 2920

ESSAR CONSTRUCTIONS LTD ESSAR CONSTRUCTIONS LTD INDIA 06-Jul-09 2 HPX 1HPX11A S6 WATER 250.00 6.00 64.70 11.00 2900

ESSAR CONSTRUCTIONS LTD ESSAR CONSTRUCTIONS LTD INDIA 06-Jul-09 2 HPX 1HPX11A A8 SOUR WATER 198.00 19.00 52.10 11.00 2950

ESSAR CONSTRUCTIONS LTD ESSAR CONSTRUCTIONS LTD INDIA 06-Jul-09 1 HPX 1HPX11A S8 SLOP OIL 39.00 5.00 68.00 7.50 2900

ESSAR CONSTRUCTIONS LTD ESSAR CONSTRUCTIONS LTD INDIA 06-Jul-09 1 HPX 1HPX11A S6 SKIMMED OIL 48.00 6.30 88.60 11.00 2920

IOCL, DELHI IOCL, DIGBOI & GUWAHATI INDIA 09-Sep-09 3 HPX 1HPX11A S6 NAPHTHA 75.00 23.50 63.00 11.00 2950

IOCL, DELHI IOCL, DIGBOI & GUWAHATI INDIA 09-Sep-09 2 HPX 1HPX11A S8 LIGHT NAPTHA + LPG 100.00 8.60 83.00 7.50 2900

IOCL, DELHI IOCL, DIGBOI & GUWAHATI INDIA 09-Sep-09 2 HPX 1HPX11A S6 LIGHT NAPTHA 100.00 9.50 85.00 7.50 2900

IOCL, DELHI IOCL, DIGBOI & GUWAHATI INDIA 09-Sep-09 2 HPX 1HPX11A S6 LIGHT NAPTHA 150.00 8.50 85.00 7.50 2900

IOCL, DELHI IOCL, DIGBOI & GUWAHATI INDIA 09-Sep-09 2 HPX 1HPX11A S6 Boiler Feed Water 150.00 5.00 21.00 3.70 1450

IOCL, DELHI IOCL, DIGBOI & GUWAHATI INDIA 09-Sep-09 2 HPX 1HPX11A S6 HYDROCARBON 70.00 18.10 65.80 11.00 2950

IOCL, DELHI IOCL, DIGBOI & GUWAHATI INDIA 09-Sep-09 2 HPX 1HPX11A S6 HYDROCARBON 165.00 7.10 74.00 7.50 2900

KAZTROYSERVICE INFRASTRUCTURE INDIA PVT LTD HPCL-MITTAL ENERGY LTD INDIA 21-Dec-09 2 HPX 1HPX11A A8 SOUR WATER 125.00 14.60 73.00 15.00 2910

JACOBS/ VIJAY TANKS, BARODA IOCL,Baroda INDIA 15-Sep-03 2 HPX 1HPX11A S6 BENZENE 45.00 8.00 83.29 11.00 2900

RELIANCE INDUSTRIES LTD RELIANCE INDUSTRIES LTD INDIA 31-Aug-04 2 HPX 1HPX11A S6 CORROSION INHIBITOR TRANSFER 65.00 5.00 19.10 2.20 1440
RELIANCE INDUSTRIES LTD, JAMNAGR RELIANCE INDUSTRIES LTD, JAMNAGR INDIA 31-Aug-04 1 HPX 1HPX11A S6 STABILITY ADDITIVE 42.00 5.00 17.00 3.70 1450

RELIANCE PETROLEUM LIMITED RELIANCE PETROLEUM LIMITED INDIA 15-Oct-07 1 HPX 1HPX11A S6 WATER 65.00 3.70 72.51 7.50 2900

RELIANCE PETROLEUM LIMITED RELIANCE PETROLEUM LIMITED INDIA 15-Oct-07 2 HPX 1HPX11A S6 CHEMICAL 60.00 3.70 72.51 7.50 2900
GUJARAT NARMADA VALLEY FERTILIZER GUJARAT NARMADA VALLEY FERTILIZER COMPANY
COMPANY LIMITED LIMITED INDIA 15-Oct-07 2 HPX 1HPX11A S6 HYDROCARBON 60.00 3.50 18.09 4.00 1445

RELIANCE INDUSTRIES LIMITED RELIANCE INDUSTRIES LIMITED INDIA 30-Sep-07 1 HPX 1HPX11A S8 SOUR WATER 80.00 8.00 17.80 3.70 1440

L & T BARODA INDIAN OIL CORPORATION LIMITED INDIA 06-Mar-08 10 HPX 1HPX11A S6 GT 47.00 12.00 83.00 15.00 2900

RELIANCE PETROLEUM LIMITED RELIANCE PETROLEUM LIMITED INDIA 26-Aug-08 1 HPX 1HPX11A S8 SOUR WATER 80.00 8.00 17.80 2.20 1475

RELIANCE INDUSTRIES LIMITED RELIANCE INDUSTRIES LIMITED INDIA 30-Oct-08 2 HPX 1HPX11A S6 WAO OFF GAS KO WATER PUMPS 50.00 15.50 76.77 15.00 2950

RELIANCE PORTS AND TERMINALS LTD RELIANCE PORTS AND TERMINALS LTD INDIA 30-Dec-08 2 HPX 1HPX11A S6 DIESEL 55.00 4.00 72.09 7.50 2900

RELIANCE PETROLEUM LTD RELIANCE PETROLEUM LTD INDIA 06-Feb-09 1 HPX 1HPX11A S8 SOUR WATER 80.00 8.00 17.80 2.20 1475

LINDE ENGINEERING INDIA PVT LTD GENERAL HOLDING CORPORATION INDIA 01-Sep-09 2 HPX 1HPX11A A8 Demineralised Water 65.00 8.00 85.00 11.00 2900

Indian Oil Corporation Limited Indian Oil Corporation Limited INDIA 21-Mar-04 2 HPX 1HPX11A S6 Hot well-Slop Oil 45.00 5.10 93.30 9.30 2900

IOCL, DELHI IOCL, DELHI INDIA 12-Mar-04 2 HPX 1HPX11A A8 WATER 55.00 17.30 57.10 11.00 2950

ENGINEERS INDIA LIMITED IOCL, PANIPAT INDIA 17-Jun-04 2 HPX 1HPX11A S6 SLOP OIL 65.30 4.40 15.10 2.20 1400

ENGINEERS INDIA LIMITED IOCL, PANIPAT INDIA 17-Jun-04 2 HPX 1HPX11A S6NACE WATER 40.00 2.80 23.20 2.20 1430

ENGINEERS INDIA LIMITED IOCL, PANIPAT INDIA 17-Jun-04 2 HPX 1HPX11A S6NACE WATER 40.00 5.80 20.20 1.50 1390

Kochi Refineries Limited Kochi Refineries Limited INDIA 14-Jun-04 2 HPX 1HPX11A S6 LPG(HC) 40.00 14.50 62.50 7.50 2900

Indian Oil Crporation Limited Indian Oil Crporation Limited INDIA 27-Jul-04 1 HPX 1HPX11A S6 HYDROCARBON 103.00 8.10 91.10 9.30 2910

PUNJ LIOYD LTD IOCL,HALDIA INDIA 18-Dec-04 2 HPX 1HPX11A S8 Separator Water 40.00 5.00 53.00 11.00 2900

PUNJ LIOYD LTD IOCL,HALDIA INDIA 18-Dec-04 2 HPX 1HPX11A S6 Lean Amine 40.00 5.90 85.55 11.00 2900

INDIAN OIL CORPORATION LIMITED INDIAN OIL CORPORATION LIMITED INDIA 01-Dec-06 1 HPX 1HPX11A S6 ISOMERALENCEIVINOF ACID (MS-SKO) 40.00 10.00 91.00 11.00 2920

ENGINEERS INDIA LIMITED HPCL,MUMBAI INDIA 04-Sep-06 2 HPX 1HPX11A S8 HC Solvent 65 2.4 77.1 11 2910

HINDUSTAN PETROLEUM CORPORATION LTD HINDUSTAN PETROLEUM CORPORATION LTD INDIA 15-Aug-06 2 HPX 1HPX11A D2 SEA WATER 15.60 5.00 71.00 9.30 2910

INDIAN OIL CORPORATION LIMITED INDIAN OIL CORPORATION LIMITED INDIA 26-Jan-07 2 HPX 1HPX11A A8 SOUR WATER 150.00 17.30 57.10 11.00 2920

