Annexure I

RFI Raised by L&T for inspection & RFI selected by EE


8/19/2021 View Message In Print Format

Satra I Man Pvt Ltd


  Survey Engineer2 -DSIR <sur2@dsirtp2ee.in>

From :   Survey Engineer2 -DSIR <sur2@dsirtp2ee.in>


Date :   Mon, 25 Jan 2021 13:52:40 +0530 (IST)
To :   mgrinfra-dicdl@gujarat.gov.in, vivek.mehra@aecom.com,
shakymuni.bahatre@aecom.com, sourabh.tuljapurkar@aecom.com, jm5-dicdl
<jm5-dicdl@gujrat.gov.in>
CC :   Team Leader-DSIR <tl@dsirtp2ee.in>, RE-DSIR <re@dsirtp2ee.in>, HE1
<he1@dsirtp2ee.in>, HE2 <he2@dsirtp2ee.in>, Struture Engineer-DSIR
<stru1@dsirtp2ee.in>, Struture Engineer 03 -DSIR <stru3@dsirtp2ee.in>, QC
Engineer-1 <qaqc1@dsirtp2ee.in>, QC Engineer-2 <qaqc2@dsirtp2ee.in>, Survey
Engineer -DSIR <sur1@dsirtp2ee.in>, Survey Engineer2 -DSIR
<sur2@dsirtp2ee.in>, Safety Engineer-DSIR <safe1@dsirtp2ee.in>, QSRS
<qsrs@dsirtp2ee.in>
Subject :   EE's RFI Summary dated 25.01.2021
Attachments :   RFI_SUMMARY_FOR_25.01.2021.pdf
 
Dear Sir,

Please find herewith attached EE's RFI Summary dated 25.01.2021

--

 
Thanks & Regards

Wakil Ahmad(Survey Engineer2)

EE_Dholera

mail.satragroup.in/servlet/ViewMessageServlet?foldername=INBOX&uidl=1611562960824.32673&msgid=986&action=print&login=sur2&ID=null 1/1
DESIGN AND CONSTRUCTION OF ROADS AND SERVICES OF ACTIVATION AREA IN DHOLERA SPECIAL INVESTMENT REGION AREA, DHOLERA
Client : Dholera Industrial City Development Limited. (DICDL)
Employer's Engineer : Yooshin Engineering Corporation in JV with Multi Media and SATRA
Contractor : Larsen & Toubro Limited
Submission
23-Jan-21
Date :
Summary of RFI raised
Inspection
25-Jan-21
Date :
Location
Sr. No. RFI No. Time Description Sub Activity Layer/Lift/No. Side Remarks
Name of the Road From / Chainage To / Chainage

SURVEY
Layout Checking for Recycle Water @ B-48 Road (CENTER to RHS) Pipe Line Crossing @ CH.0+785 CENTER to
1 LNT-TP2-AA-RS-SUR-RFI-174164 8:30 AM RECYCLE-PC SURVEY B-48 0+785 0+785
(Property Connection) Length-9.4m RHS
Layout Checking for Recycle Water @ CPR-7 Road (CENTER to BHS) Pipe Line Crossing @ CH.0+255 CENTER to
2 LNT-TP2-AA-RS-SUR-RFI-174165 9:30 AM RECYCLE-PC SURVEY CPR-7 0+255 0+255
(Property Connection) Length-24m BHS
Layout Checking for Potable Water @ CPR-7 Road (CENTER to BHS) Pipe Line Crossing @ CH.0+250 CENTER to
3 LNT-TP2-AA-RS-SUR-RFI-174166 9:30 AM POTABLE-PC SURVEY CPR-7 2+50 2+50
(Property Connection) Length-24m BHS
Layout Checking for Potable Water @ B-48 Road (CENTER to BHS) Pipe Line Crossing @ CH.0+770 CENTER to
4 LNT-TP2-AA-RS-SUR-RFI-174167 9:00 AM POTABLE-PC SURVEY B-48 0+770 0+770
(Property Connection) Length-10.4m BHS
Layout Checking for Insdutriual Effluent Water @ B-48 Road (CENTER to BHS) Pipe Line Crossing @ CENTER to
5 LNT-TP2-AA-RS-SUR-RFI-174168 9:00 AM IE-PC SURVEY B-48 0+820 0+820 SUR1
CH.0+820 (Property Connection) Length-12.13m BHS
Layout Checking of As Built of Thust Block for Recycle Water Rising Main @ G-7 Road (LHS ) Ch-
6 LNT-TP2-AA-RS-SUR-RFI-174169 10:30 AM RW-RM AS BUILT SURVEY G-7 0+900 0+900 LHS SUR2
0+900 & 0+900
Layout Checking of As Built of Thust Block for Recycle Water Rising Main @ G-7 Road (RHS ) Ch-
7 LNT-TP2-AA-RS-SUR-RFI-174170 10:30 AM RW-RM AS BUILT SURVEY G-7 0+900 0+900 RHS SUR2
0+900 & 0+900
Layout Checking of As Built of Thust Block for Recycle Water Rising Main @ B-42 Road (CENTER) Ch-
8 LNT-TP2-AA-RS-SUR-RFI-174171 10:00 AM RW-RM AS BUILT SURVEY B-42 0+715 0+715 CENTER SUR2
0+715
Layout Checking of As Built of Thust Block for Industrial Effluent Rising Main @ G-7 Road (RHS) Ch-
9 LNT-TP2-AA-RS-SUR-RFI-174172 10:30 AM IE-RM AS BUILT SURVEY G-7 0+855 0+898 RHS SUR2
0+855, 0+855, 0+855, 0+898
Layout Checking of As Built of Thust Block for Industrial Effluent Rising Main @ G-7 Road (LHS) Ch-
10 LNT-TP2-AA-RS-SUR-RFI-174173 10:30 AM IE-RM AS BUILT SURVEY G-7 0+855 0+855 LHS SUR2
0+855, 0+855, 0+855,
11 LNT-TP2-AA-RS-SUR-RFI-174174 8:00 AM SWD Layout Checking @ G6 Road SURVEY G6 0+021 0+040 LHS
ROAD
12 LNT-TP2-AA-RS-ROD-RFI-174175 10:00 AM ROAD FDD & Level Checking of MCW Subgrade @ B42 Road Offset- 0.0m to 6.0m Subgrade Top B42 2+100 2+370 BHS
E3 & E1 Node No- E3 LHS Ch: 1+970 to 1+988 & E1
13 LNT-TP2-AA-RS-ROD-RFI-174176 10:00 AM ROAD FDD Checking for Embankment @ E3 & E1 Node No-110 Embankment 7th -
110 RHS Ch: 3+827 to 3+846
E3 & E1 Node No- E3 LHS Ch: 1+970 to 1+988 & E1
14 LNT-TP2-AA-RS-ROD-RFI-174177 6:00 PM ROAD FDD Checking for Embankment @ E3 & E1 Node No-110 Embankment 8th -
110 RHS Ch: 3+827 to 3+846
FDD & Level Checking for Embankment @ G4 & G7 Junction Node- 175 Activation Area End G4 & G7 Junction
15 LNT-TP2-AA-RS-ROD-RFI-174178 9:00 AM ROAD Embankment Top 1+590 1+610 BHS
Portion Node- 175
G4 & G7 Junction
16 LNT-TP2-AA-RS-ROD-RFI-174179 2:00 PM ROAD FDD Checking for Subgrade @ G4 & G7 Junction Node- 175 Activation Area End Portion Subgrade 1st 1+590 1+610 BHS
Node- 175
G4 & G7 Junction
17 LNT-TP2-AA-RS-ROD-RFI-174180 5:00 PM ROAD FDD Checking for Subgrade @ G4 & G7 Junction Node- 175 Activation Area End Portion Subgrade 2nd 1+590 1+610 BHS
Node- 175
18 LNT-TP2-AA-RS-ROD-RFI-174181 11:00 AM ROAD FDD & Level Checking for Rectification of Subgrade Top @ CPR5 Road Offset- 0m to 7m Subgrade Top CPR5 0+250 0+290 BHS HE2
19 LNT-TP2-AA-RS-ROD-RFI-174182 9:00 AM ROAD Checking for Perforated Pipe Laying @ B55 Road Perforated Pipe Laying B55 0+650 0+695 BHS
Field Dry Density , Level & Surface regularity Checking for WMM Laying @ B57 Road Offset- 0.3m to
20 LNT-TP2-AA-RS-ROD-RFI-174183 9:00 AM ROAD WMM TOP B57 0+050 0+400 RHS HE3
7.3m
21 LNT-TP2-AA-RS-ROD-RFI-174184 4:00 PM ROAD FDD & Level Checking for MCW Subgrade @ B57 Road Width- 14.6m Subgrade Top B57 1+700 1+900 BHS HE3
22 LNT-TP2-AA-RS-ROD-RFI-174185 10:00 AM ROAD FDD & Level Checking for MPC Subgrade @ J1 Road Offset- 10.8m to 13.5m MPC Subgrade Top J1 0+050 0+200 LHS
23 LNT-TP2-AA-RS-ROD-RFI-174186 12:00 PM ROAD FDD & Level Checking for MPC Subgrade @ J1 Road Offset- 10.8m to 13.5m MPC Subgrade Top J1 0+200 0+400 LHS
24 LNT-TP2-AA-RS-ROD-RFI-174187 3:00 PM ROAD FDD & Level Checking for OGL @ G6 Road Offset 0m to 30m OGL G6 0+000 0+200 RHS
25 LNT-TP2-AA-RS-ROD-RFI-174188 12:00 PM ROAD FDD & Level Checking for Subgrade @ D9 Road Offset- 0m to 8.1m Subgrade Top D9 0+380 0+440 BHS
26 LNT-TP2-AA-RS-ROD-RFI-174189 10:00 AM ROAD FDD Checking for Outer MPC Embankment @ G6 Road Offset- 23m to 29m MPC Embankment 6th G6 2+970 3+000 LHS
27 LNT-TP2-AA-RS-ROD-RFI-174190 6:00 PM ROAD FDD Checking for Outer MPC Embankment @ G6 Road Offset- 23m to 29m MPC Embankment 7th G6 2+970 3+000 LHS
28 LNT-TP2-AA-RS-ROD-RFI-174191 10:00 AM ROAD FDD Checking for Outer MPC Embankment @ G6 Road Offset- 23m to 29m MPC Embankment 6th G6 1+630 1+650 RHS
29 LNT-TP2-AA-RS-ROD-RFI-174192 6:00 PM ROAD FDD Checking for Outer MPC Embankment @ G6 Road Offset- 23m to 29m MPC Embankment 7th G6 1+630 1+650 RHS
30 LNT-TP2-AA-RS-ROD-RFI-174193 10:00 AM ROAD FDD Checking for Outer MPC Embankment @ G6 Road Offset- 23m to 29m MPC Embankment 7th G6 2+850 2+950 RHS
31 LNT-TP2-AA-RS-ROD-RFI-174194 6:00 PM ROAD FDD Checking for Outer MPC Embankment @ G6 Road Offset- 23m to 29m MPC Embankment 8th G6 2+850 2+950 RHS
32 LNT-TP2-AA-RS-ROD-RFI-174195 6:00 PM ROAD FDD Checking for Outer MPC Embankment @ G6 Road Offset- 23m to 29m MPC Embankment 8th G6 2+900 2+970 LHS
33 LNT-TP2-AA-RS-ROD-RFI-174196 4:00 PM ROAD FDD Checking for Embankment @ G6 Road Offset- 0m to 11.5m Embankment 1st G6 0+000 0+200 RHS
34 LNT-TP2-AA-RS-ROD-RFI-174197 4:00 PM ROAD Checking for Perforated Pipe Laying @ B42 Road Perforated Pipe Laying B42 1+590 1+800 BHS
Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ B42 Road Offset- 5.0m to
35 LNT-TP2-AA-RS-ROD-RFI-174198 5:00 PM ROAD CTSB TOP B42 1+590 1+800 BHS
6.0m
Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ B42 Road Offset- 0.0m to
36 LNT-TP2-AA-RS-ROD-RFI-174199 5:00 PM ROAD CTSB TOP B42 2+300 2+570 BHS
5.0m
37 LNT-TP2-AA-RS-ROD-RFI-174200 8:00 AM ROAD Checking for Perforated Pipe Laying @ B42 Road Perforated Pipe Laying B42 0+850 1+300 RHS
Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ B42 Road Offset- 5.0m to
38 LNT-TP2-AA-RS-ROD-RFI-174201 8:00 AM ROAD CTSB TOP B42 0+850 1+300 RHS
6.5m
Field Dry Density , Level & Surface regularity Checking for WMM Laying @ B42 Road Offset- 0.0m to
39 LNT-TP2-AA-RS-ROD-RFI-174202 8:00 AM ROAD WMM TOP B42 2+600 2+800 BHS HE3
6.0m
40 LNT-TP2-AA-RS-ROD-RFI-174203 5:00 PM ROAD Application of Prime coat @ B42 Road Offset- 0.0m to 6.0m PRIME COAT B42 2+600 2+800 BHS
Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ B41/2 Road Offset- 0.0m
41 LNT-TP2-AA-RS-ROD-RFI-174204 8:00 AM ROAD CTSB TOP B41/2 0+850 0+980 BHS HE3
to 6.0m
42 LNT-TP2-AA-RS-ROD-RFI-174205 10:00 AM ROAD Kerb Laying Alignment & Level Checking @ B42 Road Offset- 6m KERB LAYING B42 3+100 3+340 BHS
43 LNT-TP2-AA-RS-ROD-RFI-174206 11:00 AM ROAD Kerb Laying Alignment & Level Checking @ B57 Road Offset- 0.3m KERB LAYING B57 0+040 0+130 BHS
44 LNT-TP2-AA-RS-ROD-RFI-174207 10:00 AM ROAD Kerb Laying Alignment & Level Checking @ G7 Road Offset- 17m KERB LAYING G7 1+640 1+700 RHS
MPC & CYCLE TRACK WMM
45 LNT-TP2-AA-RS-ROD-RFI-174208 10:00 AM ROAD FDD & Level Checking for inner MPC & CYCLE TRACK WMM TOP @ H1 Road Offset- 25.5m to 30.5m H1 4+300 4+400 RHS
TOP
46 LNT-TP2-AA-RS-ROD-RFI-174209 10:00 AM ROAD FDD & Level Checking of Subgrade @ B41/2 Road Offset- 0m to 6m Subgrade Top B41/2 0+910 0+920 RHS HE3
47 LNT-TP2-AA-RS-ROD-RFI-174210 10:00 AM ROAD Field Dry Density Checking of Subgrade @ B41/2 Road Offset- 0m to 6m Subgrade 2nd B41/2 0+910 0+920 LHS
48 LNT-TP2-AA-RS-ROD-RFI-174211 4:00 PM ROAD FDD & Level Checking of Subgrade @ B41/2 Road Offset- 0m to 6m Subgrade Top B41/2 0+910 0+920 LHS
49 LNT-TP2-AA-RS-ROD-RFI-174212 11:00 AM ROAD FDD & Level Checking of Subgrade @ CPR7 Road Offset- 0m to 7m Subgrade Top CPR7 0+560 0+592 BHS
SERVICES
50 LNT-TP2-AA-RS-SER-RFI-174213 5:00 PM EDGE BEAM Shuttering & Concrete Checking for Precast block of Edge Beam (290*150*300) @ PC Yard Shuttering & Concreting - - - -
Checking of Reinforcement, Shuttering & Concrete for MPC Slab (3180 x 2500 x 150 - 3 No), (4180 x Reinforcement, Shuttering &
51 LNT-TP2-AA-RS-SER-RFI-174214 5:00 PM SWD PC Yard - - -
2500 x 150 -3 No), (3680 x 2500 x 150 - 3 No) @ PC Yard Concreting
Reinforcement, Shuttering & Concrete Checking for UCD (PD, Utility, Water duct) Jointing Wall (1.5m) Reinforcement, Shuttering &
52 LNT-TP2-AA-RS-SER-RFI-174215 5:00 PM SWD H1 - - -
@ H1 Road Ch- 5+545 & 5+620 Median Concreting
UTILITY CROSS Reinforcement, Shuttering & Concrete Checking for UCD (PD) Jointing Slab (1.0m) @ G7 Road Ch- Reinforcement, Shuttering &
53 LNT-TP2-AA-RS-SER-RFI-174216 5:00 PM G7 - - -
DUCT 2+885 & 3+330 Median Concreting
UTILITY CROSS Excavation, Bed level, & PCC Laying Checking for UCD (PD) Tapering Portion (2.2m) @ G4 Road Ch:
54 LNT-TP2-AA-RS-SER-RFI-174217 5:00 PM Concreting G4 - - BHS
DUCT 7+020
Reinforcement, Shuttering & Concrete Checking for property connection Jointing Wall & Slab (1.5m) Reinforcement, Shuttering &
55 LNT-TP2-AA-RS-SER-RFI-174218 5:00 PM SWD G4 - - -
@ G4 Road Ch: 6+775, 6+640, 6+700, 6+395, 6+085 LHS & 6+875, 6+455 RHS Concreting
Reinforcement, Shuttering & Concrete Checking for property connection Jointing Raft (1.4m) @ G4 Reinforcement, Shuttering &
56 LNT-TP2-AA-RS-SER-RFI-174219 5:00 PM SWD G4 - - RHS
Road Ch: 3+210 Concreting
57 LNT-TP2-AA-RS-SER-RFI-174220 4:00 PM SWD Checking of Excavation, Bed Level & PCC Laying @ C7/2 Road Concreting C7/2 4+580 4+620 LHS
Reinforcement, Shuttering & Concrete Checking for Raft & Haunch with Invert Level Checking @ D9 Reinforcement, Shuttering &
58 LNT-TP2-AA-RS-SER-RFI-174221 4:00 PM SWD D9 0+155 0+170 RHS ST1
Road (Part-2) Concreting
Reinforcement, Shuttering &
59 LNT-TP2-AA-RS-SER-RFI-174222 4:00 PM SWD Reinforcement, Shuttering & Concrete Checking for Wall @ D9 Road (Part-2) D9 0+125 0+140 RHS ST1
Concreting
60 LNT-TP2-AA-RS-SER-RFI-174223 4:00 PM SWD Checking of Excavation, Bed Level & PCC Laying @ G6 Road Concreting G6 0+021 0+040 LHS
Reinforcement, Shuttering &
61 LNT-TP2-AA-RS-SER-RFI-174224 4:00 PM SWD Casting of Inlet Ch: 1+480 @ H1 Road H1 - - RHS
Concreting
62 LNT-TP2-AA-RS-SER-RFI-174225 8:00 AM PD Checking of PD inner side Back filling with crusher dust @ C7/2 Road PD Back filling 1st C7/2 4+715 4+765 LHS
63 LNT-TP2-AA-RS-SER-RFI-174226 3:00 PM PD Checking of PD inner side Back filling with crusher dust @ C7/2 Road PD Back filling 2nd C7/2 4+715 4+765 LHS
64 LNT-TP2-AA-RS-SER-RFI-174227 5:00 PM PD Checking of PD inner side Back filling with crusher dust @ C7/2 Road PD Back filling 3rd C7/2 4+715 4+765 LHS
Checking of Excavation, PCC (M20) Laying & Top Level Checking for Insdutrial Effluent @ B-48 Road CENTER to
65 LNT-TP2-AA-RS-SER-RFI-174228 11:30 AM IE-PC EXCAVATION & PCC B-48 0+820 0+820
CENTER to RHS Pipe Line Crossing @ Ch-0+820 (Proparty Connection) Length-10.13m RHS
Checking of Excavation, PCC (M20) Laying & Top Level Checking for Thrust for Insdutrial Effluent @ B-
66 LNT-TP2-AA-RS-SER-RFI-174229 9:00 AM IE THRUST BLOCK B-42 2+040 2+040 CENTER
42 Road Road
Reinforcement & Shuttering Checking & Concreting (M40) for Thrust Block of Pipe Line for Insdustrial
67 LNT-TP2-AA-RS-SER-RFI-174230 3:00 PM IE THRUST BLOCK B-42 2+040 2+040 CENTER
Effluent @ B-42 Road
68 LNT-TP2-AA-RS-SER-RFI-174231 9:00 AM IE Excavation & Sand Bed Level Checking of Pipe Line for Industrial Effluent @ E-1 Road EXCAVATION & BEDDING E-1 2+829 2+916.70 CENTER
69 LNT-TP2-AA-RS-SER-RFI-174232 11:30 AM IE Jointing & Laying of 1000 mm Dia.HDPE Pipe for Industrial Effluent @ E-1 Road LAYING & JOINTING E-1 2+829 2+916.70 CENTER
Reinforcement & Shuttering Checking & Concreting (M40) for Casing for Sewerage @ B-57 Road CENTER to
70 LNT-TP2-AA-RS-SER-RFI-174233 10:00 AM SEWER-PC CASING B-57 1+480 1+920
CENTER to LHS Pipe Line Crossing @ CH.1+480 (Property Connection) Length-13 m each BHS
71 LNT-TP2-AA-RS-SER-RFI-174234 11:00 AM POTABLE Excavation & Bed Level Checking of Pipe Line for Potable Water @ E-3 Road EXCAVATION & BEDDING E-3 0+700 0+864.68 LHS
72 LNT-TP2-AA-RS-SER-RFI-174235 2:30 PM POTABLE Laying & Jointing of 110mm Dia.HDPE of Pipe Line for Potable Water @ E-3 Road JOINTING & LAYING E-3 0+650 0+864.68 LHS
73 LNT-TP2-AA-RS-SER-RFI-174236 3:30 PM POTABLE Backfilling by Crusher Dust of Pipe Line for Potable Water @ E-3 Road CRUSHER DUST BACKFILING E-3 0+650 0+864.68 LHS
Checking of Excavation, PCC (M20) Laying & Top Level Checking for Potable Water @ B-48 Road CENTER to
74 LNT-TP2-AA-RS-SER-RFI-174237 11:00 AM POTABLE-PC EXCAVATION & PCC B-48 0+770 0+770
(CENTER to RHS ) Pipe Line Crossing @ CH.0+770 (Property Connection) Length-8.4m RHS
Reinforcement & Shuttering Checking & Concreting (M40) for Casing for Recycle Water @ B-57 Road CENTER to
75 LNT-TP2-AA-RS-SER-RFI-174238 5:00 PM RECYCLE-PC CASING B-57 1+720 1+720
(CENTER to BHS) Pipe Line Crossing @ CH.1+720 (Property Connection) Length-14.6m BHS
Checking of Excavation, PCC (M20) Laying & Top Level Checking for Recycle Water @ B-48 Road CENTER to
76 LNT-TP2-AA-RS-SER-RFI-174239 11:30 AM RECYCLE-PC EXCAVATION & PCC B-48 0+785 0+785
(CENTER to RHS) Pipe Line Crossing @ CH.0+785 (Property Connection) Length-7.4m RHS
Checking of Excavation, PCC (M20) Laying & Top Level Checking for Thrust for Recycle Water @ E-2
77 LNT-TP2-AA-RS-SER-RFI-174240 9:00 AM RECYCLE THRUST BLOCK E-2 1+966.95 1+966.95 RHS
Road
Reinforcement & Shuttering Checking & Concreting (M40) & for Thrust Block of Pipe Line for Recycle
78 LNT-TP2-AA-RS-SER-RFI-174241 3:00 PM RECYCLE THRUST BLOCK E-2 1+966.95 1+966.95 RHS
Water @ E-2 Road
Reinforcement & Shuttering Checking & Concreting (M40) & Top Level Checking for Raft of Power
79 LNT-TP2-AA-RS-SER-RFI-174242 9:00 AM PD RAFT & TOP LEVEL G-7 3+090 3+100 LHS
Duct Size 2.7m*1.8m @ G-7 Road
Reinforcement & Shuttering Checking & Concreting (M40) & for Wall 2nd Lift & Slab of Power Duct
80 LNT-TP2-AA-RS-SER-RFI-174243 10:00 AM PD WALL 2nd LIFT & SLAB G-7 3+115 3+125 LHS
Size 2.7m*1.8m @ G-7 Road
Reinforcement & Shuttering Checking & Concreting (M40) & for Wall 2nd Lift & Slab of Power Duct
81 LNT-TP2-AA-RS-SER-RFI-174244 10:00 AM PD WALL 2nd LIFT & SLAB H-1 1+305 1+315 RHS
Size 2.7m*1.8m @ H-1 Road
Checking of Excavation, PCC (M20) Laying & Top Level Checking for Power Duct Size 2.7m*1.8m @ A-6
82 LNT-TP2-AA-RS-SER-RFI-174245 11:30 AM PD PD PCC & TOP LEVEL A-6 0+180 0+200 LHS
Road
Reinforcement & Shuttering Checking & Concreting (M40) & Top Level Checking for Raft of Power
83 LNT-TP2-AA-RS-SER-RFI-174246 1:30 PM PD RAFT & TOP LEVEL G-6 0+570 0+585 RHS
Duct Size 2.7m*1.8m @ G-6 Road
Reinforcement & Shuttering Checking & Concreting (M40) Checking for Wall of Power Duct Size
84 LNT-TP2-AA-RS-SER-RFI-174247 3:00 PM PD WALL G-6 0+520 0+530 RHS
2.7m*1.8m @ G-6 Road
Reinforcement & Shuttering Checking & Concreting (M40) Checking for Wall 1st LIft of Power Duct
85 LNT-TP2-AA-RS-SER-RFI-174248 10:00 AM PD WALL 1st LIFT G-7 3+100 3+110 LHS
Size 2.7m*1.8m @ G-7 Road
STRUCTURE
Reinforcement & Shuttering Checking & Concreting (M40) of 3rd Flight Stair Case (Elv-13.721 to
86 LNT-TP2-AA-RS-STR-RFI-174249 10:00 AM ESR 3rd FLIGHT OF STAIR CASE ESR R-2 - - -
16.221m) @ ESR R-2
87 LNT-TP2-AA-RS-STR-RFI-174250 9:00 AM ESR Reinforcement & Shuttering Checking & Concreting (M40) of 4th Flight Stair Case @ ESR R- 4th FLIGHT OF STAIR CASE ESR R-2 - - - ST1
88 LNT-TP2-AA-RS-STR-RFI-174251 9:00 AM ESR Reinforcement & Shuttering Checking & Concreting (M40) for Column10th Lift C-9 @ ESR R-8 10 th Lift CLOUMN ESR R-8 - - -
89 LNT-TP2-AA-RS-STR-RFI-174252 10:00 AM ESR Reinforcement & Shuttering Checking & Concreting (M40) for Grade Slab@ ESR P-1 GARD SLAB ESR P-1 - - -
90 LNT-TP2-AA-RS-STR-RFI-174253 9:00 AM ESR Checking of Line, Level & Aliment of DI,Pipe Erection (Lnlet,Overflow, Delivery& Wash Out) @ ESR P-1 ERECTION- PIPE ESR P-1 - - -
91 LNT-TP2-AA-RS-STR-RFI-174254 9:00 AM ESR Checking and Inspection of Water Filling insaide tank of Hydro testing for ESR @ ESR P-1 HYDRO TESTING ESR P-1 - - -
Reinforcement & Shuttering Checking & Concreting (M40) for Stair Column (TC,TC-2 & C-14 & Paridi
92 LNT-TP2-AA-RS-STR-RFI-174255 10:00 AM ESR FINAL LIFT & BEAM ESR P-2 ESR P-2 - - ST3
Wall Final Lift & Beam @ ESR P-2
Checking of Reinforcement, Shuttering & Concrete for column casting (C1, C2, C6, C7) @ E1 Road Ch: Reinforcement, Shuttering &
93 LNT-TP2-AA-RS-STR-RFI-174256 8:00 AM BUS SHELTER E1 - - RHS
1+324 Concreting
Checking of Reinforcement, Shuttering & Concrete for column casting (C3, C4, C5) @ E1 Road Ch: Reinforcement, Shuttering &
94 LNT-TP2-AA-RS-STR-RFI-174257 5:00 PM BUS SHELTER E1 - - LHS
1+645 Concreting
Checking of Reinforcement, Shuttering & Concrete for column casting (C1, C3, C4, C5, C7) @ K2 Road Reinforcement, Shuttering &
95 LNT-TP2-AA-RS-STR-RFI-174258 4:00 PM BUS SHELTER K2 - - RHS
Ch: 0+470 Concreting
Checking of Reinforcement, Shuttering & Concrete for Precast MPC Slab 3680 x 2500 x 150 - 2 No's Reinforcement, Shuttering &
96 LNT-TP2-AA-RS-STR-RFI-174259 4:00 PM MJB G7 Bridge - - -
@ G7 Bridge Concreting
97 LNT-TP2-AA-RS-STR-RFI-174260 8:00 AM OUTFALL Checking of PCC Laying at U/S Apron Portion (A2 Side) (triangular area) @ Outfall-2 Concreting OUTFALL-2 - - - ST3
98 LNT-TP2-AA-RS-STR-RFI-174261 8:00 AM OUTFALL Checking of CC Block Errection (60m to 120m) @ Outfall-2 Erection OUTFALL-2 - - - ST3
ELECTRICAL
99 LNT-TP2-AA-RS-ELE-RFI-174262 10:00 AM ELE Checking of Excavation & BC Cutting for Laying of Mulity Way Duct of Bus Shelter @ G-7 Road EXCAVATION -BC CUTTING G-7 0+530 0+545 BHS
100 LNT-TP2-AA-RS-ELE-RFI-174263 10:00 AM ELE Checking of Excavation & BC Cutting for Laying of Mulity Way Duct of Bus Shelter @ G-7 Road EXCAVATION -BC CUTTING G-7 1+270 1+295 BHS
101 LNT-TP2-AA-RS-ELE-RFI-174264 10:00 AM ELE Checking of Excavation & BC Cutting for Laying of Mulity Way Duct of Bus Shelter @ H-1 Road EXCAVATION -BC CUTTING H-1 2+030 2+030 BHS
102 LNT-TP2-AA-RS-ELE-RFI-174265 10:00 AM ELE Checking of Excavation & BC Cutting for Laying of Mulity Way Duct of High Mast @ H-1 Road EXCAVATION -BC CUTTING H-1 1+790 1+810 LHS
OTHERS
BATCHING
103 LNT-TP2-AA-RS-OTH-RFI-174266 10:00 AM Clibrtaion of Batching Plant (CP30-Schwing Stetter) of Montecc Near by STP CALIBRATION STP STP - QAQC2
PLANT
NCR
104 LNT-TP2-AA-RS-NCR-RFI-174267 9:00 AM NCR NCR CLOSING NO -423 Checking of BC layer and WMM layer removed @ CPR3 Road NCR CLOSING NO -423 CPR3 0+325 0+335 RHS HE3
105 LNT-TP2-AA-RS-NCR-RFI-174268 11:00 AM NCR NCR CLOSING NO -595 Checking of BC layer and WMM layer removed @ CPR3 Road NCR CLOSING NO -595 CPR3 0+500 0+510 LHS HE3
NCR CLOSING NO -439 Checking for Field Dry Density of WMM Top laying & Application of Prime Coat
106 LNT-TP2-AA-RS-NCR-RFI-174269 10:00 AM NCR NCR CLOSING NO -439 CPR3 0+150 0+165 RHS HE3
@ CPR3 Road
NCR CLOSING NO -591 Checking for Rectification of Kerb Laying @ G4 Road Ch: 2+458 to 2+495
107 LNT-TP2-AA-RS-NCR-RFI-174270 9:00 AM NCR LHS, 1+820 to 1+840 LHS, 3+295 to 3+315 LHS, 3+190 to 3+200 LHS, 3+250 to 3+255 LHS, 3+970 to NCR CLOSING NO -591 G4 - - - HE2
3+990 RHS, 2+550 to 2+570 RHS, 2+470 to 2+490 RHS, 4+095 to 4+180 BHS

Sub‐ professional EE staff Total


SP23 Guarang Patel Sur1 1
SP24 Wakil Ahmad Sur2 5
SP14 HE1 0
SP33 Y N Tripathi HE3 8
SP10 Rakesh R ST1 3
SP34 Dilip Rathod ST3 3
SP20 Srirish QAQC1 0
SP 22 0
SP35 Chandrakanta QAQC2 1
SP32 Pranav HE4 0
SP11 ST2 0
SP15 K.N Mishra HE2 2
Total EE RFI 23
Total RFI by L&T 107
Percentage % 21.50%
8/19/2021 View Message In Print Format

