Steam Boiler Systems From Bosch: Highly Efficient and Reliable Process Heat
Steam Boiler Systems From Bosch: Highly Efficient and Reliable Process Heat
Steam Boiler Systems From Bosch: Highly Efficient and Reliable Process Heat
from Bosch
www.bosch-industrial.com
Efficiency
Design Equipment
The steam-drying unit and the generously dimensioned is not required, which makes cleaning significantly We offer the UNIVERSAL steam boiler CSB as a the boiler control BCO that allows connection to
steam chamber in the Universal CSB design guarantee easier. Furthermore, the energy requirement for the complete boiler system including equipment*. The automation systems. The sensors, actuators and
a high level of steam quality that suits your processes. burner fan is reduced thanks to the low flue-gas-side basic equipment comprises the boiler pressure country-specific safety equipment are already wired
The high-quality production of the entire boiler body resistance. vessel, the control and safety components, the and combined in the terminal box. Pre-assembled,
using the latest in welding robots allows for a particu- burner unit, an integrated economizer, a pump plug-in and coded cable bundles simplify the
larly high level of robustness and durability. The telescopic reversing chamber of the industrial module, a terminal box and the compact control CSC connection between the boiler control cabinet and
steam boiler makes maintenance and inspection work mounted on the boiler. Alternatively, you can select the terminal box.
Thanks to the special helical heat exchanger tubes, the easier. It can be opened safely by a sliding system
heat exchange per m² of heating surface is improved without needing very much space. Likewise, the entire
significantly. The use of inserts in the exhaust system rear tube plate is fully accessible.
1 10 8 32 6 5 36 4 7 3 9 7 2 26 12 13 14 17 37
Compatible products
Flue gas heat exchanger ECO
Feed water cooling module FWM
Condensate service module CSM
Water service module WSM
Water treatment module WTM
Pump module PM
Water analyzer WA
Feed water regulation module RM
Blow-down, expansion and cooling module BEM
Expansion and heat recovery module EHM
Expansion, heat recovery and blow-down
module EHB
Vapour cooler VC
Compact steam boiler control CSC
Gas regulation module GRM
Oil supply module OSM 18 33 21 20 19 24 25 28 23
Oil circulation module OCM
Oil pressure regulation module ORM
Oil preheater module OPM
Steam distributor SD 1 Control cabinet with compact steam control CSC, 17 Sight hole
Steam accumulator module SAM swivel-mounted (alternatively boiler control BCO) 18 Burner
Controls for optimising combustion 2 Blow-off tap 19 Insulation with protective shell
Compact steam boiler control CSC 3 Reflective water level indicator 20 Base frame
Boiler control BCO 4 Manostat tube shut-off valve, maintenance-free 21 Gas regulation module
System control SCO 5 Pressure limiter 23 Pump module
Remote access MEC Remote 6 Pressure transducer (4–20 mA) 24 Drain shut-off valve, maintenance-free
Digital efficiency assistant MEC Optimize 25 Quick shut-off blow-down valve
7 Low-level limiter electrode
8 Pressure gauge 26 Inspection opening, steam side
For further information please see our brochure 9 Level transducer (4–20 mA) 28 Telescopic rear reversing chamber for easy
‘Boiler and efficiency components’. 10 Pressure gauge shut-off valve with testing function inspection
12 Steam removal valve 32 Flue gas heat exchanger ECO
13 Full-lift safety valve 33 Connection piping ECO/boiler
14 Desalting and fully automatic conductivity 36 Water inlet connection ECO
measurement (here not drawn) 37 Bow-type handle for reversing chamber
*The equipment level is variable and can be freely configured to customer requirements.
12 | Steam boilers Steam boilers | 13
The product designation U-MB stands for “UNIVERSAL Modular Boiler” (three-pass steam Safety pressure in bar up to 16
boiler in modular design). The U-MB type consists of several modules, which fulfil your
Max. temperature in °C 204
individual requirements perfectly. Typical application areas are the food and beverage
industry, laundry and cleaning businesses, as well as smaller industrial companies. Oil, gas, multi-fuel firing
Fuel
Biogas, bio-oil, hydrogen, special fuels
14 | Steam boilers Steam boilers | 15
Design Equipment
The steam boiler U-MB is designed as a three-pass The choice of the steam section has a critical influence We offer the UNIVERSAL steam boiler U-MB as a specific safety devices are already wired and combined
flame tube/smoke tube boiler. It consists of several on the steam quality. A generous sizing has a very complete boiler system including equipment.* The in the terminal box. Pre-assembled, plug-in and coded
modules, namely the heat generating section in three- positive impact on the residual steam moisture. basic equipment comprises the boiler pressure vessel, cable bundles simplify the connection between the
pass design, the steam chamber on top of this, and an the control and safety components, the burner unit, an boiler control cabinet and the terminal box. The free-
integrated economizer. Thanks to its three-pass design, The integrated economizer has a direct influence on the integrated economizer, a pump module, a terminal box standing or wall-mounted control cabinet can be
there is no requirement for flow components in the energy efficiency. The heat contained in the flue gases and the control cabinet including the intelligent boiler adapted and set up to best suit the requirements on
smoke tubes. is used for preheating the boiler feed water, meaning control BCO. The sensors, actuators and country- site.