IOCL HARYANA IOCL HARYANA INDIA 06-Jan-07 1 HPX 1HPX11A S6 WATER 50.00 15.00 90.00 18.50 2950

TECHNIP KT INDIA LIMITED BHARAT OMAN REFINERIES LIMITED INDIA 05-Dec-07 2 HPX 1HPX11A S6 CAUSTIC 40.00 20.70 65.80 15.00 2950
BONGAIGAON REFINERY & PETROCHEMICAL
ENGINEERS INDIA LIMITED SLIMITED INDIA 28-Mar-08 2 HPX 1HPX11A S6 STABILIZED NAPTHA 96.00 4.70 88.80 9.30 2900
BONGAIGAON REFINERY & PETROCHEMICAL
ENGINEERS INDIA LIMITED SLIMITED INDIA 28-Mar-08 2 HPX 1HPX11A S6 LP CONDENSATE 125.00 6.00 73.10 9.30 2900

ENGINEERS INDIA LIMITED BHARAT OMAN REFINERIES LIMITED INDIA 22-Jun-08 2 HPX 1HPX11A S8 WATER 55.00 13.30 69.00 11.00 2950
BONGAIGAON REFINERY & PETROCHEMICALS BONGAIGAON REFINERY & PETROCHEMICALS
LIMITED LIMITED INDIA 29-Apr-08 2 HPX 1HPX11A S8 FUEL NAPTHA PUMP 40.00 7.40 87.20 9.30 2890

ENGINEERS INDIA LIMITED BHARAT OMAN REFINERIES LIMITED INDIA 10-Apr-08 2 HPX 1HPX11A S8 WATER 55.00 4.80 69.10 7.50 2900

PUNJLOYD IOCL,HALDIA INDIA 24-Mar-08 2 HPX 1HPX11A S6 H2S 40.00 11.00 76.00 11.00 2900

ENGINEERS INDIA LIMITED ENGINEERS INDIA LIMITED INDIA 07-Jun-08 2 HPX 1HPX11A S6 SOLVENT CONDENSATE 50.00 3.80 22.80 3.70 1450

PUNJLOYD IOCL, GUJARATH INDIA 27-Feb-09 2 HPX 1HPX11A S6 CAUSTIC 40.00 5.70 69.00 11.00 2900

ENGINEERS INDIA LIMITED CHENNAI PETROLEUM CORPORATION LIMITED INDIA 27-May-09 2 HPX 1HPX11A S6 Steam Condensate 150.00 4.40 72.00 11.00 2900

TECHNIP KT INDIA LTD HPCL - MITTA ENERGY LTD INDIA 3-Nov-09 2 HPX 1HPX11A S3 - 44.00 5.30 55.00 7.50 2900

HPCL- MITTAL ENERGY LIMITED HPCL- MITTAL ENERGY LIMITED INDIA 22-Feb-10 2 HPX 1HPX11A S6 Steam Condensate 115.00 14.80 70.10 11.00 2950
HPCL- MITTAL ENERGY LIMITED HPCL- MITTAL ENERGY LIMITED INDIA 22-Feb-10 2 HPX 1HPX11A S6 Steam Condensate 65.00 11.20 91.50 15.00 2920

HPCL- MITTAL ENERGY LIMITED HPCL- MITTAL ENERGY LIMITED INDIA 22-Nov-09 2 HPX 1HPX11A S8 RECIRCULATED SOLVENT/NAPHTHA 65.00 11.20 91.50 15.00 2920

HPCL- MITTAL ENERGY LIMITED HPCL- MITTAL ENERGY LIMITED INDIA 22-Nov-09 2 HPX 1HPX11A S8 RECIRCULATED SOLVENT/NAPHTHA 65.00 15.00 91.50 15.00 2920

MARC FLOW ENGINEERS GASTECH PROCESS ENGINEERING (I) LTD INDIA 31-Mar-09 3 HPX 1HPX11A S6 HYDROCARBON 60.00 4.00 7.00 7.50 2900

MARC FLOW ENGINEERS Marc Flow Engineers 09-Aug-05 2 HPX 1HPX11A A8 R32 Day tank pump 100.00 4.30 18.50 2.20 1430

TECHNIP IOCL INDIA 21-Jan-04 1 HPX 1HPX11A S6 REFRIGERNAT(PROPANE) 45.00 2.50 15.80 5.50 1475

ENGINEERS INDIA LIMITED HPCL-VIZAG INDIA 24-Aug-04 2 HPX 1HPX11A S6 HYDROCARBON 170.00 14.70 90.20 11.00 2950

LARSEN AND TURBO LIMITED ONGC RUDRA SAGAR INDIA 27-Jun-07 2 HPX 1HPX11A S6 LP EMULSION 45.00 10.00 75.00 11.00 2920

LARSEN AND TURBO LIMITED ONGC RUDRA SAGAR INDIA 27-Jun-07 2 HPX 1HPX11A S6 FLARE KO 60.00 10.00 65.00 11.00 2900

BHARAT PETROLEUM CORPORATION LTD BHARAT PETROLEUM CORPORATION LIMITED INDIA 22-Dec-07 2 HPX 1HPX11A S6 RICH AMINE 50.00 18.00 66.30 15.00 2920

BHARAT HEAVY ELECTRICALS LIMITED BHARAT HEAVY ELECTRICALS LIMITED INDIA 11-Dec-07 2 HPX 1HPX11A C6 CONDENSATE 98.00 2.00 15.62 1.10 1450

BHARAT HEAVY ELECTRICALS LIMITED BRPL-ASSAM INDIA 30-Sep-08 2 HPX 1HPX11A C6 CONDENSATE 100.00 5.30 60.00 7.50 2900

CHENNAI PETROLEUM CORPORATION LIMITED CHENNAI PETROLEUM CORPORATION LIMITED INDIA 26-Nov-08 2 HPX 1HPX11A A8 DM WATER 65.00 5.50 71.00 9.30 2900

CHENNAI PETROLEUM CORPORATION LIMITED CHENNAI PETROLEUM CORPORATION LIMITED INDIA 26-Nov-08 2 HPX 1HPX11A S8 HC SOLVENT 65.00 6.10 74.30 7.50 2900

INDIAN OIL CORPORATION LTD- HALDIA INDIAN OIL CORPORATION LTD- HALDIA INDIA 31-Jul-04 2 HPX 1HPX11A S6 Gasoline 40.00 15.27 69.65 11.00 2910

INDIAN OIL CORPORATION LIMITED INDIAN OIL CORPORATION LIMITED INDIA 14-Apr-06 1 HPX 1HPX11A S6 LWC CRUDE PUMP 75 13.10 69.00 11.00 2920

NICCO CORPORATION LTD ONGC KARAIKAL INDIA 02-Dec-06 2 HPX 1HPX11A S6 CONDENSATE 45.00 13.40 82.34 11.00 2930

INDIAN OIL CORPORATION LIMITED INDIAN OIL CORPORATION LIMITED- BARUANI INDIA 05-Dec-06 2 HPX 1HPX11A S8 SOLVENT 65.00 12.10 81.50 11.00 2900

JINDAL STEEL & POWER LTD JINDAL STEEL & POWER LTD INDIA 20-Apr-10 2 HPX 1HPX11A S6 H2S LADEN METHANOL 44 9.7 50.9 7.5 2900

FLOWSERVE S.A FLOWSERVE S.A ARGENTINA 20-Feb-02 4 HPX 1HPX11A C6 HYDROCARBON 450.00 8.40 77.80 11.00 2900

FLOWSERVE S.A FLOWSERVE S.A ARGENTINA 20-Feb-02 2 HPX 1HPX11A S6 HYDROCARBON 100.00 6.20 34.00 2.20 2900

FLOW SERVE PTE LTD TOYO ENGINEERING / RUSSIA 10-Jun-02 2 HPX 1HPX11A 0.00 0.00 0.00 0.00 0

FLOWSERVE PTE LTD LUNDIN MALAYSIA LIMITED 22-Sep-02 2 HPX 1HPX11A S6 32.00 20.00 85.00 15.00 2950

CHENG CHEN MACHINERY CO LTD, TAIWAN CHINESE PETROLEUM CORP. TAIWAN 31-Jul-03 4 HPX 1HPX11A S6 HYDROCARBON 140.00 22.90 115.00 30.00 3540

NILGATA WORTHING TON CO LTD NILGATA WORTHING TON CO LTD SINGAPORE 15-Oct-03 1 HPX 1HPX11A S6 16.00 20.00 80.00 15.00 2950

FPD SINGAPORE M/S SCHENKER (FREIGHT FORWADER) SINGAPORE 10-Apr-03 2 HPX 1HPX11A S6 WILD NAPHTHA 46.00 26.00 96.00 15.00 3540