Satra I Man Pvt Ltd


  Survey Engineer2 -DSIR <sur2@dsirtp2ee.in>

From :   DC-DSIR <dc@dsirtp2ee.in>


Date :   Thu, 28 Jan 2021 11:42:42 +0530 (IST)
To :   mgrinfra-dicdl@gujarat.gov.in, vivek.mehra@aecom.com,
shakymuni.bahatre@aecom.com, sourabh.tuljapurkar@aecom.com, jm5-dicdl
<jm5-dicdl@gujrat.gov.in>
CC :   Team Leader-DSIR <tl@dsirtp2ee.in>, RE-DSIR <re@dsirtp2ee.in>, HE1
<he1@dsirtp2ee.in>, HE2 <he2@dsirtp2ee.in>, Struture Engineer-DSIR
<stru1@dsirtp2ee.in>, Struture Engineer 03 -DSIR <stru3@dsirtp2ee.in>, QC
Engineer-1 <qaqc1@dsirtp2ee.in>, QC Engineer-2 <qaqc2@dsirtp2ee.in>, Survey
Engineer -DSIR <sur1@dsirtp2ee.in>, Survey Engineer2 -DSIR
<sur2@dsirtp2ee.in>, Safety Engineer-DSIR <safe1@dsirtp2ee.in>, QSRS
<qsrs@dsirtp2ee.in>
Subject :   EE's RFI Summary dated 28.01.2021
Attachments :   RFI_SUMMARY_FOR_28.01.2021.pdf
 
Dear Sir,

Please find herewith attached EE's RFI Summary dated 28.01.2021

 
Thanks & Regards, 

Darshan Shrimali

Accountant

Employer’s Engineer (Dholera SIR)

 
 

mail.satragroup.in/servlet/ViewMessageServlet?foldername=INBOX&uidl=1611814362026.34032&msgid=973&action=print&login=sur2&ID=null 1/1
DESIGN AND CONSTRUCTION OF ROADS AND SERVICES OF ACTIVATION AREA IN DHOLERA SPECIAL INVESTMENT REGION AREA, DHOLERA
Client : Dholera Industrial City Development Limited. (DICDL)
Employer's Engineer : Yooshin Engineering Corporation in JV with Multi Media and SATRA
Contractor : Larsen & Toubro Limited
Submission
27-Jan-21
Date :
Summary of RFI raised
Inspection
28-Jan-21
Date :
Location
Sr. No. RFI No. Time Description Sub Activity Layer/Lift/No. Side Remarks
Name of the Road From / Chainage To / Chainage

SURVEY
1 LNT-TP2-AA-RS-SUR-RFI-174412 9:00 AM SL Layout Checking for Street Light @ D-9 Road SURVEY D-9 0+000 0+322 CENTER Sur1
2 LNT-TP2-AA-RS-SUR-RFI-174413 9:00 AM SL Layout Checking for Street Light @ D-9 Road SURVEY D-9 0+390 0+598 CENTER Sur1
Layout Checking for Sewearge Rising Main @ B-57 Road (CENTER to LHS) Pipe Line Crossing @ CENTER to
3 LNT-TP2-AA-RS-SUR-RFI-174414 10:00 AM SEWER-RM-RC SURVEY B-57 1+862 1+862
CH.1+862 (Road Crossing) Length-0+000 to 0+022m LHS
Layout Checking of As Built of Thust Block for Recycle Water @ B-56 Road (CENTER) Ch-0+758 &
4 LNT-TP2-AA-RS-SUR-RFI-174415 10:30 AM RW AS BUILT SURVEY B-56 0+758 1+019 CENTER Sur1
1+019
5 LNT-TP2-AA-RS-SUR-RFI-174416 10:30 AM IE Layout Checking of As Built of Thust Block for Industrial Effluent @ B-56 Road (RHS) Ch-0+235 AS BUILT SURVEY B-56 0+235 0+235 RHS Sur1
Layout Checking of As Built of Thust Block for Industrial Effluent @ B-56 Road (LHS) Ch-0+235,
6 LNT-TP2-AA-RS-SUR-RFI-174417 10:30 AM IE AS BUILT SURVEY B-56 0+235 0+390 LHS Sur1
0+385, 0+390
7 LNT-TP2-AA-RS-SUR-RFI-174418 11:00 AM IE Layout Checking of As Built of Thust Block for Industrial Effluent @ B-55 Road (CENTER) Ch-0+680 AS BUILT SURVEY B-55 0+680 0+680 CENTER Sur2
Layout Checking of As Built of Thust Block for Recycle Water @ CPR-5 Road (CENTER to RHS) Ch- CENTER to
8 LNT-TP2-AA-RS-SUR-RFI-174419 9:30 AM RW AS BUILT SURVEY CPR-5 0+264 0+264 Sur2
0+264 LHS
Layout Checking for Potable Water @ CPR-5 Road (CENTER to RHS) Pipe Line Crossing @ CENTER to
9 LNT-TP2-AA-RS-SUR-RFI-174420 9:30 AM POTABLE-PC SURVEY CPR-5 0+264.45 0+264.45 Sur2
CH.0264.45 (Property Connection) Length-11.87m RHS
10 LNT-TP2-AA-RS-SUR-RFI-174421 8:00 AM SURVEY Layout Checking for Earthen Bund at U/S Side @ Outfall-2 SURVEY OUTFALL-2 - - BHS
ROAD

11 LNT-TP2-AA-RS-ROD-RFI-174422 4:00 PM ROAD FDD Checking for MCW Subgrade @ B57 Road Offset- 0.3m to 7.3m Subgrade 2nd B57 2+300 2+400 BHS

12 LNT-TP2-AA-RS-ROD-RFI-174423 5:00 PM ROAD FDD Checking for MCW Subgrade @ B57 Road Offset- 0.3m to 7.3m Subgrade 2nd B57 2+400 2+525 BHS

13 LNT-TP2-AA-RS-ROD-RFI-174424 2:00 PM ROAD FDD & Level Checking for MCW Subgrade Top @ B57 Road Offset- 0.3m to 7.3m Subgrade Top B57 2+160 2+300 BHS

14 LNT-TP2-AA-RS-ROD-RFI-174425 11:00 AM ROAD FDD & Level Checking for MPC Subgrade @ B59 Road Offset- 6.0m to 9.88m MPC Subgrade Top B59 1+000 1+200 LHS

15 LNT-TP2-AA-RS-ROD-RFI-174426 8:00 AM ROAD FDD Checking of MCW Subgrade @ E3 Road Offset- 0.0m to 8.6m Subgrade 1st E3 0+850 0+900 BHS

16 LNT-TP2-AA-RS-ROD-RFI-174427 9:00 AM ROAD FDD Checking of MCW Subgrade @ E3 Road Offset- 0.0m to 8.6m Subgrade 2nd E3 1+600 1+700 BHS

17 LNT-TP2-AA-RS-ROD-RFI-174428 8:00 AM ROAD FDD & Level Checking of MCW Subgrade @ E3 Road Offset- 0.0m to 8.6m Subgrade Top E3 1+650 1+950 BHS

18 LNT-TP2-AA-RS-ROD-RFI-174429 10:00 AM ROAD FDD & Level Checking of MCW Subgrade @ E3 Road Offset- 0.0m to 8.6m Subgrade Top E3 1+100 1+300 LHS HE2
Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ E3 Road Offset- 6.1m
19 LNT-TP2-AA-RS-ROD-RFI-174430 8:00 AM ROAD CTSB TOP E3 0+500 0+680 LHS HE2
to 8.1m
Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ B41/2 Road Offset-
20 LNT-TP2-AA-RS-ROD-RFI-174431 8:00 AM ROAD CTSB TOP B41/2 0+850 0+930 BHS HE3
0.0m to 6.0m
Field Dry Density , Level & Surface regularity Checking for WMM Laying @ B42 Road Offset- 0.0m
21 LNT-TP2-AA-RS-ROD-RFI-174432 8:00 AM ROAD WMM TOP B42 3+200 3+360 BHS HE3
to 6.0m
22 LNT-TP2-AA-RS-ROD-RFI-174433 5:00 PM ROAD Application of Prime coat @ B42 Road Offset- 0.0m to 6.0m PRIME COAT B42 3+000 3+360 BHS

23 LNT-TP2-AA-RS-ROD-RFI-174434 8:00 AM ROAD Checking for Perforated Pipe Laying @ B42 Road Perforated Pipe Laying B42 1+600 1+800 BHS
Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ B42 Road Offset- 5.0m
24 LNT-TP2-AA-RS-ROD-RFI-174435 8:00 AM ROAD CTSB TOP B42 1+600 1+800 BHS HE3
to 6.0m
25 LNT-TP2-AA-RS-ROD-RFI-174436 8:00 AM ROAD Checking for Perforated Pipe Laying @ B42 Road Perforated Pipe Laying B42 1+800 1+900 BHS
Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ B42 Road Offset- 5.0m
26 LNT-TP2-AA-RS-ROD-RFI-174437 8:00 AM ROAD CTSB TOP B42 1+800 1+900 BHS
to 6.5m
27 LNT-TP2-AA-RS-ROD-RFI-174438 10:00 AM ROAD FDD Checking of MCW Subgrade @ B42 Road Offset- 0.0m to 6.0m Subgrade 2nd B42 2+270 2+370 BHS

28 LNT-TP2-AA-RS-ROD-RFI-174439 6:00 PM ROAD FDD & Level Checking of MCW Subgrade @ B42 Road Offset- 0.0m to 6.0m Subgrade Top B42 2+270 2+370 BHS

29 LNT-TP2-AA-RS-ROD-RFI-174440 8:00 AM ROAD Checking for Perforated Pipe Laying @ CPR7 Road Perforated Pipe Laying CPR7 0+000 0+250 BHS
Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ CPR7 Road Offset- 5.5m
30 LNT-TP2-AA-RS-ROD-RFI-174441 8:00 AM ROAD CTSB TOP CPR7 0+000 0+250 BHS
to 7.0m
Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ CPR7 Road Offset- 0.0m
31 LNT-TP2-AA-RS-ROD-RFI-174442 8:00 AM ROAD CTSB TOP CPR7 0+300 0+600 RHS
to 6.0m
E3 & E1 Node No- E3 LHS Ch: 2+010 to 2+021 & E1 LHS Ch:
32 LNT-TP2-AA-RS-ROD-RFI-174443 10:00 AM ROAD FDD Checking for Embankment @ E3 & E1 Node No-110 Embankment 5th -
110 3+827 to 3+846
E3 & E1 Node No- E3 LHS Ch: 2+010 to 2+021 & E1 LHS Ch:
33 LNT-TP2-AA-RS-ROD-RFI-174444 6:00 PM ROAD FDD Checking for Embankment @ E3 & E1 Node No-110 Embankment 6th -
110 3+827 to 3+846
E1 & A6 Junction E1 LHS Ch: 3+080 to 3+099 & A6 LHS Ch:
34 LNT-TP2-AA-RS-ROD-RFI-174445 10:00 AM ROAD FDD Checking for Embankment @ E1 & A6 Junction Node No- 108 Embankment 7th -
Node No- 108 0+013 to 0+022
E1 & A6 Junction E1 LHS Ch: 3+080 to 3+099 & A6 LHS Ch:
35 LNT-TP2-AA-RS-ROD-RFI-174446 6:00 PM ROAD FDD Checking for Embankment @ E1 & A6 Junction Node No- 108 Embankment 8th -
Node No- 108 0+013 to 0+022
E1 & A6 Junction E1 LHS Ch: 3+053 to 3+070 & A6 LHS Ch:
36 LNT-TP2-AA-RS-ROD-RFI-174447 10:00 AM ROAD FDD Checking for Embankment @ E1 & A6 Junction Node No- 108 Embankment 7th -
Node No- 108 0+013 to 0+022
E1 & A6 Junction E1 LHS Ch: 3+053 to 3+070 & A6 LHS Ch:
37 LNT-TP2-AA-RS-ROD-RFI-174448 6:00 PM ROAD FDD Checking for Embankment @ E1 & A6 Junction Node No- 108 Embankment 8th -
Node No- 108 0+013 to 0+022

38 LNT-TP2-AA-RS-ROD-RFI-174449 10:00 AM ROAD FDD & Level Checking for Outer MPC WMM TOP @ G7 Road Offset- 23m to 27.5m MPC WMM TOP G7 2+150 2+250 RHS

39 LNT-TP2-AA-RS-ROD-RFI-174450 10:00 AM ROAD FDD & Level Checking for inner MPC WMM TOP @ G7 Road Offset- 17m to 23m MPC WMM TOP G7 2+150 2+250 RHS

40 LNT-TP2-AA-RS-ROD-RFI-174451 10:00 AM ROAD FDD & Level Checking for WMM TOP @ G7 Road Offset- 17m to 27.5m WMM TOP G7 0+300 0+350 RHS

41 LNT-TP2-AA-RS-ROD-RFI-174452 4:00 PM ROAD FDD & Level Checking of MCW Subgrade @ E3 Road Offset- 0.0m to 8.6m Subgrade Top E3 1+100 1+300 LHS

42 LNT-TP2-AA-RS-ROD-RFI-174453 4:00 PM ROAD FDD & Level Checking of MCW Subgrade @ E3 Road Offset- 0.0m to 8.6m Subgrade Top E3 1+100 1+300 RHS

43 LNT-TP2-AA-RS-ROD-RFI-174454 4:00 PM ROAD FDD & Level Checking of MCW Subgrade @ E3 Road Offset- 0.0m to 8.1m Subgrade Top E3 0+800 0+900 LHS

44 LNT-TP2-AA-RS-ROD-RFI-174455 4:00 PM ROAD FDD & Level Checking of MCW Subgrade @ E3 Road Offset- 0.0m to 8.1m Subgrade Top E3 0+800 0+900 RHS

45 LNT-TP2-AA-RS-ROD-RFI-174456 10:00 AM ROAD FDD Checking for inner MPC Embankment @ E3 Road Offset- 8.6m to 13.6m MPC Embankment 7th E3 1+400 1+600 RHS

46 LNT-TP2-AA-RS-ROD-RFI-174457 5:00 PM ROAD FDD Checking for inner MPC Embankment @ E3 Road Offset- 8.6m to 13.6m MPC Embankment 8th E3 1+400 1+600 RHS

47 LNT-TP2-AA-RS-ROD-RFI-174458 10:00 AM ROAD FDD Checking for inner MPC Embankment @ E3 Road Offset- 8.6m to 13.6m MPC Embankment 9th E3 1+100 1+400 RHS

48 LNT-TP2-AA-RS-ROD-RFI-174459 6:00 PM ROAD FDD Checking for inner MPC Embankment @ E3 Road Offset- 8.6m to 13.6m MPC Embankment 10th E3 1+100 1+400 RHS

49 LNT-TP2-AA-RS-ROD-RFI-174460 10:00 AM ROAD FDD Checking for Outer MPC Embankment @ E3 Road Offset- 13.6m to 17m MPC Embankment 8th E3 1+400 1+600 RHS

50 LNT-TP2-AA-RS-ROD-RFI-174461 4:00 PM ROAD FDD Checking for Outer MPC Embankment @ E3 Road Offset- 13.6m to 17m MPC Embankment 9th E3 0+900 1+300 RHS

51 LNT-TP2-AA-RS-ROD-RFI-174462 6:00 PM ROAD FDD Checking for Outer MPC Embankment @ E3 Road Offset- 13.6m to 17m MPC Embankment 9th E3 1+300 1+600 RHS

52 LNT-TP2-AA-RS-ROD-RFI-174463 6:00 PM ROAD FDD Checking for Outer MPC Embankment @ E3 Road Offset- 13.6m to 17m MPC Embankment 9th E3 1+600 1+900 RHS

53 LNT-TP2-AA-RS-ROD-RFI-174464 10:00 AM ROAD FDD & Level Checking of MCW Subgrade @ D9 Road Offset- 0.0m to 8.1m Subgrade Top D9 0+580 0+595 BHS HE2

54 LNT-TP2-AA-RS-ROD-RFI-174465 10:00 AM ROAD FDD & Level Checking of MCW Subgrade @ D9 Road Offset- 0.0m to 8.1m Subgrade Top D9 0+380 0+440 BHS

55 LNT-TP2-AA-RS-ROD-RFI-174466 4:00 PM ROAD FDD & Level Checking for Subgrade @ C7/2 Road Offset- 0m to 10.25m Subgrade Top C7/2 5+740 5+880 RHS

56 LNT-TP2-AA-RS-ROD-RFI-174467 5:00 PM ROAD FDD & Level Checking of MCW Subgrade @ D7 Road Offset- 0.0m to 8.1m Subgrade Top D7 0+700 0+870 BHS

57 LNT-TP2-AA-RS-ROD-RFI-174468 10:00 AM ROAD FDD Checking for Embankment @ D7 Road Offset- 0.0m to 8.1m Embankment 1st D7 0+710 0+720 BHS

58 LNT-TP2-AA-RS-ROD-RFI-174469 3:00 PM ROAD FDD Checking for Embankment @ D7 Road Offset- 0.0m to 8.1m Embankment 2nd D7 0+710 0+720 BHS

59 LNT-TP2-AA-RS-ROD-RFI-174470 6:00 PM ROAD FDD Checking for Embankment @ D7 Road Offset- 0.0m to 8.1m Embankment 3rd D7 0+710 0+720 BHS

60 LNT-TP2-AA-RS-ROD-RFI-174471 4:00 PM ROAD FDD & Level Checking for Subgrade @ CPR12 Road Offset- 0m to 7m Subgrade Top CPR12 0+000 0+100 BHS HE2

61 LNT-TP2-AA-RS-ROD-RFI-174472 11:00 AM ROAD FDD & Level Checking for Subgrade @ E1 Road Offset- 8.1m to 15.1m Subgrade Top E1 1+900 2+100 LHS

62 LNT-TP2-AA-RS-ROD-RFI-174473 4:00 PM ROAD FDD & Level Checking for MPC GSB Top Layer @ E1 Road Offset- 8.1m to 15.3m MPC GSB TOP E1 2+100 2+200 LHS

63 LNT-TP2-AA-RS-ROD-RFI-174474 5:00 PM ROAD FDD Checking for Service Road Subgrade @ G6 Road Offset- 17.5m to 23m Service Road Subgrade 1st G6 2+100 2+700 LHS

64 LNT-TP2-AA-RS-ROD-RFI-174475 4:00 PM ROAD FDD & Level Checking for Service Road Subgrade @ G6 Road Offset- 17.5m to 23m Service Road Subgrade Top G6 1+300 1+600 RHS

65 LNT-TP2-AA-RS-ROD-RFI-174476 4:00 PM ROAD FDD & Level Checking for Service Road Subgrade @ G6 Road Offset- 17.5m to 23m Service Road Subgrade Top G6 1+300 1+600 LHS

66 LNT-TP2-AA-RS-ROD-RFI-174477 4:00 PM ROAD FDD Checking for Subgrade @ H1 Road Offset- 0m to 22m Subgrade 2nd H1 1+190 1+500 RHS
67 LNT-TP2-AA-RS-ROD-RFI-174478 4:00 PM ROAD FDD Checking for Subgrade @ H1 Road Offset- 0m to 22m Subgrade 2nd H1 1+190 1+500 LHS

68 LNT-TP2-AA-RS-ROD-RFI-174479 5:00 PM ROAD FDD & Level Checking for Service Road Outer MPC GSB TOP @ H1 Road Offset- 42.5m to 45.3m Service Road MPC GSB TOP H1 1+500 1+800 LHS

69 LNT-TP2-AA-RS-ROD-RFI-174480 11:00 AM ROAD Kerb Laying Alignment & Level Checking @ B57 Road KERB LAYING B57 0+020 0+130 BHS

70 LNT-TP2-AA-RS-ROD-RFI-174481 10:00 AM ROAD Kerb Laying Alignment & Level Checking @ B57 Road Offset- 0.3m KERB LAYING B57 0+020 0+130 BHS
Checking of Alignment & Level Checking for Kerb Laying (Outer Slip Road) @ E1 RHS & E2 RHS
71 LNT-TP2-AA-RS-ROD-RFI-174482 11:00 AM ROAD KERB LAYING Node no-107 - - -
Road Node no-107
Checking of Alignment & Level Checking for Kerb Laying (Outer Slip Road) @ E1 RHS & E2 LHS
72 LNT-TP2-AA-RS-ROD-RFI-174483 11:00 AM ROAD KERB LAYING Node no-107 - - -
Road Node no-107
73 LNT-TP2-AA-RS-ROD-RFI-174484 8:00 AM ROAD Application of Tack coat laying (RS-1) @ B42 Road Offset- 0.0m to 6.0m TACK COAT B42 2+600 3+050 BHS

74 LNT-TP2-AA-RS-ROD-RFI-174485 9:00 AM ROAD Laying of BC Grade-2, Level and Surface regularity Checking @ B42 Road Offset- 0.0m to 6.0m BC GRADE-2 B42 2+600 3+050 BHS HE3
Field Dry Density , Level & Surface regularity Checking for WMM Laying @ B57 Road Offset- 0.3m
75 LNT-TP2-AA-RS-ROD-RFI-174486 8:00 AM ROAD WMM TOP B57 0+070 0+400 BHS
to 7.3m
E1 RHS Ch: 1+834 to 1+848 & G7 RHS Ch:
76 LNT-TP2-AA-RS-ROD-RFI-174487 9:00 AM ROAD Checking for FDD & WMM Layer Laying @ Node- 106 WMM TOP Node- 106 -
1+975 to 1+989
E1 RHS Ch: 1+834 to 1+848 & G7 RHS Ch:
77 LNT-TP2-AA-RS-ROD-RFI-174488 4:00 PM ROAD Application of Prime coat @ Node- 106 PRIME COAT Node- 106 -
1+975 to 1+989
E1 RHS Ch: 2+535 to 2+565 & E2 RHS Ch:
78 LNT-TP2-AA-RS-ROD-RFI-174489 4:00 PM ROAD Application of Prime coat @ Node- 107 PRIME COAT Node- 107 -
1+960 to 1+990
E1 RHS Ch: 2+495 to 2+555 & E2 LHS Ch:
79 LNT-TP2-AA-RS-ROD-RFI-174490 4:00 PM ROAD Application of Prime coat @ Node- 107 PRIME COAT Node- 107 -
1+960 to 1+990
Earthen Bund Embankment
80 LNT-TP2-AA-RS-ROD-RFI-174491 8:00 AM ROAD FDD Checking for Embankment Outfall Earthen Bund (A3 to A2) @ Outfall -2 OUTFALL-2 - - -
1st
Earthen Bund Embankment
81 LNT-TP2-AA-RS-ROD-RFI-174492 10:00 AM ROAD FDD Checking for Embankment Outfall Earthen Bund (A3 to A2) @ Outfall -2 OUTFALL-2 - - -
2nd
Earthen Bund Embankment
82 LNT-TP2-AA-RS-ROD-RFI-174493 12:00 PM ROAD FDD Checking for Embankment Outfall Earthen Bund (A3 to A2) @ Outfall -2 OUTFALL-2 - - -
3rd
Earthen Bund Embankment
83 LNT-TP2-AA-RS-ROD-RFI-174494 2:00 PM ROAD FDD Checking for Embankment Outfall Earthen Bund (A3 to A1) @ Outfall -2 OUTFALL-2 - - -
1st
Earthen Bund Embankment
84 LNT-TP2-AA-RS-ROD-RFI-174495 4:00 PM ROAD FDD Checking for Embankment Outfall Earthen Bund (A3 to A1) @ Outfall -2 OUTFALL-2 - - -
2nd
Earthen Bund Embankment
85 LNT-TP2-AA-RS-ROD-RFI-174496 5:30 PM ROAD FDD Checking for Embankment Outfall Earthen Bund (A3 to A1) @ Outfall -2 OUTFALL-2 - - -
3rd
86 LNT-TP2-AA-RS-ROD-RFI-174497 8:00 AM ROAD FDD & Level Checking for Embankment @ CPR7 Road Offset- 5.0m to 7.0m Embankment Top CPR7 0+285 0+300 BHS HE2

87 LNT-TP2-AA-RS-ROD-RFI-174498 6:30 PM ROAD FDD Checking for Subgrade @ CPR7 Road Offset- 5.0m to 7.0m Subgrade 1st CPR7 0+285 0+300 BHS
SERVICES
88 LNT-TP2-AA-RS-SER-RFI-174499 5:00 PM EDGE BEAM Shuttering & Concrete Checking for Precast block of Edge Beam (290*150*300) @ PC Yard Shuttering & Concreting - - - -
Checking of Reinforcement, Shuttering & Concrete for MPC Slab (3180 x 2500 x 150 - 3 No), (4180 Reinforcement, Shuttering &
89 LNT-TP2-AA-RS-SER-RFI-174500 5:00 PM SWD PC Yard - - -
x 2500 x 150 -3 No), (3680 x 2500 x 150 - 3 No) @ PC Yard Concreting
Reinforcement, Shuttering & Concrete Checking for UCD (PD, Utility, Water duct) Jointing Wall Reinforcement, Shuttering &
90 LNT-TP2-AA-RS-SER-RFI-174501 5:00 PM SWD H1 - - -
(1.6m) @ H1 Road Ch- 5+545 & 5+620 Median Concreting
91 LNT-TP2-AA-RS-SER-RFI-174502 5:00 PM SWD Checking for SWD Cleaning @ G7 Road SWD Cleaning G7 1+795 2+007 LHS ST3
Reinforcement, Shuttering & Concrete Checking for Raft & Haunch with Invert Level Checking @ Reinforcement, Shuttering &
92 LNT-TP2-AA-RS-SER-RFI-174503 4:00 PM SWD D9 0+170 0+185 RHS
D9 Road (Part-2) Concreting
Reinforcement, Shuttering &
93 LNT-TP2-AA-RS-SER-RFI-174504 4:00 PM SWD Casting of Inlet Ch: 1+480 @ H1 Road H1 - - RHS
Concreting
Reinforcement & Shuttering Checking & Concreting (M40) for Thrust Block of Pipe Line for
94 LNT-TP2-AA-RS-SER-RFI-174505 9:00 AM IE THRUST BLOCK B-42 2+040 2+040 CENTER
Insdustrial Effluent @ B-42 Road
Checking of Excavation, PCC (M20) Laying & Top Level Checking for Sewerage @ B-57 Road CENTER CENTER to
95 LNT-TP2-AA-RS-SER-RFI-174506 8:00 AM SEWER-PC EXCAVATION & PCC B-57 2+040 2+040
to LHS Pipe Line Crossing @ CH.2+040 (Property Connection) Length-17.07m each LHS
Checking of Excavation, PCC (M20) Laying & Top Level Checking for Sewerage @ B-57 Road LHS to CENTER to
96 LNT-TP2-AA-RS-SER-RFI-174507 8:00 AM SEWER-PC EXCAVATION & PCC B-57 2+040 2+040
RHS Pipe Line Crossing @ CH.1+920 (Property Connection) Length-25m each LHS
Jointing & Laying of 160mm Dia.HDPE Pipe for Sewerage @ B-57 Road CENTER to LHS Pipe Line
97 LNT-TP2-AA-RS-SER-RFI-174508 9:30 AM SEWER-PC JOINTING & LAYING B-57 1+920 1+920 LHS to RHS HE3
Crossing @ CH.2+040 (Property Connection) Length-17.07m each
Reinforcement & Shuttering Checking & Concreting (M40) for Casing for Sewerage @ B-57 Road CENTER to
98 LNT-TP2-AA-RS-SER-RFI-174509 3:30 PM SEWER-PC CASING B-57 2+040 2+040
CENTER to LHS Pipe Line Crossing @ CH.2+040 (Property Connection) Length-17.07m each LHS
Jointing & Laying of 160mm Dia.HDPE Pipe for Sewerage @ B-57 Road LHS to RHS Pipe Line Crossing
99 LNT-TP2-AA-RS-SER-RFI-174510 10:00 AM SEWER-PC JOINTING & LAYING B-57 1+920 1+920 LHS to RHS
@ CH.1+920 (Property Connection) Length-25m each
Reinforcement & Shuttering Checking & Concreting (M40) for Casing for Sewerage @ B-57 Road
100 LNT-TP2-AA-RS-SER-RFI-174511 3:00 PM SEWER-PC CASING B-57 1+920 1+920 LHS to RHS
LHS to RHS Pipe Line Crossing @ CH.1+920 (Property Connection) Length-25m each

Checking of Excavation, PCC (M20) Laying & Top Level Checking for Potable Water @ CPR-5 Road CENTER to
101 LNT-TP2-AA-RS-SER-RFI-174512 11:00 AM POTABLE-RC EXCAVATION & PCC CPR-5 0+264 0+264
(CENTER to RHS ) Pipe Line Crossing @ CH.0+264 (Road Crossing) Length-0+000 to 0+011.87 RHS
Jointing & Laying of 110mm Dia.HDPE Pipe for Potable @ CPR-5 Road (CENTER to RHS ) Pipe Line CENTER to
102 LNT-TP2-AA-RS-SER-RFI-174513 1:30 PM POTABLE-RC JOINTING & LAYING CPR-5 0+264 0+264
Crossing @ CH.0+264 (Road Crossing) Length-0+000 to 0+009 RHS
Reinforcement & Shuttering Checking & Concreting (M40) for Casing for Potable Water @ CPR-5 CENTER to
103 LNT-TP2-AA-RS-SER-RFI-174514 4:30 PM POTABLE-RC CASING CPR-5 0+264 0+264
Road (CENTER to RHS ) Pipe Line Crossing @ CH.0+264 (Road Crossing) Length-0+000 to 0+011.87 RHS

Checking of Excavation, PCC (M20) Laying & Top Level Checking for Potable Water @ B-57 Road CENTER to
104 LNT-TP2-AA-RS-SER-RFI-174515 8:00 AM POTABLE-PC EXCAVATION & PCC B-57 2+050 2+050
(CENTER to LHS) Pipe Line Crossing @ CH-2+050 (Property Connection) Length-15.05m LHS
Jointing & Laying of 90mm Dia.HDPE Pipe for Potable @B-57 Road (CENTER to LHS) Pipe Line CENTER to
105 LNT-TP2-AA-RS-SER-RFI-174516 9:30 AM POTABLE-PC JOINTING & LAYING B-57 2+050 2+050 HE3
Crossing @ CH-2+050 (Property Connection) Length-15.05m LHS
Reinforcement & Shuttering Checking & Concreting (M40) for Casing for Potable Water @B-57 CENTER to
106 LNT-TP2-AA-RS-SER-RFI-174517 3:30 PM POTABLE-PC CASING B-57 2+050 2+050
Road (CENTER to LHS) Pipe Line Crossing @ CH-2+050 (Property Connection) Length-15.05m LHS
Checking of Excavation, PCC (M20) Laying & Top Level Checking for Potable Water @ B-57 Road
107 LNT-TP2-AA-RS-SER-RFI-174518 8:00 AM POTABLE-PC EXCAVATION & PCC B-57 1+780 1+780 LHS to RHS
(CENTER to LHS) Pipe Line Crossing @ CH-1+780 (Property Connection) Length-25m
Jointing & Laying of 90mm Dia.HDPE Pipe for Potable @ B-57 Road (CENTER to LHS) Pipe Line
108 LNT-TP2-AA-RS-SER-RFI-174519 9:30 AM POTABLE-PC JOINTING & LAYING B-57 1+780 1+780 LHS to RHS
Crossing @ CH-1+780 (Property Connection) Length-25m
Reinforcement & Shuttering Checking & Concreting (M40) for Casing for Potable Water @ B-57
109 LNT-TP2-AA-RS-SER-RFI-174520 3:30 PM POTABLE-PC CASING B-57 1+780 1+780 LHS to RHS
Road (CENTER to LHS) Pipe Line Crossing @ CH-1+780 (Property Connection) Length-25m
110 LNT-TP2-AA-RS-SER-RFI-174521 9:00 AM POTABLE-RM Excavation & Bed Level Checking of Pipe Line for Potable Water Rising Main @ G-4 Road EXCAVATION & BEDDING G-4 4+390.62 4+500 RHS
111 LNT-TP2-AA-RS-SER-RFI-174522 12:30 PM POTABLE-RM Jointing & Laying of 400mm Dia.DI, K-9 Pipe for Potable Water Rising Main @ G-4 Road LAYING & JOINTING G-4 4+390.62 4+600 RHS HE2
112 LNT-TP2-AA-RS-SER-RFI-174523 3:30 PM POTABLE-RM Backfilling by Crusher Dust of Pipe Line for Potable Water Rising Main @ G-4 Road CRUSHER DUST BACKFILING G-4 4+390.62 4+600 RHS
Checking of Excavation, PCC (M20) Laying & Top Level Checking for Recycle Water @ B-48 Road CENTER to
113 LNT-TP2-AA-RS-SER-RFI-174524 10:00 AM RECYCLE-PC EXCAVATION & PCC B-48 0+785 0+785
(CENTER to RHS) Pipe Line Crossing @ CH.0+785 (Property Connection) Length-7.4m RHS
Jointing & Laying of 90mm Dia.HDPE Pipe for Potable @Recycle Water @ B-48 Road (CENTER to CENTER to
114 LNT-TP2-AA-RS-SER-RFI-174525 11:30 AM RECYCLE-PC JOINTING & LAYING B-48 0+785 0+785
RHS) Pipe Line Crossing @ CH.0+785 (Property Connection) Length-9.4m RHS
Reinforcement & Shuttering Checking & Concreting (M40) for Casing for Potable Water @Recycle
CENTER to
115 LNT-TP2-AA-RS-SER-RFI-174526 3:30 PM RECYCLE-PC Water @ B-48 Road (CENTER to RHS) Pipe Line Crossing @ CH.0+785 (Property Connection) Length- CASING B-48 0+785 0+785
RHS
4.4m
Checking of Excavation, PCC (M20) Laying & Top Level Checking for Recycle Water @ CPR-5 Road CENTER to
116 LNT-TP2-AA-RS-SER-RFI-174527 11:00 AM RECYCLE-RC EXCAVATION & PCC CPR-5 0+264 0+264
(CENTER to BHS ) Pipe Line Crossing @ CH.0+264 (Road Crossing) Length-0+000 to 0+020 BHS
Jointing & Laying of 125mm Dia.HDPE Pipe for Recycle Water @ CPR-5 Road (CENTER to BHS ) Pipe CENTER to
117 LNT-TP2-AA-RS-SER-RFI-174528 12:30 PM RECYCLE-RC JOINTING & LAYING CPR-5 0+264 0+264 HE2
Line Crossing @ CH.0+264 (Road Crossing) Length-0+000 to 0+018.63 BHS
Reinforcement & Shuttering Checking & Concreting (M40) for Casing for Recycle Water @ CPR-5 CENTER to
118 LNT-TP2-AA-RS-SER-RFI-174529 3:30 PM RECYCLE-RC CASING CPR-5 0+264 0+264
Road (CENTER to BHS ) Pipe Line Crossing @ CH.0+264 (Road Crossing) Length-0+000 to 0+014 BHS