that fuel consumption and emissions are reduced.
The heat generating section of the U-MB is based on
the UNIMAT boiler design – proven for decades and The steam boiler is tested for type examination and is
many thousands of times in practice. The generously manufactured to the strict guidelines of the Module D
sized flame tube geometry enables an efficient Quality Assurance System of the Pressure Equipment
combustion process. Directive.
1 2 3 22 10 8 13 6 5 7 12 9 26 15 16 34 33 32 28
Compatible products
Flue gas heat exchanger ECO
Flue gas heat exchanger ECO for condensing use
Feed water cooling module FWM
Condensate service module CSM
Water service module WSM
Water treatment module WTM
Pump module PM
Water analyzer WA
Feed water regulation module RM
Blow-down, expansion and cooling module BEM
Expansion and heat recovery module EHM
Expansion, heat recovery and blow-down
module EHB
Vapour cooler VC
Gas regulation module GRM 18 17 21 20 14 19 27 24 14 25 23
*The equipment level is variable and can be freely configured to customer requirements.
16 | Steam boilers Steam boilers | 17
Design Equipment
Our three-pass patent dating from 1952 forms the maximised steam chamber which is particularly We offer the UNIVERSAL steam boiler UL-S/UL-SX as a up to 4,000 kg/h. The sensors, actuators and country-
basis for the outstanding and ongoing success of this advantageous for dynamic steam demands. The flame complete boiler system including equipment*. The specific safety devices are already wired and
type series. The lateral flame tube (1st pass) and the tube is fixed at both ends of the boiler body and basic equipment comprises the boiler pressure vessel, combined in the terminal box. Pre-assembled, plug-in
adjacent smoke tube bundles (2nd and 3rd pass) are occurring tensions can be passed on via diagonal the control and safety components, the burner unit, an and coded cable bundles simplify the connection
ideally integrated into the pressure vessel together stays (corner anchors). In comparison to stud bolt integrated economizer, a pump module, a terminal box between the boiler control cabinet and the terminal
with the fully wetback reversing chamber. This design constructions the Bosch design increases robustness and the control cabinet including the intelligent boiler box. The free-standing or wall-mounted control
results in a large heating surface with smallest overall and durability of the boilers (as described on page 5 control BCO. Alternatively, you can use the compact cabinet can be adapted and set up to best suit the
dimensions. Additionally, the UL-S boiler has thus a of this brochure). steam control CSC for UL-S boilers with an output of requirements on site.
1 2 3 4 5 6 7 8 9 10 26 11 12 13 14 33 15 16 34 17 35 32
Compatible products
Flue gas heat exchanger ECO
Flue gas heat exchanger ECO for condensing use
Feed water cooling module FWM
Condensate service module CSM
Water service module WSM
Water treatment module WTM
Pump module PM
Water analyzer WA
Feed water regulation module RM
Blow-down, expansion and cooling module BEM
Expansion and heat recovery module EHM
Expansion, heat recovery and blow-down
module EHB
18 21 20 22 24 25 19 27 28 30 23
Vapour cooler VC
Air preheating system APH
Gas regulation module GRM
Oil supply module OSM
1 Control cabinet with boiler control BCO 16 Feed water shut-off valve, maintenance-free
Oil circulation module OCM
(CSC control version for boilers with an output of 17 Sight hole
Oil pressure regulation module ORM
up to 4,000 kg/h as an alternative) 18 Burner
Oil preheater module OPM 2 Blow-off tap 19 Insulation with protective shell
Steam distributor SD 3 Reflective water level indicator 20 Base frame
Steam accumulator module SAM 4 Manostat tube shut-off valve, maintenance-free 21 Gas regulation module
Superheater module 5 Pressure limiter 22 Terminal box
Controls for optimising combustion 6 Pressure transducer (4–20 mA) 23 Pump module
Compact steam boiler control CSC 7 Low-level limiter electrode 24 Drain shut-off valve, maintenance-free
Boiler control BCO 8 Pressure gauge 25 Quick shut-off blow-down valve
Integrated flue gas heat exchanger and flue gas heat exchanger
System control SCO for condensing use 9 Level transducer (4–20 mA) 26 Inspection opening, steam side
Remote access MEC Remote 10 Pressure gauge shut-off valve with testing function 27 Inspection opening, water side
Digital efficiency assistant MEC Optimize 11 Steam dryer 28 Inspection opening, flue gas side
12 Steam removal valve 30 Flue gas collection chamber
13 Full-lift safety valve 32 Flue gas heat exchanger ECO
For further information please see our brochure
14 Fully automatic conductivity measurement 33 Connection piping ECO/boiler
‘Boiler and efficiency components’.