FLOW SERVE PUMP DIVISION FLOW SERVE PUMP DIVISION 30-Apr-04 2 HPX 1HPX11A S6 OTHER 66.00 13.60 67.00 7.23 2900

FLOW SERVE PUMP DIVISION FLOW SERVE PUMP DIVISION 30-Apr-04 1 HPX 1HPX11A S6 HYDROCARBON 63.00 13.70 62.70 8.08 2900

THOMPSONS KELLY & LEWIS THOMPSONS KELLY & LEWIS AUSTRALIA 19-Sep-04 1 HPX 1HPX11A S6 HYDROCARBON 40.00 9.80 54.50 33.60 2900

FPD SINGAPORE PTE LTD UNACOL LTD SINGAPORE 1 HPX 1HPX11A S6 OTHER 49.00 4.50 24.60 3.70 1750

FPD AUSTRALIA BP REFINERY- Bulwar Isaland AUSTRALIA 20-Apr-05 2 HPX 1HPX11A S6NACE SLOP OIL 40.00 16.80 77.00 11.00 2950

FLOW SERVE Pte LTD FLOW SERVE Pte LTD 2 HPX 1HPX11A S6 0.00 0.00 0.00 0.00 0

ADVANCE POWER TRADE SDN BHD CIF SUDAN PORT 11-May-05 2 HPX 1HPX11A S8 HYDROCARBON 90.00 250.00 68.00 11.00 2900

ADAVANCE POWER TRADESON BHD CIF SUDAN PORT SUDAN 05-Nov-05 2 HPX 1HPX11A S8 HYDROCARBON 90.00 11.80 68.00 9.17 2900

FLOWSERVE PUMP DIVISION(TKL) FLOWSERVE PUMP DIVISION(TKL) 06-Dec-05 1 HPX 1HPX11A A8 CHEMICAL 60.00 2.00 6.60 4.00 965

DAIREN CHEMICAL CORPORATION DAIREN CHEMICAL CORPORATION TAIWAN 10-May-06 2 HPX 1HPX11A A8 WATER 25.00 6.70 135.00 18.50 3560
FLOWSERVE VERNON OPERATIONS FLOWSERVE VERNON OPERATIONS 27-Jun-06 2 HPX 1HPX11A S6 WATER 38.00 13.90 23.70 4.00 1770

FLOWSERVE VERNON OPERATIONS FLOWSERVE VERNON OPERATIONS 18-Aug-06 1 HPX 1HPX11A C6 0.00 0.00 0.00 0.00 0

FLOWSERVE S.A FLOWSERVE S.A 18-Sep-06 2 HPX 1HPX11A S6 HYDROCARBON 75.00 8.70 71.00 11.00 2900

CTCI OVER SEAS CTCI CORPORATION 16-Mar-07 2 HPX 1HPX11A S6 0.00 4.34 60.30 11.00 2900

CTCI OVER SEAS CTCI CORPORATION 16-Mar-07 1 HPX 1HPX11A S6 0.00 4.37 59.70 7.50 2900

CTCI OVER SEAS CTCI CORPORATION 16-Mar-07 1 HPX 1HPX11A S6 0.00 4.37 59.70 7.50 2900

CTCI OVER SEAS CTCI CORPORATION 16-Mar-07 2 HPX 1HPX11A S6 0.00 4.48 75.00 11.00 2900

FLOWSERVE PUMP DIVISION(TKL) FLOWSERVE PUMP DIVISION(TKL) 06-Jul-07 2 HPX 1HPX11A A8 45.00 0.00 0.00 7.50 2900

CTCI CORPORATION CTCI CORPORATION 19-Oct-07 1 HPX 1HPX11A A8 CHEMICAL 102.00 6.50 61.90 11.00 2900

CTCI CORPORATION CTCI CORPORATION 19-Oct-07 1 HPX 1HPX11A A8 CHEMICAL 70.00 6.50 61.90 11.00 2900

MEHTA FLOW SDN BHD MEHTA FLOW SDN BHD 11-Jun-07 2 HPX 1HPX11A S6 CLOSED DRAIN TRANSFER 68.00 5.00 86.40 11.00 2900

AKDENIZ AKARYAKIT DEPOLAMA NAK TIC A.S AKDENIZ AKARYAKIT DEPOLAMA NAK TIC A.S 01-Oct-07 2 HPX 1HPX11A S6 OTHER 40.00 5.00 65.79 7.50 2900

AKDENIZ AKARYAKIT DEPOLAMA NAK TIC A.S AKDENIZ AKARYAKIT DEPOLAMA NAK TIC A.S 01-Oct-07 2 HPX 1HPX11A S6 OTHER 40.00 10.00 59.81 11.00 2900

CPC CPC 31-Dec-07 2 HPX 1HPX11A C6 0.00 0.00 0.00 0.00 0

FLOWSERVE PVT LTD FLOWSERVE PVT LTD JAPAN 14-Dec-07 2 HPX 1HPX11A S6 HYDROCARBON 216.00 5.00 23.60 4.00 1740
MODEC OFFSHORE PRODUCTION SYSTEMS
PTE LTD MODED OFFSHORE PRODUCTION SYSTEMS PTE LTD USA 27-Jan-08 1 HPX 1HPX11A S6 HYDROCARBON 70.00 5.40 23.60 3.70 1740
MODEC OFFSHORE PRODUCTION SYSTEMS
PTE LTD MODED OFFSHORE PRODUCTION SYSTEMS PTE LTD USA 27-Jan-08 2 HPX 1HPX11A S6 LEAN MEG BOOSTER PUMP 40.00 2.50 32.30 3.70 1770

FLOWSERVE PVT LTD FLOWSERVE PVT LTD ARGENTINA 04-Jan-08 2 HPX 1HPX11A S6 HYDROCARBON 10.00 5.50 56.30 10.00 2900
GRAND ALPHA INTERNATIONAL
CORPORATION GRAND ALPHA INTERNATIONAL CORPORATION TAIWAN 19-Mar-08 2 HPX 1HPX11A S6 HYDROCARBON 30.00 2.50 31.30 3.00 1740

ENSERV SDN BHD MALAYSIAN REFINING COMPANY MALAYSIA 02-Sep-08 2 HPX 1HPX11A C6 STEAM CONDENSATE 204.00 9.00 83.10 11.00 2900

FLOWSERVE PUMP DIVISION(TKL) FLOWSERVE PUMP DIVISION(TKL) AUSTRALIA 18-Jul-08 1 HPX 1HPX11A S8 HYDROCARBON 29.00 21.00 76.40 15.00 2950

KANG CHUAN ENGINEERING CHINESE PETROLEUM CORPORATION CHINA 10-Nov-08 2 HPX 1HPX11A S6 HYDROCARBON 43.00 16.10 84.00 11.00 3540

KANG CHUAN ENGINEERING CHINESE PETROLEUM CORPORATION CHINA 10-Nov-08 2 HPX 1HPX11A S6 HYDROCARBON 43.00 5.10 110.00 18.50 3480

FLOWSERVE PTE LTD FLOWSERVE PTE LTD SINGAPORE 31-Jul-08 2 HPX 1HPX11A S6 DIESEL TRANSFER PUMP 65.00 13.20 58.00 11.00 2950
GRAND ALPHA INTERNATIONAL
CORPORATION CHINESE PETROLEUM CORPORATION TAIWAN 26-Aug-08 2 HPX 1HPX11A S6 HYDROCARBON 20.00 16.50 98.50 22.00 3480