Checking of Excavation, PCC (M20) Laying & Top Level Checking for Recycle Water @ B-57 Road CENTER to
119 LNT-TP2-AA-RS-SER-RFI-174530 8:00 AM RECYCLE-PC EXCAVATION & PCC B-57 2+035 2+035
(CENTER to LHS) Pipe Line Crossing @ CH.2+035 (Property Connection) Length-12.92m LHS
Jointing & Laying of 90mm Dia.HDPE Pipe for Recycle @ B-57 Road (CENTER to LHS) Pipe Line CENTER to
120 LNT-TP2-AA-RS-SER-RFI-174531 9:30 AM RECYCLE-PC JOINTING & LAYING B-57 2+035 2+035
Crossing @ CH.2+035 (Property Connection) Length-12.92m LHS
Reinforcement & Shuttering Checking & Concreting (M40) for Casing for Recycle Water @ B-57 CENTER to
121 LNT-TP2-AA-RS-SER-RFI-174532 3:30 PM RECYCLE-PC CASING B-57 2+035 2+035
Road (CENTER to LHS) Pipe Line Crossing @ CH.2+035 (Property Connection) Length-12.92m LHS
Checking of Excavation, PCC (M20) Laying & Top Level Checking for Recycle Water @ B-57 Road (LHS
122 LNT-TP2-AA-RS-SER-RFI-174533 8:00 AM RECYCLE-PC EXCAVATION & PCC B-57 1+720 1+720 LHS to RHS
to RHS) Pipe Line Crossing @ CH.1+720 (Property Connection) Length-25m
Jointing & Laying of 90mm Dia.HDPE Pipe for Recycle @ B-57 Road (LHS to RHS) Pipe Line Crossing
123 LNT-TP2-AA-RS-SER-RFI-174534 9:30 AM RECYCLE-PC JOINTING & LAYING B-57 1+720 1+720 LHS to RHS
@ CH.1+720 (Property Connection) Length-25m
Checking of Excavation, PCC (M20) Laying & Top Level Checking for Thrust for Recycle Water @ G-4
124 LNT-TP2-AA-RS-SER-RFI-174535 11:00 AM RECYCLE THRUST BLOCK G-4 5+527.47 5+527.47 RHS
Road
Reinforcement & Shuttering Checking & Concreting (M40) & for Thrust Block of Pipe Line for
125 LNT-TP2-AA-RS-SER-RFI-174536 5:00 PM RECYCLE THRUST BLOCK G-4 5+527.47 5+527.47 RHS
Recycle Water @ G-4 Road
Reinforcement & Shuttering Checking & Concreting (M40) & for Wall 2nd Lift & Slab of Power Duct
126 LNT-TP2-AA-RS-SER-RFI-174537 10:30 AM PD WALL 2nd LIFT & SLAB G-7 3+090 3+100 LHS ST3
Size 2.7m*1.8m @ G-7 Road
Checking of Excavation, PCC (M20) Laying & Top Level Checking for Power Duct Size 2.2m*1.8m @ E-
127 LNT-TP2-AA-RS-SER-RFI-174538 10:30 AM PD PD PCC & TOP LEVEL E-3 2+135 2+135 LHS
3 Road (Bridge Connectivity) Length-9m
Reinforcement & Shuttering Checking & Concreting (M40) Checking for Wall 1st LIft of Power Duct
128 LNT-TP2-AA-RS-SER-RFI-174539 10:30 AM PD WALL 1st LIFT G-6 3+090 0+570 0+585
Size 2.7m*1.8m @ G-6 Road
STRUCTURE
129 LNT-TP2-AA-RS-STR-RFI-174540 10:00 AM ESR Checking of Excavation PCC (M20) Laying for Grade Slab@ ESR P-1 GARD SLAB PCC ESR P-1 ESR P-1 - - ST3
130 LNT-TP2-AA-RS-STR-RFI-174541 10:00 AM ESR Reinforcement & Shuttering Checking & Concreting (M20) for Grade Slab@ ESR P-1 GARD SLAB ESR P-1 - - -
Reinforcement & Shuttering Checking & Concreting (M40) of 3rd Flight Stair Case (Elv-13.721 to
131 LNT-TP2-AA-RS-STR-RFI-174542 11:00 AM ESR 3rd FLIGHT OF STAIR CASE ESR R-2 - - -
16.221m) @ ESR R-2
Reinforcement & Shuttering Checking & Concreting (M40) Pardi Wall 6th Lift (Grid-C-4 to C-5 ) (C-5
132 LNT-TP2-AA-RS-STR-RFI-174543 9:30 AM ESR 6th Lift PARDI WALL ESR R-6 - - -
to C-8), (C-8 to C-9) & (C-9 to C-6) Elv-15.161m to 16.361 @ ESR R-6
Reinforcement & Shuttering Checking & Concreting (M40) for Stair Case Cloumn C-13, C-14 & 1st 1st LIFT ClLOUMN BOTTAM
133 LNT-TP2-AA-RS-STR-RFI-174544 9:00 AM ESR ESR R-9 - - - ST3
Lift Bottam Slab C-5 @ ESR R-9 SLAB
Reinforcement & Shuttering Checking & Concreting (M40) for Beam top (Inciuding SB-1 & SB-2) Elv-
134 LNT-TP2-AA-RS-STR-RFI-174545 9:00 AM ESR TOP BEAM ESR P-2 - - - ST3
38.979 @ ESR P-2
Checking of Reinforcement, Shuttering & Concrete for Top Beam (C1, C2, C3, C4, C5, C6, C7) @ E1 Reinforcement, Shuttering &
135 LNT-TP2-AA-RS-STR-RFI-174546 5:00 PM BUS SHELTER E1 - - LHS
Road Ch: 1+375 Concreting
Checking of Reinforcement, Shuttering & Concrete for column casting (C1, C3, C4, C5, C7) @ K2 Reinforcement, Shuttering &
136 LNT-TP2-AA-RS-STR-RFI-174547 8:00 AM BUS SHELTER K2 - - RHS
Road Ch: 0+470 Concreting
137 LNT-TP2-AA-RS-STR-RFI-174548 8:00 AM OUTFALL Checking of PCC Laying at U/S Side Apron @ Outfall -2 Concreting OUTFALL-2 - - - ST3
138 LNT-TP2-AA-RS-STR-RFI-174549 5:00 PM OUTFALL Checking of Stone Pitching at D/S Side launching Apron (60m to 120m) @ Outfall -2 Stone Pitching OUTFALL-2 - - -
Checking of Reinforcement, Shuttering & Concrete for Precast MPC Slab (3.600 x 2.5 x 0.150)m - 2 Reinforcement, Shuttering &
139 LNT-TP2-AA-RS-STR-RFI-174550 4:00 PM MJB G7 Bridge - - -
No's, (1.0 x 2.5 x 0.150)m - 1 No's @ G7 Bridge Concreting
Checking of Stone Pitching with 1:5 cement mortar at LHS (A2 Side) up stream & down stream
140 LNT-TP2-AA-RS-STR-RFI-174551 3:00 PM OUTFALL Stone Pitching OUTFALL-1 - - - ST3
@ Outfall -1
Checking of Stone Pitching with 1:5 cement mortar at RHS (A1 Side) up stream & down stream
141 LNT-TP2-AA-RS-STR-RFI-174552 4:00 PM OUTFALL Stone Pitching OUTFALL-1 - - -
@ Outfall -1
Checking of outer side slope making for bund at RHS (A1 Side) up stream & down stream side @
142 LNT-TP2-AA-RS-STR-RFI-174553 10:00 AM OUTFALL Bund Slope Making OUTFALL-1 - - -
Outfall -1
Checking of outer side slope making for bund at LHS (A2 Side) up stream & down stream side @
143 LNT-TP2-AA-RS-STR-RFI-174554 12:00 PM OUTFALL Bund Slope Making OUTFALL-1 - - -
Outfall -1
ELECTRICAL
Checking of Excavation, PCC (M20) Laying , Top Level Checking of Pole Foundation for Street Light
144 LNT-TP2-AA-RS-ELE-RFI-174555 10:00 AM SL POLE FOUNDATION PCC D-9 0+370 0+570 CENTER
@ D-9 Road
Checking of Excavation, PCC (M20) Laying , Top Level Checking of Hand Hole for Street Light @ D-9
145 LNT-TP2-AA-RS-ELE-RFI-174556 10:00 AM SL HAND HOLE PCC D-9 0+370 0+570 CENTER
Road
Checking of Excavation, PCC (M20) Laying , Top Level Checking of Pole Foundation for Street Light
146 LNT-TP2-AA-RS-ELE-RFI-174557 10:00 AM SL POLE FOUNDATION PCC B-48 0+640 0+880 RHS
@ B-48 Road
Checking of Excavation, PCC (M20) Laying , Top Level Checking of Hand Hole for Street Light @ B-48
147 LNT-TP2-AA-RS-ELE-RFI-174558 10:00 AM SL HAND HOLE PCC B-48 0+640 0+880 RHS
Road
148 LNT-TP2-AA-RS-ELE-RFI-174559 10:00 AM SL Erection of Light Pole for Street Light @ H-2 Road ERECTION- LIGHT POLE H-2 0+060 0+590 LHS
149 LNT-TP2-AA-RS-ELE-RFI-174560 10:00 AM SL Erection of Light Pole for Street Light @ H-2 Road ERECTION- LIGHT POLE H-2 0+060 0+590 RHS
TESTING-EARTH PIT
150 LNT-TP2-AA-RS-ELE-RFI-174561 10:00 AM SL Testing of Earth Pit Resistance for Street Light @ G-4 Road G-4 1+700 2+300 RHS (MPC) Sur2
RESISTANCE
TESTING-EARTH PIT
151 LNT-TP2-AA-RS-ELE-RFI-174562 10:00 AM SL Testing of Earth Pit Resistance for Street Light @ G-4 Road G-4 5+030 5+460 RHS Sur2
RESISTANCE
152 LNT-TP2-AA-RS-ELE-RFI-174563 10:00 AM SL Checking of Erection of Controller for Street Light @ C-7/2 Road ERECTION- CONTROLLER C-7/2 5+750 6+065 CENTER
153 LNT-TP2-AA-RS-ELE-RFI-174564 10:00 AM SL Checking of Erection of Controller for Street Light @ G-4 Road ERECTION- CONTROLLER G-4 1+700 2+300 RHS (MPC)
154 LNT-TP2-AA-RS-ELE-RFI-174565 10:00 AM SL Checking of Erection of Controller for Street Light @ G-4 Road ERECTION- CONTROLLER G-4 5+030 5+460 RHS
OTHERS
Reinforcement, Shuttering & Concrete Checking for Pile Cap (Over Head Gantry Foundation) @ G4 Reinforcement, Shuttering &
155 LNT-TP2-AA-RS-OTH-RFI-174566 8:00 AM PILE G4 - - LHS ST3
Road (MPC-1) Ch: 1+900 Concreting
NCR
NCR CLOSING NO -591 Checking of Kerb Laying @ C7/1 Road Ch: 1+225 to 1+235 LHS, 1+175 to
1+185 LHS, 0+760 to 0+790 RHS, 0+093 to 0+200 RHS, 0+600 to 0+700 LHS, 0+380 to 0+400 RHS,
156 LNT-TP2-AA-RS-NCR-RFI-174567 9:00 AM NCR NCR CLOSING NO -591 C7/1 - - - HE2
0+650 to 0+930 LHS, 1+200 to 1+338 LHS, 0+480 to 0+750 RHS, 1+000 to 1+050 LHS, 1+143 to 1+340
LHS

Sub-professional
EE staff Total
code
SP23 Guarang Patel Sur1 5
SP24 Wakil Ahmad Sur2 5
SP15 K.N Mishra HE2 8
SP33 Y N Tripathi HE3 6
SP10 Rakesh R ST1 0
SP34 Dilip Rathod ST3 8
SP20 Shirish Rathod QAQC1 0
SP35 Chandrakant QAQC2 0
Total EE RFI 32
Total RFI by L&T 156
Percentage 20.51%
8/19/2021 View Message In Print Format

Satra I Man Pvt Ltd


  Survey Engineer2 -DSIR <sur2@dsirtp2ee.in>

From :   DC-DSIR <dc@dsirtp2ee.in>


Date :   Thu, 4 Feb 2021 11:16:09 +0530 (IST)
To :   mgrinfra-dicdl@gujarat.gov.in, vivek.mehra@aecom.com,
shakymuni.bahatre@aecom.com, sourabh.tuljapurkar@aecom.com, jm5-dicdl
<jm5-dicdl@gujrat.gov.in>
CC :   Team Leader-DSIR <tl@dsirtp2ee.in>, RE-DSIR <re@dsirtp2ee.in>, HE1
<he1@dsirtp2ee.in>, HE2 <he2@dsirtp2ee.in>, Struture Engineer-DSIR
<stru1@dsirtp2ee.in>, Struture Engineer 03 -DSIR <stru3@dsirtp2ee.in>, QC
Engineer-1 <qaqc1@dsirtp2ee.in>, QC Engineer-2 <qaqc2@dsirtp2ee.in>, Survey
Engineer -DSIR <sur1@dsirtp2ee.in>, Survey Engineer2 -DSIR
<sur2@dsirtp2ee.in>, Safety Engineer-DSIR <safe1@dsirtp2ee.in>, QSRS
<qsrs@dsirtp2ee.in>
Subject :   EE's RFI Summary dated 04.02.2021
Attachments :   RFI_SUMMARY_FOR_04.02.2021.pdf
 
Dear Sir,

Please find herewith attached EE's RFI Summary dated 04.02.2021

 
Thanks & Regards, 

Darshan Shrimali

Accountant

Employer’s Engineer (Dholera SIR)

 
 

mail.satragroup.in/servlet/ViewMessageServlet?foldername=INBOX&uidl=1612417569191.38901&msgid=939&action=print&login=sur2&ID=null 1/1
DESIGN AND CONSTRUCTION OF ROADS AND SERVICES OF ACTIVATION AREA IN DHOLERA SPECIAL INVESTMENT REGION AREA, DHOLERA
Client : Dholera Industrial City Development Limited. (DICDL)
Employer's Engineer : Yooshin Engineering Corporation in JV with Multi Media and SATRA
Contractor : Larsen & Toubro Limited
Submission
3-Feb-21
Date :
Summary of RFI raised
Inspection
4-Feb-21
Date :
Location
Sr. No. RFI No. Time Description Sub Activity Layer/Lift/No. Side Remarks
Name of the Road From / Chainage To / Chainage

SURVEY
1 LNT-TP2-AA-RS-SUR-RFI-175310 10:30 AM POTABLE Layout Checking of As Built of Thust Block for Potable Water @ G-4 Road (LHS ) Ch-1+625 & 1+690 (LHS) AS BUILT SURVEY G-4 1+625 1+690 LHS SUR2
Layout Checking of As Built of Thust Block for Potable Water @ G-4 Road (LHS ) Ch-1+690, 1+690
2 LNT-TP2-AA-RS-SUR-RFI-175311 10:30 AM POTABLE AS BUILT SURVEY G-4 1+690 1+690 CENTER SUR2
(CENTER)
Layout Checking of As Built of Thust Block for Potable Water Rising Main @ G-4 Road (RHS ) Ch-1+640,
3 LNT-TP2-AA-RS-SUR-RFI-175312 10:30 AM POTABLE-RM AS BUILT SURVEY G-4 1+640 4+020 RHS SUR2
2+340, 2+350, 4+020
4 LNT-TP2-AA-RS-SUR-RFI-175313 10:30 AM IE -RM ayout Checking of As Built of Thust Block for Insdutrial Effluent Rising Main @ G-4 Road SURVEY G-4 4+110 4+110 RHS SUR2
5 LNT-TP2-AA-RS-SUR-RFI-175314 10:00 AM SEWER-RM Layout Checking of As Built of Thust Block for Sewerage Rising Main @ C-9 Road (RHS ) Ch-1+630 AS BUILT SURVEY C-9 1+630 1+630 CENTER SUR1
UTILITY
6 LNT-TP2-AA-RS-SUR-RFI-175315 5:00 PM Checking of Layout & Marking for UCD @ B42 Road Ch: 2+025, 2+080, 2+945, 3+020 SURVEY B42 - - BHS
CROSS DUCT
ROAD
7 LNT-TP2-AA-RS-ROD-RFI-175316 11:00 AM ROAD Kerb Laying Alignment & Level Checking @ B42 Road Offset- 6.0m KERB LAYING B42 1+355 1+500 BHS

8 LNT-TP2-AA-RS-ROD-RFI-175317 4:00 PM ROAD FDD & Level Checking for MPC Subgrade Top Layer @ E3 Road Offset- 8.1m to 15.1m MPC Subgrade Top E3 0+060 0+130 RHS

9 LNT-TP2-AA-RS-ROD-RFI-175318 3:00 PM ROAD FDD & Level Checking of MPC GSB TOP Layer @ E3 Road Offset- 8.1m to 15.1m MPC GSB TOP E3 0+130 0+250 RHS

10 LNT-TP2-AA-RS-ROD-RFI-175319 3:00 PM ROAD FDD & Level Checking of MPC GSB TOP Layer @ E3 Road Offset- 8.1m to 15.1m MPC GSB TOP E3 0+440 0+500 RHS

11 LNT-TP2-AA-RS-ROD-RFI-175320 4:30 PM ROAD FDD & Level Checking for Inner MPC WMM TOP @ E3 Road Offset- 8.1m to 11.1m MPC WMM TOP E3 0+300 0+440 RHS

12 LNT-TP2-AA-RS-ROD-RFI-175321 5:00 PM ROAD FDD & Level Checking for Inner MPC WMM TOP @ E3 Road Offset- 8.1m to 11.1m MPC WMM TOP E3 0+130 0+230 RHS

13 LNT-TP2-AA-RS-ROD-RFI-175322 4:30 PM ROAD FDD & Level Checking for CYCLE TRACK WMM TOP @ E3 Road Offset- 11.1m to 13.1m CYCLE TRACK WMM TOP E3 0+300 0+440 RHS

14 LNT-TP2-AA-RS-ROD-RFI-175323 4:30 PM ROAD FDD & Level Checking of Outer MPC WMM TOP Layer @ E3 Road Offset- 13.1m to 15.1m MPC WMM TOP E3 0+300 0+440 RHS

15 LNT-TP2-AA-RS-ROD-RFI-175324 4:00 PM ROAD FDD & Level Checking of MPC WMM TOP Layer @ E2 Road Offset- 8.1 m to 15.1m MPC WMM TOP E2 0+900 0+930 RHS

16 LNT-TP2-AA-RS-ROD-RFI-175325 4:00 PM ROAD FDD & Level Checking of MPC WMM TOP Layer @ E2 Road Offset- 8.1 m to 15.1m MPC WMM TOP E2 0+590 0+650 RHS

17 LNT-TP2-AA-RS-ROD-RFI-175326 10:00 AM ROAD FDD & Level Checking for Service Road MPC GSB Top Layer @ G4 Road Offset- 35m to 38.5m Service Road MPC GSB TOP G4 2+300 2+240 RHS

18 LNT-TP2-AA-RS-ROD-RFI-175327 10:00 AM ROAD FDD & Level Checking for Service Road MPC WMM Top Layer @ G4 Road Offset- 35m to 38.5m Service Road MPC WMM TOP G4 2+050 2+240 RHS
Service Road MPC Subgrade
19 LNT-TP2-AA-RS-ROD-RFI-175328 4:00 PM ROAD FDD & Level Checking for Service Road Outer MPC Subgrade Top @ G4 Road Offset- 35m to 38.5m G4 1+700 1+850 RHS
Top
20 LNT-TP2-AA-RS-ROD-RFI-175329 4:00 PM ROAD FDD & Level Checking for Service Road Subgrade @ G6 Road Offset- 17.5m to 23m Service Road Subgrade Top G6 1+300 1+640 LHS

21 LNT-TP2-AA-RS-ROD-RFI-175330 4:00 PM ROAD FDD Checking for Service Road Subgrade @ G6 Road Offset- 17.5m to 23m Service Road Subgrade 1st G6 1+700 1+900 LHS

22 LNT-TP2-AA-RS-ROD-RFI-175331 4:00 PM ROAD FDD Checking for Service Road Subgrade @ G6 Road Offset- 17.5m to 23m Service Road Subgrade 1st G6 1+700 1+900 RHS
MPC & Service Road
23 LNT-TP2-AA-RS-ROD-RFI-175332 6:00 PM ROAD FDD Checking for Inner MPC & Service Road Embankment @ G6 Road Offset- 13.0m to 23.0m G6 1+900 2+100 LHS
Embankment 7th
MPC & Service Road
24 LNT-TP2-AA-RS-ROD-RFI-175333 6:00 PM ROAD FDD Checking for Inner MPC & Service Road Embankment @ G6 Road Offset- 13.0m to 23.0m G6 1+900 2+150 RHS
Embankment 7th
25 LNT-TP2-AA-RS-ROD-RFI-175334 4:00 PM ROAD FDD Checking for Outer MPC Embankment @ G6 Road Offset- 23m to 29m MPC Embankment 8th G6 1+700 1+950 RHS

26 LNT-TP2-AA-RS-ROD-RFI-175335 4:00 PM ROAD FDD Checking for Outer MPC Embankment @ G6 Road Offset- 23m to 29m MPC Embankment 8th G6 1+630 1+650 RHS

27 LNT-TP2-AA-RS-ROD-RFI-175336 10:00 AM ROAD FDD & Level Checking for MPC GSB Top Layer @ E1 Road Offset- 8.1m to 15.3m MPC GSB TOP E1 2+000 2+200 LHS

28 LNT-TP2-AA-RS-ROD-RFI-175337 10:00 AM ROAD FDD & Level Checking for MPC WMM Top Layer @ H1 Road Offset- 25.5m to 35m MPC WMM TOP H1 4+500 4+600 RHS
8/19/2021 View Message In Print Format

Satra I Man Pvt Ltd


  Survey Engineer2 -DSIR <sur2@dsirtp2ee.in>

From :   DC-DSIR <dc@dsirtp2ee.in>


Date :   Fri, 5 Feb 2021 10:57:52 +0530 (IST)
To :   mgrinfra-dicdl@gujarat.gov.in, vivek.mehra@aecom.com,
shakymuni.bahatre@aecom.com, sourabh.tuljapurkar@aecom.com, jm5-dicdl
<jm5-dicdl@gujrat.gov.in>
CC :   Team Leader-DSIR <tl@dsirtp2ee.in>, RE-DSIR <re@dsirtp2ee.in>, HE1
<he1@dsirtp2ee.in>, HE2 <he2@dsirtp2ee.in>, Struture Engineer-DSIR
<stru1@dsirtp2ee.in>, Struture Engineer 03 -DSIR <stru3@dsirtp2ee.in>, QC
Engineer-1 <qaqc1@dsirtp2ee.in>, QC Engineer-2 <qaqc2@dsirtp2ee.in>, Survey
Engineer -DSIR <sur1@dsirtp2ee.in>, Survey Engineer2 -DSIR
<sur2@dsirtp2ee.in>, Safety Engineer-DSIR <safe1@dsirtp2ee.in>, QSRS
<qsrs@dsirtp2ee.in>
Subject :   EE's RFI Summary dated 05.02.2021
Attachments :   RFI_SUMMARY_FOR_05.02.2021.pdf
 
Dear Sir,

Please find herewith attached EE's RFI Summary dated 05.02.2021

 
Thanks & Regards, 

Darshan Shrimali

Accountant

Employer’s Engineer (Dholera SIR)


 

mail.satragroup.in/servlet/ViewMessageServlet?foldername=INBOX&uidl=1612502872486.30284&msgid=935&action=print&login=sur2&ID=null 1/1
DESIGN AND CONSTRUCTION OF ROADS AND SERVICES OF ACTIVATION AREA IN DHOLERA SPECIAL INVESTMENT REGION AREA, DHOLERA
Client : Dholera Industrial City Development Limited. (DICDL)
Employer's Engineer : Yooshin Engineering Corporation in JV with Multi Media and SATRA
Contractor : Larsen & Toubro Limited
Submission
4-Feb-21
Date :
Summary of RFI raised
Inspection
5-Feb-21
Date :
Location
Sr. No. RFI No. Time Description Sub Activity Layer/Lift/No. Side Remarks
Name of the Road From / Chainage To / Chainage

SURVEY
Layout Checking of As Built of Thust Block for Recycle Water @ CPR-12 Road (CENTER ) Ch-0+252 &
1 LNT-TP2-AA-RS-SUR-RFI-175424 10:30 AM RECYCLE AS BUILT SURVEY CPR-12 0+252 0+378 CENTER SUR1
0+378
Layout Checking of As Built of Thust Block for Recycle Water Rising Main @ CPR-12 Road (CENTER )
2 LNT-TP2-AA-RS-SUR-RFI-175425 10:00 AM RECYCLE-RM AS BUILT SURVEY CPR-12 0+255 0+255 CENTER SUR1
Ch-0+255
Layout Checking for Potable Water @ E-3 Road (LHS to BHS) Pipe Line Crossing @ CH.1+033.54,
3 LNT-TP2-AA-RS-SUR-RFI-175426 10:00 AM POTABLE-PC SURVEY E-3 1+033.54 1+915.94 LHS to BHS SUR2
1+256.54, 1+483.54, 1+713.30, 1+914.94 ( Proparty Connection) Length-35m
Layout Checking for Recycle Water @ E-3 Road (LHS to BHS) Pipe Line Crossing @ CH.1+035, 1+258,
4 LNT-TP2-AA-RS-SUR-RFI-175427 10:00 AM RECYCLE-PC SURVEY E-3 1+035 1+715 LHS to BHS SUR2
1+485, 1+715 ( Proparty Connection) Length-35m
ROAD

5 LNT-TP2-AA-RS-ROD-RFI-175428 11:00 AM ROAD Kerb Laying Alignment & Level Checking @ B42 Road Offset- 6.0m KERB LAYING B42 1+350 1+900 BHS

6 LNT-TP2-AA-RS-ROD-RFI-175429 4:00 PM ROAD FDD & Level Checking for Inner MPC WMM TOP @ E3 Road Offset- 8.1m to 11.1m MPC WMM TOP E3 0+500 0+680 RHS

7 LNT-TP2-AA-RS-ROD-RFI-175430 4:00 PM ROAD FDD & Level Checking for CYCLE TRACK WMM TOP @ E3 Road Offset- 11.1m to 13.1m CYCLE TRACK WMM TOP E3 0+500 0+680 RHS

8 LNT-TP2-AA-RS-ROD-RFI-175431 4:00 PM ROAD FDD & Level Checking of Outer MPC WMM TOP Layer @ E3 Road Offset- 13.1m to 15.1m MPC WMM TOP E3 0+500 0+680 RHS

9 LNT-TP2-AA-RS-ROD-RFI-175432 4:00 PM ROAD FDD & Level Checking for Inner MPC WMM TOP @ E3 Road Offset- 8.1m to 11.1m MPC WMM TOP E3 0+130 0+250 RHS

10 LNT-TP2-AA-RS-ROD-RFI-175433 4:00 PM ROAD FDD & Level Checking for CYCLE TRACK WMM TOP @ E3 Road Offset- 11.1m to 13.1m CYCLE TRACK WMM TOP E3 0+130 0+250 RHS

11 LNT-TP2-AA-RS-ROD-RFI-175434 4:00 PM ROAD FDD & Level Checking of Outer MPC WMM TOP Layer @ E3 Road Offset- 13.1m to 15.1m MPC WMM TOP E3 0+130 0+250 RHS

12 LNT-TP2-AA-RS-ROD-RFI-175435 4:00 PM ROAD FDD & Level Checking of MPC GSB TOP Layer @ E3 Road Offset- 8.1m to 15.1m MPC GSB TOP E3 0+060 0+130 RHS

13 LNT-TP2-AA-RS-ROD-RFI-175436 12:00 PM ROAD FDD & Level Checking of MPC WMM TOP Layer @ E2 Road Offset- 8.1 m to 15.1m MPC WMM TOP E2 0+975 1+005 RHS
Field Dry Density , Level & Surface regularity Checking for WMM Laying @ B42 Road Offset- 0.0m
14 LNT-TP2-AA-RS-ROD-RFI-175437 8:00 AM ROAD WMM TOP B42 1+350 1+600 BHS HE3
to 6.0m
15 LNT-TP2-AA-RS-ROD-RFI-175438 8:00 AM ROAD Application of Prime coat @ B42 Road Offset- 0.0m to 6.0m PRIME COAT B42 1+100 1+350 BHS HE3

16 LNT-TP2-AA-RS-ROD-RFI-175439 8:00 AM ROAD Application of Prime coat @ B42 Road Offset- 0.0m to 6.5m PRIME COAT B42 0+880 1+100 BHS
Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ B42 Road Offset- 5.0m to
17 LNT-TP2-AA-RS-ROD-RFI-175440 8:00 AM ROAD CTSB TOP B42 0+730 0+850 BHS HE3
6.5m
Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ B41/1 Road Offset-
18 LNT-TP2-AA-RS-ROD-RFI-175441 8:00 AM ROAD CTSB TOP B41/1 0+000 0+070 BHS HE3
0.0m to 5.0m
Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ B43 Road Offset- 5.0m to
19 LNT-TP2-AA-RS-ROD-RFI-175442 8:00 AM ROAD CTSB TOP B43 1+230 1+320 RHS HE3
6.0m
B43 BHS Ch- 1+300 to 1+330 &
20 LNT-TP2-AA-RS-ROD-RFI-175443 8:00 AM ROAD Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ B43 & E3 Node Portion CTSB TOP B43 & E3 -
E3 LHS Ch-0+220 to 0+260
Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ E3 Road Offset- 0.0m to
21 LNT-TP2-AA-RS-ROD-RFI-175444 8:00 AM ROAD CTSB TOP E3 1+100 1+300 RHS
8.6m
Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ C7/2 Road Offset- 4.0m
22 LNT-TP2-AA-RS-ROD-RFI-175445 8:00 AM ROAD CTSB TOP C7/2 5+800 5+900 RHS
to 10.0m
23 LNT-TP2-AA-RS-ROD-RFI-175446 10:00 AM ROAD Kerb Laying Alignment & Level Checking @ B57 Road Offset- 7.3m KERB LAYING B57 0+730 1+300 LHS
E3 LHS Ch: 2+240 to 2+261 &
24 LNT-TP2-AA-RS-ROD-RFI-175447 9:00 AM ROAD Application of Tack coat laying (RS-1) @ Node- 111 TACK COAT Node- 111 -
G4 RHS Ch: 4+006 to 4+030
E3 LHS Ch: 2+240 to 2+261 &
25 LNT-TP2-AA-RS-ROD-RFI-175448 10:00 AM ROAD Laying of BC Grade-2, Level and Surface regularity Checking @ Node- 111 BC GRADE-2 Node- 111 -
G4 RHS Ch: 4+006 to 4+030
E3 RHS Ch: 2+187 to 2+245 &
26 LNT-TP2-AA-RS-ROD-RFI-175449 9:00 AM ROAD Application of Tack coat laying (RS-1) @ Node- 111 TACK COAT Node- 111 -
G4 LHS Ch: 4+054 to 4+112
E3 RHS Ch: 2+187 to 2+245 &
27 LNT-TP2-AA-RS-ROD-RFI-175450 10:00 AM ROAD Laying of BC Grade-2, Level and Surface regularity Checking @ Node- 111 BC GRADE-2 Node- 111 -
G4 LHS Ch: 4+054 to 4+112
28 LNT-TP2-AA-RS-ROD-RFI-175451 10:00 AM ROAD FDD & Level Checking for Service Road MPC GSB Top Layer @ G4 Road Offset- 35m to 37.5m Service Road MPC GSB TOP G4 1+700 2+050 RHS
Service Road MPC WMM
29 LNT-TP2-AA-RS-ROD-RFI-175452 10:00 AM ROAD FDD & Level Checking for Service Road MPC WMM Top Layer @ G4 Road Offset- 35m to 37.5m G4 2+300 2+240 RHS
TOP
30 LNT-TP2-AA-RS-ROD-RFI-175453 3:00 PM ROAD FDD & Level Checking for Outer MPC WMM TOP @ J1 Road Offset- 8.1m to 12.5m MPC WMM TOP J1 0+450 0+600 LHS