and desalting 34 Vent shut-off valve ECO
15 Feed water non-return valve 35 Drain shut-off valve ECO (draining)
*The equipment level is variable and can be freely configured to customer requirements.
20 | Steam boilers Steam boilers | 21
Design Equipment
Its suitability for the unrestricted parallel or single tubes and the smoke tube areas further accelerate We offer the UNIVERSAL steam boiler ZFR/ZFR-X as a specific safety devices are already wired and combined
operation of its firing units is not only due to the sta- the circulation. complete boiler system including equipment*. The in the terminal box. Pre-assembled, plug-in and coded
ble separation on the flue gas side. The special design basic equipment includes the boiler pressure vessel, cable bundles simplify the connection between the
measures for neutralising the tension forces in single- A fully automatic operation with one or both burners is the control and safety components, the burner unit, an boiler control cabinet and the terminal box. The free-
flame tube operation are crucial for permanent stability. possible without restriction due to the approved integrated economizer, a pump module, a terminal box standing or wall-mounted control cabinet can be
The flame tubes are pushed through in the front and single-flame tube operation. Even different fuels in and the control cabinet including the intelligent boiler adapted and set up to best suit the requirements on
rear floors and welded tightly all around. In contrast to both firing units do not present any barriers. The control BCO. The sensors, actuators and country- site.
boiler designs with stud bolts, inadmissible bending control range is doubled and each low load phase is run
stresses are avoided. The integrated rear flue gas with one burner and with consequent gain in efficiency
chamber thus offers the advantages of the fully wet- level.
back cooling while significantly reducing its mechanical
stress. Water circulation and heat transport are 1 2 3 4 5 6 7 8 9 10 26 11 12 14 13 33 15 16 34 32 30 35
increased by means of guide profiles on the boiler For further information please see our technical report
base. Additionally, flow paths between the flame ‘Double-flame tube boilers’.
Compatible products
Flue gas heat exchanger ECO
Flue gas heat exchanger ECO for condensing use
Feed water cooling module FWM
Condensate service module CSM
Water service module WSM
Water treatment module WTM
Pump module PM
Water analyzer WA
Feed water regulation module RM
Blow-down, expansion and cooling module BEM
Expansion and heat recovery module EHM 18 21 20 19 22 31 24 25 27 17 28 23
Expansion, heat recovery and blow-down
module EHB
Vapour cooler VC 1 Control cabinet with boiler control BCO 18 Burner
Air preheating system APH 2 Blow-off tap 19 Insulation with protective shell
Gas regulation module GRM 3 Reflective water level indicator 20 Base frame
Oil supply module OSM 4 Manostat tube shut-off valve, maintenance-free 21 Gas regulation module
Oil circulation module OCM 5 Pressure limiter 22 Terminal box
Oil pressure regulation module ORM 6 Pressure transducer (4–20 mA) 23 Pump module
Oil preheater module OPM Water service module WSM 7 Low-level limiter electrode 24 Drain shut-off valve, maintenance-free
Steam distributor SD 8 Pressure gauge 25 Quick shut-off blow-down valve
Steam accumulator module SAM 9 Level transducer (4–20 mA) 26 Inspection opening, steam side
Superheater module 10 Pressure gauge shut-off valve with testing function 27 Inspection opening, water side
Controls for optimising combustion 11 Steam dryer 28 Inspection opening, flue gas side
Boiler control BCO 12 Steam removal valve 30 Flue gas collection chamber
System control SCO 13 Full-lift safety valve 31 Water circulation guide profiles
Remote access MEC Remote 14 Fully automatic conductivity measurement and 32 Flue gas heat exchanger ECO
Digital efficiency assistant MEC Optimize desalting 33 Connection piping ECO/boiler
15 Feed water non-return valve 34 Vent shut-off valve ECO
For further information please see our brochure 16 Feed water shut-off valve, maintenance-free 35 Drain shut-off valve ECO (draining)
‘Boiler and efficiency components’. 17 Sight hole
*The equipment level is variable and can be freely configured to customer requirements.