TCI SANMAR CHEMICALS LLC TCI SANMAR CHEMICALS LLC EGYPT 12-May-09 2 HPX 1HPX11A S8 100 10 67.16 11.00 2900

FLOWSERVE FLUID MOTION CONTROL (SUZHOU) CORP


FLOWSERVE
LTD FLUID MOTION CONTROL (SUZHOU) CORP LTD CHINA 6-Apr-09 2 HPX 1HPX11A S6 HYDROCARBON 160 8.6 12.8 1.50 1475

CTCI CORPORATION CTCI CORPORATION TAIWAN 31-Aug-09 2 HPX 1HPX11A S6 38 22 129.5 22.00 3540

CTCI CORPORATION CTCI CORPORATION TAIWAN 31-Aug-09 2 HPX 1HPX11A S6 40 22.5 65.4 15.00 3540

CTCI CORPORATION CTCI CORPORATION TAIWAN 31-Aug-09 2 HPX 1HPX11A S6 230 11 72.7 15.00 3480

CTCI CORPORATION CTCI CORPORATION TAIWAN 31-Aug-09 2 HPX 1HPX11A A8 280 11 72.2 15.00 3480

CTCI CORPORATION CHINESE PETROLEUM CORPORATION TAIWAN 30-Apr-10 2 HPX 1HPX11A S6 HYDROCARBON 30 18 92.3 18.50 3540
MANGALORE REFINERY AND
MANGALORE REFINERY AND PETROCHEMICALS LTD INDIA 17-Jan-10 2 HPX 1HPX11A S6 HYDROCARBON 180 20.3 77.4 15.00 2920
PETROCHEMICALS LTD
FLOWSERVE POMPES ALSTOM SHOIBA-PHASE III PROJECT ARNAGE 4-Jan-10 2 HPX 1HPX11A S8 DOMESTIC WATER 35 7.8 75.0 15.00 3480
CHEMPLAST SANMAR, CHENNAI TCI SANMAR CHEMICALS EGYPT 31-Dec-09 2 HPX 1HPX11A A8 VCM 20 10.0 20.0 4.00 1430
CHEMPLAST SANMAR, CHENNAI TCI SANMAR CHEMICALS EGYPT 31-Dec-09 1 HPX 1HPX11A A8 AQUEOUS 50 10.0 68.9 11.00 2920
JINDAL STEEL & POWER LTD JINDAL STEEL & POWER LTD INDIA 20-Jul-10 2 HPX 1HPX11A A8 PHENOLIC PITCH 185 7.0 57.1 7.50 2900
IOCL, DIGBOI IOCL, DIGBOI INDIA 18-Mar-10 1 HPX 1HPX11A S6 STABILISED CONDENSATE 50 10.0 71.4 11.00 2900
LARSEN & TOUBRO LTD MANGALORE REFINERY AND PETROCHEMICALS LTD INDIA 8-Jul-10 1 HPX 1HPX11A S6 CONDENSATE 175 10.0 60.0 9.30 2900
JINDAL STEEL & POWER LTD JINDAL STEEL & POWER LTD INDIA 5-Oct-10 2 HPX 1HPX11A A8 PHENOLIC PITCH 210 11.0 60.7 11.00 2950
JINDAL STEEL & POWER LTD JINDAL STEEL & POWER LTD INDIA 5-Oct-10 2 HPX 1HPX11A S8 CAUSTIC SODA 75 15.4 57.5 18.50 2950
MANGALORE REFINERY AND PETROCHEMICALS LTD
MANGALORE REFINERY AND PETROCHEMICALS LTD INDIA 9-Aug-10 2 HPX 1HPX11A S6 CAUSTIC SOLUTION(15WT%) 65 14.3 59.6 11.00 2950
MANGALORE REFINERY AND PETROCHEMICALS LTD
MANGALORE REFINERY AND PETROCHEMICALS LTD INDIA 9-Aug-10 2 HPX 1HPX11A S6 CAUSTIC 65 17.0 71.6 15.00 2950
JINDAL STEEL & POWER LTD JINDAL STEEL & POWER LTD INDIA 17-Jun-10 1 HPX 1HPX11A S6 FRESH METHANOL 130 5.5 55.49 7.50 2900
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP TO FOLLOW ABU DHABI 20-Jul-10 2 HPX 1HPX11A S6 - 52 5.0 20.0 1.50 1450
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP TO FOLLOW ABU DHABI 20-Jul-10 2 HPX 1HPX11A S6 - 52 5.0 20.0 1.50 1450
ENGINEERS INDIA LTD BRAHMAPUTRA CRACKER & POLYMER LTD INDIA 26-Sep-10 2 HPX 1HPX11A S6 LP STEAM CONDENSATE 220 5.6 79.0 11.00 2900
HINDUSTAN PETROLEUM CORPORATION LTD HINDUSTAN PETROLEUM CORPORATION LTD INDIA 1-Jun-10 3 HPX 1HPX11A S6 20 WT% CAUSTIC SOLUTION 100 5.0 82.3 15.00 2900
ESSAR CONSTRUCTIONS ESSAR CONSTRUCTIONS INDIA 26-Jul-10 2 HPX 1HPX11A S8 SOUR WATER CONTAINING TRACES OF AMINE 55 3.1 17.3 1.50 1450
IOCL NOIDA IOCL NOIDA INDIA 5-Aug-10 1 HPX 1HPX11A S6 CURDE OIL 20 15.0 90.0 18.50 2950
IOCL DELHI IOCL PARADIP INDIA 19-Jan-11 2 HPX 1HPX11A A8 - 75 8.0 89.8 15.00 2910
IOCL DELHI IOCL PARADIP INDIA 8-Jan-11 2 HPX 1HPX11A A8 SOUR WATER 113 5.0 57.7 7.50 2895
IOCL DELHI IOCL PARADIP INDIA 5-Jan-11 2 HPX 1HPX11A ALLOY 20 SPENT ACID 38 5.2 78.7 18.50 2900
IOCL DELHI IOCL PARADIP INDIA 22-Feb-11 2 HPX 1HPX11A S6 LPG (HC+H2S+H2O) 47 23.2 82.0 9.30 2950
IOCL DELHI IOCL PARADIP INDIA 22-Feb-11 2 HPX 1HPX11A S6 WILD NAPTHA (HC+H2S+H2O) 47 12.0 69.0 9.30 2920
IOCL DELHI IOCL PARADIP INDIA 14-Jan-11 2 HPX 1HPX11A S8 PURGE WATER 33 9.0 70.3 15.00 2900
GULF FARABI PETROCHEMICAL COMPANY GULF FARABI PETROCHEMICAL COMPANY SAUDI ARABIA 9-Feb-11 1 HPX 1HPX11A S6 HOT OIL 260 4.7 19.7 2.20 1740
IOCL MATHURA IOCL MATHURA INDIA 8-Mar-11 2 HPX 1HPX11A S6 - 80 8.0 77.2 15.00 2900
FUTAI ENGINEERING CO LTD CHINESE PETROLEUM CORPORATION TAIWAN 30-May-11 2 HPX 1HPX11A S6 HYDROCARBON 180 25.0 105.0 18.50 3540
FUTAI ENGINEERING CO LTD CHINESE PETROLEUM CORPORATION TAIWAN 30-May-11 1 HPX 1HPX11A S6 HYDROCARBON 100 24.0 95.0 30.00 3540
IOCL GUJARAT IOCL GUJARAT INDIA 3-May-11 2 HPX 1HPX11A S6 DM WATER - - - 11.00 -
ENGINEERS INDIA LTD BRAHMAPUTRA CRACKER & POLYMER LTD INDIA 14-Jul-11 2 HPX 1HPX11A S6 HYDROCARBON 340 5.2 81.7 15.00 2900
ENGINEERS INDIA LTD BRAHMAPUTRA CRACKER & POLYMER LTD INDIA 14-Jul-11 2 HPX 1HPX11A S6 C6-C8 HYDROCARBONS 165 12.9 70.7 11.00 2950
LARSEN & TOUBRO LTD ONGC MANGALORE PETROCHEMICAL LTD INDIA 20-Aug-11 2 HPX 1HPX11A S6 HYDROCARBON 120 5.9 71.6 5.50 2880
TECHNIP FRANCE QATAR GAS - PMP PROJECT (QATAR) QATAR 9-Sep-11 1 HPX 1HPX11A A8 - 155 10.0 20 3.00 1475
ONGC MANGALORE PETROCHEMICALS LTD ONGC MANGALORE PETROCHEMICALS LTD INDIA 18-Aug-11 2 HPX 1HPX11A S6 SULFOLANC, WATER & AROMATICS 38 6.7 69.6 7.50 2900