31 LNT-TP2-AA-RS-ROD-RFI-175454 10:00 AM ROAD FDD & Level Checking for Outer MPC GSB TOP @ J1 Road Offset- 8.1m to 12.9m MPC GSB TOP J1 0+140 0+250 RHS

32 LNT-TP2-AA-RS-ROD-RFI-175455 3:00 PM ROAD FDD & Level Checking for Outer MPC GSB TOP @ J1 Road Offset- 8.1m to 12.9m MPC GSB TOP J1 0+400 0+600 LHS

33 LNT-TP2-AA-RS-ROD-RFI-175456 10:00 AM ROAD FDD Checking for Outer MPC Embankment @ G6 Road Offset- 23m to 29m MPC Embankment 9th G6 1+640 1+700 LHS

34 LNT-TP2-AA-RS-ROD-RFI-175457 6:00 PM ROAD FDD & Level Checking for Outer MPC Embankment @ G6 Road Offset- 23m to 29m MPC Embankment Top G6 1+640 1+700 LHS

35 LNT-TP2-AA-RS-ROD-RFI-175458 10:00 AM ROAD FDD Checking for Outer MPC Embankment @ G6 Road Offset- 23m to 29m MPC Embankment 9th G6 1+630 1+650 RHS

36 LNT-TP2-AA-RS-ROD-RFI-175459 6:00 PM ROAD FDD & Level Checking for Outer MPC Embankment @ G6 Road Offset- 23m to 29m MPC Embankment Top G6 1+630 1+650 RHS

37 LNT-TP2-AA-RS-ROD-RFI-175460 6:00 PM ROAD FDD Checking for Outer MPC Embankment @ G6 Road Offset- 23m to 29m MPC Embankment 9th G6 1+700 1+950 RHS
MPC & Service Road
38 LNT-TP2-AA-RS-ROD-RFI-175461 4:00 PM ROAD FDD Checking for Inner MPC & Service Road Embankment @ G6 Road Offset- 13.0m to 23.0m G6 1+900 2+100 LHS
Embankment 8th
MPC & Service Road
39 LNT-TP2-AA-RS-ROD-RFI-175462 4:00 PM ROAD FDD Checking for Inner MPC & Service Road Embankment @ G6 Road Offset- 13.0m to 23.0m G6 1+900 2+150 RHS
Embankment 8th
40 LNT-TP2-AA-RS-ROD-RFI-175463 10:00 AM ROAD FDD Checking for inner MPC Embankment @ E3 Road Offset- 8.6m to 13.6m MPC Embankment 3rd E3 1+300 1+600 LHS

41 LNT-TP2-AA-RS-ROD-RFI-175464 6:00 PM ROAD FDD Checking for inner MPC Embankment @ E3 Road Offset- 8.6m to 13.6m MPC Embankment 4th E3 1+300 1+600 LHS

42 LNT-TP2-AA-RS-ROD-RFI-175465 10:00 AM ROAD FDD Checking for inner MPC Embankment @ E3 Road Offset- 8.6m to 13.6m MPC Embankment 3rd E3 1+600 2+000 LHS

43 LNT-TP2-AA-RS-ROD-RFI-175466 6:00 PM ROAD FDD Checking for inner MPC Embankment @ E3 Road Offset- 8.6m to 13.6m MPC Embankment 4th E3 1+600 2+000 LHS

44 LNT-TP2-AA-RS-ROD-RFI-175467 10:00 AM ROAD FDD Checking for Outer MPC Embankment @ E3 Road Offset- 13.6m to 18m MPC Embankment 3rd E3 1+300 1+600 LHS

45 LNT-TP2-AA-RS-ROD-RFI-175468 4:00 PM ROAD FDD Checking for Outer MPC Embankment @ E3 Road Offset- 13.6m to 18m MPC Embankment 4th E3 1+300 1+600 LHS

46 LNT-TP2-AA-RS-ROD-RFI-175469 10:00 AM ROAD FDD Checking for Outer MPC Embankment @ E3 Road Offset- 13.6m to 18m MPC Embankment 4th E3 1+600 2+000 LHS

47 LNT-TP2-AA-RS-ROD-RFI-175470 6:00 PM ROAD FDD Checking for Outer MPC Embankment @ E3 Road Offset- 13.6m to 18m MPC Embankment 5th E3 1+600 2+000 LHS

48 LNT-TP2-AA-RS-ROD-RFI-175471 10:00 AM ROAD FDD Checking for inner MPC Subgrade @ E1 Road Offset- 8.1m to 13.1m MPC Subgrade 1st E1 2+850 3+000 LHS

49 LNT-TP2-AA-RS-ROD-RFI-175472 3:00 PM ROAD FDD & Level Checking for MPC GSB TOP @ G7 Road Offset- 17.0m to 27.5m MPC GSB TOP G7 2+120 2+190 LHS

50 LNT-TP2-AA-RS-ROD-RFI-175473 6:00 PM ROAD FDD & Level Checking for inner MPC Granular Top Layer @ G7 Road Offset- 17m to 21m MPC Granular Top G7 2+120 2+190 LHS

51 LNT-TP2-AA-RS-ROD-RFI-175474 6:00 PM ROAD FDD Checking for inner MPC Subgrade @ E1 Road Offset- 8.1m to 13.1m MPC Subgrade 2nd E1 2+850 3+000 LHS

52 LNT-TP2-AA-RS-ROD-RFI-175475 10:00 AM ROAD FDD & Level Checking for MPC WMM Top Layer @ H1 Road Offset- 25.5m to 35m MPC WMM TOP H1 4+600 4+750 RHS

53 LNT-TP2-AA-RS-ROD-RFI-175476 10:00 AM ROAD FDD & Level Checking for Outer MPC GSB TOP @ C10 Road Offset- 10.75m to 13.75m MPC GSB TOP C10 0+200 0+400 LHS

54 LNT-TP2-AA-RS-ROD-RFI-175477 4:00 PM ROAD FDD & Level Checking for MPC WMM TOP @ C10 Road Offset- 10.75m to 13.75m MPC WMM TOP C10 0+200 0+400 LHS
Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ G7 Road Offset- 6.5m to
55 LNT-TP2-AA-RS-ROD-RFI-175478 4:00 PM ROAD CTSB TOP G7 3+100 3+220 BHS
14m
Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ CPR7 Road Offset- 0.0m
56 LNT-TP2-AA-RS-ROD-RFI-175479 8:00 AM ROAD CTSB TOP CPR7 0+300 0+570 BHS
to 5.5m
Field Dry Density , Level & Surface regularity Checking of CTSB Laying for Site instruction @ CPR7
57 LNT-TP2-AA-RS-ROD-RFI-175480 8:00 AM ROAD CTSB TOP CPR7 0+435 0+540 BHS
Road Offset- 0.0m to 2.5m
SERVICES
Checking of Reinforcement, Shuttering & Concrete for MPC Slab (3180 x 2500 x 150 - 3 No), (4180 x Reinforcement, Shuttering &
58 LNT-TP2-AA-RS-SER-RFI-175481 5:00 PM SWD PC Yard - - -
2500 x 150 -3 No), (3680 x 2500 x 150 - 3 No), (1580 x 2500 x 150 - 3 No) @ PC Yard Concreting
Reinforcement, Shuttering & Concrete Checking for Precast inlet/ Manhole cover slab
Reinforcement, Shuttering &
59 LNT-TP2-AA-RS-SER-RFI-175482 5:00 PM SWD (0.640*0.640*0.175 - 1 No), (0.740*0.740*0.175 - 9 No), (0.740*0.820*0.175 - 2 No), - - - -
Concreting
(0.890*0.820*0.175 - 1 No),(1.140*0.695*0.175 - 2 No), (1.640*0.425*0.225 - 3 No) @ Precast Yard
UTILITY CROSS Reinforcement, Shuttering & Concrete Checking for UCD (Utility) Jointing Raft (2.0m) @ E2 Road Ch: Reinforcement, Shuttering &
60 LNT-TP2-AA-RS-SER-RFI-175483 5:00 PM E2 - - RHS
DUCT 1+970 Concreting
UTILITY CROSS Reinforcement, Shuttering & Concrete Checking for UCD (Utility) Jointing Raft (1.6m) @ G4 Road Reinforcement, Shuttering &
61 LNT-TP2-AA-RS-SER-RFI-175484 5:00 PM G4 - - RHS
DUCT Ch: 3+915 Concreting
UTILITY CROSS Reinforcement, Shuttering & Concrete Checking for UCD (PD) Jointing Raft (1.3m) @ C10 Road Ch: Reinforcement, Shuttering &
62 LNT-TP2-AA-RS-SER-RFI-175485 5:00 PM C10 - - BHS
DUCT 0+045 Concreting
Reinforcement, Shuttering & Concrete Checking for property connection Jointing Slab (1.4m) @ H1 Reinforcement, Shuttering &
63 LNT-TP2-AA-RS-SER-RFI-175486 5:00 PM SWD H1 - - LHS
Road Ch: 5+705, 5+585, 5+555, 5+465, 5+455 Concreting
Reinforcement, Shuttering &
64 LNT-TP2-AA-RS-SER-RFI-175487 4:00 PM SWD Reinforcement, Shuttering & Concrete Checking for Slab @ D9 Road (Part-2) D9 0+115 0+140 RHS
Concreting
Checking of Angle Fixing, Shuttering & Concrete for SWD Inlet Groove @ E1 Road Ch: 2605, 2635,
65 LNT-TP2-AA-RS-SER-RFI-175488 4:00 PM SWD Shuttering & Concreting E1 - - LHS
2665, 2695, 2725, 2755
Reinforcement & Shuttering Checking & Concreting (M40) Thrust Block of Pipe Line for Sewerage
66 LNT-TP2-AA-RS-SER-RFI-175489 9:30 AM SEWER-RM THRUST BLOCK B-57 1+862 1+862 CENTER
Rising Main @ B-57 Road Ch-1+862
HYDROSTATIC PRESSURE
67 LNT-TP2-AA-RS-SER-RFI-175490 10:00 AM POTABLE Checking of Hydrostatic Pressure testing of HDPE 110 mm Dia. HDPE For Potable Water @ G-7 Road G-7 2+750 2+890 RHS
TEST
Checking of Excavation, PCC (M20) Laying & Top Level Checking for Potable Water @ E-3 Road
CENTER to
68 LNT-TP2-AA-RS-SER-RFI-175491 11:30 AM POTABLE-PC (CENTER to BHS ) Pipe Line Crossing @ CH.1+033.54, 1+256.54, 1+483.54 (Property Connection) EXCAVATION & PCC E-3 1+033.54 2+300
BHS
Length-31m
Checking of Excavation, PCC (M20) Laying & Top Level Checking for Recycle Water @ E-3 Road
CENTER to
69 LNT-TP2-AA-RS-SER-RFI-175492 11:30 AM RECYCLE-PC (CENTER to BHS ) Pipe Line Crossing @ CH.1+033.54, 1+256.54, 1+483.54 (Property Connection) EXCAVATION & PCC E-3 1+033.54 2+300
BHS
Length-31m
Checking of Hydrostatic Pressure testing of HDPE 200 & 140 mm Dia. HDPE For Recycle Water @ G-7 HYDROSTATIC PRESSURE
70 LNT-TP2-AA-RS-SER-RFI-175493 2:30 PM RECYCLE G-7 2+750 2+890 RHS HE2
Road TEST
Reinforcement & Shuttering Checking & Concreting (M40) for Thrust Block of Pipe Line for Recycle
71 LNT-TP2-AA-RS-SER-RFI-175494 8:00 AM RECYCLE THRUST BLOCK G-4 7+016 7+016 LHS (MPC)
Water @ G-4 Road
RECYCLE & Checking of Excavation & BC Cutting for Potable & Recycle Water @ C-9 Road Pipe Line Crossing @ CENTER to
72 LNT-TP2-AA-RS-SER-RFI-175495 8:00 AM EXCAVATION -BC CUTTING C-9 1+050 1+388
POTALE Ch-1+050, 1+055, 1+060, 1+120, 1+030, 1+238, 1+250, 1+328, 1+388 (Road Crossing) LHS
Reinforcement & Shuttering Checking & Concreting (M40) & Top Level Checking for Raft of Power
73 LNT-TP2-AA-RS-SER-RFI-175496 9:00 AM PD RAFT & TOP LEVEL H-1 1+345 1+350 RHS
Duct Size 2.7m*1.8m @ H-1 Road
Reinforcement & Shuttering Checking & Concreting (M40) Checking for Wall 1st LIft of Power Duct
74 LNT-TP2-AA-RS-SER-RFI-175497 9:00 AM PD WALL 1st LIFT H-1 1+335 1+345 RHS
Size 2.7m*1.8m @ H-1 Road
Reinforcement & Shuttering Checking & Concreting (M40) & for Wall 2nd Lift & Slab of Power Duct
75 LNT-TP2-AA-RS-SER-RFI-175498 10:30 AM PD WALL 2nd LIFT & SLAB A-6 0+200 0+220 LHS
Size 2.7m*1.8m @ A-6 Road
Reinforcement & Shuttering Checking & Concreting (M40) & for Wall 2nd Lift & Slab of Power Duct
76 LNT-TP2-AA-RS-SER-RFI-175499 4:00 PM PD WALL 2nd LIFT & SLAB H-1 1+310 1+325 RHS
Size 2.7m*1.8m @ H-1 Road
Reinforcement & Shuttering Checking & Concreting (M40) & for Wall 2nd Lift & Slab of Power Duct
77 LNT-TP2-AA-RS-SER-RFI-175500 11:30 AM PD WALL 2nd LIFT & SLAB G-6 0+585 0+595 RHS
Size 2.7m*1.8m @ G-6 Road
Reinforcement & Shuttering Checking & Concreting (M40) & Top Level Checking for Raft of Power
78 LNT-TP2-AA-RS-SER-RFI-175501 10:30 AM PD RAFT & TOP LEVEL A-6 0+160 0+180 LHS
Duct Size 2.7m*1.8m @ A-6 Road
Reinforcement & Shuttering Checking & Concreting (M40) Checking for Wall 1st LIft of Power Duct
79 LNT-TP2-AA-RS-SER-RFI-175502 10:30 AM PD WALL 1st LIFT A-6 0+180 0+200 LHS
Size 2.7m*1.8m @ A-6 Road
Reinforcement & Shuttering Checking & Concreting (M40) & Top Level Checking for Raft of Power
80 LNT-TP2-AA-RS-SER-RFI-175503 11:45 AM PD RAFT & TOP LEVEL E-3 2+017 2+017 LHS
Duct Size 2.2m*1.8m @ E-3 Road (Bridge Connectivity) Length-10.4m
Reinforcement & Shuttering Checking & Concreting (M40) & Top Level Checking for Raft of Power JUNTCION- G-4
81 LNT-TP2-AA-RS-SER-RFI-175504 11:45 AM PD RAFT & TOP LEVEL 0+000 0+020 RHS & LHS
Duct Size 2.7m*1.8m @ G-4 (RHS) Road Ch.0+000 to 0+020 & G-7 Road (LHS) Junction & G-7
STRUCTURE
Reinforcement & Shuttering Checking & Concreting (M40) of 3rd Flight Stair Case (Elv-13.721 to
82 LNT-TP2-AA-RS-STR-RFI-175505 9:30 AM ESR 3rd FLIGHT OF STAIR CASE ESR R-2 - - - ST1
16.221m) @ ESR R-2
Reinforcement & Shuttering Checking & Concreting (M40) Pardi Wall 7th Lift (Grid-C-4 to C-5 ) (C-5
83 LNT-TP2-AA-RS-STR-RFI-175506 9:30 AM ESR 7th Lift PARDI WALL ESR R-6 - - - ST1
to C-8), (C-8 to C-9) & (C-9 to C-6) Elv-17.561m to 18.161 @ ESR R-6
84 LNT-TP2-AA-RS-STR-RFI-175507 9:30 AM ESR Checking of Excavation PCC (M20) Laying for Grade Slab@ ESR P-1 GARD SLAB PCC ESR P-1 - - -
Reinforcement & Shuttering Checking & Concreting (M40) for Column 1st Lift C-5 ELV-28.790 to
85 LNT-TP2-AA-RS-STR-RFI-175508 9:30 AM ESR 1st LIFT COLUMN ESR R-7 - - -
31.190m @ ESR R-7
Excavation, Bed level, & PCC Laying Checking for Approach Slab @ F1A Bridge (C7/2 road side) up
86 LNT-TP2-AA-RS-STR-RFI-175509 4:00 PM MJB Concreting F1A Bridge - - -
stream.
Checking for Reinforcement, Shuttering & Concreting for Abutment-3 Wall final lift (16m to 30m) Reinforcement, Shuttering &
87 LNT-TP2-AA-RS-STR-RFI-175510 5:00 PM OUTFALL OUTFALL-2 - - - ST3
@ Outfall-2 Concreting
Earthen Bund Embankment
88 LNT-TP2-AA-RS-STR-RFI-175511 8:00 AM OUTFALL FDD Checking for Embankment (A1 Side) Earthen Bund @ Outfall -2 OUTFALL-2 - - - ST3
1st
Earthen Bund Embankment
89 LNT-TP2-AA-RS-STR-RFI-175512 10:00 AM OUTFALL FDD Checking for Embankment (A1 Side) Earthen Bund @ Outfall -2 OUTFALL-2 - - -
2nd
Earthen Bund Embankment
90 LNT-TP2-AA-RS-STR-RFI-175513 8:00 AM OUTFALL FDD Checking for Embankment Earthen Bund wing wall portion (A1 Side) @ Outfall -2 OUTFALL-2 - - -
7th
Earthen Bund Embankment
91 LNT-TP2-AA-RS-STR-RFI-175514 10:00 AM OUTFALL FDD Checking for Embankment Earthen Bund wing wall portion (A1 Side) @ Outfall -2 OUTFALL-2 - - -
Top
OTHERS
Reinforcement, Shuttering & Concrete Checking for Pile Cap (Over Head Gantry Foundation) @ H1 Reinforcement, Shuttering &
92 LNT-TP2-AA-RS-OTH-RFI-175515 10:00 AM PILE H1 - - RHS ST1
Road (MPC) Ch: 2+200 Concreting
NCR
93 LNT-TP2-AA-RS-NCR-RFI-175516 9:00 AM NCR NCR CLOSING NO -585 Checking for Application of Tack Coat & BC laying @ CPR9 Road NCR CLOSING NO -585 CPR9 1+790 1+800 RHS HE2
94 LNT-TP2-AA-RS-NCR-RFI-175517 10:00 AM NCR NCR CLOSING NO -586 Checking for Application of Tack Coat & BC laying @ CPR10 Road Ch: 0+400 NCR CLOSING NO -586 CPR10 - - RHS HE2

95 LNT-TP2-AA-RS-NCR-RFI-175518 9:00 AM NCR NCR CLOSING NO -609 Checking for Application of Tack Coat & BC laying @ G7 Road NCR CLOSING NO -609 G7 1+690 1+700 RHS HE2

96 LNT-TP2-AA-RS-NCR-RFI-175519 9:00 AM NCR NCR CLOSING NO -611 Checking of BC layer removed @ G7 Road NCR CLOSING NO -611 G7 1+195 1+198 LHS HE2
NCR CLOSING NO -611 Levelling, Rolling & FDD Checking for WMM Layer & Application of Prime
97 LNT-TP2-AA-RS-NCR-RFI-175520 2:00 PM NCR NCR CLOSING NO -611 G7 1+195 1+198 LHS HE2
Coat @ G7 Road

Sub- professional EE staff Total


SP23 Guarang Patel Sur1 2
SP24 Wakil Ahmad Sur2 2
SP33 Y N Tripathi HE3 5
SP10 Rakesh R ST1 3
SP34 Dilip Rathod ST3 2
SP20 Srirish QAQC1 0
SP35 Chandrakanta QAQC2 0
SP15 K.N Mishra HE2 6
Total EE RFI 20
Total RFI by L&T 97
Percentage % 20.62%
8/19/2021 View Message In Print Format

Satra I Man Pvt Ltd


  Survey Engineer2 -DSIR <sur2@dsirtp2ee.in>

From :   DC-DSIR <dc@dsirtp2ee.in>


Date :   Sat, 6 Feb 2021 10:44:57 +0530 (IST)
To :   mgrinfra-dicdl@gujarat.gov.in, vivek.mehra@aecom.com,
shakymuni.bahatre@aecom.com, sourabh.tuljapurkar@aecom.com, jm5-dicdl
<jm5-dicdl@gujrat.gov.in>
CC :   Team Leader-DSIR <tl@dsirtp2ee.in>, RE-DSIR <re@dsirtp2ee.in>, HE1
<he1@dsirtp2ee.in>, HE2 <he2@dsirtp2ee.in>, Struture Engineer-DSIR
<stru1@dsirtp2ee.in>, Struture Engineer 03 -DSIR <stru3@dsirtp2ee.in>, QC
Engineer-1 <qaqc1@dsirtp2ee.in>, QC Engineer-2 <qaqc2@dsirtp2ee.in>, Survey
Engineer -DSIR <sur1@dsirtp2ee.in>, Survey Engineer2 -DSIR
<sur2@dsirtp2ee.in>, Safety Engineer-DSIR <safe1@dsirtp2ee.in>, QSRS
<qsrs@dsirtp2ee.in>
Subject :   EE's RFI Summary dated 06.02.2021
Attachments :   RFI_SUMMARY_FOR_06.02.2021.pdf
 
Dear Sir,

Please find herewith attached EE's RFI Summary dated 06.02.2021

 
Thanks & Regards, 

Darshan Shrimali

Accountant

Employer’s Engineer (Dholera SIR)

 
 

mail.satragroup.in/servlet/ViewMessageServlet?foldername=INBOX&uidl=1612588497745.30721&msgid=931&action=print&login=sur2&ID=null 1/1
DESIGN AND CONSTRUCTION OF ROADS AND SERVICES OF ACTIVATION AREA IN DHOLERA SPECIAL INVESTMENT REGION AREA, DHOLERA
Client : Dholera Industrial City Development Limited. (DICDL)
Employer's Engineer : Yooshin Engineering Corporation in JV with Multi Media and SATRA
Contractor : Larsen & Toubro Limited
Submission
5-Feb-21
Date :
Summary of RFI raised
Inspection
6-Feb-21
Date :
Location
Sr. No. RFI No. Time Description Sub Activity Layer/Lift/No. Side Remarks
Name of the Road From / Chainage To / Chainage

SURVEY
Layout Checking of As Built of Thust Block for Industrial Effluent Rising Main @ H-2 Road (RHS)
1 LNT-TP2-AA-RS-SUR-RFI-175521 10:30 AM IE-RM AS BUILT SURVEY H-2 0+655 1+300 RHS SUR1
Ch-0+655, 1+295, 1+300
ROAD
2 LNT-TP2-AA-RS-ROD-RFI-175522 8:00 AM ROAD FDD Checking of MCW Subgrade @ E3 Road Offset- 0.0m to 8.6m Subgrade 2nd E3 1+300 1+600 BHS

3 LNT-TP2-AA-RS-ROD-RFI-175523 8:30 AM ROAD FDD & Level Checking for MPC Subgrade @ H1 Road Offset- 25m to 34m MPC Subgrade Top H1 2+700 3+000 LHS

4 LNT-TP2-AA-RS-ROD-RFI-175524 11:00 AM ROAD Kerb Laying Alignment & Level Checking @ B42 Road Offset- 6.0m KERB LAYING B42 1+350 1+510 BHS

5 LNT-TP2-AA-RS-ROD-RFI-175525 8:00 AM ROAD Checking for Perforated Pipe Laying @ B41/1 Road Offset- 5.0m to 6.0m Perforated Pipe Laying B41/1 0+000 0+050 BHS
Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ B41/1 Road Offset-
6 LNT-TP2-AA-RS-ROD-RFI-175526 8:00 AM ROAD CTSB TOP B41/1 0+000 0+050 BHS HE3
5.0m to 6.0m
7 LNT-TP2-AA-RS-ROD-RFI-175527 8:00 AM ROAD Checking for Perforated Pipe Laying @ B41/2 Road Offset- 5.0m to 6.0m Perforated Pipe Laying B41/2 0+880 0+930 BHS
Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ B41/2 Road Offset-
8 LNT-TP2-AA-RS-ROD-RFI-175528 8:00 AM ROAD CTSB TOP B41/2 0+880 0+930 BHS HE3
5.0m to 6.0m
Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ E3 Road Offset- 0.0m
9 LNT-TP2-AA-RS-ROD-RFI-175529 8:00 AM ROAD CTSB TOP E3 0+900 1+100 BHS
to 8.6m
Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ G6 Road Offset- 0m
10 LNT-TP2-AA-RS-ROD-RFI-175530 8:00 AM ROAD CTSB TOP G6 2+030 2+100 BHS HE2
to 10m
Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ G6 Road Offset- 2.5m
11 LNT-TP2-AA-RS-ROD-RFI-175531 8:00 AM ROAD CTSB TOP G6 0+530 0+680 BHS HE2
to 10m
Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ G6 Road Offset- 2.5m
12 LNT-TP2-AA-RS-ROD-RFI-175532 8:00 AM ROAD CTSB TOP G6 1+870 1+950 BHS
to 10.5m
B43 BHS Ch- 1+300 to 1+330 &
13 LNT-TP2-AA-RS-ROD-RFI-175533 8:00 AM ROAD Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ B43 & E3 Node No- 68 CTSB TOP Node No- 68 -
E3 LHS Ch-0+220 to 0+260
Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ B41/1 & B42 Node No-
14 LNT-TP2-AA-RS-ROD-RFI-175534 8:00 AM ROAD CTSB TOP Node No- 70 B41/1 BHS Ch: 0+000 to 0+030 -
70
15 LNT-TP2-AA-RS-ROD-RFI-175535 10:00 AM ROAD Kerb Laying Alignment & Level Checking @ B57 Road Offset- 7.3m KERB LAYING B57 1+000 1+380 LHS

16 LNT-TP2-AA-RS-ROD-RFI-175536 3:00 PM ROAD FDD & Level Checking for Outer MPC WMM TOP @ J1 Road Offset- 8.1m to 12.5m MPC WMM TOP J1 0+140 0+300 RHS

17 LNT-TP2-AA-RS-ROD-RFI-175537 2:00 PM ROAD FDD & Level Checking for MPC GSB TOP @ K2 Road Offset- 13m to 24m MPC GSB TOP K2 1+600 1+800 LHS

18 LNT-TP2-AA-RS-ROD-RFI-175538 11:00 AM ROAD FDD & Level Checking for MPC-1 GSB TOP @ K2 Road Offset- 13m to 18.5m MPC-1 GSB TOP K2 1+500 1+600 LHS

19 LNT-TP2-AA-RS-ROD-RFI-175539 5:00 PM ROAD FDD & Level Checking for MPC-1 Granular Top Layer @ K2 Road Offset- 13m to 16.5m MPC-1 Granular Top K2 1+500 1+800 LHS

20 LNT-TP2-AA-RS-ROD-RFI-175540 3:00 PM ROAD FDD & Level Checking for MPC-2 WMM TOP @ K2 Road Offset- 18.5m to 24m MPC-2 WMM TOP K2 1+370 1+500 LHS
MPC & Service Road
21 LNT-TP2-AA-RS-ROD-RFI-175541 6:00 PM ROAD FDD Checking for Inner MPC & Service Road Embankment @ G6 Road Offset- 13.0m to 23.0m G6 1+900 2+100 LHS
Embankment 9th
MPC & Service Road
22 LNT-TP2-AA-RS-ROD-RFI-175542 6:00 PM ROAD FDD Checking for Inner MPC & Service Road Embankment @ G6 Road Offset- 13.0m to 23.0m G6 1+900 2+150 RHS
Embankment 9th
MPC & Service Road
23 LNT-TP2-AA-RS-ROD-RFI-175543 10:00 AM ROAD FDD Checking for Inner MPC & Service Road Embankment @ G6 Road Offset- 13.0m to 23.0m G6 1+630 1+700 LHS
Embankment 7th
MPC & Service Road
24 LNT-TP2-AA-RS-ROD-RFI-175544 6:00 PM ROAD FDD Checking for Inner MPC & Service Road Embankment @ G6 Road Offset- 13.0m to 23.0m G6 1+630 1+700 LHS
Embankment 8th
25 LNT-TP2-AA-RS-ROD-RFI-175545 11:00 AM ROAD FDD & Level Checking for Outer MPC Embankment @ G6 Road Offset- 23m to 29m MPC Embankment Top G6 1+630 1+650 RHS
26 LNT-TP2-AA-RS-ROD-RFI-175546 6:00 PM ROAD FDD Checking for Service Road Subgrade @ G6 Road Offset- 17.5m to 23m Service Road Subgrade 2nd G6 1+700 1+900 LHS

27 LNT-TP2-AA-RS-ROD-RFI-175547 6:00 PM ROAD FDD Checking for Service Road Subgrade @ G6 Road Offset- 17.5m to 23m Service Road Subgrade 2nd G6 1+700 1+800 RHS

28 LNT-TP2-AA-RS-ROD-RFI-175548 10:00 AM ROAD FDD & Level Checking for MPC Subgrade @ E1 Road Offset- 8.1m to 15.3m MPC Subgrade Top E1 1+980 2+000 LHS

29 LNT-TP2-AA-RS-ROD-RFI-175549 10:00 AM ROAD FDD & Level Checking for MPC Subgrade @ E1 Road Offset- 8.1m to 15.5m MPC Subgrade Top E1 2+850 3+000 LHS

30 LNT-TP2-AA-RS-ROD-RFI-175550 6:00 PM ROAD FDD & Level Checking for MPC WMM TOP @ E1 Road Offset- 8.1m to 15m MPC WMM TOP E1 1+850 2+000 LHS

31 LNT-TP2-AA-RS-ROD-RFI-175551 10:00 AM ROAD FDD & Level Checking for inner MPC Granular Top Layer @ E1 Road Offset- 8.1m to 11.1m MPC Granular Top E1 1+850 2+000 LHS

32 LNT-TP2-AA-RS-ROD-RFI-175552 4:00 PM ROAD FDD & Level Checking for MPC GSB Top Layer @ E1 Road Offset- 8.1m to 15.3m MPC GSB TOP E1 1+980 2+000 LHS HE3

33 LNT-TP2-AA-RS-ROD-RFI-175553 10:00 AM ROAD FDD Checking for inner MPC Embankment @ E3 Road Offset- 8.6m to 13.6m MPC Embankment 5th E3 1+300 1+600 LHS

34 LNT-TP2-AA-RS-ROD-RFI-175554 6:00 PM ROAD FDD Checking for inner MPC Embankment @ E3 Road Offset- 8.6m to 13.6m MPC Embankment 6th E3 1+300 1+600 LHS

35 LNT-TP2-AA-RS-ROD-RFI-175555 9:00 AM ROAD FDD Checking for inner MPC Embankment @ E3 Road Offset- 8.6m to 13.6m MPC Embankment 5th E3 1+600 2+000 LHS

36 LNT-TP2-AA-RS-ROD-RFI-175556 6:00 PM ROAD FDD Checking for inner MPC Embankment @ E3 Road Offset- 8.6m to 13.6m MPC Embankment 6th E3 1+600 2+000 LHS

37 LNT-TP2-AA-RS-ROD-RFI-175557 9:00 AM ROAD FDD Checking for Outer MPC Embankment @ E3 Road Offset- 13.6m to 18m MPC Embankment 5th E3 1+300 1+600 LHS

38 LNT-TP2-AA-RS-ROD-RFI-175558 6:00 PM ROAD FDD Checking for Outer MPC Embankment @ E3 Road Offset- 13.6m to 18m MPC Embankment 6th E3 1+300 1+600 LHS

39 LNT-TP2-AA-RS-ROD-RFI-175559 10:00 AM ROAD FDD Checking for Outer MPC Embankment @ E3 Road Offset- 13.6m to 18m MPC Embankment 6th E3 1+600 2+000 LHS

40 LNT-TP2-AA-RS-ROD-RFI-175560 6:00 PM ROAD FDD Checking for Outer MPC Embankment @ E3 Road Offset- 13.6m to 18m MPC Embankment 7th E3 1+600 2+000 LHS

