Item 1
Tell whether the structure is exempted in Building permit or not: Installation of Window Grilles

Response: Exempted

Correct answer: Exempted

Score: 1 out of 1 Yes

Item 2
Identify if it’s part of Ancillary Plan or Accessory Plan: Water Line Layout

Response: Ancillary

Correct answer: Ancillary

Score: 1 out of 1 Yes

Item 3
Identify if it’s part of Ancillary Plan or Accessory Plan: Schedule of Beams

Response: Accessory

Correct answer: Anicllary

Score: 0 out of 1 No

Item 4
The width of any seat shall be not less than _____.

Response: 450mm

Correct answer: 450mm

Score: 1 out of 1 Yes

Item 5
Identify if it’s part of Ancillary Plan or Accessory Plan: Schedule of Doors and Windows

Response: Ancillary

Correct answer: Ancillary

Score: 1 out of 1 Yes

Item 6
DO NOT PUT COMMA (,) IN YOUR ANSWER. Ex. PHP 150000.00

_____ The administrative fine if the owner changed the existing use or occupancy even if constructed under a valid building permit.

Response: PHP 10000.00

Correct answer: NOT EXCEEDING PHP10000.00

Score: 0 out of 1 No

Item 7

https://usl-tuguegarao.neolms.com/student_quiz_assignment/submissions/22440004 1/7
4/30/2021 Submissions - CODE 764- ARCH 1273 Professional Practice 1: Laws Affecting the Practice of Architecture - MIDTERM EXAMINATION -
Circular stairs may be used as an exit provided the minimum width if run is _____mm.

Response: Not less than 250mm

Correct answer: Not less than 250mm

Score: 1 out of 1 Yes

Item 8
Identify if it’s part of Ancillary Plan or Accessory Plan: Foundation Plan

Response: Ancillary

Correct answer: Ancillary

Score: 1 out of 1 Yes

Item 9
No leaf of an exit door shall exceed _____ meters in width.

Response: 1.20m

Correct answer: 1.20m

Score: 1 out of 1 Yes

Item 10
_____ He/ she is the current DPWH secretary.

Response: mark villar

Correct answer: MARK VILLAR, Mark Villar, mark villar

Score: 1 out of 1 Yes

Item 11
Any physical change to increase its value, utility, or aesthetic quality is called _____.

Response: renovation

Correct answer: RENOVATION, renovation, Renovation

Score: 1 out of 1 Yes

Item 12
DO NOT PUT COMMA (,) IN YOUR ANSWER. Ex. PHP 150000.00

_____ The fine of failing to post Building permit construction sign.

Response: PHP 5000.00

Correct answer: PHP 5000.00, P5000.00, PHP 5000.00, 5000

Score: 1 out of 1 Yes

Item 13
Identify if it’s part of Ancillary Plan or Accessory Plan: East to West Section

Response: Ancillary

Correct answer: Ancillary

Score: 1 out of 1 Yes

Item 14
Identify if it’s part of Ancillary Plan or Accessory Plan: Swimming Pool Section

Response: Accessory

Correct answer: Accessory

https://usl-tuguegarao.neolms.com/student_quiz_assignment/submissions/22440004 2/7
4/30/2021 Submissions - CODE 764- ARCH 1273 Professional Practice 1: Laws Affecting the Practice of Architecture - MIDTERM EXAMINATION -
Score: 1 out of 1 Yes

Item 15
Total meters required above highest grade for a C-3 Occupancy.

Response: 48-180

Correct answer: 48-180

Score: 1 out of 1 Yes

Item 16
Tell whether the structure is exempted in Building permit or not: 5.00 sqm detached aviaries

Response: Exempted

Correct answer: Exempted

Score: 1 out of 1 Yes

Item 17
_____ is a systematic dismantling, in whole or in part of a building.

Response: DEMOLITION

Correct answer: DEMOLITION, demolition, Demolition

Score: 1 out of 1 Yes

Item 18
Identify if it’s part of Ancillary Plan or Accessory Plan: Mechanical Plan

Response: Ancillary

Correct answer: Ancillary

Score: 1 out of 1 Yes

Item 19
Identify if it’s part of Ancillary Plan or Accessory Plan: Mausoleum Plan

Response: Accessory

Correct answer: Accessory

Score: 1 out of 1 Yes

Item 20
The four-hour fire resistive type of construction throughout and structural elements shall be of Steel, iron, concrete or masonry.

Response: Type IV

Correct answer: Type V

Score: 0 out of 1 No

Item 21
_____ is defined as all on-site work done from site preparation, excavation, foundation, assembly of components, and installation of utilities and equipment

Response: CONSTRUCTION

Correct answer: CONSTRUCTION, construction, Construction

Score: 1 out of 1 Yes

Item 22
_____ are secondary structures located within the same premises, the use of which is incidental to the main building.

Response: [none]

https://usl-tuguegarao.neolms.com/student_quiz_assignment/submissions/22440004 3/7
4/30/2021 Submissions - CODE 764- ARCH 1273 Professional Practice 1: Laws Affecting the Practice of Architecture - MIDTERM EXAMINATION -
Correct answer: ANCILLARY BUILDING, ancillary building, Ancillary Building, Ancillary building

Score: 0 out of 1 No

Item 23
_____ are any person, firm, partnership, corporation, head of government/private institution, or organization, applying for issuance of permits.