ONGC MANGALORE PETROCHEMICALS LTD ONGC MANGALORE PETROCHEMICALS LTD INDIA 18-Aug-11 2 HPX 1HPX11A S6 AROMATIC HYDROCARBON 40 20.8 64.2 11.00 2950
IOT INFRASTRUCTURE & ENERGY SERVICES LTD CAIRN ENERGY INDIA PVT LTD INDIA 7-Jul-11 2 HPX 1HPX11A S6 - 40 10.0 1.5barg 3.70 1475
ENGINEERS INDIA LTD BRAHMAPUTRA CRACKER & POLYMER LTD INDIA 16-Dec-11 1 HPX 1HPX11A A8 HYDROCARBON 80.0 4.0 62.0 5.50 2900
TECHNIP KT INDIA BPCL, Mumbai INDIA 19-Aug-11 2 HPX 1HPX11A A8 DEMINERALIZED WATER 40 9.1 55.5 11.00 2900
MATIX FERTILIZERS & CHEMICALS MATIX FERTILIZERS & CHEMICALS INDIA 20-Oct-11 2 HPX 1HPX11A S6(LCB) - 80 23.0 66.2 11.00 2950
KAZSTROYSERVICE INFRASTRUCTURE INDIA PVT, LTD OIL & NATURAL GAS CORPORATION INDIA 30-Sep-11 1 HPX 1HPX11A S6 - 44 3.0 13.7 4.00 1450
KAZSTROYSERVICE INFRASTRUCTURE INDIA PVT, LTD OIL & NATURAL GAS CORPORATION INDIA 30-Sep-11 1 HPX 1HPX11A S6 - 44 3.0 13.7 4.00 1450
SNC-LAVALIN Engineering India Pvt Ltd Numaligarh Refinery Ltd INDIA 14-Dec-11 2 HPX 1HPX11A S6 - 178 17.5 85.0 11.00 2950
PETROFAC International (UAE) LLC SC TURKMENGAS UAE 13-Mar-12 2 HPX 1HPX11A A8 - 115 8.2 76.6 11.00 2900
Flowserve Desio SAIPEM, S.P.A DESIO 30-Jul-12 2 HPX 1HPX11A S6 120 8.8 65.0 11.00 3480
Flowserve Desio SAIPEM, S.P.A DESIO 30-Jul-12 2 HPX 1HPX11A S6 - 50 8.2 72.0 7.50 3480
Flowserve Desio SAIPEM, S.P.A DESIO 30-Jul-12 2 HPX 1HPX11A S6 - 59 20.6 75.0 11.00 3540
Flowserve Desio SAIPEM, S.P.A DESIO 30-Jul-12 1 HPX 1HPX11A A8 - 285 11.0 27.0 4.00 1770
Flowserve Desio SAIPEM, S.P.A DESIO 30-Jul-12 1 HPX 1HPX11A A8 - 285 11.0 27.0 4.00 1770
Essar Engineering India Ltd Essar Engineering India Ltd INDIA 16-May-12 1 HPX 1HPX11A A8 WET SLOP OIL 37 6.0 75 7.50 2900
Essar Engineering India Ltd Essar Engineering India Ltd INDIA 16-May-12 1 HPX 1HPX11A A8 WET SLOP OIL 37 6.0 75 7.50 2900
ENGINEERS INDIA LIMITED GSPC INDIA 6-Mar-12 1 HPX 1HPX11A S6 - 65 7.0 85 15.00 2900
ENGINEERS INDIA LIMITED GSPC INDIA 6-Mar-12 1 HPX 1HPX11A S6 - 65 7.0 85 15.00 2900
IOCL DIGBOI IOCL DIGBOI INDIA 6-Jun-12 2 HPX 1HPX11A S6 - 80 7.0 76.3 11.00 2900
FLOWSERVE SAUDI ARABIA EPPM SAUDI ARABIA 31-May-12 2 HPX 1HPX11A S6 - 250 10.0 19.63 4.00 1770
FLOWSERVE SAUDI ARABIA EPPM SAUDI ARABIA 31-May-12 2 HPX 1HPX11A S6 - 320 15.0 110.05 18.50 3480
ENSERVE SDN. BHD KEBABANGEN PETROLEUM OPERATING CO SDN BHD Malaysia 3-Aug-12 2 HPX 1HPX11A D2 - 115 17.8 75.4 15.00 2950
CPCL CHENNAI CPCL CHENNAI INDIA 22-Oct-12 2 HPX 1HPX11A S6 HYDROCARBON 44 20.0 66 7.50 2950
FLOWSERVE NIIGATA FORMOSA PETROCHEMICAL JAPAN 10-Oct-12 2 HPX 1HPX11A S6 Hydrocarbon 139 10.1 59 11.20 3480
FLOWSERVE NIIGATA FORMOSA PETROCHEMICAL JAPAN 10-Oct-12 2 HPX 1HPX11A S6 HC+SOLVENT 67 13.3 79 11.20 3480
FLOWSERVE NIIGATA FORMOSA PETROCHEMICAL JAPAN 10-Oct-12 2 HPX 1HPX11A S6 Hydrocarbon 53 12.3 75 11.20 3480
FLOWSERVE NIIGATA FORMOSA PETROCHEMICAL JAPAN 10-Oct-12 2 HPX 1HPX11A S6 Hydrocarbon 98 12.4 78 14.90 3480
HPCL Vizag HPCL Vizag INDIA 12-Feb-13 2 HPX 1HPX11A A8 RICH AMINE 110 20.0 51.02 11.00 2930
HPCL Vizag HPCL Vizag INDIA 12-Feb-13 2 HPX 1HPX11A A8 RICH AMINE 110 20.0 51.02 11.00 2930
MARC FLOW ENGINEERS HPCL KADAPA INDIA 16-Oct-12 1 HPX 1HPX11A S6 BENZINE / GASOLINE 50 12.0 64.37 9.30 2900
TCI SANMAR CHEMICALS S.A.E TCI SANMAR CHEMICALS S.A.E EGYPT 4-May-13 1 HPX 1HPX11A A8 VCM LIQUID 20 10.0 20.01 4.00 1430
ENGINEERS INDIA LTD IOCL Panipat INDIA 18-Jun-13 2 HPX 1HPX11A S6 HC + POLYMER & HEXANE 60 13.4 92 9.30 2920
RELIANCE MUMBAI RELIANCE DAHEJ INDIA 18-May-13 2 HPX 1HPX11A S6 EDC 105 5.0 13.37 4.00 1440
MARC FLOW ENGINEERS ENGINEERS INDIA LTD INDIA 30-Apr-13 4 HPX 1HPX11A S6 BOILER FLOW DOWN WATER 150 16.3 75 15.00 2950
RELIANCE INDUSTRIES RELIANCE NAGOTHANE PROJECT INDIA 23-Jul-13 2 HPX 1HPX11A S6 HYDROCARBON 160 4.5 20.5 3.70 1450
SAMSUNG ENGINEERING CO LTD Takreer UAE 18-Mar-14 2 HPX 1HPX11A S-6 HT Slurry to CB Train-1 90 9.0 54 11.00 2900
SAMSUNG ENGINEERING CO LTD Takreer UAE 18-Mar-14 2 HPX 1HPX11A S-6 HT Slurry to CB Train 2 90 9.0 56 11.00 2900
SAMSUNG ENGINEERING CO LTD Takreer UAE 18-Mar-14 2 HPX 1HPX11A S-6 HC Flare KO Drum Water Pumps 200 5.0 55 11.00 2900
SAMSUNG ENGINEERING CO LTD Takreer UAE 18-Mar-14 2 HPX 1HPX11A S-6 Caustic Addition Pump 50 12.5 63.9 15.00 2900
SAMSUNG ENGINEERING CO LTD Takreer UAE 18-Mar-14 2 HPX 1HPX11A A8 50% Fresh Caustic 40 10.0 18 4.00 1475
SAMSUNG ENGINEERING CO LTD Takreer UAE 9-May-14 2 HPX 1HPX11A S6 Recovered Condensate 105 22.0 84 15.00 2950
WORTHINGTON S.R.L WORTHINGTON S.R.L DESIO 15-Jan-14 2 HPX 1HPX11A S6 HYDROCARBON 120 8.5 76.8 11.00 2900
WORTHINGTON S.R.L WORTHINGTON S.R.L DESIO 15-Jan-14 2 HPX 1HPX11A S6 HYDROCARBON 135 15.0 62.8 11.00 2950
WORTHINGTON S.R.L WORTHINGTON S.R.L DESIO 15-Jan-14 2 HPX 1HPX11A S6 HYDROCARBON 325 14.8 65.3 15.00 2900