41 LNT-TP2-AA-RS-ROD-RFI-175561 11:30 AM ROAD FDD & Level Checking for Outer MPC GSB TOP @ C10 Road Offset- 10.5m to 13.8m MPC GSB TOP C10 0+400 0+500 LHS

42 LNT-TP2-AA-RS-ROD-RFI-175562 4:00 PM ROAD FDD & Level Checking for Outer MPC WMM TOP @ C10 Road Offset- 10.5m to 13.5m MPC WMM TOP C10 0+400 0+500 LHS

43 LNT-TP2-AA-RS-ROD-RFI-175563 4:00 PM ROAD FDD & Level Checking for MPC WMM Top Layer @ H1 Road Offset- 25.5m to 35m MPC WMM TOP H1 4+500 4+600 RHS

44 LNT-TP2-AA-RS-ROD-RFI-175564 2:00 PM ROAD FDD & Level Checking for MPC WMM TOP @ G7 Road Offset- 17.0m to 27.5m MPC WMM TOP G7 2+110 2+290 LHS HE2
E1 & A6 Junction E1 LHS Ch: 3+080 to 3+099 & A6
45 LNT-TP2-AA-RS-ROD-RFI-175565 6:00 PM ROAD FDD Checking for Subgrade @ E1 & A6 Junction Node No- 108 Subgrade 1st -
Node No- 108 RHS Ch: 0+013 to 0+022
E1 & A6 Junction E1 LHS Ch: 3+053 to 3+070 & A6
46 LNT-TP2-AA-RS-ROD-RFI-175566 6:00 PM ROAD FDD Checking for Subgrade @ E1 & A6 Junction Node No- 108 Subgrade 1st -
Node No- 108 LHS Ch: 0+013 to 0+022
Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ B41/2 & B42 Node No- B41/2 BHS Ch: 0+880 to 0+930
47 LNT-TP2-AA-RS-ROD-RFI-175567 8:00 AM ROAD CTSB TOP Node No- 71 -
71 & B42 RHS Ch: 3+190 to 3+250
FDD & Level Checking for Inner MPC & Service Road Embankment @ G6 Road Offset- 13.0m to MPC & Service Road
48 LNT-TP2-AA-RS-ROD-RFI-175568 4:00 PM ROAD G6 1+180 1+200 LHS
23.0m Embankment Top
Field Dry Density , Level & Surface regularity Checking for WMM Laying @ B42 Road Offset-
49 LNT-TP2-AA-RS-ROD-RFI-175569 9:00 AM ROAD WMM TOP B42 0+880 1+110 RHS
5.0m to 6.5m
50 LNT-TP2-AA-RS-ROD-RFI-175570 4:00 PM ROAD Application of Prime coat @ B42 Road Offset- 0.0m to 6.5m PRIME COAT B42 0+880 1+350 BHS HE3
Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ B42 Road Offset-
51 LNT-TP2-AA-RS-ROD-RFI-175571 2:00 PM ROAD CTSB TOP B42 1+920 2+000 BHS
0.0m to 6.5m
SERVICES

Checking of Reinforcement, Shuttering & Concrete for MPC Slab (3180 x 2500 x 150 - 3 No), Reinforcement, Shuttering &
52 LNT-TP2-AA-RS-SER-RFI-175572 5:00 PM SWD PC Yard - - - ST1
(4180 x 2500 x 150 -3 No), (3680 x 2500 x 150 - 3 No), (1580 x 2500 x 150 - 3 No) @ PC Yard Concreting
Reinforcement, Shuttering & Concrete Checking for Precast inlet/ Manhole cover slab
Reinforcement, Shuttering &
53 LNT-TP2-AA-RS-SER-RFI-175573 5:00 PM SWD (0.640*0.640*0.175 - 1 No), (0.740*0.740*0.175 - 9 No), (0.740*0.820*0.175 - 2 No), - - - -
Concreting
(1.140*0.695*0.175 - 2 No), (1.640*0.425*0.225 - 3 No) @ Precast Yard
UTILITY Reinforcement, Shuttering & Concrete Checking for UCD (PD) Jointing Raft (1.3m) @ C10 Road Reinforcement, Shuttering &
54 LNT-TP2-AA-RS-SER-RFI-175574 5:00 PM C10 - - BHS
CROSS DUCT Ch: 0+045 Concreting
UTILITY Reinforcement, Shuttering & Concrete Checking for UCD (Utility) Jointing Raft (1.8m) @ G4 Road Reinforcement, Shuttering &
55 LNT-TP2-AA-RS-SER-RFI-175575 5:00 PM G4 - - RHS
CROSS DUCT Ch: 3+915 Concreting
UTILITY
56 LNT-TP2-AA-RS-SER-RFI-175576 5:00 PM Excavation, Bed level, & PCC Laying Checking for Utility Cross Duct @ B42 Road Ch: 2+025 Concreting B42 - - BHS
CROSS DUCT
Reinforcement, Shuttering &
57 LNT-TP2-AA-RS-SER-RFI-175577 4:00 PM SWD Reinforcement, Shuttering & Concrete Checking for Wall @ D9 Road (Part-2) D9 0+165 0+175 RHS ST1
Concreting
58 LNT-TP2-AA-RS-SER-RFI-175578 11:00 AM IE Water Tightening Test of 800mm Dia.DI, K-7 Pipe Line for Insdutrial Effluent @ G-4 Road TEST-WATER TIGHTENING G-4 2+160 2+190 RHS HE2
59 LNT-TP2-AA-RS-SER-RFI-175579 1:00 PM IE Water Tightening Test of 800mm Dia.DI, K-7 Pipe Line for Insdutrial Effluent @ G-4 Road TEST-WATER TIGHTENING G-4 2+190 2+220 RHS
Checking of Hydrostatic Pressure testing of HDPE 160 mm Dia. HDPE For Potable Water @ B-42 HYDROSTATIC PRESSURE
60 LNT-TP2-AA-RS-SER-RFI-175580 9:00 AM POTABLE B-42 2+080 2+900 CENTER HE3
Road TEST
Reinforcement & Shuttering Checking & Concreting (M40) for Casing for Potable Water @ B-42
61 LNT-TP2-AA-RS-SER-RFI-175581 9:00 AM POTABLE-PC CASING B-42 2+125 2+540 CENTER
Road (CENTER ) Pipe Line Crossing @ CH.2+125, 2+300, 2+540 (Property Connection) Length-20m

Checking of Excavation, PCC (M20) Laying & Top Level Checking for Potable Water @ C-9 Road CENTER to
62 LNT-TP2-AA-RS-SER-RFI-175582 8:00 AM POTABLE-PC EXCAVATION & PCC C-9 1+055 1+490
(CENTER to LHS ) Pipe Line Crossing @ CH.1+055, 1+230, 1+490 (Property Connection) Length-10m LHS

Reinforcement & Shuttering Checking & Concreting (M40) for Casing for Potable Water @ B-48 CENTER to
63 LNT-TP2-AA-RS-SER-RFI-175583 10:30 AM POTABLE-PC CASING B-48 0+770 0+770
Road (CENTER to RHS) Pipe Line Crossing @ CH.0+770 (Property Connection) Length-5.4m RHS
Reinforcement & Shuttering Checking & Concreting (M40) for Casing for Potable Water
CENTER to
64 LNT-TP2-AA-RS-SER-RFI-175584 10:30 AM RECYCLE-PC @Recycle Water @ B-48 Road (CENTER to RHS) Pipe Line Crossing @ CH.0+785 (Property CASING B-48 0+785 0+785
RHS
Connection) Length-4.4m
Reinforcement & Shuttering Checking & Concreting (M40) for Casing for Recycle Water @ G-4
65 LNT-TP2-AA-RS-SER-RFI-175585 3:00 PM RECYCLE-RC CASING G-4 7+016 7+016 LHS (MPC)
Road LHS ) MPC Pipe Line Crossing @ CH.7+016 (Road Crossing) Length-0+000 to 0+021.5
Checking of Excavation & BC Cutting for Recycle Water @ CPR-2 Road Pipe Line Crossing @ Ch-
66 LNT-TP2-AA-RS-SER-RFI-175586 8:00 AM POTABLE EXCAVATION -BC CUTTING CPR-2 0+380 0+405 CENTER
0+380, 0+405
Reinforcement & Shuttering Checking & Concreting (M40) & Top Level Checking for Raft of
67 LNT-TP2-AA-RS-SER-RFI-175587 8:00 AM PD RAFT & TOP LEVEL A-6 0+134 0+160 LHS
Power Duct Size 2.7m*1.8m @ A-6 Road
Reinforcement & Shuttering Checking & Concreting (M40) Checking for Wall of Power Duct Size
68 LNT-TP2-AA-RS-SER-RFI-175588 10:00 AM PD WALL A-6 0+155 0+180 LHS
2.7m*1.8m @ A-6 Road
Reinforcement & Shuttering Checking & Concreting (M40) & Top Level Checking for Raft of
69 LNT-TP2-AA-RS-SER-RFI-175589 9:00 AM PD RAFT & TOP LEVEL E-3 2+035 2+035 RHS
Power Duct Size 2.2m*1.8m @ E-3 Road (Bridge Connectivity) Length-8.8m
Reinforcement & Shuttering Checking & Concreting (M40) &Wall of Power Duct Size 2.2m*1.8m
70 LNT-TP2-AA-RS-SER-RFI-175590 11:00 AM PD RAFT & TOP LEVEL E-3 2+017 2+017 RHS
@ E-3 Road @ Ch-2+017 (Bridge Connectivity) Length-8.9m
Reinforcement & Shuttering Checking & Concreting (M40) & Top Level Checking for Raft
71 LNT-TP2-AA-RS-SER-RFI-175591 10:00 AM PD-MH RAFT & TOP LEVEL G-6 2+975 2+975 LHS
(Manhole & Airvet) of Power Duct Size 2.7m*1.8m @ G-6 Road Ch-2+975
STRUCTURE
Checking of Reinforcement, Shuttering & Concreting for Bus Shelter Starter (C1, C2, C3, C4, C5, Reinforcement, Shuttering &
72 LNT-TP2-AA-RS-STR-RFI-175592 5:00 PM BUS SHELTER K2 - - LHS ST3
C6, C7) @ K2 Road Ch: 0+190 Concreting
Checking of Reinforcement, Shuttering & Concrete for column casting (C2-C6) @ K2 Road Ch: Reinforcement, Shuttering &
73 LNT-TP2-AA-RS-STR-RFI-175593 5:00 PM BUS SHELTER K2 - - RHS ST3
0+470 Concreting
Checking of Reinforcement, Shuttering & Concrete for Top Beam (C1, C2, C3, C4, C5, C6, C7) @ E1 Reinforcement, Shuttering &
74 LNT-TP2-AA-RS-STR-RFI-175594 4:00 PM BUS SHELTER E1 - - RHS
Road Ch: 1+324 Concreting
Excavation, Bed level, & PCC Laying Checking for Approach Slab @ F1A Bridge (C7/2 road side)
75 LNT-TP2-AA-RS-STR-RFI-175595 4:00 PM MJB Concreting F1A Bridge - - -
up stream.
Checking for Reinforcement, Shuttering & Concreting for Abutment-3 Wall final lift (16m to Reinforcement, Shuttering &
76 LNT-TP2-AA-RS-STR-RFI-175596 12:00 PM OUTFALL OUTFALL-2 - - - ST3
30m) @ Outfall-2 Concreting
ELECTRICAL
Reinforcement & Shuttering Checking & Concreting (M40) & for Poie Foundation of Street Light
77 LNT-TP2-AA-RS-ELE-RFI-175597 10:00 AM SL POLE FOUNDATION G-4 4+210 4+420 RHS
@ G-4 Road
Checking of Excavation, PCC (M20) Laying & Top Level Checking for Foundation of High Mast (SA-
78 LNT-TP2-AA-RS-ELE-RFI-175598 10:00 AM HM PCC & TOP LEVEL B-53 0+020 0+020 RHS
08-MDB-N261-HM-1 ) @ B-53 Road Ch-0+020
Checking of Excavation, PCC (M20) Laying & Top Level Checking for Foundation of High Mast (SA-
79 LNT-TP2-AA-RS-ELE-RFI-175599 10:00 AM HM PCC & TOP LEVEL B-56 & C-16 2+365 1+510 LHS & LHS
02-DBI-N266-HM-1 ) @ B-56 Road LHS Ch-2+365 & C-16 Road LHS Ch-1+510
Checking of Excavation, PCC (M20) Laying & Top Level Checking for Foundation of High Mast (SA-
80 LNT-TP2-AA-RS-ELE-RFI-175600 10:00 AM HM PCC & TOP LEVEL J-1 0+660 0+620 RHS
08-MDB-N254-HM-1 & 2 ) @ J-1 Road Ch-0+660 , 0+620
Checking of Excavation, PCC (M20) Laying & Top Level Checking for Foundation of High Mast (SA-
81 LNT-TP2-AA-RS-ELE-RFI-175601 10:00 AM HM PCC & TOP LEVEL H-2 0+630 0+650 RHS & LHS
08-MDB-N255-HM-1 & 2 ) @ H-2 Road Ch-0+630 (RHS) , 0+650 (LHS)
OTHERS
Reinforcement, Shuttering & Concrete Checking for Pile Cap (Over Head Gantry Foundation) @ Reinforcement, Shuttering &
82 LNT-TP2-AA-RS-OTH-RFI-175602 5:00 PM PILE H1 - - RHS ST1
H1 Road (MPC) Ch: 2+200 Concreting
83 LNT-TP2-AA-RS-OTH-RFI-175603 10:00 AM CALIBRATION WMM Pugmil Calibration of Plant No:6 @ DSIR TP 2E CALIBRATION DSIR-TP2E - - - QAQC2
NCR

84 LNT-TP2-AA-RS-NCR-RFI-175604 9:00 AM NCR NCR CLOSING NO -611 Checking for Application of Tack Coat & BC laying @ G7 Road NCR CLOSING NO -611 G7 1+195 1+198 LHS HE2

Sub- professional EE staff Total


SP23 Guarang Patel Sur1 1
SP24 Wakil Ahmad Sur2 0
SP33 Y N Tripathi HE3 5
SP10 Rakesh R ST1 3
SP34 Dilip Rathod ST3 3
SP20 Srirish QAQC1 0
SP35 Chandrakanta QAQC2 1
SP15 K.N Mishra HE2 5
Total EE RFI 18
Total RFI by L&T 84
Percentage % 21.43%
Annexure II
RFI Status submitted by L&T
8/14/2021 View Message In Print Format

Satra I Man Pvt Ltd


  Survey Engineer2 -DSIR <sur2@dsirtp2ee.in>

From :   K Bala Subramanyam <karbs@lntecc.com>


Date :   Fri, 29 Jan 2021 03:48:10 +0000
To :   RE-DSIR <re@dsirtp2ee.in>
CC :   Team Leader-DSIR <tl@dsirtp2ee.in>, Rajesh Sharma
<Rajeshsharma@lntecc.com>, HE1 <he1@dsirtp2ee.in>, HE2 <he2@dsirtp2ee.in>,
Struture Engineer-DSIR <stru1@dsirtp2ee.in>, Struture Engineer-DSIR
<stru2@dsirtp2ee.in>, Survey Engineer2 -DSIR <sur2@dsirtp2ee.in>, Struture
Engineer 03 -DSIR <stru3@dsirtp2ee.in>, SQS-DSIR <sqs@dsirtp2ee.in>,
"mgrinfra-dicdl@gujarat.gov.in" <mgrinfra-dicdl@gujarat.gov.in>, Survey Engineer
-DSIR <sur1@dsirtp2ee.in>, Raghunandan Dahagam <Drn@lntecc.com>,
Vithiyapathy Rathinasamy <rvp@lntecc.com>, PE-DSIR <pe@dsirtp2ee.in>, Anil
Kumar <kumaranilkumar@lntecc.com>, Shaha Mohan Kalachand <MOHAN-
SHAHA@lntecc.com>, Survey Engineer -DSIR <sur1@dsirtp2ee.in>, singhkumar
<singhkumar@lntecc.com>, QC Engineer-1 <qaqc1@dsirtp2ee.in>, QC Engineer-2
<qaqc2@dsirtp2ee.in>, "Milon Maity ." <milonmaity@lntecc.com>, QSRS
<qsrs@dsirtp2ee.in>, Bhangadiya Nikunj Mansukhbhai
<nmbhangadiya@lntecc.com>
Subject :   RFI status for 25-01-2021
Attachments :   RFI STATUS FOR 25.01.2021.xlsx
 
Dear Sir

Enclosed here with the RFI Status for 25-01-2021.

 
   Thanks & Regards
K Bala Subramanyam
  Mobile–9909017586
 

 
Sensitivity: LNT Construction Internal Use

mail.satragroup.in/servlet/ViewMessageServlet?foldername=INBOX&uidl=1611892063863.10223&msgid=1&action=print&login=sur2&ID=null 1/2
DESIGN AND CONSTRUCTION OF ROADS AND SERVICES OF ACTIVATION AREA IN DHOLERA SPECIAL INVESTMENT REGION AREA, DHOLERA
Client : Dholera Industrial City Development Limited. (DICDL)
Employer's Engineer : Yooshin Engineering Corporation in JV with Multi Media and SATRA
Contractor : Larsen & Toubro Limited
Submission
23-Jan-21
Date :
Summary of RFI raised
Inspection
25-Jan-21
Date :
Location
Corrected
Sr. No. RFI No. Time Description Sub Activity Layer/Lift/No. Side Status Corrected Chainage Width Remarks Remarks
Name of the Road From / Chainage To / Chainage Date

SURVEY
Layout Checking for Recycle Water @ B-48 Road (CENTER to RHS) Pipe Line Crossing @ CH.0+785 CENTER to
1 LNT-TP2-AA-RS-SUR-RFI-174164 8:30 AM RECYCLE-PC SURVEY B-48 0+785 0+785 APPROVED
(Property Connection) Length-9.4m RHS
Layout Checking for Recycle Water @ CPR-7 Road (CENTER to BHS) Pipe Line Crossing @ CH.0+255 CENTER to
2 LNT-TP2-AA-RS-SUR-RFI-174165 9:30 AM RECYCLE-PC SURVEY CPR-7 0+255 0+255 APPROVED
(Property Connection) Length-24m BHS
Layout Checking for Potable Water @ CPR-7 Road (CENTER to BHS) Pipe Line Crossing @ CH.0+250 CENTER to
3 LNT-TP2-AA-RS-SUR-RFI-174166 9:30 AM POTABLE-PC SURVEY CPR-7 2+50 2+50 APPROVED
(Property Connection) Length-24m BHS
Layout Checking for Potable Water @ B-48 Road (CENTER to BHS) Pipe Line Crossing @ CH.0+770 CENTER to
4 LNT-TP2-AA-RS-SUR-RFI-174167 9:00 AM POTABLE-PC SURVEY B-48 0+770 0+770 APPROVED
(Property Connection) Length-10.4m BHS
Layout Checking for Insdutriual Effluent Water @ B-48 Road (CENTER to BHS) Pipe Line Crossing @ CENTER to
5 LNT-TP2-AA-RS-SUR-RFI-174168 9:00 AM IE-PC SURVEY B-48 0+820 0+820 APPROVED EE SUR1
CH.0+820 (Property Connection) Length-12.13m BHS
Layout Checking of As Built of Thust Block for Recycle Water Rising Main @ G-7 Road (LHS ) Ch-0+900
6 LNT-TP2-AA-RS-SUR-RFI-174169 10:30 AM RW-RM AS BUILT SURVEY G-7 0+900 0+900 LHS APPROVED EE SUR2
& 0+900
Layout Checking of As Built of Thust Block for Recycle Water Rising Main @ G-7 Road (RHS ) Ch-0+900
7 LNT-TP2-AA-RS-SUR-RFI-174170 10:30 AM RW-RM AS BUILT SURVEY G-7 0+900 0+900 RHS APPROVED EE SUR2
& 0+900
Layout Checking of As Built of Thust Block for Recycle Water Rising Main @ B-42 Road (CENTER) Ch-
8 LNT-TP2-AA-RS-SUR-RFI-174171 10:00 AM RW-RM AS BUILT SURVEY B-42 0+715 0+715 CENTER APPROVED EE SUR2
0+715
Layout Checking of As Built of Thust Block for Industrial Effluent Rising Main @ G-7 Road (RHS) Ch-
9 LNT-TP2-AA-RS-SUR-RFI-174172 10:30 AM IE-RM AS BUILT SURVEY G-7 0+855 0+898 RHS APPROVED EE SUR2
0+855, 0+855, 0+855, 0+898
Layout Checking of As Built of Thust Block for Industrial Effluent Rising Main @ G-7 Road (LHS) Ch-
10 LNT-TP2-AA-RS-SUR-RFI-174173 10:30 AM IE-RM AS BUILT SURVEY G-7 0+855 0+855 LHS APPROVED EE SUR2
0+855, 0+855, 0+855,
11 LNT-TP2-AA-RS-SUR-RFI-174174 8:00 AM SWD Layout Checking @ G6 Road SURVEY G6 0+021 0+040 LHS APPROVED
ROAD
12 LNT-TP2-AA-RS-ROD-RFI-174175 10:00 AM ROAD FDD & Level Checking of MCW Subgrade @ B42 Road Offset- 0.0m to 6.0m Subgrade Top B42 2+100 2+370 BHS APPROVED Ch-2170 to 2260 27.01.2021 12
E3 & E1 Node No- E3 LHS Ch: 1+970 to 1+988 & E1
13 LNT-TP2-AA-RS-ROD-RFI-174176 10:00 AM ROAD FDD Checking for Embankment @ E3 & E1 Node No-110 Embankment 7th - APPROVED 25.01.2021 390 Sqmt
110 RHS Ch: 3+827 to 3+846
E3 & E1 Node No- E3 LHS Ch: 1+970 to 1+988 & E1
14 LNT-TP2-AA-RS-ROD-RFI-174177 6:00 PM ROAD FDD Checking for Embankment @ E3 & E1 Node No-110 Embankment 8th - APPROVED 25.01.2021 390 Sqmt
110 RHS Ch: 3+827 to 3+846
FDD & Level Checking for Embankment @ G4 & G7 Junction Node- 175 Activation Area End G4 & G7 Junction G4 Road, Ch-1590 to 1600,
15 LNT-TP2-AA-RS-ROD-RFI-174178 9:00 AM ROAD Embankment Top 1+590 1+610 BHS APPROVED 25.01.2021 34
Portion Node- 175 Offset-0.0 to 17.0
G4 & G7 Junction G4 Road, Ch-1590 to 1600,
16 LNT-TP2-AA-RS-ROD-RFI-174179 2:00 PM ROAD FDD Checking for Subgrade @ G4 & G7 Junction Node- 175 Activation Area End Portion Subgrade 1st 1+590 1+610 BHS APPROVED 27.01.2021 34
Node- 175 Offset-0.0 to 17.0
G4 & G7 Junction G4 Road, Ch-1590 to 1600,
17 LNT-TP2-AA-RS-ROD-RFI-174180 5:00 PM ROAD FDD Checking for Subgrade @ G4 & G7 Junction Node- 175 Activation Area End Portion Subgrade 2nd 1+590 1+610 BHS APPROVED 27.01.2021 34
Node- 175 Offset-0.0 to 17.0
18 LNT-TP2-AA-RS-ROD-RFI-174181 11:00 AM ROAD FDD & Level Checking for Rectification of Subgrade Top @ CPR5 Road Offset- 0m to 7m Subgrade Top CPR5 0+250 0+290 BHS APPROVED 25.01.2021 14 EE HE2
19 LNT-TP2-AA-RS-ROD-RFI-174182 9:00 AM ROAD Checking for Perforated Pipe Laying @ B55 Road Perforated Pipe Laying B55 0+650 0+695 BHS APPROVED Ch-650 to 697 25.01.2021 -
Field Dry Density , Level & Surface regularity Checking for WMM Laying @ B57 Road Offset- 0.3m to
20 LNT-TP2-AA-RS-ROD-RFI-174183 9:00 AM ROAD WMM TOP B57 0+050 0+400 RHS Not Ready EE HE3
7.3m
21 LNT-TP2-AA-RS-ROD-RFI-174184 4:00 PM ROAD FDD & Level Checking for MCW Subgrade @ B57 Road Width- 14.6m Subgrade Top B57 1+700 1+900 BHS ALREADY APPROVED RFI NO-173964 EE HE3
22 LNT-TP2-AA-RS-ROD-RFI-174185 10:00 AM ROAD FDD & Level Checking for MPC Subgrade @ J1 Road Offset- 10.8m to 13.5m MPC Subgrade Top J1 0+050 0+200 LHS APPROVED Offset-8.1 to 13.5 25.01.2021 5.4
23 LNT-TP2-AA-RS-ROD-RFI-174186 12:00 PM ROAD FDD & Level Checking for MPC Subgrade @ J1 Road Offset- 10.8m to 13.5m MPC Subgrade Top J1 0+200 0+400 LHS APPROVED Offset-8.1 to 13.5 25.01.2021 5.4
24 LNT-TP2-AA-RS-ROD-RFI-174187 3:00 PM ROAD FDD & Level Checking for OGL @ G6 Road Offset 0m to 30m OGL G6 0+000 0+200 RHS APPROVED 25.01.2021 30
25 LNT-TP2-AA-RS-ROD-RFI-174188 12:00 PM ROAD FDD & Level Checking for Subgrade @ D9 Road Offset- 0m to 8.1m Subgrade Top D9 0+380 0+440 BHS APPROVED 25.01.2021 14.2
26 LNT-TP2-AA-RS-ROD-RFI-174189 10:00 AM ROAD FDD Checking for Outer MPC Embankment @ G6 Road Offset- 23m to 29m MPC Embankment 6th G6 2+970 3+000 LHS Not Ready
27 LNT-TP2-AA-RS-ROD-RFI-174190 6:00 PM ROAD FDD Checking for Outer MPC Embankment @ G6 Road Offset- 23m to 29m MPC Embankment 7th G6 2+970 3+000 LHS Not Ready
28 LNT-TP2-AA-RS-ROD-RFI-174191 10:00 AM ROAD FDD Checking for Outer MPC Embankment @ G6 Road Offset- 23m to 29m MPC Embankment 6th G6 1+630 1+650 RHS APPROVED 25.01.2021 6
29 LNT-TP2-AA-RS-ROD-RFI-174192 6:00 PM ROAD FDD Checking for Outer MPC Embankment @ G6 Road Offset- 23m to 29m MPC Embankment 7th G6 1+630 1+650 RHS APPROVED 25.01.2021 6
30 LNT-TP2-AA-RS-ROD-RFI-174193 10:00 AM ROAD FDD Checking for Outer MPC Embankment @ G6 Road Offset- 23m to 29m MPC Embankment 7th G6 2+850 2+950 RHS APPROVED Ch-2850 to 2900 25.01.2021 6
31 LNT-TP2-AA-RS-ROD-RFI-174194 6:00 PM ROAD FDD Checking for Outer MPC Embankment @ G6 Road Offset- 23m to 29m MPC Embankment 8th G6 2+850 2+950 RHS APPROVED Ch-2850 to 2900 25.01.2021 6
32 LNT-TP2-AA-RS-ROD-RFI-174195 6:00 PM ROAD FDD Checking for Outer MPC Embankment @ G6 Road Offset- 23m to 29m MPC Embankment 8th G6 2+900 2+970 LHS APPROVED 25.01.2021 6
33 LNT-TP2-AA-RS-ROD-RFI-174196 4:00 PM ROAD FDD Checking for Embankment @ G6 Road Offset- 0m to 11.5m Embankment 1st G6 0+000 0+200 RHS Not Ready
34 LNT-TP2-AA-RS-ROD-RFI-174197 4:00 PM ROAD Checking for Perforated Pipe Laying @ B42 Road Perforated Pipe Laying B42 1+590 1+800 BHS APPROVED Ch-1585 to 1800 27.01.2021 -
Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ B42 Road Offset- 5.0m to
35 LNT-TP2-AA-RS-ROD-RFI-174198 5:00 PM ROAD CTSB TOP B42 1+590 1+800 BHS Not Ready
6.0m
Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ B42 Road Offset- 0.0m to
36 LNT-TP2-AA-RS-ROD-RFI-174199 5:00 PM ROAD CTSB TOP B42 2+300 2+570 BHS Not Ready
5.0m
37 LNT-TP2-AA-RS-ROD-RFI-174200 8:00 AM ROAD Checking for Perforated Pipe Laying @ B42 Road Perforated Pipe Laying B42 0+850 1+300 RHS APPROVED LHS, Ch-850 to 1060 & RHS, Ch- 25.01.2021 -
Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ B42 Road Offset- 5.0m to LHS Ch-850 to 1060 (5.0 to 1.5, 1.5 &
38 LNT-TP2-AA-RS-ROD-RFI-174201 8:00 AM ROAD CTSB TOP B42 0+850 1+300 RHS APPROVED 27.01.2021
6.5m 6.5), RHS Ch-850 to 1110 (5.0 1.0
Field Dry Density , Level & Surface regularity Checking for WMM Laying @ B42 Road Offset- 0.0m to
39 LNT-TP2-AA-RS-ROD-RFI-174202 8:00 AM ROAD WMM TOP B42 2+600 2+800 BHS APPROVED Ch-2600 to 2800 25.01.2021 12 EE HE3
6.0m
40 LNT-TP2-AA-RS-ROD-RFI-174203 5:00 PM ROAD Application of Prime coat @ B42 Road Offset- 0.0m to 6.0m PRIME COAT B42 2+600 2+800 BHS APPROVED Ch-2600 to 3070 27.01.2021 12
Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ B41/2 Road Offset- 0.0m to
41 LNT-TP2-AA-RS-ROD-RFI-174204 8:00 AM ROAD CTSB TOP B41/2 0+850 0+980 BHS Not Ready EE HE3
6.0m
42 LNT-TP2-AA-RS-ROD-RFI-174205 10:00 AM ROAD Kerb Laying Alignment & Level Checking @ B42 Road Offset- 6m KERB LAYING B42 3+100 3+340 BHS APPROVED LHS Ch-3000 to 3320 & RHS Ch- 27.01.2021 6.0 m
8/19/2021 View Message In Print Format

Satra I Man Pvt Ltd


  Survey Engineer2 -DSIR <sur2@dsirtp2ee.in>

From :   K Bala Subramanyam <karbs@lntecc.com>


Date :   Mon, 1 Feb 2021 06:17:45 +0000
To :   RE-DSIR <re@dsirtp2ee.in>
CC :   Team Leader-DSIR <tl@dsirtp2ee.in>, Rajesh Sharma
<Rajeshsharma@lntecc.com>, HE1 <he1@dsirtp2ee.in>, HE2 <he2@dsirtp2ee.in>,
Struture Engineer-DSIR <stru1@dsirtp2ee.in>, Struture Engineer-DSIR
<stru2@dsirtp2ee.in>, Survey Engineer2 -DSIR <sur2@dsirtp2ee.in>, Struture
Engineer 03 -DSIR <stru3@dsirtp2ee.in>, SQS-DSIR <sqs@dsirtp2ee.in>,
"mgrinfra-dicdl@gujarat.gov.in" <mgrinfra-dicdl@gujarat.gov.in>, Survey Engineer
-DSIR <sur1@dsirtp2ee.in>, Raghunandan Dahagam <Drn@lntecc.com>,
Vithiyapathy Rathinasamy <rvp@lntecc.com>, PE-DSIR <pe@dsirtp2ee.in>, Anil
Kumar <kumaranilkumar@lntecc.com>, Shaha Mohan Kalachand <MOHAN-
SHAHA@lntecc.com>, Survey Engineer -DSIR <sur1@dsirtp2ee.in>, singhkumar
<singhkumar@lntecc.com>, QC Engineer-1 <qaqc1@dsirtp2ee.in>, QC Engineer-2
<qaqc2@dsirtp2ee.in>, "Milon Maity ." <milonmaity@lntecc.com>, QSRS
<qsrs@dsirtp2ee.in>, Bhangadiya Nikunj Mansukhbhai
<nmbhangadiya@lntecc.com>
Subject :   RFI status for 28-01-2021
Attachments :   RFI STATUS FOR 28.01.2021.xlsx
 
Dear Sir

Enclosed here with the RFI Status for 28-01-2021.