Response: APPLICANT

Correct answer: APPLICANT, PERMITTEE, Applicant, Permittee, applicant, permittee

Score: 1 out of 1 Yes

Item 24
Identify if it’s part of Ancillary Plan or Accessory Plan: Sanitary Line Layout

Response: Ancillary

Correct answer: Ancillary

Score: 1 out of 1 Yes

Item 25
Identify if it’s part of Ancillary Plan or Accessory Plan: Septic Tank Plan

Response: Accessory

Correct answer: Accessory

Score: 1 out of 1 Yes

Item 26
Identify if it’s part of Ancillary Plan or Accessory Plan: Swabbing Booth Section

Response: Accessory

Correct answer: Accessory

Score: 1 out of 1 Yes

Item 27
Tell whether the structure is exempted in Building permit or not: 5.99sqm single use Greenhouse

Response: Exempted

Correct answer: Exempted

Score: 1 out of 1 Yes

Item 28
The minimum rear setback requirement for R-2 Basic Type of Occupancy.

Response: 2.0m

Correct answer: 2.0m

Score: 1 out of 1 Yes

Item 29
Tell whether the structure is exempted in Building permit or not: 600mm deep garden pool

Response: Not Exempted

Correct answer: Not Exempted

Score: 1 out of 1 Yes

Item 30
_____ are pre-formatted, prescribed form duly accomplished and notarized by the respective design professional with validation matrices related to other building rules.

https://usl-tuguegarao.neolms.com/student_quiz_assignment/submissions/22440004 4/7
4/30/2021 Submissions - CODE 764- ARCH 1273 Professional Practice 1: Laws Affecting the Practice of Architecture - MIDTERM EXAMINATION -
Response: APPLICATION FORMS

Correct answer: APPLICATION FORMS, Application Forms, Application forms, application forms, APPLICANT FORMS, Applicant Forms, applicant forms

Score: 1 out of 1 Yes

Item 31
DO NOT PUT COMMA (,) IN YOUR ANSWER. Ex. PHP 150000.00

_____ The administrative fine of not having building/ demolition permit.

Response: PHP 10000.00

Correct answer: NOT EXCEEDING PHP10000.00, not exceeding PHP10000.00, NOT MORE THAN PHP 10000, NOT EXCEEDING 10000, not exceeding 10000, not
more than 10000, Not more than 10000

Score: 0 out of 1 No

Item 32
DO NOT PUT COMMA (,) IN YOUR ANSWER. Ex. PHP 150000.00

_____ The fine of unauthorized change during construction in plans and specs.

Response: PHP 10000.00

Correct answer: PHP 10000.00, Php 10000.00, 10000 Pesos, 10000

Score: 1 out of 1 Yes

Item 33
Tell whether the structure is exempted in Building permit or not: 18 sqm independent shed

Response: Exempted

Correct answer: Not Exempted

Score: 0 out of 1 No

Item 34
_____ it is defined as changes in materials, partitioning, location/size of openings, structural parts, existing utilities and equipment but does not increase building height/area.

Response: ALTERATION

Correct answer: ALTERATION, Alteration, alteration

Score: 1 out of 1 Yes

Item 35
Identify if it’s part of Ancillary Plan or Accessory Plan: Stage Plans

Response: Accessory

Correct answer: Accessory

Score: 1 out of 1 Yes

Item 36
Identify if it’s part of Ancillary Plan or Accessory Plan: Column Schedule

Response: Ancillary

Correct answer: Ancillary

Score: 1 out of 1 Yes

Item 37
The slope of exit passageway shall not exceed ________.

https://usl-tuguegarao.neolms.com/student_quiz_assignment/submissions/22440004 5/7
4/30/2021 Submissions - CODE 764- ARCH 1273 Professional Practice 1: Laws Affecting the Practice of Architecture - MIDTERM EXAMINATION -
Response: 1 in 8

Correct answer: 1 in 8

Score: 1 out of 1 Yes

Item 38
The minimum thickness of solid RC Slab with Average cover to reinforcement with 3- hour fire resistive rating.

Response: 150mm

Correct answer: 25mm

Score: 0 out of 1 No

Item 39
Identify if it’s part of Ancillary Plan or Accessory Plan: Reflected Ceiling Plan

Response: Ancillary

Correct answer: Ancillary

Score: 1 out of 1 Yes

Item 40
DO NOT PUT COMMA (,) IN YOUR ANSWER. Ex. PHP 150000.00

_____ The fine of non- compliance with the work stoppage order.

Response: PHP 10000.00

Correct answer: PHP 8000.00, PHP 8000.00, 8000.00 PESOS, Php 8000.00, 8000

Score: 0 out of 1 No

Item 41
_____ is defined as new construction which increases height and/or floor area of existing structures.

Response: ADDITION

Correct answer: ADDITION, Addition, addition

Score: 1 out of 1 Yes

Item 42
The number of allowable storeys or floors above established grade from a R-2 Maximum Occupancy.

Response: 3

Correct answer: 12

Score: 0 out of 1 No

Item 43
Every Corridor or exit balcony shall not be less than _______ in width.

Response: 1.10m

Correct answer: 1.10m

Score: 1 out of 1 Yes

Item 44
Identify if it’s part of Ancillary Plan or Accessory Plan: Ground Floor Plan

Response: Ancillary

Correct answer: Ancillary

Score: 1 out of 1 Yes

https://usl-tuguegarao.neolms.com/student_quiz_assignment/submissions/22440004 6/7
4/30/2021 Submissions - CODE 764- ARCH 1273 Professional Practice 1: Laws Affecting the Practice of Architecture - MIDTERM EXAMINATION -

Item 45
_____ is the department defined by the PD 1096.

GIVE THE COMPLETE NAME OF THE DEPARTMENT AND ANSWER IT IN UPPERCASE FORM.

Response: DEPARTMENT OF PUBLIC WORK AND HIGHWAYS

Correct answer: DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

Score: 0 out of 1 No