SIEMENS PTE LTD PETROLEUM DEVELOPMENT OMAN Singapore 7-Nov-13 2 HPX 1HPX11A A8 PRODUCED WATER FEED PUMP 82 20.0 66.01 15.00 2915
HPCL Vizag HPCL Vizag INDIA 26-Sep-13 2 HPX 1HPX11A A8 RICH AMINE 110 20.0 51.02 11.00 2930
MARC FLOW ENGINEERS HPCL, VAPOUR RECOVERY UNIT, KADAPA INDIA 18-Jul-13 1 HPX 1HPX11A S6 MS / GASOLINE - VRS 50 12.0 64.37 9.30 2900
TECHNIP MMHE (MALIKAI) JOINT VENTURE SABAH SHELL PETROLEUM COMPANY LTD Malaysia 2-Apr-14 2 HPX 1HPX11A A8 GTG DIESEL TRANSFER PUMPS 50 10.0 87.2 15.00 2930
IOCL GUJARAT IOCL GUJARAT INDIA 19-Nov-13 2 HPX 1HPX11A S8 WATER WITH HIGH AMINE AND SULFIDE 1.04 10.0 76.92 11.00 2900
WORTHINGTON S.R.L DANGOTE FERTILIZER LTD, SAIPEM DESIO 18-Aug-14 4 HPX 1HPX11A A8 OH CONDENSATE PUMP 70 15.0 53 11.00 2950
MARC FLOW ENGINEERS ISGEC/BORL INDIA 8-Jun-14 2 HPX 1HPX11A S6 BOILER BLOW DOWN WATER 150 24.0 76.30 18.50 2950
IOCL GUWAHATI IOCL GUWAHATI INDIA 4-Oct-13 2 HPX 1HPX11A S6 CFO PRODUCT PUMP 400 15.5 84.5 15.00 2950
CRAB & TAUR ENGINEERS PVT LTD PETROLEUM DEVELOPMENT OMAN L.L.C INDIA 24-Aug-14 6 HPX 1HPX11A A8 Cooling water pump 70 13.0 49.5 11.00 2900
MIT SUBISHI INTERNATIONAL NGHI SON REFINERY AND PETROCHEMICAL LLC VIETNAM 15-Feb-15 2 HPX 1HPX11A S8 AMINE WASH WATER 92 22.0 63 15.00 2950
JGCS CONSORTIUM NGHI SON REFINERY AND PETROCHEMICAL LLC VIETNAM 31-May-15 2 HPX 1HPX11A S6 CONDENSATE PUMPS 130 13.0 69 15.00 2900
DAELIM-PETROFAC JOINT ORPIC/SOHAR REFINERY KOREA 30-Apr-15 2 HPX 1HPX11A A8 SPENT CAUSTIC PUMPS 35 17.9 71.5 15.00 2950
DAELIM-PETROFAC JOINT ORPIC/SOHAR REFINERY KOREA 30-Apr-15 2 HPX 1HPX11A S6 LPG PRODUCT RECYCLE PUMP 39 7.7 75.7 5.50 2900
DAELIM-PETROFAC SRIP JOINT VENTUREOMAN OIL REFINARIES & PETROLIUM INDUSTRIES COMPANY UAE 13-May-15 2 HPX 1HPX11A S6 Wet Flare K.O. Drum Pumps 50 20.0 68.4 11.00 2950
MARC FLOW ENGINEERS RELIANCE INDUSTRIES DAHEJ INDIA 5-Jul-15 1 HPX 1HPX11A S6 BENZENE 47 7.0 19.61 4.00 1450
FLUOR LTD KUWAIT NATIONAL PETROLEUM COMPANY KUWAIT 2-Nov-16 6 HPX 1HPX11A A-8 Reflux Pumps 170 17.2 57.1 11.00 2950
FLUOR LTD KUWAIT NATIONAL PETROLEUM COMPANY KUWAIT 2-Nov-16 2 HPX 1HPX11A S-8 ACID GAS FLARE KO DRUM PUMP 90 11.4 64.2 11.00 2900
CHEMIE-TECH LLC SAFER EXPLORATION AND PRODUCTION COMPANY YEMEN 8-Sep-15 2 HPX 1HPX11A S-6 FUEL (DIESEL) TRANSFER PUMPS 10 15.0 70.72 11.00 2950
CHEMIE-TECH LLC SAFER EXPLORATION AND PRODUCTION COMPANY YEMEN 8-Sep-15 HPX 1HPX11A S-6 FUEL (DIESEL) TRANSFER PUMPS 40 15.0 66.79 11.00 2950
FLOWSERVE NIIGATA STAR REFINERY (SOCAR) JAPAN 2-Nov-15 2 HPX 1HPX11A S-6 HYDROCARBON 42 23.5 77 7.50 2950
FLOWSERVE NIIGATA STAR REFINERY (SOCAR) JAPAN 2-Nov-15 2 HPX 1HPX11A S-6 HOT CONDENSATE PUMP 153 17.5 72 14.90 2950
FLOWSERVE NIIGATA STAR REFINERY (SOCAR) JAPAN 2-Nov-15 2 HPX 1HPX11A S-6 HYDROCARBON/FLARE WATER 100 20.0 76 15.00 2950
FLOWSERVE NIIGATA STAR REFINERY (SOCAR) JAPAN 2-Nov-15 1 HPX 1HPX11A S-6 HOT OIL FEED PUMP 360 15.0 47 15.00 2940
FLOWSERVE NIIGATA STAR REFINERY (SOCAR) JAPAN 2-Nov-15 2 HPX 1HPX11A S-6 HOT CONDENSATE 111 21.8 72 15.00 2950
FLOWSERVE NIIGATA STAR REFINERY (SOCAR) JAPAN 2-Nov-15 2 HPX 1HPX11A S-6 REFORMATE NAPHTHA INTERMEDIATE 80 18.0 66 11.20 2950
MARC FLOW ENGINEERS MARC FLOW ENGINEERS INDIA 5-Sep-15 1 HPX 1HPX11A S-6 MS/GASOLINE - VRS 50 12.0 64.37 9.30 2900
JACOBS NETHERLANDS B.V MAADEN WAAD AL SHAMAL PHOSPHATE COMPANY S-6
SAUDI ARABIA 12-Apr-16 2 HPX 1HPX11A FUEL OIL TRANSFER PUMPS 40 24 74 18.5 3540
CTCI CORPORATION CHINESE PETROLEUM CORPORATION TAIWAN 24-May-16 2 HPX 1HPX11A S8 SOUR WATER 48 21.4 62.3 15.00 3540
FLOWSERVE AI RUSHAID CO LTD SAUDI ARAMCO SAUDI ARABIA 12-Jul-15 2 HPX 1HPX11A PROPANE COMPRESSOR KO DRUM PUMPS 7 12.6 22.3 3.73 1770
FLOWSERVE AI RUSHAID CO LTD SAUDI ARAMCO SAUDI ARABIA 12-Jul-15 2 HPX 1HPX11A LP CONDENSATE FLASH DRUM PUMP 145 25.6 91.9 22.40 3540
FLOWSERVE FLOWSERVE JAPAN JAPAN 7-Sep-15 2 HPX 1HPX11A A8(NACE) REFLUX 170 14.0 68 15.00 2950
FLOWSERVE FLOWSERVE JAPAN JAPAN 26-Jul-15 2 HPX 1HPX11A S8 FLARE WATER KO DRUM PUMP 103 10.0 60.25 11.20 2900
ENGINEERS INDIA LTD CPCL MANALI INDIA 7-Feb-15 2 HPX 1HPX11A S-6 (NACE) Sour Water Pump 150 22.5 69.8 15.00 2950
ENGINEERS INDIA LTD CPCL MANALI INDIA 7-Feb-15 2 HPX 1HPX11A S-6 (NACE) LPG Wash Wtr Circulation Pumps 85 5.3 56.4 7.50 2900
ENGINEERS INDIA LTD CPCL MANALI INDIA 7-Feb-15 2 HPX 1HPX11A S8 Fresh Solvent Pumps 65 8.2 77 7.46 2900
ENGINEERS INDIA LTD CPCL MANALI INDIA 7-Feb-15 2 HPX 1HPX11A S8 Inter Stage Caustic Pump 65 5.4 57.1 11.20 2900
MARC FLOW ENGINEERS INDIA 15-Oct-14 1 HPX 1HPX11A S6 BENZIN / GASOLINE 60 7.5 68.2 7.50 2900
PETROFAC INTERNATIONAL LIMITED Kuwait Oil Company(K.S.C) KUWAIT 31-Dec-16 2 HPX 1HPX11A A8 POTABLE WATER PUMP 80 16.5 66 15.00 2950
RELIANCE INDUSTRIES LTD HAZIRA RELIANCE INDUSTRIES LTD HAZIRA INDIA 28-Sep-16 2 HPX 1HPX11A S6 STEAM CONDENSATE 270 4.3 75.3 11.00 2900