   Thanks & Regards


K Bala Subramanyam
  Mobile–9909017586
 

 
Sensitivity: LNT Construction Internal Use

mail.satragroup.in/servlet/ViewMessageServlet?foldername=INBOX&uidl=1612160440174.12223&msgid=1&action=print&login=sur2&ID=null 1/2
DESIGN AND CONSTRUCTION OF ROADS AND SERVICES OF ACTIVATION AREA IN DHOLERA SPECIAL INVESTMENT REGION AREA, DHOLERA
Client : Dholera Industrial City Development Limited. (DICDL)
Employer's Engineer : Yooshin Engineering Corporation in JV with Multi Media and SATRA
Contractor : Larsen & Toubro Limited
Submission
27-Jan-21
Date :
Summary of RFI raised
Inspection
28-Jan-21
Date :
Location
Corrected
Sr. No. RFI No. Time Description Sub Activity Layer/Lift/No. Side Status Corrected Chainage Width Remarks Remarks
Name of the Road From / Chainage To / Chainage Date

SURVEY
1 LNT-TP2-AA-RS-SUR-RFI-174412 9:00 AM SL Layout Checking for Street Light @ D-9 Road SURVEY D-9 0+000 0+322 CENTER APPROVED
2 LNT-TP2-AA-RS-SUR-RFI-174413 9:00 AM SL Layout Checking for Street Light @ D-9 Road SURVEY D-9 0+390 0+598 CENTER APPROVED
Layout Checking for Sewearge Rising Main @ B-57 Road (CENTER to LHS) Pipe Line Crossing @ CENTER to
3 LNT-TP2-AA-RS-SUR-RFI-174414 10:00 AM SEWER-RM-RC SURVEY B-57 1+862 1+862 APPROVED EE Sur1
CH.1+862 (Road Crossing) Length-0+000 to 0+022m LHS
4 LNT-TP2-AA-RS-SUR-RFI-174415 10:30 AM RW Layout Checking of As Built of Thust Block for Recycle Water @ B-56 Road (CENTER) Ch-0+758 & 1+019 AS BUILT SURVEY B-56 0+758 1+019 CENTER APPROVED EE Sur1

5 LNT-TP2-AA-RS-SUR-RFI-174416 10:30 AM IE Layout Checking of As Built of Thust Block for Industrial Effluent @ B-56 Road (RHS) Ch-0+235 AS BUILT SURVEY B-56 0+235 0+235 RHS APPROVED EE Sur1
Layout Checking of As Built of Thust Block for Industrial Effluent @ B-56 Road (LHS) Ch-0+235, 0+385,
6 LNT-TP2-AA-RS-SUR-RFI-174417 10:30 AM IE AS BUILT SURVEY B-56 0+235 0+390 LHS APPROVED EE Sur1
0+390
7 LNT-TP2-AA-RS-SUR-RFI-174418 11:00 AM IE Layout Checking of As Built of Thust Block for Industrial Effluent @ B-55 Road (CENTER) Ch-0+680 AS BUILT SURVEY B-55 0+680 0+680 CENTER APPROVED EE Sur2
CENTER to
8 LNT-TP2-AA-RS-SUR-RFI-174419 9:30 AM RW Layout Checking of As Built of Thust Block for Recycle Water @ CPR-5 Road (CENTER to RHS) Ch-0+264 AS BUILT SURVEY CPR-5 0+264 0+264 APPROVED EE Sur2
LHS
Layout Checking for Potable Water @ CPR-5 Road (CENTER to RHS) Pipe Line Crossing @ CH.0264.45 CENTER to
9 LNT-TP2-AA-RS-SUR-RFI-174420 9:30 AM POTABLE-PC SURVEY CPR-5 0+264.45 0+264.45 APPROVED EE Sur2
(Property Connection) Length-11.87m RHS
10 LNT-TP2-AA-RS-SUR-RFI-174421 8:00 AM SURVEY Layout Checking for Earthen Bund at U/S Side @ Outfall-2 SURVEY OUTFALL-2 - - BHS APPROVED EE Sur1
ROAD
11 LNT-TP2-AA-RS-ROD-RFI-174422 4:00 PM ROAD FDD Checking for MCW Subgrade @ B57 Road Offset- 0.3m to 7.3m Subgrade 2nd B57 2+300 2+400 BHS Not Ready
12 LNT-TP2-AA-RS-ROD-RFI-174423 5:00 PM ROAD FDD Checking for MCW Subgrade @ B57 Road Offset- 0.3m to 7.3m Subgrade 2nd B57 2+400 2+525 BHS Not Ready
13 LNT-TP2-AA-RS-ROD-RFI-174424 2:00 PM ROAD FDD & Level Checking for MCW Subgrade Top @ B57 Road Offset- 0.3m to 7.3m Subgrade Top B57 2+160 2+300 BHS Not Ready
14 LNT-TP2-AA-RS-ROD-RFI-174425 11:00 AM ROAD FDD & Level Checking for MPC Subgrade @ B59 Road Offset- 6.0m to 9.88m MPC Subgrade Top B59 1+000 1+200 LHS APPROVED Offset-6.0 to 10.0 28.01.2021 4
15 LNT-TP2-AA-RS-ROD-RFI-174426 8:00 AM ROAD FDD Checking of MCW Subgrade @ E3 Road Offset- 0.0m to 8.6m Subgrade 1st E3 0+850 0+900 BHS APPROVED 28.01.2021 17.2
16 LNT-TP2-AA-RS-ROD-RFI-174427 9:00 AM ROAD FDD Checking of MCW Subgrade @ E3 Road Offset- 0.0m to 8.6m Subgrade 2nd E3 1+600 1+700 BHS APPROVED Ch-1600 to 1650 28.01.2021 17.2
17 LNT-TP2-AA-RS-ROD-RFI-174428 8:00 AM ROAD FDD & Level Checking of MCW Subgrade @ E3 Road Offset- 0.0m to 8.6m Subgrade Top E3 1+650 1+950 BHS Not Ready
18 LNT-TP2-AA-RS-ROD-RFI-174429 10:00 AM ROAD FDD & Level Checking of MCW Subgrade @ E3 Road Offset- 0.0m to 8.6m Subgrade Top E3 1+100 1+300 LHS Not Ready EE HE2
Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ E3 Road Offset- 6.1m to
19 LNT-TP2-AA-RS-ROD-RFI-174430 8:00 AM ROAD CTSB TOP E3 0+500 0+680 LHS Not Ready EE HE2
8.1m
Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ B41/2 Road Offset- 0.0m to
20 LNT-TP2-AA-RS-ROD-RFI-174431 8:00 AM ROAD CTSB TOP B41/2 0+850 0+930 BHS Not Ready EE HE3
6.0m
Field Dry Density , Level & Surface regularity Checking for WMM Laying @ B42 Road Offset- 0.0m to
21 LNT-TP2-AA-RS-ROD-RFI-174432 8:00 AM ROAD WMM TOP B42 3+200 3+360 BHS ALREADY APPROVED RFI NO-174340 EE HE3
6.0m
22 LNT-TP2-AA-RS-ROD-RFI-174433 5:00 PM ROAD Application of Prime coat @ B42 Road Offset- 0.0m to 6.0m PRIME COAT B42 3+000 3+360 BHS ALREADY APPROVED RFI NO-174341
23 LNT-TP2-AA-RS-ROD-RFI-174434 8:00 AM ROAD Checking for Perforated Pipe Laying @ B42 Road Perforated Pipe Laying B42 1+600 1+800 BHS ALREADY APPROVED RFI NO-174197
Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ B42 Road Offset- 5.0m to
24 LNT-TP2-AA-RS-ROD-RFI-174435 8:00 AM ROAD CTSB TOP B42 1+600 1+800 BHS Not Ready EE HE3
6.0m
25 LNT-TP2-AA-RS-ROD-RFI-174436 8:00 AM ROAD Checking for Perforated Pipe Laying @ B42 Road Perforated Pipe Laying B42 1+800 1+900 BHS APPROVED BHS 28.01.2021 -
Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ B42 Road Offset- 5.0m to
26 LNT-TP2-AA-RS-ROD-RFI-174437 8:00 AM ROAD CTSB TOP B42 1+800 1+900 BHS Not Ready
6.5m
27 LNT-TP2-AA-RS-ROD-RFI-174438 10:00 AM ROAD FDD Checking of MCW Subgrade @ B42 Road Offset- 0.0m to 6.0m Subgrade 2nd B42 2+270 2+370 BHS ALREADY APPROVED RFI-174279
28 LNT-TP2-AA-RS-ROD-RFI-174439 6:00 PM ROAD FDD & Level Checking of MCW Subgrade @ B42 Road Offset- 0.0m to 6.0m Subgrade Top B42 2+270 2+370 BHS APPROVED Ch-2260 to 2370 28.01.2021 12
29 LNT-TP2-AA-RS-ROD-RFI-174440 8:00 AM ROAD Checking for Perforated Pipe Laying @ CPR7 Road Perforated Pipe Laying CPR7 0+000 0+250 BHS Not Ready
Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ CPR7 Road Offset- 5.5m to
30 LNT-TP2-AA-RS-ROD-RFI-174441 8:00 AM ROAD CTSB TOP CPR7 0+000 0+250 BHS Not Ready
7.0m
Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ CPR7 Road Offset- 0.0m to
31 LNT-TP2-AA-RS-ROD-RFI-174442 8:00 AM ROAD CTSB TOP CPR7 0+300 0+600 RHS Not Ready
6.0m
E3 & E1 Node No- E3 LHS Ch: 2+010 to 2+021 & E1 LHS
32 LNT-TP2-AA-RS-ROD-RFI-174443 10:00 AM ROAD FDD Checking for Embankment @ E3 & E1 Node No-110 Embankment 5th - APPROVED 28.01.2021 390 Sqmt
110 Ch: 3+827 to 3+846
E3 & E1 Node No- E3 LHS Ch: 2+010 to 2+021 & E1 LHS
33 LNT-TP2-AA-RS-ROD-RFI-174444 6:00 PM ROAD FDD Checking for Embankment @ E3 & E1 Node No-110 Embankment 6th - APPROVED 28.01.2021 390 Sqmt
110 Ch: 3+827 to 3+846
E1 & A6 Junction E1 LHS Ch: 3+080 to 3+099 & A6 LHS E1 LHS Ch: 3+080 to 3+060
34 LNT-TP2-AA-RS-ROD-RFI-174445 10:00 AM ROAD FDD Checking for Embankment @ E1 & A6 Junction Node No- 108 Embankment 7th - APPROVED 28.01.2021 125 Sqmt
Node No- 108 Ch: 0+013 to 0+022 & A6 LHS Ch: 0+008 to
E1 & A6 Junction E1 LHS Ch: 3+080 to 3+099 & A6 LHS E1 LHS Ch: 3+080 to 3+060
35 LNT-TP2-AA-RS-ROD-RFI-174446 6:00 PM ROAD FDD Checking for Embankment @ E1 & A6 Junction Node No- 108 Embankment 8th - APPROVED 28.01.2021 125 Sqmt
Node No- 108 Ch: 0+013 to 0+022 & A6 LHS Ch: 0+008 to
E1 & A6 Junction E1 LHS Ch: 3+053 to 3+070 & A6 LHS E1 LHS Ch: 3+051 to 3+071
36 LNT-TP2-AA-RS-ROD-RFI-174447 10:00 AM ROAD FDD Checking for Embankment @ E1 & A6 Junction Node No- 108 Embankment 7th - APPROVED 28.01.2021 125 Sqmt
Node No- 108 Ch: 0+013 to 0+022 & A6 RHS Ch: 0+008 to
E1 & A6 Junction E1 LHS Ch: 3+053 to 3+070 & A6 LHS E1 LHS Ch: 3+051 to 3+071
37 LNT-TP2-AA-RS-ROD-RFI-174448 6:00 PM ROAD FDD Checking for Embankment @ E1 & A6 Junction Node No- 108 Embankment 8th - APPROVED 28.01.2021 125 Sqmt
Node No- 108 Ch: 0+013 to 0+022 & A6 RHS Ch: 0+008 to
38 LNT-TP2-AA-RS-ROD-RFI-174449 10:00 AM ROAD FDD & Level Checking for Outer MPC WMM TOP @ G7 Road Offset- 23m to 27.5m MPC WMM TOP G7 2+150 2+250 RHS APPROVED Ch-2180 to 2290 28.01.2021 4.5
39 LNT-TP2-AA-RS-ROD-RFI-174450 10:00 AM ROAD FDD & Level Checking for inner MPC WMM TOP @ G7 Road Offset- 17m to 23m MPC WMM TOP G7 2+150 2+250 RHS WRONG RFI Granular RFI Balance
40 LNT-TP2-AA-RS-ROD-RFI-174451 10:00 AM ROAD FDD & Level Checking for WMM TOP @ G7 Road Offset- 17m to 27.5m WMM TOP G7 0+300 0+350 RHS APPROVED Ch-300 to 350, (Offset-23.0 28.01.2021 4.5
41 LNT-TP2-AA-RS-ROD-RFI-174452 4:00 PM ROAD FDD & Level Checking of MCW Subgrade @ E3 Road Offset- 0.0m to 8.6m Subgrade Top E3 1+100 1+300 LHS Not Ready
42 LNT-TP2-AA-RS-ROD-RFI-174453 4:00 PM ROAD FDD & Level Checking of MCW Subgrade @ E3 Road Offset- 0.0m to 8.6m Subgrade Top E3 1+100 1+300 RHS Not Ready
43 LNT-TP2-AA-RS-ROD-RFI-174454 4:00 PM ROAD FDD & Level Checking of MCW Subgrade @ E3 Road Offset- 0.0m to 8.1m Subgrade Top E3 0+800 0+900 LHS Not Ready
44 LNT-TP2-AA-RS-ROD-RFI-174455 4:00 PM ROAD FDD & Level Checking of MCW Subgrade @ E3 Road Offset- 0.0m to 8.1m Subgrade Top E3 0+800 0+900 RHS Not Ready
45 LNT-TP2-AA-RS-ROD-RFI-174456 10:00 AM ROAD FDD Checking for inner MPC Embankment @ E3 Road Offset- 8.6m to 13.6m MPC Embankment 7th E3 1+400 1+600 RHS APPROVED 28.01.2021 5
8/19/2021 View Message In Print Format

Satra I Man Pvt Ltd


  Survey Engineer2 -DSIR <sur2@dsirtp2ee.in>

From :   K Bala Subramanyam <karbs@lntecc.com>


Date :   Mon, 8 Feb 2021 13:01:57 +0000
To :   RE-DSIR <re@dsirtp2ee.in>
CC :   Team Leader-DSIR <tl@dsirtp2ee.in>, Arun Kumar Tripathi
<ARUNKTRIPATHI@lntecc.com>, Raghunandan Dahagam <Drn@lntecc.com>,
"Rajesh Sharma" <Rajeshsharma@lntecc.com>, HE1 <he1@dsirtp2ee.in>, HE2
<he2@dsirtp2ee.in>, Struture Engineer-DSIR <stru1@dsirtp2ee.in>, Struture
Engineer-DSIR <stru2@dsirtp2ee.in>, Survey Engineer2 -DSIR
<sur2@dsirtp2ee.in>, Struture Engineer 03 -DSIR <stru3@dsirtp2ee.in>, SQS-
DSIR <sqs@dsirtp2ee.in>, "mgrinfra-dicdl@gujarat.gov.in" <mgrinfra-
dicdl@gujarat.gov.in>, Survey Engineer -DSIR <sur1@dsirtp2ee.in>, Vithiyapathy
Rathinasamy <rvp@lntecc.com>, PE-DSIR <pe@dsirtp2ee.in>, Anil Kumar
<kumaranilkumar@lntecc.com>, "Shaha Mohan Kalachand" <MOHAN-
SHAHA@lntecc.com>, Survey Engineer -DSIR <sur1@dsirtp2ee.in>, singhkumar
<singhkumar@lntecc.com>, QC Engineer-1 <qaqc1@dsirtp2ee.in>, QC Engineer-2
<qaqc2@dsirtp2ee.in>, "Milon Maity ." <milonmaity@lntecc.com>, QSRS
<qsrs@dsirtp2ee.in>, "Bhangadiya Nikunj Mansukhbhai"
<nmbhangadiya@lntecc.com>
Subject :   RFI status for 04-02-2021
Attachments :   RFI STATUS FOR 04.02.2021.xlsx
 
Dear Sir

Enclosed here with the RFI Status for 04-02-2021

   Thanks & Regards


K Bala Subramanyam
  Mobile–9909017586
 

 
Sensitivity: LNT Construction Internal Use

mail.satragroup.in/servlet/ViewMessageServlet?foldername=INBOX&uidl=1612789289259.13036&msgid=1&action=print&login=sur2&ID=null 1/2
DESIGN AND CONSTRUCTION OF ROADS AND SERVICES OF ACTIVATION AREA IN DHOLERA SPECIAL INVESTMENT REGION AREA, DHOLERA
Client : Dholera Industrial City Development Limited. (DICDL)
Employer's Engineer : Yooshin Engineering Corporation in JV with Multi Media and SATRA
Contractor : Larsen & Toubro Limited
Submission
3-Feb-21
Date :
Summary of RFI raised
Inspection
4-Feb-21
Date :
Location
Corrected
Sr. No. RFI No. Time Description Sub Activity Layer/Lift/No. To / Side Status Corrected Chainage Width Remarks Remarks
Name of the Road From / Chainage Date
Chainage
SURVEY

1 LNT-TP2-AA-RS-SUR-RFI-175310 10:30 AM POTABLE Layout Checking of As Built of Thust Block for Potable Water @ G-4 Road (LHS ) Ch-1+625 & 1+690 (LHS) AS BUILT SURVEY G-4 1+625 1+690 LHS APPROVED EE SUR2

2 LNT-TP2-AA-RS-SUR-RFI-175311 10:30 AM POTABLE Layout Checking of As Built of Thust Block for Potable Water @ G-4 Road (LHS ) Ch-1+690, 1+690 (CENTER) AS BUILT SURVEY G-4 1+690 1+690 CENTER APPROVED EE SUR2

Layout Checking of As Built of Thust Block for Potable Water Rising Main @ G-4 Road (RHS ) Ch-1+640,
3 LNT-TP2-AA-RS-SUR-RFI-175312 10:30 AM POTABLE-RM AS BUILT SURVEY G-4 1+640 4+020 RHS APPROVED EE SUR2
2+340, 2+350, 4+020
4 LNT-TP2-AA-RS-SUR-RFI-175313 10:30 AM IE -RM ayout Checking of As Built of Thust Block for Insdutrial Effluent Rising Main @ G-4 Road SURVEY G-4 4+110 4+110 RHS APPROVED EE SUR2
5 LNT-TP2-AA-RS-SUR-RFI-175314 10:00 AM SEWER-RM Layout Checking of As Built of Thust Block for Sewerage Rising Main @ C-9 Road (RHS ) Ch-1+630 AS BUILT SURVEY C-9 1+630 1+630 CENTER APPROVED EE SUR1
UTILITY CROSS
6 LNT-TP2-AA-RS-SUR-RFI-175315 5:00 PM Checking of Layout & Marking for UCD @ B42 Road Ch: 2+025, 2+080, 2+945, 3+020 SURVEY B42 - - BHS APPROVED
DUCT
ROAD
7 LNT-TP2-AA-RS-ROD-RFI-175316 11:00 AM ROAD Kerb Laying Alignment & Level Checking @ B42 Road Offset- 6.0m KERB LAYING B42 1+355 1+500 BHS Not Ready
8 LNT-TP2-AA-RS-ROD-RFI-175317 4:00 PM ROAD FDD & Level Checking for MPC Subgrade Top Layer @ E3 Road Offset- 8.1m to 15.1m MPC Subgrade Top E3 0+060 0+130 RHS APPROVED Ch-60 to 100 04.02.2021 7
9 LNT-TP2-AA-RS-ROD-RFI-175318 3:00 PM ROAD FDD & Level Checking of MPC GSB TOP Layer @ E3 Road Offset- 8.1m to 15.1m MPC GSB TOP E3 0+130 0+250 RHS APPROVED Ch-140 to 230 (Offset-13.1 to 15.1) 05.02.2021 2
10 LNT-TP2-AA-RS-ROD-RFI-175319 3:00 PM ROAD FDD & Level Checking of MPC GSB TOP Layer @ E3 Road Offset- 8.1m to 15.1m MPC GSB TOP E3 0+440 0+500 RHS APPROVED 04.02.2021 7
11 LNT-TP2-AA-RS-ROD-RFI-175320 4:30 PM ROAD FDD & Level Checking for Inner MPC WMM TOP @ E3 Road Offset- 8.1m to 11.1m MPC WMM TOP E3 0+300 0+440 RHS Not Ready
12 LNT-TP2-AA-RS-ROD-RFI-175321 5:00 PM ROAD FDD & Level Checking for Inner MPC WMM TOP @ E3 Road Offset- 8.1m to 11.1m MPC WMM TOP E3 0+130 0+230 RHS Not Ready
13 LNT-TP2-AA-RS-ROD-RFI-175322 4:30 PM ROAD FDD & Level Checking for CYCLE TRACK WMM TOP @ E3 Road Offset- 11.1m to 13.1m CYCLE TRACK WMM TOP E3 0+300 0+440 RHS Not Ready
14 LNT-TP2-AA-RS-ROD-RFI-175323 4:30 PM ROAD FDD & Level Checking of Outer MPC WMM TOP Layer @ E3 Road Offset- 13.1m to 15.1m MPC WMM TOP E3 0+300 0+440 RHS Not Ready
15 LNT-TP2-AA-RS-ROD-RFI-175324 4:00 PM ROAD FDD & Level Checking of MPC WMM TOP Layer @ E2 Road Offset- 8.1 m to 15.1m MPC WMM TOP E2 0+900 0+930 RHS APPROVED 04.02.2021 7
16 LNT-TP2-AA-RS-ROD-RFI-175325 4:00 PM ROAD FDD & Level Checking of MPC WMM TOP Layer @ E2 Road Offset- 8.1 m to 15.1m MPC WMM TOP E2 0+590 0+650 RHS Not Ready
17 LNT-TP2-AA-RS-ROD-RFI-175326 10:00 AM ROAD FDD & Level Checking for Service Road MPC GSB Top Layer @ G4 Road Offset- 35m to 38.5m Service Road MPC GSB TOP G4 2+300 2+240 RHS APPROVED Offset-35.0 to 37.8 04.02.2021 2.8
18 LNT-TP2-AA-RS-ROD-RFI-175327 10:00 AM ROAD FDD & Level Checking for Service Road MPC WMM Top Layer @ G4 Road Offset- 35m to 38.5m Service Road MPC WMM TOP G4 2+050 2+240 RHS APPROVED Offset-35.0 to 37.5 05.02.2021 2.5
Service Road MPC Subgrade
19 LNT-TP2-AA-RS-ROD-RFI-175328 4:00 PM ROAD FDD & Level Checking for Service Road Outer MPC Subgrade Top @ G4 Road Offset- 35m to 38.5m G4 1+700 1+850 RHS Not Ready
Top
20 LNT-TP2-AA-RS-ROD-RFI-175329 4:00 PM ROAD FDD & Level Checking for Service Road Subgrade @ G6 Road Offset- 17.5m to 23m Service Road Subgrade Top G6 1+300 1+640 LHS APPROVED MPC Subgrade 2nd, Ch-1360 to 1600 04.02.2021 5.5
21 LNT-TP2-AA-RS-ROD-RFI-175330 4:00 PM ROAD FDD Checking for Service Road Subgrade @ G6 Road Offset- 17.5m to 23m Service Road Subgrade 1st G6 1+700 1+900 LHS APPROVED Ch-1850 to 1900 04.02.2021 5.5
22 LNT-TP2-AA-RS-ROD-RFI-175331 4:00 PM ROAD FDD Checking for Service Road Subgrade @ G6 Road Offset- 17.5m to 23m Service Road Subgrade 1st G6 1+700 1+900 RHS ALREADY APPROVED RFI NO-175246
MPC & Service Road
23 LNT-TP2-AA-RS-ROD-RFI-175332 6:00 PM ROAD FDD Checking for Inner MPC & Service Road Embankment @ G6 Road Offset- 13.0m to 23.0m G6 1+900 2+100 LHS APPROVED 04.02.2021 10
Embankment 7th
MPC & Service Road
24 LNT-TP2-AA-RS-ROD-RFI-175333 6:00 PM ROAD FDD Checking for Inner MPC & Service Road Embankment @ G6 Road Offset- 13.0m to 23.0m G6 1+900 2+150 RHS APPROVED 04.02.2021 10
Embankment 7th
25 LNT-TP2-AA-RS-ROD-RFI-175334 4:00 PM ROAD FDD Checking for Outer MPC Embankment @ G6 Road Offset- 23m to 29m MPC Embankment 8th G6 1+700 1+950 RHS Not Ready
26 LNT-TP2-AA-RS-ROD-RFI-175335 4:00 PM ROAD FDD Checking for Outer MPC Embankment @ G6 Road Offset- 23m to 29m MPC Embankment 8th G6 1+630 1+650 RHS APPROVED 04.02.2021 6
27 LNT-TP2-AA-RS-ROD-RFI-175336 10:00 AM ROAD FDD & Level Checking for MPC GSB Top Layer @ E1 Road Offset- 8.1m to 15.3m MPC GSB TOP E1 2+000 2+200 LHS APPROVED Ch-1910 to 1980 05.02.2021 7.2
28 LNT-TP2-AA-RS-ROD-RFI-175337 10:00 AM ROAD FDD & Level Checking for MPC WMM Top Layer @ H1 Road Offset- 25.5m to 35m MPC WMM TOP H1 4+500 4+600 RHS Not Ready
29 LNT-TP2-AA-RS-ROD-RFI-175338 7:00 AM ROAD FDD & Level Checking for MCW Subgrade @ H1 Road Offset- 25m to 35m Subgrade Top H1 3+300 3+500 LHS APPROVED MPC Subgrade Top, (Offset-25.5 to 04.02.2021 10.5
30 LNT-TP2-AA-RS-ROD-RFI-175339 8:00 AM ROAD FDD & Level Checking for MCW Subgrade @ H1 Road Offset- 25m to 35m Subgrade Top H1 2+700 3+000 LHS Not Ready
31 LNT-TP2-AA-RS-ROD-RFI-175340 10:00 AM ROAD FDD Checking for inner MPC Embankment @ E3 Road Offset- 8.6m to 13.6m MPC Embankment 1st E3 1+300 1+600 LHS APPROVED 04.02.2021 5
32 LNT-TP2-AA-RS-ROD-RFI-175341 6:00 PM ROAD FDD Checking for inner MPC Embankment @ E3 Road Offset- 8.6m to 13.6m MPC Embankment 2nd E3 1+300 1+600 LHS APPROVED 04.02.2021 5
33 LNT-TP2-AA-RS-ROD-RFI-175342 10:00 AM ROAD FDD Checking for inner MPC Embankment @ E3 Road Offset- 8.6m to 13.6m MPC Embankment 1st E3 1+600 2+000 LHS APPROVED 04.02.2021 5
34 LNT-TP2-AA-RS-ROD-RFI-175343 6:00 PM ROAD FDD Checking for inner MPC Embankment @ E3 Road Offset- 8.6m to 13.6m MPC Embankment 2nd E3 1+600 2+000 LHS APPROVED 04.02.2021 5
35 LNT-TP2-AA-RS-ROD-RFI-175344 10:00 AM ROAD FDD Checking for Outer MPC Embankment @ E3 Road Offset- 13.6m to 18m MPC Embankment 1st E3 1+300 1+600 LHS APPROVED 04.02.2021 4.4
36 LNT-TP2-AA-RS-ROD-RFI-175345 6:00 PM ROAD FDD Checking for Outer MPC Embankment @ E3 Road Offset- 13.6m to 18m MPC Embankment 2nd E3 1+300 1+600 LHS APPROVED 04.02.2021 4.4
37 LNT-TP2-AA-RS-ROD-RFI-175346 9:00 AM ROAD FDD Checking for Outer MPC Embankment @ E3 Road Offset- 13.6m to 18m MPC Embankment 2nd E3 1+600 2+000 LHS APPROVED 04.02.2021 4.4
38 LNT-TP2-AA-RS-ROD-RFI-175347 4:00 PM ROAD FDD Checking for Outer MPC Embankment @ E3 Road Offset- 13.6m to 18m MPC Embankment 3rd E3 1+600 2+000 LHS APPROVED 04.02.2021 4.4
39 LNT-TP2-AA-RS-ROD-RFI-175348 10:00 AM ROAD FDD Checking for Outer MPC Subgrade @ G7 Road Offset- 23.0m to 29.0m MPC Subgrade 1st G7 2+120 2+190 LHS APPROVED Ch-2120 to 2180 04.02.2021 6
40 LNT-TP2-AA-RS-ROD-RFI-175349 3:00 PM ROAD FDD Checking for Outer MPC Subgrade @ G7 Road Offset- 23.0m to 29.0m MPC Subgrade 2nd G7 2+120 2+190 LHS APPROVED Ch-2120 to 2180 04.02.2021 6
41 LNT-TP2-AA-RS-ROD-RFI-175350 6:30 PM ROAD FDD & Level Checking for Outer MPC Subgrade @ G7 Road Offset- 23.0m to 29.0m MPC Subgrade Top G7 2+120 2+190 LHS APPROVED Ch-2120 to 2180 05.02.2021 6
42 LNT-TP2-AA-RS-ROD-RFI-175351 10:00 AM ROAD FDD Checking for Inner MPC Subgrade @ G7 Road Offset- 17.0m to 23.0m MPC Subgrade 1st G7 2+120 2+130 LHS APPROVED Ch-2120 to 2150 04.02.2021 6
43 LNT-TP2-AA-RS-ROD-RFI-175352 3:00 PM ROAD FDD Checking for Inner MPC Subgrade @ G7 Road Offset- 17.0m to 23.0m MPC Subgrade 2nd G7 2+120 2+130 LHS APPROVED Ch-2120 to 2150 04.02.2021 6
44 LNT-TP2-AA-RS-ROD-RFI-175353 6:30 PM ROAD FDD & Level Checking for Inner MPC Subgrade @ G7 Road Offset- 17.0m to 23.0m MPC Subgrade Top G7 2+120 2+190 LHS APPROVED Ch-2120 to 2150 04.02.2021 6

45 LNT-TP2-AA-RS-ROD-RFI-175354 8:00 AM ROAD Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ G7 Road Offset- 6.5m to 14m CTSB TOP G7 3+200 3+400 RHS APPROVED Ch-3200 to 3401 04.02.2021 7.5

46 LNT-TP2-AA-RS-ROD-RFI-175355 8:00 AM ROAD Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ G7 Road Offset- 3.5m to 6.5m CTSB TOP G7 3+235 3+310 LHS APPROVED Ch-3235 to 3401 04.02.2021 3 EE HE2

47 LNT-TP2-AA-RS-ROD-RFI-175356 8:00 AM ROAD Field Dry Density , Level & Surface regularity Checking for WMM Laying @ G7 Road Offset- 3.5m to 6.5m WMM TOP G7 3+100 3+205 RHS Not Ready EE HE2

48 LNT-TP2-AA-RS-ROD-RFI-175357 8:00 AM ROAD Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ CPR7 Road Offset- 4.5m to 7.0m CTSB TOP CPR7 0+040 0+250 RHS Not Ready

49 LNT-TP2-AA-RS-ROD-RFI-175358 8:00 AM ROAD Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ CPR7 Road Offset- 6.0m to 7.0m CTSB TOP CPR7 0+040 0+250 LHS Not Ready

50 LNT-TP2-AA-RS-ROD-RFI-175359 8:00 AM ROAD Field Dry Density , Level & Surface regularity Checking for WMM Laying @ B57 Road Offset- 0.3m to 7.3m WMM TOP B57 1+000 1+390 - Not Ready EE HE3
51 LNT-TP2-AA-RS-ROD-RFI-175360 8:00 AM ROAD Field Dry Density , Level & Surface regularity Checking for WMM Laying @ B42 Road Offset- 0.0m to 6.0m WMM TOP B42 1+100 1+350 LHS APPROVED Ch-1110 to 1350 05.02.2021 6 EE HE3

52 LNT-TP2-AA-RS-ROD-RFI-175361 8:00 AM ROAD Application of Prime coat @ B42 Road Offset- 0.0m to 6.0m PRIME COAT B42 1+100 1+350 BHS Not Ready EE HE3

53 LNT-TP2-AA-RS-ROD-RFI-175362 8:00 AM ROAD Field Dry Density , Level & Surface regularity Checking for WMM Laying @ B42 Road Offset- 0.0m to 6.5m WMM TOP B42 0+880 1+100 LHS APPROVED Ch-880 to 1110 (Offset-5.0 to 6.5) 05.02.2021 1.5 EE HE3

54 LNT-TP2-AA-RS-ROD-RFI-175363 8:00 AM ROAD Application of Prime coat @ B42 Road Offset- 0.0m to 6.5m PRIME COAT B42 0+880 1+100 BHS Not Ready
55 LNT-TP2-AA-RS-ROD-RFI-175364 8:00 AM ROAD Checking for Perforated Pipe Laying @ B42 Road Offset- 5.0m to 6.5m Perforated Pipe Laying B42 0+730 0+850 BHS APPROVED Ch-732 to 850 05.02.2021 -
56 LNT-TP2-AA-RS-ROD-RFI-175365 8:00 AM ROAD Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ B42 Road Offset- 5.0m to 6.5m CTSB TOP B42 0+730 0+850 BHS APPROVED Ch-732 to 850 05.02.2021 3

Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ B41/2 Road Offset- 0.0m to
57 LNT-TP2-AA-RS-ROD-RFI-175366 8:00 AM ROAD CTSB TOP B41/2 0+850 0+930 BHS APPROVED Ch-880 to 910 (Offset-0.0 to 5.0) 04.02.2021 10 EE HE3
6.0m
58 LNT-TP2-AA-RS-ROD-RFI-175367 10:00 AM ROAD Kerb Laying Alignment & Level Checking @ B57 Road Offset- 7.3m KERB LAYING B57 0+780 1+100 LHS Not Ready
59 LNT-TP2-AA-RS-ROD-RFI-175368 11:00 AM ROAD FDD & Level Checking for Outer MPC WMM TOP @ J1 Road Offset- 8.1m to 12.5m MPC WMM TOP J1 0+250 0+450 LHS APPROVED Ch-310 to 410 05.02.2021 4.4
60 LNT-TP2-AA-RS-ROD-RFI-175369 3:00 PM ROAD FDD & Level Checking for Outer MPC GSB TOP @ J1 Road Offset- 8.1m to 12.9m MPC GSB TOP J1 0+250 0+450 RHS Not Ready
61 LNT-TP2-AA-RS-ROD-RFI-175370 4:00 PM ROAD FDD & Level Checking for Outer MPC WMM TOP @ B55 Road Offset- 6m to 9m MPC WMM TOP B55 0+300 0+600 RHS Not Ready
62 LNT-TP2-AA-RS-ROD-RFI-175371 9:00 AM ROAD FDD & Level Checking for MPC-2 GSB TOP @ K2 Road Offset- 16.5m to 18.5m MPC-2 GSB TOP K2 1+500 1+600 LHS Not Ready
63 LNT-TP2-AA-RS-ROD-RFI-175372 4:00 PM ROAD FDD & Level Checking for MPC-2 GSB TOP @ K2 Road Offset- 16.5m to 24m MPC-2 GSB TOP K2 1+600 1+800 LHS Not Ready
64 LNT-TP2-AA-RS-ROD-RFI-175373 5:00 PM ROAD FDD & Level Checking for MPC-2 WMM TOP @ K2 Road Offset- 18.5m to 24m MPC-2 WMM TOP K2 1+400 1+600 LHS Not Ready
65 LNT-TP2-AA-RS-ROD-RFI-175374 11:00 AM ROAD FDD & Level Checking for MPC-1 GSB TOP @ H1 Road Offset- 22m to 27.5m MPC-1 GSB TOP H1 5+530 5+550 LHS APPROVED Ch-5540 to 5560 04.02.2021 5.5
66 LNT-TP2-AA-RS-ROD-RFI-175375 3:00 PM ROAD FDD & Level Checking for MPC-1 GSB TOP @ H1 Road Offset- 22m to 27.5m MPC-1 GSB TOP H1 5+600 5+630 LHS APPROVED Ch-5600 to 5620 04.02.2021 5.5
67 LNT-TP2-AA-RS-ROD-RFI-175376 4:00 PM ROAD FDD & Level Checking for MPC-1 GSB TOP @ H1 Road Offset- 22m to 27.5m MPC-1 GSB TOP H1 5+690 5+700 LHS APPROVED 04.02.2021 5.5
68 LNT-TP2-AA-RS-ROD-RFI-175377 11:00 AM ROAD FDD Checking for Outer MPC Subgrade @ B43 Road Offset- 6.0m to 10.5m MPC Subgrade 1st B43 1+280 1+328 RHS WRONG RFI Embankment Top Balance
69 LNT-TP2-AA-RS-ROD-RFI-175378 3:00 PM ROAD FDD Checking for Outer MPC Subgrade @ B43 Road Offset- 6.0m to 10.5m MPC Subgrade 2nd B43 1+280 1+328 RHS WRONG RFI Embankment Top Balance
70 LNT-TP2-AA-RS-ROD-RFI-175379 5:00 PM ROAD FDD Checking for Utility crossing duct trench bed @ B42 Road Ch: 2+025 Utility duct trench bed B42 - - BHS APPROVED 04.02.2021 -
SERVICES
UTILITY CROSS
71 LNT-TP2-AA-RS-SER-RFI-175380 5:00 PM Excavation, Bed level, & PCC Laying Checking for Utility Cross Duct (17Rmt) @ B42 Road Ch: 2+025 Concreting B42 - - BHS NOT APPROVED
DUCT
Checking of Reinforcement, Shuttering & Concrete for MPC Slab (3180 x 2500 x 150 - 3 No), (4180 x 2500 x Reinforcement, Shuttering &
72 LNT-TP2-AA-RS-SER-RFI-175381 5:00 PM SWD PC Yard - - - NOT APPROVED
150 -3 No), (3680 x 2500 x 150 - 3 No), (1580 x 2500 x 150 - 3 No) @ PC Yard Concreting
Reinforcement, Shuttering & Concrete Checking for Precast inlet/ Manhole cover slab (0.640*0.640*0.175 -
Reinforcement, Shuttering &
73 LNT-TP2-AA-RS-SER-RFI-175382 5:00 PM SWD 1 No), (0.740*0.780*0.175 - 9 No), (0.740*0.820*0.175 - 2 No), (0.890*0.820*0.175 - 2 - - - - NOT APPROVED
Concreting
No),(1.140*0.695*0.175 - 2 No), (1.640*0.425*0.225 - 3 No) @ Precast Yard
Reinforcement, Shuttering &
74 LNT-TP2-AA-RS-SER-RFI-175383 4:00 PM SWD Reinforcement, Shuttering & Concrete Checking for Wall @ D9 Road (Part-2) D9 0+190 0+200 RHS NOT APPROVED
Concreting
Reinforcement, Shuttering &
75 LNT-TP2-AA-RS-SER-RFI-175384 4:00 PM SWD Checking of Reinforcement, Shuttering & Concrete for Precast box Jointing Slab @ H1 Road Ch: 1+450 H1 - - RHS NOT APPROVED
Concreting
76 LNT-TP2-AA-RS-SER-RFI-175385 11:30 AM IE-MH PCC (M20) of Manhole No.63 to 59 for Insdutrial effluent @ G-6 Road MH PCC & TOP LEVEL G-6 2+135 2+245 RHS APPROVED
Reinforcement & Shuttering Checking & Concreting (M40) for 2nd Lift Thrust Block of Pipe Line for
77 LNT-TP2-AA-RS-SER-RFI-175386 11:00 AM IE-RM THRUST BLOCK CPR-7 0+310 0+310 CENTER APPROVED 05-02-21
Insdustrial Effluent Rising Main @ CPR-7 Road
78 LNT-TP2-AA-RS-SER-RFI-175387 9:00 AM POTABLE Excavation & Bed Level Checking of Pipe Line for Potable Water @ B-42 Road EXCAVATION & BEDDING B-42 2+084.20 2+100 CENTER NOT APPROVED
79 LNT-TP2-AA-RS-SER-RFI-175388 11:00 AM POTABLE Laying & Jointing of 160mm Dia.HDPE of Pipe Line for Potable Water @ B-42 Road JOINTING & LAYING B-42 2+084.20 2+100 CENTER NOT APPROVED
80 LNT-TP2-AA-RS-SER-RFI-175389 11:50 AM POTABLE Backfilling by Crusher Dust of Pipe Line for Potable Water @ B-42 Road CRUSHER DUST BACKFILING B-42 2+084.20 2+100 CENTER NOT APPROVED
81 LNT-TP2-AA-RS-SER-RFI-175390 10:00 AM POTABLE Excavation & Bed Level Checking of Pipe Line for Potable Water @ G-7 Road EXCAVATION & BEDDING G-7 2+750 2+890 RHS APPROVED
82 LNT-TP2-AA-RS-SER-RFI-175391 1:00 PM POTABLE Laying & Jointing of 110mm Dia.HDPE of Pipe Line for Potable Water @ G-7 Road JOINTING & LAYING G-7 2+750 2+890 RHS APPROVED
83 LNT-TP2-AA-RS-SER-RFI-175392 3:00 PM POTABLE Backfilling by Crusher Dust of Pipe Line for Potable Water @ G-7 Road CRUSHER DUST BACKFILING G-7 2+750 2+890 RHS APPROVED
Checking of Excavation, PCC (M20) Laying & Top Level Checking for Thrust for Potable Water @ G-4 Road
84 LNT-TP2-AA-RS-SER-RFI-175393 8:00 AM POTABLE THRUST BLOCK G-4 7+018.16 7+018.16 LHS APPROVED 05-02-21
(LHS) Ch-7+018.16 (90 & tee Bend)
Reinforcement & Shuttering Checking & Concreting (M40) for Thrust Block of Pipe Line for Potble Water
85 LNT-TP2-AA-RS-SER-RFI-175394 11:00 AM POTABLE THRUST BLOCK G-4 7+018.16 7+018.16 LHS APPROVED 05-02-21
@ G-4 Road (LHS) Ch-7+018.16 (90 & tee Bend)
86 LNT-TP2-AA-RS-SER-RFI-175395 9:00 AM POTABLE-RM Excavation & Bed Level Checking of Pipe Line for Potable Water Rising Main @ G-4 Road EXCAVATION & BEDDING G-4 4+390.62 4+590 RHS NOT APPROVED
87 LNT-TP2-AA-RS-SER-RFI-175396 11:00 AM POTABLE-RM Jointing & Laying of 400mm Dia.DI, K-9 Pipe for Potable Water Rising Main @ G-4 Road LAYING & JOINTING G-4 4+390.62 4+590 RHS NOT APPROVED
88 LNT-TP2-AA-RS-SER-RFI-175397 3:00 PM POTABLE-RM Backfilling by Crusher Dust of Pipe Line for Potable Water Rising Main @ G-4 Road CRUSHER DUST BACKFILING G-4 4+390.62 4+590 RHS NOT APPROVED
89 LNT-TP2-AA-RS-SER-RFI-175398 9:00 AM RECYCLE Excavation & Bed Level Checking of Pipe Line for Recycle Water @ B-42 Road EXCAVATION & BEDDING B-42 2+082.8 2+100 CENTER APPROVED
90 LNT-TP2-AA-RS-SER-RFI-175399 11:00 AM RECYCLE Laying & Jointing of 400mm Dia.DI, K-7 of Pipe Line for Recycle Water @ B-42 Road JOINTING & LAYING B-42 2+082.8 2+100 CENTER APPROVED
91 LNT-TP2-AA-RS-SER-RFI-175400 2:00 PM RECYCLE Backfilling by Crusher Dust of Pipe Line for Potable Water @ B-42 Road CRUSHER DUST BACKFILLING B-42 2+082.8 2+100 CENTER APPROVED
92 LNT-TP2-AA-RS-SER-RFI-175401 10:30 AM RECYCLE Excavation & Bed Level Checking of Pipe Line for Recycle Water @ G-7 Road EXCAVATION & BEDDING G-7 2+750 2+890 RHS APPROVED
93 LNT-TP2-AA-RS-SER-RFI-175402 1:30 PM RECYCLE Laying & Jointing of 200mm & 140mm of Pipe Line for Recycle Water @ G-7 Road JOINTING & LAYING G-7 2+750 2+890 RHS APPROVED
94 LNT-TP2-AA-RS-SER-RFI-175403 4:30 PM RECYCLE Backfilling by Crusher Dust of Pipe Line for Potable Water @ G-7 Road CRUSHER DUST BACKFILLING G-7 2+750 2+890 RHS APPROVED
95 LNT-TP2-AA-RS-SER-RFI-175404 11:30 AM RECYCLE Excavation & Bed Level Checking of Pipe Line for Recycle Water @ E-3 Road EXCAVATION & BEDDING E-3 1+000 1+494 RHS APPROVED 1+270 1+494
96 LNT-TP2-AA-RS-SER-RFI-175405 1:30 PM RECYCLE Laying & Jointing of 250mm of Pipe Line for Recycle Water @ E-3 Road JOINTING & LAYING E-3 1+000 1+494 RHS APPROVED 1+270 1+494
97 LNT-TP2-AA-RS-SER-RFI-175406 4:30 PM RECYCLE Backfilling by Crusher Dust of Pipe Line for Potable Water @ E-3 Road CRUSHER DUST BACKFILLING E-3 1+000 1+494 RHS APPROVED 1+270 1+494

98 LNT-TP2-AA-RS-SER-RFI-175407 8:00 AM RECYCLE Checking of Excavation, PCC (M20) Laying & Top Level Checking for Thrust for Recycle Water @ G-4 Road THRUST BLOCK G-4 7+016 7+016 LHS APPROVED 05-02-21
STRUCTURE
99 LNT-TP2-AA-RS-STR-RFI-175408 9:30 AM ESR Reinforcement & Shuttering Checking & Concreting (M40) of 11th Flight Stair Case (@ ESR P-1 11th FLIGHT OF STAIR CASE ESR P-1 ESR P-1 - - NOT APPROVED EE ST1
100 LNT-TP2-AA-RS-STR-RFI-175409 10:00 AM ESR Checking of Size and Aliment of Fero Cement Jali Ventilation With Mosquito net for Fixing @ ESR P-2 FERO CEMENT JALI ESR P-2 ESR P-2 - - HOLD
Reinforcement, Shuttering &
101 LNT-TP2-AA-RS-STR-RFI-175410 5:00 PM BUS SHELTER Checking of Reinforcement, Shuttering & Concrete for column casting (C2-C6) @ K2 Road Ch: 0+470 K2 - - RHS NOT APPROVED EE ST3
Concreting
Checking of Reinforcement, Shuttering & Concrete for Top Beam (C1, C2, C3, C4, C5, C6, C7) @ E1 Road Reinforcement, Shuttering &
102 LNT-TP2-AA-RS-STR-RFI-175411 5:00 PM BUS SHELTER E1 - - RHS NOT APPROVED EE ST1
Ch: 1+324 Concreting
103 LNT-TP2-AA-RS-STR-RFI-175412 8:00 AM OUTFALL Checking of PCC Laying for U/S Apron (3*3 block type) @ Outfall -2 Concreting OUTFALL-2 - - - NOT APPROVED EE ST3
104 LNT-TP2-AA-RS-STR-RFI-175413 8:00 AM OUTFALL FDD Checking for Embankment at wing wall portion (A1 Side), D/S Side area @ Outfall -2 Embankment 5th OUTFALL-2 - - - Not Ready
105 LNT-TP2-AA-RS-STR-RFI-175414 10:00 AM OUTFALL FDD Checking for Embankment at wing wall portion (A1 Side), D/S Side area @ Outfall -2 Embankment 6th OUTFALL-2 - - - Not Ready
ELECTRICAL
Checking of Excavation, PCC (M20) Laying & Top Level Checking for Foundation of High Mast (SA-06-MDB-
106 LNT-TP2-AA-RS-ELE-RFI-175415 10:00 AM HM PCC & TOP LEVEL B-57 1+410 1+470 LHS & RHS APPROVED
N258-HM-1 ) & (SA-04-MDB-N258-HM-1) @ B-57 Road Ch-1+410 (LHS)/Ch-1+470 (RHS)
OTHERS
Reinforcement, Shuttering & Concrete Checking for Pile Cap (Over Head Gantry Foundation) @ H1 Road Reinforcement, Shuttering &
107 LNT-TP2-AA-RS-OTH-RFI-175416 10:00 AM PILE H1 - - RHS NOT APPROVED EE ST1
(MPC) Ch: 2+200 Concreting
Unlined
108 LNT-TP2-AA-RS-OTH-RFI-175417 10:00 AM As built Checking of Unlined Channel inner Slope @ Unlined Channel Zone-3 Inner Slope Unlined Channel 1+290 1+865 LHS HOLD EE SUR1
Channel
Unlined
109 LNT-TP2-AA-RS-OTH-RFI-175418 10:00 AM As built Checking of Unlined Channel inner Slope @ Unlined Channel Zone-3 Inner Slope Unlined Channel 1+290 1+865 RHS HOLD EE SUR1
Channel
NCR
NCR CLOSING NO -552 FDD, Level & Surface regularity Checking for CTSB Top Layer @ CPR5 Road Offset-
110 LNT-TP2-AA-RS-NCR-RFI-175419 8:00 AM NCR NCR CLOSING NO -552 CPR5 0+050 0+250 BHS Not Ready EE HE2
0.0m to 6.0m
111 LNT-TP2-AA-RS-NCR-RFI-175420 10:00 AM NCR NCR CLOSING NO -602 Checking of BC layer removed @ G4 Road Ch: 6+375 NCR CLOSING NO -602 G4 - - RHS APPROVED 04.02.2021 - EE HE2
112 LNT-TP2-AA-RS-NCR-RFI-175421 9:00 AM NCR NCR CLOSING NO -585 FDD & Level Checking for WMM Layer & Application of Prime Coat @ CPR9 Road NCR CLOSING NO -585 CPR9 1+790 1+800 RHS APPROVED 04.02.2021 - EE HE2

NCR CLOSING NO -586 FDD & Level Checking for WMM Layer & Application of Prime Coat @ CPR10 Road
113 LNT-TP2-AA-RS-NCR-RFI-175422 9:00 AM NCR NCR CLOSING NO -586 CPR10 - - RHS APPROVED 04.02.2021 - EE HE2
Ch: 0+400
114 LNT-TP2-AA-RS-NCR-RFI-175423 9:00 AM NCR NCR CLOSING NO -609 FDD & Level Checking for WMM Layer & Application of Prime Coat @ G7 Road NCR CLOSING NO -609 G7 1+690 1+700 RHS APPROVED 04.02.2021 - EE HE2
8/19/2021 View Message In Print Format

Satra I Man Pvt Ltd


  Survey Engineer2 -DSIR <sur2@dsirtp2ee.in>

From :   K Bala Subramanyam <karbs@lntecc.com>


Date :   Mon, 8 Feb 2021 13:23:55 +0000
To :   RE-DSIR <re@dsirtp2ee.in>
CC :   Team Leader-DSIR <tl@dsirtp2ee.in>, Arun Kumar Tripathi
<ARUNKTRIPATHI@lntecc.com>, Raghunandan Dahagam <Drn@lntecc.com>,
"Rajesh Sharma" <Rajeshsharma@lntecc.com>, HE1 <he1@dsirtp2ee.in>, HE2
<he2@dsirtp2ee.in>, Struture Engineer-DSIR <stru1@dsirtp2ee.in>, Struture
Engineer-DSIR <stru2@dsirtp2ee.in>, Survey Engineer2 -DSIR
<sur2@dsirtp2ee.in>, Struture Engineer 03 -DSIR <stru3@dsirtp2ee.in>, SQS-
DSIR <sqs@dsirtp2ee.in>, "mgrinfra-dicdl@gujarat.gov.in" <mgrinfra-
dicdl@gujarat.gov.in>, Survey Engineer -DSIR <sur1@dsirtp2ee.in>, Vithiyapathy
Rathinasamy <rvp@lntecc.com>, PE-DSIR <pe@dsirtp2ee.in>, Anil Kumar
<kumaranilkumar@lntecc.com>, "Shaha Mohan Kalachand" <MOHAN-
SHAHA@lntecc.com>, Survey Engineer -DSIR <sur1@dsirtp2ee.in>, singhkumar
<singhkumar@lntecc.com>, QC Engineer-1 <qaqc1@dsirtp2ee.in>, QC Engineer-2
<qaqc2@dsirtp2ee.in>, "Milon Maity ." <milonmaity@lntecc.com>, QSRS
<qsrs@dsirtp2ee.in>, "Bhangadiya Nikunj Mansukhbhai"
<nmbhangadiya@lntecc.com>
Subject :   RFI status for 05-02-2021
Attachments :   RFI STATUS FOR 05.02.2021.xlsx
 
 
Dear Sir

Enclosed here with the RFI Status for 05-02-2021

   Thanks & Regards


K Bala Subramanyam
  Mobile–9909017586
 

 
Sensitivity: LNT Construction Internal Use

mail.satragroup.in/servlet/ViewMessageServlet?foldername=INBOX&uidl=1612790962352.13064&msgid=1&action=print&login=sur2&ID=null 1/2
DESIGN AND CONSTRUCTION OF ROADS AND SERVICES OF ACTIVATION AREA IN DHOLERA SPECIAL INVESTMENT REGION AREA, DHOLERA
Client : Dholera Industrial City Development Limited. (DICDL)
Employer's Engineer : Yooshin Engineering Corporation in JV with Multi Media and SATRA
Contractor : Larsen & Toubro Limited
Submission
4-Feb-21
Date :
Summary of RFI raised
Inspection
5-Feb-21
Date :
Location
Sr. No. RFI No. Time Description Sub Activity Layer/Lift/No. Side Status Corrected Chainage Corrected Date Width Remarks Remarks
Name of the Road From / Chainage To / Chainage

SURVEY
Layout Checking of As Built of Thust Block for Recycle Water @ CPR-12 Road (CENTER ) Ch-0+252 &
1 LNT-TP2-AA-RS-SUR-RFI-175424 10:30 AM RECYCLE AS BUILT SURVEY CPR-12 0+252 0+378 CENTER APPROVED EE SUR1
0+378
Layout Checking of As Built of Thust Block for Recycle Water Rising Main @ CPR-12 Road (CENTER ) Ch-
2 LNT-TP2-AA-RS-SUR-RFI-175425 10:00 AM RECYCLE-RM AS BUILT SURVEY CPR-12 0+255 0+255 CENTER APPROVED EE SUR1
0+255
Layout Checking for Potable Water @ E-3 Road (LHS to BHS) Pipe Line Crossing @ CH.1+033.54,
3 LNT-TP2-AA-RS-SUR-RFI-175426 10:00 AM POTABLE-PC SURVEY E-3 1+033.54 1+915.94 LHS to BHS APPROVED EE SUR2
1+256.54, 1+483.54, 1+713.30, 1+914.94 ( Proparty Connection) Length-35m
Layout Checking for Recycle Water @ E-3 Road (LHS to BHS) Pipe Line Crossing @ CH.1+035, 1+258,
4 LNT-TP2-AA-RS-SUR-RFI-175427 10:00 AM RECYCLE-PC SURVEY E-3 1+035 1+715 LHS to BHS APPROVED EE SUR2
1+485, 1+715 ( Proparty Connection) Length-35m
ROAD
5 LNT-TP2-AA-RS-ROD-RFI-175428 11:00 AM ROAD Kerb Laying Alignment & Level Checking @ B42 Road Offset- 6.0m KERB LAYING B42 1+350 1+900 BHS Not Ready
6 LNT-TP2-AA-RS-ROD-RFI-175429 4:00 PM ROAD FDD & Level Checking for Inner MPC WMM TOP @ E3 Road Offset- 8.1m to 11.1m MPC WMM TOP E3 0+500 0+680 RHS Not Ready
7 LNT-TP2-AA-RS-ROD-RFI-175430 4:00 PM ROAD FDD & Level Checking for CYCLE TRACK WMM TOP @ E3 Road Offset- 11.1m to 13.1m CYCLE TRACK WMM TOP E3 0+500 0+680 RHS Not Ready
8 LNT-TP2-AA-RS-ROD-RFI-175431 4:00 PM ROAD FDD & Level Checking of Outer MPC WMM TOP Layer @ E3 Road Offset- 13.1m to 15.1m MPC WMM TOP E3 0+500 0+680 RHS Not Ready
9 LNT-TP2-AA-RS-ROD-RFI-175432 4:00 PM ROAD FDD & Level Checking for Inner MPC WMM TOP @ E3 Road Offset- 8.1m to 11.1m MPC WMM TOP E3 0+130 0+250 RHS Not Ready
10 LNT-TP2-AA-RS-ROD-RFI-175433 4:00 PM ROAD FDD & Level Checking for CYCLE TRACK WMM TOP @ E3 Road Offset- 11.1m to 13.1m CYCLE TRACK WMM TOP E3 0+130 0+250 RHS Not Ready
11 LNT-TP2-AA-RS-ROD-RFI-175434 4:00 PM ROAD FDD & Level Checking of Outer MPC WMM TOP Layer @ E3 Road Offset- 13.1m to 15.1m MPC WMM TOP E3 0+130 0+250 RHS Not Ready
12 LNT-TP2-AA-RS-ROD-RFI-175435 4:00 PM ROAD FDD & Level Checking of MPC GSB TOP Layer @ E3 Road Offset- 8.1m to 15.1m MPC GSB TOP E3 0+060 0+130 RHS APPROVED Ch-60 to 140 05.02.2021 7
13 LNT-TP2-AA-RS-ROD-RFI-175436 12:00 PM ROAD FDD & Level Checking of MPC WMM TOP Layer @ E2 Road Offset- 8.1 m to 15.1m MPC WMM TOP E2 0+975 1+005 RHS Not Ready
Field Dry Density , Level & Surface regularity Checking for WMM Laying @ B42 Road Offset- 0.0m to
14 LNT-TP2-AA-RS-ROD-RFI-175437 8:00 AM ROAD WMM TOP B42 1+350 1+600 BHS Not Ready EE HE3
6.0m
15 LNT-TP2-AA-RS-ROD-RFI-175438 8:00 AM ROAD Application of Prime coat @ B42 Road Offset- 0.0m to 6.0m PRIME COAT B42 1+100 1+350 BHS Not Ready EE HE3
16 LNT-TP2-AA-RS-ROD-RFI-175439 8:00 AM ROAD Application of Prime coat @ B42 Road Offset- 0.0m to 6.5m PRIME COAT B42 0+880 1+100 BHS Not Ready
Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ B42 Road Offset- 5.0m to
17 LNT-TP2-AA-RS-ROD-RFI-175440 8:00 AM ROAD CTSB TOP B42 0+730 0+850 BHS ALREADY APPROVED EE HE3
6.5m
Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ B41/1 Road Offset- 0.0m to
18 LNT-TP2-AA-RS-ROD-RFI-175441 8:00 AM ROAD CTSB TOP B41/1 0+000 0+070 BHS APPROVED Ch-0 to 50 05.02.2021 10 EE HE3
5.0m
Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ B43 Road Offset- 5.0m to
19 LNT-TP2-AA-RS-ROD-RFI-175442 8:00 AM ROAD CTSB TOP B43 1+230 1+320 RHS APPROVED Ch-1210 to 1280 05.02.2021 1 EE HE3
6.0m
20 LNT-TP2-AA-RS-ROD-RFI-175443 8:00 AM ROAD Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ B43 & E3 Node Portion CTSB TOP B43 & E3 B43 BHS Ch- 1+300 to 1+330 & - Not Ready
Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ E3 Road Offset- 0.0m to
21 LNT-TP2-AA-RS-ROD-RFI-175444 8:00 AM ROAD CTSB TOP E3 1+100 1+300 RHS Not Ready
8.6m
Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ C7/2 Road Offset- 4.0m to Ch-5810 to 5880 (Offset-4.0
22 LNT-TP2-AA-RS-ROD-RFI-175445 8:00 AM ROAD CTSB TOP C7/2 5+800 5+900 RHS APPROVED 06.02.2021 4.5
10.0m to 8.5)
23 LNT-TP2-AA-RS-ROD-RFI-175446 10:00 AM ROAD Kerb Laying Alignment & Level Checking @ B57 Road Offset- 7.3m KERB LAYING B57 0+730 1+300 LHS Not Ready
24 LNT-TP2-AA-RS-ROD-RFI-175447 9:00 AM ROAD Application of Tack coat laying (RS-1) @ Node- 111 TACK COAT Node- 111 E3 LHS Ch: 2+240 to 2+261 & G4 - APPROVED Length-45 m 05.02.2021 5.5
25 LNT-TP2-AA-RS-ROD-RFI-175448 10:00 AM ROAD Laying of BC Grade-2, Level and Surface regularity Checking @ Node- 111 BC GRADE-2 Node- 111 E3 LHS Ch: 2+240 to 2+261 & G4 - APPROVED Length-45 m 05.02.2021 5.5
26 LNT-TP2-AA-RS-ROD-RFI-175449 9:00 AM ROAD Application of Tack coat laying (RS-1) @ Node- 111 TACK COAT Node- 111 E3 RHS Ch: 2+187 to 2+245 & - APPROVED Length-70 m 05.02.2021 7
27 LNT-TP2-AA-RS-ROD-RFI-175450 10:00 AM ROAD Laying of BC Grade-2, Level and Surface regularity Checking @ Node- 111 BC GRADE-2 Node- 111 E3 RHS Ch: 2+187 to 2+245 & - APPROVED Length-70 m 05.02.2021 7
28 LNT-TP2-AA-RS-ROD-RFI-175451 10:00 AM ROAD FDD & Level Checking for Service Road MPC GSB Top Layer @ G4 Road Offset- 35m to 37.5m Service Road MPC GSB TOP G4 1+700 2+050 RHS Not Ready

29 LNT-TP2-AA-RS-ROD-RFI-175452 10:00 AM ROAD FDD & Level Checking for Service Road MPC WMM Top Layer @ G4 Road Offset- 35m to 37.5m Service Road MPC WMM TOP G4 2+300 2+240 RHS APPROVED Ch-2270 to 2300 06.02.2021 2.5

30 LNT-TP2-AA-RS-ROD-RFI-175453 3:00 PM ROAD FDD & Level Checking for Outer MPC WMM TOP @ J1 Road Offset- 8.1m to 12.5m MPC WMM TOP J1 0+450 0+600 LHS APPROVED Ch-410 to 600 06.02.2021 4.4
31 LNT-TP2-AA-RS-ROD-RFI-175454 10:00 AM ROAD FDD & Level Checking for Outer MPC GSB TOP @ J1 Road Offset- 8.1m to 12.9m MPC GSB TOP J1 0+140 0+250 RHS Not Ready
32 LNT-TP2-AA-RS-ROD-RFI-175455 3:00 PM ROAD FDD & Level Checking for Outer MPC GSB TOP @ J1 Road Offset- 8.1m to 12.9m MPC GSB TOP J1 0+400 0+600 LHS Not Ready
33 LNT-TP2-AA-RS-ROD-RFI-175456 10:00 AM ROAD FDD Checking for Outer MPC Embankment @ G6 Road Offset- 23m to 29m MPC Embankment 9th G6 1+640 1+700 LHS APPROVED 05.02.2021 6
34 LNT-TP2-AA-RS-ROD-RFI-175457 6:00 PM ROAD FDD & Level Checking for Outer MPC Embankment @ G6 Road Offset- 23m to 29m MPC Embankment Top G6 1+640 1+700 LHS FAIL
35 LNT-TP2-AA-RS-ROD-RFI-175458 10:00 AM ROAD FDD Checking for Outer MPC Embankment @ G6 Road Offset- 23m to 29m MPC Embankment 9th G6 1+630 1+650 RHS APPROVED 05.02.2021 6
36 LNT-TP2-AA-RS-ROD-RFI-175459 6:00 PM ROAD FDD & Level Checking for Outer MPC Embankment @ G6 Road Offset- 23m to 29m MPC Embankment Top G6 1+630 1+650 RHS APPROVED 05.02.2021 6
37 LNT-TP2-AA-RS-ROD-RFI-175460 6:00 PM ROAD FDD Checking for Outer MPC Embankment @ G6 Road Offset- 23m to 29m MPC Embankment 9th G6 1+700 1+950 RHS FAIL
MPC & Service Road
38 LNT-TP2-AA-RS-ROD-RFI-175461 4:00 PM ROAD FDD Checking for Inner MPC & Service Road Embankment @ G6 Road Offset- 13.0m to 23.0m G6 1+900 2+100 LHS APPROVED 05.02.2021 10
Embankment 8th
MPC & Service Road
39 LNT-TP2-AA-RS-ROD-RFI-175462 4:00 PM ROAD FDD Checking for Inner MPC & Service Road Embankment @ G6 Road Offset- 13.0m to 23.0m G6 1+900 2+150 RHS APPROVED 05.02.2021 10
Embankment 8th
40 LNT-TP2-AA-RS-ROD-RFI-175463 10:00 AM ROAD FDD Checking for inner MPC Embankment @ E3 Road Offset- 8.6m to 13.6m MPC Embankment 3rd E3 1+300 1+600 LHS APPROVED 05.02.2021 5
41 LNT-TP2-AA-RS-ROD-RFI-175464 6:00 PM ROAD FDD Checking for inner MPC Embankment @ E3 Road Offset- 8.6m to 13.6m MPC Embankment 4th E3 1+300 1+600 LHS APPROVED 05.02.2021 5
42 LNT-TP2-AA-RS-ROD-RFI-175465 10:00 AM ROAD FDD Checking for inner MPC Embankment @ E3 Road Offset- 8.6m to 13.6m MPC Embankment 3rd E3 1+600 2+000 LHS APPROVED 05.02.2021 5
43 LNT-TP2-AA-RS-ROD-RFI-175466 6:00 PM ROAD FDD Checking for inner MPC Embankment @ E3 Road Offset- 8.6m to 13.6m MPC Embankment 4th E3 1+600 2+000 LHS APPROVED 05.02.2021 5
44 LNT-TP2-AA-RS-ROD-RFI-175467 10:00 AM ROAD FDD Checking for Outer MPC Embankment @ E3 Road Offset- 13.6m to 18m MPC Embankment 3rd E3 1+300 1+600 LHS APPROVED 05.02.2021 4.4
45 LNT-TP2-AA-RS-ROD-RFI-175468 4:00 PM ROAD FDD Checking for Outer MPC Embankment @ E3 Road Offset- 13.6m to 18m MPC Embankment 4th E3 1+300 1+600 LHS APPROVED 05.02.2021 4.4
46 LNT-TP2-AA-RS-ROD-RFI-175469 10:00 AM ROAD FDD Checking for Outer MPC Embankment @ E3 Road Offset- 13.6m to 18m MPC Embankment 4th E3 1+600 2+000 LHS APPROVED 05.02.2021 4.4
47 LNT-TP2-AA-RS-ROD-RFI-175470 6:00 PM ROAD FDD Checking for Outer MPC Embankment @ E3 Road Offset- 13.6m to 18m MPC Embankment 5th E3 1+600 2+000 LHS APPROVED 05.02.2021 4.4
48 LNT-TP2-AA-RS-ROD-RFI-175471 10:00 AM ROAD FDD Checking for inner MPC Subgrade @ E1 Road Offset- 8.1m to 13.1m MPC Subgrade 1st E1 2+850 3+000 LHS FAIL
49 LNT-TP2-AA-RS-ROD-RFI-175472 3:00 PM ROAD FDD & Level Checking for MPC GSB TOP @ G7 Road Offset- 17.0m to 27.5m MPC GSB TOP G7 2+120 2+190 LHS APPROVED Ch-2120 to 2150 (17.0 to 23.0) 05.02.2021 6.0 & 4.5
50 LNT-TP2-AA-RS-ROD-RFI-175473 6:00 PM ROAD FDD & Level Checking for inner MPC Granular Top Layer @ G7 Road Offset- 17m to 21m MPC Granular Top G7 2+120 2+190 LHS APPROVED Ch-2120 to 2150 06.02.2021 4
51 LNT-TP2-AA-RS-ROD-RFI-175474 6:00 PM ROAD FDD Checking for inner MPC Subgrade @ E1 Road Offset- 8.1m to 13.1m MPC Subgrade 2nd E1 2+850 3+000 LHS Not Ready
52 LNT-TP2-AA-RS-ROD-RFI-175475 10:00 AM ROAD FDD & Level Checking for MPC WMM Top Layer @ H1 Road Offset- 25.5m to 35m MPC WMM TOP H1 4+600 4+750 RHS Not Ready
53 LNT-TP2-AA-RS-ROD-RFI-175476 10:00 AM ROAD FDD & Level Checking for Outer MPC GSB TOP @ C10 Road Offset- 10.75m to 13.75m MPC GSB TOP C10 0+200 0+400 LHS APPROVED Ch-200 to 310 (Offset-10.5 to 06.02.2021 3
54 LNT-TP2-AA-RS-ROD-RFI-175477 4:00 PM ROAD FDD & Level Checking for MPC WMM TOP @ C10 Road Offset- 10.75m to 13.75m MPC WMM TOP C10 0+200 0+400 LHS Not Ready