24 | Steam boilers Steam boilers | 25
The Ledvice power plant in the Czech Republic, situated Four ZFR-X double-flame tube boilers generate up to
between the cities of Teplice and Bílina, is part of the 167 tons of steam per hour for starting up the steam
energy company ČEZ. The energy supplier operates at turbine for power generation. Their superheater mod-
this site, among others, a power unit with an electricity ules increase the temperature to minimise residual
output of 660 MW. Based on the principle of combined moisture in the steam. The superheated steam
heat and power generation, the waste heat produced improves the efficiency level of the plant and ensures a
during power generation is fed into the district heating gentle start-up process. In addition, the boilers also
network instead of simply being released unused into support the district heating supply. Extensive safety
the atmosphere. Heat is supplied to a total of around and automation equipment allows for a high level of
Sectional drawing UL-SX Sectional drawing ZFR-X 300 companies and 20,000 inhabitants. operation reliability and reduces supervision.
The superheater modules are installed on the front reversing chamber of the boilers.
26 | Steam boilers Steam boilers | 27
This industrial steam boiler variant is a conventional When using waste heat boilers without firing, additional
fired three-pass boiler with additional integrated peak load boilers are usually required. With the design
smoke tube pass for the utilisation of waste heat. It is variant with own firing system, the fourth pass supplies
predominantly used in combination with CHP plants or the base load, and the firing system switches on when
gas turbines. In the fourth pass of the boiler, the hot demand increases. There is no need for a further
flue gases from the upstream combustion processes pressure vessel with complete safety technology and
are used to help generate process heat. the associated space requirement and investment
costs. In addition, the use of heat exchangers in the
flue gas system of the CHP is reduced.
Design Equipment
The design of our waste heat boiler with burner The equipment options are identical to that available
Technical data of the four-pass boiler UL-S corresponds to the basic design of the UL-S series. We for the steam boiler UL-S series.
manufacture the boiler with an additional integrated
smoke tube pass (fourth pass).
Heat transfer medium High-pressure saturated steam
Water/Condensate
Steam
Flue gas
The BCO offers fully automatic and efficient boiler MEC Optimize is integrated in the boiler control
operation with smart control features. Bosch provides cabinet and records all data from the boiler and other
the control system project-specific configured and connected plant components. The operating data is
tested in a fully wired wall or floor-standing control stored locally for many years and evaluated via trend
cabinet. Combined with our system control SCO, you analyses. If the fuel consumption increases, for
can network up to six boilers and all system example, due to excessive desalting rates or soiling in
components via one operating unit. the boiler, the efficiency assistant reports possible
causes. As an option, it is possible to send
Customer-specific, fully automatic boiler operation notifications for defined cases directly to the
Comprehensive automatic functions such as output/ operator’s mobile phone via the remote connection
level control, low load control, operating hours technology MEC Remote.
counter, number of burner starts, operating and
fault messages Another important optimisation aspect is the
Storage of all operationally relevant measured maximisation of the boiler lifetime. MEC Optimize not
values for maximum data transparency only serves as a digital boiler logbook but interprets
Integrated protective functions for high supply and the entered values and helps the operator to identify
operational reliability and correct conditions that promote corrosion or are
Condition and efficiency monitoring even safety-critical. MEC Optimize also helps to avoid
Ideal water conditions due to automatic, conductivity- production losses due to interrupted process heat:
controlled desalting and blow-down process The permissible loads and switching cycles are stored
Compatible with all common automation systems for all important components. Based on the operating
for easy connection mode, the efficiency assistant determines the state of
Optional fully automatic start-up control SUC the component, predicts the probable remaining
Optional remote connection via MEC Remote lifetime and supports in maintenance planning.