RELIANCE INDUSTRIES LTD HAZIRA RELIANCE INDUSTRIES LTD HAZIRA INDIA 28-Sep-16 1 HPX 1HPX11A S6 METHANOL 135 6.5 16.07 4.00 1450
TECHNIP KT INDIA ONGC KAKINADA INDIA 14-Apr-16 2 HPX 1HPX11A S6 DIESEL FEED PUMPS 65 6.0 20.6 4.00 1450
TECHNIP KT INDIA ONGC KAKINADA INDIA 14-Apr-16 2 HPX 1HPX11A S6 DIESEL TRANSFER PUMPS 65 7.5 19.5 4.00 1450
INDIAN OIL CORPORATION LTD INDIAN OIL CORPORATION LTD INDIA 20-Apr-16 2 HPX 1HPX11A S8 NACE FLARE KOD PUMPS 150 15.0 87.7 18.50 2950
INDIAN OIL CORPORATION LTD INDIAN OIL CORPORATION LTD INDIA 20-Apr-16 2 HPX 1HPX11A S8 NACE BLOWDOWN CONDENSATE OIL 60 5.0 50 11.00 2930
NUBERG ENGINEERING LTD ADDAR SPECIALTY CHEMICAL PRODUCTION SAUDI ARABIA 12-Apr-16 2 HPX 1HPX11A A-8 SO2 Stripper Bottom Pump 61 10.3 23 4.00 1770
NUBERG ENGINEERING LTD ADDAR SPECIALTY CHEMICAL PRODUCTION SAUDI ARABIA 12-Apr-16 2 HPX 1HPX11A A-8 Neutalizer Circulation Pump 50 12.8 30 4.00 1770
NUBERG ENGINEERING LTD ADDAR SPECIALTY CHEMICAL PRODUCTION SAUDI ARABIA 12-Apr-16 2 HPX 1HPX11A A-8 Sour IPA Transfer Pump 40 24.0 73.45 15.00 3540
HPCL-MITTAL ENERGY LTD HPCL-MITTAL ENERGY LTD INDIA 24-Oct-16 2 HPX 1HPX11A S6(NACE) FRESH CAUSTIC CIRCULATION PUMP 42 10.0 20 4.00 1475
HPCL-MITTAL ENERGY LTD HPCL-MITTAL ENERGY LTD INDIA 24-Oct-16 2 HPX 1HPX11A S6 WASH WATER RECIRCULATION PUMP 43 10.0 22 4.00 1475
ENGINEERS INDIA LTD ONGC INDIA 7-Oct-16 2 HPX 1HPX11A S6 LSHS PUMP 80 22.0 80 18.50 2950
NUMALIGARH REFINERY LTD NUMALIGARH REFINERY LTD INDIA 9-Oct-16 2 HPX 1HPX11A S8 STRIPPER REFLUX PUMP 100 10.8 54.1 7.46 2900
NUMALIGARH REFINERY LTD NUMALIGARH REFINERY LTD INDIA 9-Oct-16 2 HPX 1HPX11A A8 QUENCH WATER 200 19.9 89.6 18.60 2950
ROTEK ENG HPCL-MITTAL ENERGY LTD INDIA 22-Sep-16 2 HPX 1HPX11A S6 HYDROCARBON 125 11.0 70 11.00 2900
ROTEK ENG HPCL-MITTAL ENERGY LTD INDIA 22-Sep-16 2 HPX 1HPX11A S6 CONDENSATE PUMPS-2(TURBINE DRIVEN) 125 11.0 70 11.00 2900
GS E & C CORPORATION Kuwait Oil Company(K.S.C) KUWAIT 5-Apr-17 2 HPX 1HPX11A A8 CORROSION INHIBITOR TRANSFER 55 10.0 16.9 4.00 1475
JOINT VENTURE OF TECHNICAS
1HPX11A S6(NACE)
REUNIDAS,SINOPEC,HANWA KUWAIT NATIONAL PETROLEUM COMPANY KUWAIT 10-Jul-17 4 HPX STRIPPER REFLUX PUMPS 45 17.6 69.8 11.00 2950
CHENNAI PETROLEUM CORPORATION LTD CHENNAI PETROLEUM CORPORATION LTD INDIA 18-Feb-17 2 HPX 1HPX11A S6(NACE) Stablizer Reflux pump 98 20.5 66 11.00 2950
ENGINEERS INDIA LTD OIL & NATURAL GAS CORPORATION LTD INDIA 29-Jan-17 2 HPX 1HPX11A S6 HC LIQUID/FLARE KOD PUMPS 145 15.0 64.6 15.00 2950
ENGINEERS INDIA LTD OIL & NATURAL GAS CORPORATION LTD INDIA 7-Feb-17 2 HPX 1HPX11A A8 DM WATER 65 11.0 76 15.00 2900
BEEKAY ENGINEERING CORPORATION BEEKAY ENGINEERING CORPORATION INDIA 21-Jan-17 2 HPX 1HPX11A S6 HYDROCARBON/GASOLINE 15.56 17.7 42.977 5.50 2950
JOINT VENTURE OF TECHNICAS
1HPX11A S8
REUNIDAS,SINOPEC,HANWA KUWAIT NATIONAL PETROLEUM COMPANY KUWAIT 19-Jul-17 6 HPX FRACTIONATER OVER HEAD CONDENSATE 60 17.0 74.1 15.00 2950
BPCL MAHUL BPCL MAHUL INDIA 15-Dec-16 2 HPX 1HPX11A S6 BACKWASH EFFLUENT 140 19.2 80 15.00 2950
L&T HYDROCARBON ENGINEERING LTD GSFC - GUJARAT INDIA 23-Apr-17 2 HPX 1HPX11A A8 AMMONIA CARBONATE PUMP 130 5.0 16 4.00 1450
INDIAN OIL CORPORATION LTD INDIAN OIL CORPORATION LTD INDIA 15-Jun-17 2 HPX 1HPX11A S6 NAPHTHA/STABILIZER REFLUX PUMP 100 18.7 66 7.50 2950
FLOWTECH ENG INDIAN ADDITIVES LTD INDIA 27-Jun-17 1 HPX 1HPX11A A8 ACETIC ACID 42 3.4 15 3.70 1450
BPCL KOCHI BPCL KOCHI INDIA 3-Dec-17 2 HPX 1HPX11A S6 Aldol organics recycle pump 45 4.2 68.32 11.00 2900
BPCL KOCHI BPCL KOCHI INDIA 8-Dec-17 2 HPX 1HPX11A A8 20 WT% CAUSTIC 65 16.5 65 15.00 2920
HPCL MITTAL ENERGY LTD HPCL MITTAL ENERGY LTD INDIA 14-Sep-17 2 HPX 1HPX11A S8 RICH AMINE/LEAN AMINE 100 18.0 56.4 11.00 2950
RAMAGUNDAM FERTILIZERS & CHEMICALS RAMAGUNDAM FERTILIZERS & CHEMICALS
INDIA 17-Jan-18 2 HPX 1HPX11A A8 ACID CONDENSATE 90 6.0 74 11.00 2900
LTD(RFCL) LTD(RFCL)
BPCL KOCHI BPCL KOCHI INDIA 28-Dec-17 2 HPX 1HPX11A A8 5 WT% HYDROQUINONE 38 4.3 57.4 11.00 2900
INDIAN OIL CORPORATION LTD INDIAN OIL CORPORATION LTD INDIA 11-Jan-18 2 HPX 1HPX11A S-6 KCS REVAMPED SPLITTER BOTTOM 122 16.7 65 9.30 2950
RAMAGUNDAM FERTILIZERS & CHEMICALS RAMAGUNDAM FERTILIZERS & CHEMICALS
INDIA 11-Mar-18 2 HPX 1HPX11A A8 OH condensate pump 40 17.0 54.7 11.00 2950
LTD(RFCL) LTD(RFCL)
BPCL KOCHI BPCL KOCHI INDIA 24-Jan-18 2 HPX 1HPX11A A8 ALDEHYDE 145 16.1 80 11.00 2950
BPCL KOCHI BPCL KOCHI INDIA 24-Jan-18 2 HPX 1HPX11A S6 ALCOHOLS 200 11.0 88.1 15.00 2950
INDIAN OIL CORPORATION LTD INDIAN OIL CORPORATION LTD INDIA 28-Jan-18 2 HPX 1HPX11A A8 WATER+H2S+NH3 158 8.2 70.4 15.00 2900
FILTREX S.R.L HPCL MITTAL ENERGY LTD INDIA 7-Feb-18 2 HPX 1HPX11A S6 MIXED FEED DIESEL 170 19.2 80 15.00 2950
INDIAN OIL CORPORATION LTD INDIAN OIL CORPORATION LTD INDIA 9-Aug-18 2 HPX 1HPX11A S6 2ND HDS STABILSER REFLUX 120 16.0 66.5 7.50 2950
PETRONAS CARIIGALI SDN BHD PETRONAS CARIIGALI SDN BHD MALAYSIA 27-Jun-18 1 HPX 1HPX11A S6(NACE) DIESEL TRANSFER PUMP 65 8.0 42.9 7.50 2900
FARABI DOWNSTREAM COMPANY FARABI DOWNSTREAM COMPANY SAUDI ARABIA 18-Sep-18 2 HPX 1HPX11A S6 BENZENE FEED 90 14.3 96 15.00 3540
HADAF INTERNATIONAL ENERGY COMPANY HADAF INTERNATIONAL ENERGY COMPANY SAUDI ARABIA 2-Oct-18 1 HPX 1HPX11A S6 BP, TP 160 7.0 23 3.70 1740
HADAF INTERNATIONAL ENERGY COMPANY HADAF INTERNATIONAL ENERGY COMPANY SAUDI ARABIA 2-Oct-18 1 HPX 1HPX11A S6 TP 165 12.0 23 3.70 1770
HADAF INTERNATIONAL ENERGY COMPANY HADAF INTERNATIONAL ENERGY COMPANY SAUDI ARABIA 2-Oct-18 1 HPX 1HPX11A S6 TP 165 12.0 23 3.70 1770
INDIAN OIL CORPORATION LTD INDIAN OIL CORPORATION LTD INDIA 26-Sep-18 2 HPX 1HPX11A S-6 NACE KCS HYDROCARBON 120 21.2 82.3 11.00 2950
INDIAN OIL CORPORATION LTD INDIAN OIL CORPORATION LTD INDIA 15-Oct-18 2 HPX 1HPX11A S6 Hydrocarbon 37 13.5 86.4 11.00 2950
HPCL MITTAL ENERGY LTD HPCL MITTAL ENERGY LTD INDIA 28-Aug-18 2 HPX 1HPX11A C6 STEAM CONDENSATE 190 6.6 65.6 11.00 2900
INDIAN OIL CORPORATION LTD INDIAN OIL CORPORATION LTD INDIA 12-Nov-18 2 HPX 1HPX11A A-8 Boiler Feed water 150 10.8 75 15.00 2950
INDIAN OIL CORPORATION LTD INDIAN OIL CORPORATION LTD INDIA 31-Mar-18 2 HPX 1HPX11A C6 HCGO FEED 383 12.1 66 11.00 2900
TECHNIP INDIA LTD IOCL HALDIA INDIA 5-Nov-18 2 HPX 1HPX11A S-8 (KCS) - NACE HYDROCARBON 90 14.5 65.2 7.50 2950
HYUNDAI ENGINEERING CO LTD MELAKA REFINERY MALAYSIA 31-Jan-19 2 HPX 1HPX11A S-6 Liquid HC From Flare Knock Out Drum, V-64501 60 10.0 62 11.00 2900
CTCI CORPORATION PETRONAS REFINERY AND PETROCHEMICAL CORPORATIONMALAYSIA 4-Feb-19 1 HPX 1HPX11A S-6 H2O+MeOH 75 13.0 73 15.00 2900
CTCI CORPORATION PETRONAS REFINERY AND PETROCHEMICAL CORPORATIONMALAYSIA 4-Feb-19 1 HPX 1HPX11A S-6 H2O+MeOH 75 13.0 73 15.00 2900
FARABI DOWNSTREAM COMPANY FARABI DOWNSTREAM COMPANY SAUDI ARABIA 19-Sep-18 1 HPX 1HPX11A S8 C14-C18 LINEAR ALPHA OLEFINS 50 8.4 115 15.00 3480
FARABI DOWNSTREAM COMPANY FARABI DOWNSTREAM COMPANY SAUDI ARABIA 19-Sep-18 1 HPX 1HPX11A S8 C14-C18 LINEAR ALPHA OLEFINS 50 8.4 115 15.00 3480
INDIAN OIL CORPORATION LTD INDIAN OIL CORPORATION LTD INDIA 16-Nov-18 2 HPX 1HPX11A A8 RICH MDEA 47 10.3 61 11.00 2900
ENGINEERS INDIA LTD HPCL MUMBAI INDIA 16-Feb-19 2 HPX 1HPX11A S-6 NACE Preflash sour water pumps 42 14.0 66.1 11.00 2920
PETROFAC International (UAE) LLC BPCL KOCHI INDIA 17-Jul-19 2 HPX 1HPX11A S6 SPENT CAUSTIC PUMPS 36 16.7 69.6 15.00 2920
PETROFAC International (UAE) LLC BPCL KOCHI INDIA 17-Jul-19 2 HPX 1HPX11A S6 ATM CONDENSATE PUMPS 119 16.8 76.3 15.00 2950
HPCL MITTAL ENERGY LTD HPCL MITTAL ENERGY LTD INDIA 30-May-19 2 HPX 1HPX11A S6 WATER FROM WATER SURGE DRUM 50 7.1 80 11.00 2900
MARC FLOW ENGINEERS HPCL MERRUT INDIA 23-Apr-19 2 HPX 1HPX11A S6 SUPPLY PUMPS 50 7.0 46 5.50 2900
MARC FLOW ENGINEERS CAIRN INDIA LTD INDIA 20-Jul-19 2 HPX 1HPX11A S6 HYDROCARBON 80 17.0 51.8 5.50 2900
TECNIMONT PVT LTD HPCL MITTAL ENERGY LTD INDIA 8-Nov-19 1 HPX 1HPX11A S6 1-BUTENE 40 10.9 49.3 5.50 2900
PETROFAC International (UAE) LLC HPCL INDIA 12-Dec-19 2 HPX 1HPX11A S6 LP Steam Condensate 100 5.4 51.6 7.50 2900
MARC FLOW ENGINEERS RELIANCE INDUSTRIES LTD INDIA 20-Aug-19 2 HPX 1HPX11A S6 HYDROCARBON 45 8.0 63 11.00 2900
MARC FLOW ENGINEERS RELIANCE INDUSTRIES LTD INDIA 20-Aug-19 2 HPX 1HPX11A S6 GASOLINE 45 8.0 63 7.50 2900
IOCL IOCL INDIA 28-Jan-20 2 HPX 1HPX11A S6 HYDROCARBON 40 16.8 57.3 11.00 2950
INDIAN OIL CORPORATION LTD INDIAN OIL CORPORATION LTD INDIA 09-Jul-20 2 HPX 1HPX11A S6 NACE WATER+H2S+CO2+HC 82 5.0 53 7.50 2900
L&T HYDROCARBON ENGINEERING LTD INDIAN OIL CORPORATION LTD INDIA 19-Jun-20 2 HPX 1HPX11A A8 GLYCOLS 130 11.3 68.3 15.00 2900
UOP LLC PETRO PERU TALARA REFINERY USA 02-Jan-20 1 HPX 1HPX11A S6 6.6WT% CAUSTIC 60 12.7 24.2 5.50 1760
UOP LLC PETRO PERU TALARA REFINERY USA 02-Jan-20 2 HPX 1HPX11A S6 6.6WT% CAUSTIC & WATER 66 6.2 20.7 5.50 1740
TECNICAS REUNIDAS S.A. "UTE TR JURONG
EXXONMOBIL ASIA PACIFIC PTE LTD SINGAPORE 15-Jul-20 1 HPX 1HPX11A S6 HP Fractionator Water Wash 43 17.9 66 15.00 2950
PROJECT"
TECNICAS REUNIDAS S.A. "UTE TR JURONG
EXXONMOBIL ASIA PACIFIC PTE LTD SINGAPORE 15-Jul-20 1 HPX 1HPX11A S8 Amine Drain Pump
PROJECT"
TECNICAS REUNIDAS S.A. "UTE TR JURONG
EXXONMOBIL ASIA PACIFIC PTE LTD SINGAPORE 15-Jul-20 1 HPX 1HPX11A S6 Hot Oil Tank Fill Pump
PROJECT"
INDIAN OIL CORPORATION LTD INDIAN OIL CORPORATION LTD INDIA 30-Jun-20 2 HPX 1HPX11A A8 110 11.0 60 15.00 2900
PETROFAC INTERNATIONAL (UAE) LLC GROUPMENT ISARENE(SONATRACH) ALGERIA 14-Oct-20 1 HPX 1HPX11A S-5 LTCS HOT OIL 290 13.2 52.8 11.00 2950
PETROFAC INTERNATIONAL (UAE) LLC GROUPMENT ISARENE(SONATRACH) ALGERIA 14-Oct-20 2 HPX 1HPX11A S-5 LTCS SLOP OIL 110 15.0 50.2 11.00 2930