MEC Remote is the ideal solution for all companies: Effective service support Always there for you
▶ In which the supervising personnel cannot be On request also the Bosch experts can use the We offer our customers a 24/7 service and ensure the
on-site constantly remote access to perform extended parametrisation, shortest response times through a close network of
▶ Operating single or multi-boiler systems requiring programming (PLC) and fault analysis directly on service areas. During normal working hours you can
supervision your system. If components fail, the service experts get in touch directly with your responsible service
▶ With on-call service, e. g. at the weekends can utilise remote analysis to narrow down the technician. You will find the contact details on the
cause and ensure they arrive with the appropriate control cabinet of your boiler system. For
Using the overview map of MEC Remote, you can equipment. This optimises service costs and emergencies and outside business hours, the
monitor all your boiler systems around the world. The increases system availability. 24-hour hotline is available:
secure remote access allows you to visualise the
surface of the control system and retrieve all relevant Secure remote access Service Hotline Germany/International:
boiler data. As an option, MEC Remote can send We provide a sophisticated role concept that controls +49 180 5667468*
alarm notifications via SMS or e-mail in combination both access authorisation and approved visualisation Service Hotline Austria:
with MEC Optimize. This significantly reduces the levels. The remote access function itself has a multi- +43 810 810300**
monitoring required for systems with high reliability level security concept. The external data connection
requirements, such as those in constant operation. can be turned on or off on the hardware at any time
in the boiler house using a key. The operating data
from the industrial boilers are only saved locally on
the system, not in a cloud. More than 200 Commissioning up to remote analysis
Our boiler service covers the entire life cycle of your
Bosch service plant from commissioning to regular maintenance.
technicians and Service access via MEC Remote provides fast and
cost-efficient remote support. Not sure whether your
certified service boiler system is still state-of-the-art and working
partners efficiently? Here too, our experts provide support and
worldwide evaluate potential modernisation measures based on
your specific situation.
The Beck+Heun GmbH, a leading manufacturer of Due to production extension at the Hungarian increase the availability and optimise the fuel
roller shutter casings, had modernised their machine location Nemesvámos, the confectionery consumption. Thanks to its modularity, the energy
fleet with the objective of increasing production manufacturer Haribo had a higher process heat system can be easily expanded in case of further
capacities and to produce resource-conserving. The demand. For many years, the existing U-HD steam increases in capacity.
new steam boilers UL-S have been dimensioned with boiler supplied the production with steam and heated
a peak load of 8 t/h of steam. The process heat is the buildings. For the expansion of the steam supply
used to support the pre-expanding of polystyrene Haribo selected a Bosch steam boiler UL-S with 4 t/h
granules which are subsequently processed for the and optimally-matched components. The modular
fabrication of roller shutter casings. The previous design and the pre-configured system control enabled
process heat generation plant comprised three boil- a fast integration of the existing and new boiler plant
ers with a total capacity of 5.5 t/h of steam. into the steam network. 6 t/h of steam are now avail-
The two efficient Bosch steam boilers supply a total of up to 8 t/h of able for production processes. The heating supply
steam.
Result was decoupled and is provided by a separate heating
The new boiler system not only produces 45 % more 1,900 MWh a year. Furthermore, the minimised CO2 boiler from Bosch Thermotechnology.
steam, it is also around 20 % more efficient than the emissions improve the ecological balance.
old system. The fuel demand was reduced by nearly Result
The new boiler system from Bosch is intelligently
controlled and provides a reliable and energy- The new, modular steam boiler UL-S with heat recovery equipment
efficient operation. Regular maintenance services for maximum efficiency.
Optimised
operation
Fan control
Combustion control
Water/Condensate 1 Water treatment module 7 Expansion and heat 12 To expansion and heat
Steam 2 Water service module WSM-V recovery module EHB recovery module EHB Water/Condensate 1 Water treatment module 5 Steam boiler U-HD 9 Consumer
Flue gas 3 Economizer ECO 8 Steam distributer SD 13 From condensing heat Steam 2 Water service module WSM-V 6 Condensing heat exchanger 10 Condensate service module CSM
4 Steam boiler UL-S 9 Production exchanger Flue gas 3 Economizer ECO 7 Heating boiler 11 Chimney
5 Vapour cooler VC 10 Chimney
Extremely simplified diagram 4 Steam boiler UL-S 8 Distributor 12 Fresh water
Extremely simplified diagram 6 Condensing heat exchanger 11 Fresh water
Bosch Industriekessel GmbH
Nuernberger Strasse 73
91710 Gunzenhausen
Germany
Tel. +49 9831 56253
Fax +49 9831 5692253
sales@bosch-industrial.com
Service Hotline +49 180 5667468*
Spare Parts Hotline +49 180 5010540*
Haldenweg 7
5500 Bischofshofen
Austria
Tel. +43 6462 2527300
Fax +43 6462 252766300
sales-at@bosch-industrial.com
Service Hotline +43 810 810300**
Spare Parts Hotline +49 180 5010540*
info@bosch-industrial.com
www.bosch-industrial.com
www.bosch-industrial.com/YouTube
* EUR 0.14/min from German landline; maximum mobile phone price: 0.42 Euro/min
**max. EUR 0.10/min from Austrian landline
Different charges may apply for calls from mobile networks and for international calls.