55 LNT-TP2-AA-RS-ROD-RFI-175478 4:00 PM ROAD Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ G7 Road Offset- 6.5m to 14m CTSB TOP G7 3+100 3+220 BHS Not Ready

Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ CPR7 Road Offset- 0.0m to
56 LNT-TP2-AA-RS-ROD-RFI-175479 8:00 AM ROAD CTSB TOP CPR7 0+300 0+570 BHS APPROVED 05.02.2021 11
5.5m
Field Dry Density , Level & Surface regularity Checking of CTSB Laying for Site instruction @ CPR7 Road
57 LNT-TP2-AA-RS-ROD-RFI-175480 8:00 AM ROAD CTSB TOP CPR7 0+435 0+540 BHS APPROVED 05.02.2021 2.5
Offset- 0.0m to 2.5m
SERVICES
Checking of Reinforcement, Shuttering & Concrete for MPC Slab (3180 x 2500 x 150 - 3 No), (4180 x Reinforcement, Shuttering &
58 LNT-TP2-AA-RS-SER-RFI-175481 5:00 PM SWD PC Yard - - - NOT APPROVED
2500 x 150 -3 No), (3680 x 2500 x 150 - 3 No), (1580 x 2500 x 150 - 3 No) @ PC Yard Concreting

Reinforcement, Shuttering & Concrete Checking for Precast inlet/ Manhole cover slab
Reinforcement, Shuttering &
59 LNT-TP2-AA-RS-SER-RFI-175482 5:00 PM SWD (0.640*0.640*0.175 - 1 No), (0.740*0.740*0.175 - 9 No), (0.740*0.820*0.175 - 2 No), (0.890*0.820*0.175 - - - - NOT APPROVED
Concreting
- 1 No),(1.140*0.695*0.175 - 2 No), (1.640*0.425*0.225 - 3 No) @ Precast Yard

UTILITY CROSS Reinforcement, Shuttering & Concrete Checking for UCD (Utility) Jointing Raft (2.0m) @ E2 Road Ch: Reinforcement, Shuttering &
60 LNT-TP2-AA-RS-SER-RFI-175483 5:00 PM E2 - - RHS NOT APPROVED
DUCT 1+970 Concreting
UTILITY CROSS Reinforcement, Shuttering & Concrete Checking for UCD (Utility) Jointing Raft (1.6m) @ G4 Road Ch: Reinforcement, Shuttering &
61 LNT-TP2-AA-RS-SER-RFI-175484 5:00 PM G4 - - RHS NOT APPROVED
DUCT 3+915 Concreting
UTILITY CROSS Reinforcement, Shuttering & Concrete Checking for UCD (PD) Jointing Raft (1.3m) @ C10 Road Ch: Reinforcement, Shuttering &
62 LNT-TP2-AA-RS-SER-RFI-175485 5:00 PM C10 - - BHS NOT APPROVED
DUCT 0+045 Concreting
Reinforcement, Shuttering & Concrete Checking for property connection Jointing Slab (1.4m) @ H1 Road Reinforcement, Shuttering &
63 LNT-TP2-AA-RS-SER-RFI-175486 5:00 PM SWD H1 - - LHS NOT APPROVED
Ch: 5+705, 5+585, 5+555, 5+465, 5+455 Concreting
Reinforcement, Shuttering &
64 LNT-TP2-AA-RS-SER-RFI-175487 4:00 PM SWD Reinforcement, Shuttering & Concrete Checking for Slab @ D9 Road (Part-2) D9 0+115 0+140 RHS NOT APPROVED
Concreting
Checking of Angle Fixing, Shuttering & Concrete for SWD Inlet Groove @ E1 Road Ch: 2605, 2635, 2665,
65 LNT-TP2-AA-RS-SER-RFI-175488 4:00 PM SWD Shuttering & Concreting E1 - - LHS NOT APPROVED
2695, 2725, 2755
Reinforcement & Shuttering Checking & Concreting (M40) Thrust Block of Pipe Line for Sewerage Rising
66 LNT-TP2-AA-RS-SER-RFI-175489 9:30 AM SEWER-RM THRUST BLOCK B-57 1+862 1+862 CENTER NOT APPROVED
Main @ B-57 Road Ch-1+862
67 LNT-TP2-AA-RS-SER-RFI-175490 10:00 AM POTABLE Checking of Hydrostatic Pressure testing of HDPE 110 mm Dia. HDPE For Potable Water @ G-7 Road HYDROSTATIC PRESSURE TEST G-7 2+750 2+890 RHS NOT APPROVED

Checking of Excavation, PCC (M20) Laying & Top Level Checking for Potable Water @ E-3 Road (CENTER CENTER to
68 LNT-TP2-AA-RS-SER-RFI-175491 11:30 AM POTABLE-PC EXCAVATION & PCC E-3 1+033.54 2+300 NOT APPROVED
to BHS ) Pipe Line Crossing @ CH.1+033.54, 1+256.54, 1+483.54 (Property Connection) Length-31m BHS

Checking of Excavation, PCC (M20) Laying & Top Level Checking for Recycle Water @ E-3 Road (CENTER CENTER to
69 LNT-TP2-AA-RS-SER-RFI-175492 11:30 AM RECYCLE-PC EXCAVATION & PCC E-3 1+033.54 2+300 NOT APPROVED
to BHS ) Pipe Line Crossing @ CH.1+033.54, 1+256.54, 1+483.54 (Property Connection) Length-31m BHS

Checking of Hydrostatic Pressure testing of HDPE 200 & 140 mm Dia. HDPE For Recycle Water @ G-7
70 LNT-TP2-AA-RS-SER-RFI-175493 2:30 PM RECYCLE HYDROSTATIC PRESSURE TEST G-7 2+750 2+890 RHS NOT APPROVED EE HE2
Road
Reinforcement & Shuttering Checking & Concreting (M40) for Thrust Block of Pipe Line for Recycle
71 LNT-TP2-AA-RS-SER-RFI-175494 8:00 AM RECYCLE THRUST BLOCK G-4 7+016 7+016 LHS (MPC) APPROVED
Water @ G-4 Road
RECYCLE & Checking of Excavation & BC Cutting for Potable & Recycle Water @ C-9 Road Pipe Line Crossing @ Ch- CENTER to
72 LNT-TP2-AA-RS-SER-RFI-175495 8:00 AM EXCAVATION -BC CUTTING C-9 1+050 1+388 APPROVED
POTALE 1+050, 1+055, 1+060, 1+120, 1+030, 1+238, 1+250, 1+328, 1+388 (Road Crossing) LHS
Reinforcement & Shuttering Checking & Concreting (M40) & Top Level Checking for Raft of Power Duct
73 LNT-TP2-AA-RS-SER-RFI-175496 9:00 AM PD RAFT & TOP LEVEL H-1 1+345 1+350 RHS NOT APPROVED
Size 2.7m*1.8m @ H-1 Road
Reinforcement & Shuttering Checking & Concreting (M40) Checking for Wall 1st LIft of Power Duct Size
74 LNT-TP2-AA-RS-SER-RFI-175497 9:00 AM PD WALL 1st LIFT H-1 1+335 1+345 RHS NOT APPROVED
2.7m*1.8m @ H-1 Road
Reinforcement & Shuttering Checking & Concreting (M40) & for Wall 2nd Lift & Slab of Power Duct Size
75 LNT-TP2-AA-RS-SER-RFI-175498 10:30 AM PD WALL 2nd LIFT & SLAB A-6 0+200 0+220 LHS APPROVED SLAB DONE
2.7m*1.8m @ A-6 Road
Reinforcement & Shuttering Checking & Concreting (M40) & for Wall 2nd Lift & Slab of Power Duct Size
76 LNT-TP2-AA-RS-SER-RFI-175499 4:00 PM PD WALL 2nd LIFT & SLAB H-1 1+310 1+325 RHS NOT APPROVED
2.7m*1.8m @ H-1 Road
Reinforcement & Shuttering Checking & Concreting (M40) & for Wall 2nd Lift & Slab of Power Duct Size
77 LNT-TP2-AA-RS-SER-RFI-175500 11:30 AM PD WALL 2nd LIFT & SLAB G-6 0+585 0+595 RHS APPROVED
2.7m*1.8m @ G-6 Road
Reinforcement & Shuttering Checking & Concreting (M40) & Top Level Checking for Raft of Power Duct
78 LNT-TP2-AA-RS-SER-RFI-175501 10:30 AM PD RAFT & TOP LEVEL A-6 0+160 0+180 LHS APPROVED
Size 2.7m*1.8m @ A-6 Road
Reinforcement & Shuttering Checking & Concreting (M40) Checking for Wall 1st LIft of Power Duct Size
79 LNT-TP2-AA-RS-SER-RFI-175502 10:30 AM PD WALL 1st LIFT A-6 0+180 0+200 LHS APPROVED
2.7m*1.8m @ A-6 Road
Reinforcement & Shuttering Checking & Concreting (M40) & Top Level Checking for Raft of Power Duct
80 LNT-TP2-AA-RS-SER-RFI-175503 11:45 AM PD RAFT & TOP LEVEL E-3 2+017 2+017 LHS NOT APPROVED
Size 2.2m*1.8m @ E-3 Road (Bridge Connectivity) Length-10.4m
Reinforcement & Shuttering Checking & Concreting (M40) & Top Level Checking for Raft of Power Duct JUNTCION- G-4
81 LNT-TP2-AA-RS-SER-RFI-175504 11:45 AM PD RAFT & TOP LEVEL 0+000 0+020 RHS & LHS NOT APPROVED
Size 2.7m*1.8m @ G-4 (RHS) Road Ch.0+000 to 0+020 & G-7 Road (LHS) Junction & G-7
STRUCTURE
Reinforcement & Shuttering Checking & Concreting (M40) of 3rd Flight Stair Case (Elv-13.721 to
82 LNT-TP2-AA-RS-STR-RFI-175505 9:30 AM ESR 3rd FLIGHT OF STAIR CASE ESR R-2 - - - APPROVED EE ST1
16.221m) @ ESR R-2
Reinforcement & Shuttering Checking & Concreting (M40) Pardi Wall 7th Lift (Grid-C-4 to C-5 ) (C-5 to C-
83 LNT-TP2-AA-RS-STR-RFI-175506 9:30 AM ESR 7th Lift PARDI WALL ESR R-6 - - - NOT APPROVED EE ST1
8), (C-8 to C-9) & (C-9 to C-6) Elv-17.561m to 18.161 @ ESR R-6
84 LNT-TP2-AA-RS-STR-RFI-175507 9:30 AM ESR Checking of Excavation PCC (M20) Laying for Grade Slab@ ESR P-1 GARD SLAB PCC ESR P-1 - - - APPROVED
Reinforcement & Shuttering Checking & Concreting (M40) for Column 1st Lift C-5 ELV-28.790 to
85 LNT-TP2-AA-RS-STR-RFI-175508 9:30 AM ESR 1st LIFT COLUMN ESR R-7 - - - APPROVED
31.190m @ ESR R-7
Excavation, Bed level, & PCC Laying Checking for Approach Slab @ F1A Bridge (C7/2 road side) up
86 LNT-TP2-AA-RS-STR-RFI-175509 4:00 PM MJB Concreting F1A Bridge - - - NOT APPROVED
stream.
Checking for Reinforcement, Shuttering & Concreting for Abutment-3 Wall final lift (16m to 30m) @ Reinforcement, Shuttering &
87 LNT-TP2-AA-RS-STR-RFI-175510 5:00 PM OUTFALL OUTFALL-2 - - - NOT APPROVED EE ST3
Outfall-2 Concreting
Earthen Bund Embankment
88 LNT-TP2-AA-RS-STR-RFI-175511 8:00 AM OUTFALL FDD Checking for Embankment (A1 Side) Earthen Bund @ Outfall -2 OUTFALL-2 - - - Not Ready EE ST3
1st
Earthen Bund Embankment
89 LNT-TP2-AA-RS-STR-RFI-175512 10:00 AM OUTFALL FDD Checking for Embankment (A1 Side) Earthen Bund @ Outfall -2 OUTFALL-2 - - - Not Ready
2nd
Earthen Bund Embankment
90 LNT-TP2-AA-RS-STR-RFI-175513 8:00 AM OUTFALL FDD Checking for Embankment Earthen Bund wing wall portion (A1 Side) @ Outfall -2 OUTFALL-2 - - - Not Ready
7th
Earthen Bund Embankment
91 LNT-TP2-AA-RS-STR-RFI-175514 10:00 AM OUTFALL FDD Checking for Embankment Earthen Bund wing wall portion (A1 Side) @ Outfall -2 OUTFALL-2 - - - Not Ready
Top
OTHERS
Reinforcement, Shuttering & Concrete Checking for Pile Cap (Over Head Gantry Foundation) @ H1 Reinforcement, Shuttering &
92 LNT-TP2-AA-RS-OTH-RFI-175515 10:00 AM PILE H1 - - RHS APPROVED 05-02-2021 EE ST1
Road (MPC) Ch: 2+200 Concreting
NCR
93 LNT-TP2-AA-RS-NCR-RFI-175516 9:00 AM NCR NCR CLOSING NO -585 Checking for Application of Tack Coat & BC laying @ CPR9 Road NCR CLOSING NO -585 CPR9 1+790 1+800 RHS APPROVED 05.02.2021 - EE HE2
94 LNT-TP2-AA-RS-NCR-RFI-175517 10:00 AM NCR NCR CLOSING NO -586 Checking for Application of Tack Coat & BC laying @ CPR10 Road Ch: 0+400 NCR CLOSING NO -586 CPR10 - - RHS APPROVED 05.02.2021 - EE HE2

95 LNT-TP2-AA-RS-NCR-RFI-175518 9:00 AM NCR NCR CLOSING NO -609 Checking for Application of Tack Coat & BC laying @ G7 Road NCR CLOSING NO -609 G7 1+690 1+700 RHS APPROVED 05.02.2021 - EE HE2
96 LNT-TP2-AA-RS-NCR-RFI-175519 9:00 AM NCR NCR CLOSING NO -611 Checking of BC layer removed @ G7 Road NCR CLOSING NO -611 G7 1+195 1+198 LHS APPROVED 05.02.2021 - EE HE2
NCR CLOSING NO -611 Levelling, Rolling & FDD Checking for WMM Layer & Application of Prime Coat
97 LNT-TP2-AA-RS-NCR-RFI-175520 2:00 PM NCR NCR CLOSING NO -611 G7 1+195 1+198 LHS APPROVED 05.02.2021 - EE HE2
@ G7 Road
8/19/2021 View Message In Print Format

Satra I Man Pvt Ltd


  Survey Engineer2 -DSIR <sur2@dsirtp2ee.in>

From :   K Bala Subramanyam <karbs@lntecc.com>


Date :   Tue, 9 Feb 2021 12:52:34 +0000
To :   RE-DSIR <re@dsirtp2ee.in>
CC :   Team Leader-DSIR <tl@dsirtp2ee.in>, Arun Kumar Tripathi
<ARUNKTRIPATHI@lntecc.com>, Raghunandan Dahagam <Drn@lntecc.com>,
"Rajesh Sharma" <Rajeshsharma@lntecc.com>, HE1 <he1@dsirtp2ee.in>, HE2
<he2@dsirtp2ee.in>, Struture Engineer-DSIR <stru1@dsirtp2ee.in>, Struture
Engineer-DSIR <stru2@dsirtp2ee.in>, Survey Engineer2 -DSIR
<sur2@dsirtp2ee.in>, Struture Engineer 03 -DSIR <stru3@dsirtp2ee.in>, SQS-
DSIR <sqs@dsirtp2ee.in>, "mgrinfra-dicdl@gujarat.gov.in" <mgrinfra-
dicdl@gujarat.gov.in>, Survey Engineer -DSIR <sur1@dsirtp2ee.in>, Vithiyapathy
Rathinasamy <rvp@lntecc.com>, PE-DSIR <pe@dsirtp2ee.in>, Anil Kumar
<kumaranilkumar@lntecc.com>, "Shaha Mohan Kalachand" <MOHAN-
SHAHA@lntecc.com>, Survey Engineer -DSIR <sur1@dsirtp2ee.in>, singhkumar
<singhkumar@lntecc.com>, QC Engineer-1 <qaqc1@dsirtp2ee.in>, QC Engineer-2
<qaqc2@dsirtp2ee.in>, "Milon Maity ." <milonmaity@lntecc.com>, QSRS
<qsrs@dsirtp2ee.in>, "Bhangadiya Nikunj Mansukhbhai"
<nmbhangadiya@lntecc.com>
Subject :   RFI status for 06-02-2021 & 07-02-20201
Attachments :   RFI STATUS FOR 06.02.2021.xlsx
RFI STATUS FOR 07.02.2021.xlsx
 
 
Dear Sir

Enclosed here with the RFI Status for 06-02-2021 & 07-02-2021

   Thanks & Regards


K Bala Subramanyam
  Mobile–9909017586
 

 
Sensitivity: LNT Construction Internal Use

mail.satragroup.in/servlet/ViewMessageServlet?foldername=INBOX&uidl=1612875129965.13936&msgid=1&action=print&login=sur2&ID=null 1/2
DESIGN AND CONSTRUCTION OF ROADS AND SERVICES OF ACTIVATION AREA IN DHOLERA SPECIAL INVESTMENT REGION AREA, DHOLERA
Client : Dholera Industrial City Development Limited. (DICDL)
Employer's Engineer : Yooshin Engineering Corporation in JV with Multi Media and SATRA
Contractor : Larsen & Toubro Limited
Submission
5-Feb-21
Date :
Summary of RFI raised
Inspection
6-Feb-21
Date :
Location
Corrected
Sr. No. RFI No. Time Description Sub Activity Layer/Lift/No. Side Status Corrected Chainage Width Remarks Remarks
Name of the Road From / Chainage To / Chainage Date

SURVEY
Layout Checking of As Built of Thust Block for Industrial Effluent Rising Main @ H-2 Road (RHS) Ch-
1 LNT-TP2-AA-RS-SUR-RFI-175521 10:30 AM IE-RM AS BUILT SURVEY H-2 0+655 1+300 RHS APPROVED EE SUR1
0+655, 1+295, 1+300
ROAD
2 LNT-TP2-AA-RS-ROD-RFI-175522 8:00 AM ROAD FDD Checking of MCW Subgrade @ E3 Road Offset- 0.0m to 8.6m Subgrade 2nd E3 1+300 1+600 BHS Not Ready
3 LNT-TP2-AA-RS-ROD-RFI-175523 8:30 AM ROAD FDD & Level Checking for MPC Subgrade @ H1 Road Offset- 25m to 34m MPC Subgrade Top H1 2+700 3+000 LHS FAIL
4 LNT-TP2-AA-RS-ROD-RFI-175524 11:00 AM ROAD Kerb Laying Alignment & Level Checking @ B42 Road Offset- 6.0m KERB LAYING B42 1+350 1+510 BHS APPROVED 06.02.2021 6.0 m
5 LNT-TP2-AA-RS-ROD-RFI-175525 8:00 AM ROAD Checking for Perforated Pipe Laying @ B41/1 Road Offset- 5.0m to 6.0m Perforated Pipe Laying B41/1 0+000 0+050 BHS APPROVED 06.02.2021 -
Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ B41/1 Road Offset- 5.0m
6 LNT-TP2-AA-RS-ROD-RFI-175526 8:00 AM ROAD CTSB TOP B41/1 0+000 0+050 BHS APPROVED 06.02.2021 2 EE HE3
to 6.0m
7 LNT-TP2-AA-RS-ROD-RFI-175527 8:00 AM ROAD Checking for Perforated Pipe Laying @ B41/2 Road Offset- 5.0m to 6.0m Perforated Pipe Laying B41/2 0+880 0+930 BHS APPROVED Ch-880 to 920 06.02.2021 -
Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ B41/2 Road Offset- 5.0m
8 LNT-TP2-AA-RS-ROD-RFI-175528 8:00 AM ROAD CTSB TOP B41/2 0+880 0+930 BHS APPROVED Ch-880 to 910 06.02.2021 2 EE HE3
to 6.0m
Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ E3 Road Offset- 0.0m to
9 LNT-TP2-AA-RS-ROD-RFI-175529 8:00 AM ROAD CTSB TOP E3 0+900 1+100 BHS Not Ready
8.6m
Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ G6 Road Offset- 0m to
10 LNT-TP2-AA-RS-ROD-RFI-175530 8:00 AM ROAD CTSB TOP G6 2+030 2+100 BHS Not Ready EE HE2
10m
Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ G6 Road Offset- 2.5m to
11 LNT-TP2-AA-RS-ROD-RFI-175531 8:00 AM ROAD CTSB TOP G6 0+530 0+680 BHS APPROVED Ch-540 to 680, RHS 06.02.2021 7.5 EE HE2
10m
Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ G6 Road Offset- 2.5m to
12 LNT-TP2-AA-RS-ROD-RFI-175532 8:00 AM ROAD CTSB TOP G6 1+870 1+950 BHS Not Ready
10.5m
13 LNT-TP2-AA-RS-ROD-RFI-175533 8:00 AM ROAD Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ B43 & E3 Node No- 68 CTSB TOP Node No- 68 B43 BHS Ch- 1+300 to 1+330 & - Not Ready
14 LNT-TP2-AA-RS-ROD-RFI-175534 8:00 AM ROAD Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ B41/1 & B42 Node No- 70 CTSB TOP Node No- 70 B41/1 BHS Ch: 0+000 to 0+030 - Not Ready
15 LNT-TP2-AA-RS-ROD-RFI-175535 10:00 AM ROAD Kerb Laying Alignment & Level Checking @ B57 Road Offset- 7.3m KERB LAYING B57 1+000 1+380 LHS APPROVED Ch-780 to 1380 07.02.2021 7.3 m
16 LNT-TP2-AA-RS-ROD-RFI-175536 3:00 PM ROAD FDD & Level Checking for Outer MPC WMM TOP @ J1 Road Offset- 8.1m to 12.5m MPC WMM TOP J1 0+140 0+300 RHS Not Ready
17 LNT-TP2-AA-RS-ROD-RFI-175537 2:00 PM ROAD FDD & Level Checking for MPC GSB TOP @ K2 Road Offset- 13m to 24m MPC GSB TOP K2 1+600 1+800 LHS Not Ready
18 LNT-TP2-AA-RS-ROD-RFI-175538 11:00 AM ROAD FDD & Level Checking for MPC-1 GSB TOP @ K2 Road Offset- 13m to 18.5m MPC-1 GSB TOP K2 1+500 1+600 LHS APPROVED 06.02.2021 5.5
19 LNT-TP2-AA-RS-ROD-RFI-175539 5:00 PM ROAD FDD & Level Checking for MPC-1 Granular Top Layer @ K2 Road Offset- 13m to 16.5m MPC-1 Granular Top K2 1+500 1+800 LHS APPROVED Ch-1500 to 1600 07.02.2021 3.5
20 LNT-TP2-AA-RS-ROD-RFI-175540 3:00 PM ROAD FDD & Level Checking for MPC-2 WMM TOP @ K2 Road Offset- 18.5m to 24m MPC-2 WMM TOP K2 1+370 1+500 LHS APPROVED Ch-1370 to 1440 06.02.2021 5.5
MPC & Service Road
21 LNT-TP2-AA-RS-ROD-RFI-175541 6:00 PM ROAD FDD Checking for Inner MPC & Service Road Embankment @ G6 Road Offset- 13.0m to 23.0m G6 1+900 2+100 LHS APPROVED 06.02.2021 10
Embankment 9th
MPC & Service Road
22 LNT-TP2-AA-RS-ROD-RFI-175542 6:00 PM ROAD FDD Checking for Inner MPC & Service Road Embankment @ G6 Road Offset- 13.0m to 23.0m G6 1+900 2+150 RHS APPROVED 06.02.2021 10
Embankment 9th
MPC & Service Road
23 LNT-TP2-AA-RS-ROD-RFI-175543 10:00 AM ROAD FDD Checking for Inner MPC & Service Road Embankment @ G6 Road Offset- 13.0m to 23.0m G6 1+630 1+700 LHS APPROVED 06.02.2021 10
Embankment 7th
MPC & Service Road
24 LNT-TP2-AA-RS-ROD-RFI-175544 6:00 PM ROAD FDD Checking for Inner MPC & Service Road Embankment @ G6 Road Offset- 13.0m to 23.0m G6 1+630 1+700 LHS APPROVED 06.02.2021 10
Embankment 8th
25 LNT-TP2-AA-RS-ROD-RFI-175545 11:00 AM ROAD FDD & Level Checking for Outer MPC Embankment @ G6 Road Offset- 23m to 29m MPC Embankment Top G6 1+630 1+650 RHS ALREADY APPROVED RFI NO-175459
26 LNT-TP2-AA-RS-ROD-RFI-175546 6:00 PM ROAD FDD Checking for Service Road Subgrade @ G6 Road Offset- 17.5m to 23m Service Road Subgrade 2nd G6 1+700 1+900 LHS APPROVED 06.02.2021 5.5
27 LNT-TP2-AA-RS-ROD-RFI-175547 6:00 PM ROAD FDD Checking for Service Road Subgrade @ G6 Road Offset- 17.5m to 23m Service Road Subgrade 2nd G6 1+700 1+800 RHS APPROVED 06.02.2021 5.5
28 LNT-TP2-AA-RS-ROD-RFI-175548 10:00 AM ROAD FDD & Level Checking for MPC Subgrade @ E1 Road Offset- 8.1m to 15.3m MPC Subgrade Top E1 1+980 2+000 LHS APPROVED 06.02.2021 7.2
29 LNT-TP2-AA-RS-ROD-RFI-175549 10:00 AM ROAD FDD & Level Checking for MPC Subgrade @ E1 Road Offset- 8.1m to 15.5m MPC Subgrade Top E1 2+850 3+000 LHS FAIL
30 LNT-TP2-AA-RS-ROD-RFI-175550 6:00 PM ROAD FDD & Level Checking for MPC WMM TOP @ E1 Road Offset- 8.1m to 15m MPC WMM TOP E1 1+850 2+000 LHS Not Ready
31 LNT-TP2-AA-RS-ROD-RFI-175551 10:00 AM ROAD FDD & Level Checking for inner MPC Granular Top Layer @ E1 Road Offset- 8.1m to 11.1m MPC Granular Top E1 1+850 2+000 LHS APPROVED Ch-1910 to 1980 06.02.2021 3
32 LNT-TP2-AA-RS-ROD-RFI-175552 4:00 PM ROAD FDD & Level Checking for MPC GSB Top Layer @ E1 Road Offset- 8.1m to 15.3m MPC GSB TOP E1 1+980 2+000 LHS APPROVED 06.02.2021 7.2 EE HE3
33 LNT-TP2-AA-RS-ROD-RFI-175553 10:00 AM ROAD FDD Checking for inner MPC Embankment @ E3 Road Offset- 8.6m to 13.6m MPC Embankment 5th E3 1+300 1+600 LHS APPROVED 06.02.2021 5
34 LNT-TP2-AA-RS-ROD-RFI-175554 6:00 PM ROAD FDD Checking for inner MPC Embankment @ E3 Road Offset- 8.6m to 13.6m MPC Embankment 6th E3 1+300 1+600 LHS APPROVED 06.02.2021 5
35 LNT-TP2-AA-RS-ROD-RFI-175555 9:00 AM ROAD FDD Checking for inner MPC Embankment @ E3 Road Offset- 8.6m to 13.6m MPC Embankment 5th E3 1+600 2+000 LHS APPROVED 06.02.2021 5
36 LNT-TP2-AA-RS-ROD-RFI-175556 6:00 PM ROAD FDD Checking for inner MPC Embankment @ E3 Road Offset- 8.6m to 13.6m MPC Embankment 6th E3 1+600 2+000 LHS APPROVED 06.02.2021 5
37 LNT-TP2-AA-RS-ROD-RFI-175557 9:00 AM ROAD FDD Checking for Outer MPC Embankment @ E3 Road Offset- 13.6m to 18m MPC Embankment 5th E3 1+300 1+600 LHS APPROVED 06.02.2021 4.4
38 LNT-TP2-AA-RS-ROD-RFI-175558 6:00 PM ROAD FDD Checking for Outer MPC Embankment @ E3 Road Offset- 13.6m to 18m MPC Embankment 6th E3 1+300 1+600 LHS APPROVED 06.02.2021 4.4
39 LNT-TP2-AA-RS-ROD-RFI-175559 10:00 AM ROAD FDD Checking for Outer MPC Embankment @ E3 Road Offset- 13.6m to 18m MPC Embankment 6th E3 1+600 2+000 LHS APPROVED 06.02.2021 4.4
40 LNT-TP2-AA-RS-ROD-RFI-175560 6:00 PM ROAD FDD Checking for Outer MPC Embankment @ E3 Road Offset- 13.6m to 18m MPC Embankment 7th E3 1+600 2+000 LHS APPROVED 06.02.2021 4.4
41 LNT-TP2-AA-RS-ROD-RFI-175561 11:30 AM ROAD FDD & Level Checking for Outer MPC GSB TOP @ C10 Road Offset- 10.5m to 13.8m MPC GSB TOP C10 0+400 0+500 LHS Not Ready
42 LNT-TP2-AA-RS-ROD-RFI-175562 4:00 PM ROAD FDD & Level Checking for Outer MPC WMM TOP @ C10 Road Offset- 10.5m to 13.5m MPC WMM TOP C10 0+400 0+500 LHS Not Ready
43 LNT-TP2-AA-RS-ROD-RFI-175563 4:00 PM ROAD FDD & Level Checking for MPC WMM Top Layer @ H1 Road Offset- 25.5m to 35m MPC WMM TOP H1 4+500 4+600 RHS Not Ready
44 LNT-TP2-AA-RS-ROD-RFI-175564 2:00 PM ROAD FDD & Level Checking for MPC WMM TOP @ G7 Road Offset- 17.0m to 27.5m MPC WMM TOP G7 2+110 2+290 LHS APPROVED Ch-2120 to 2150 (17.0 to 23.0) & Ch- 07.02.2021 6.0 & 4.5 EE HE2
E1 & A6 Junction E1 LHS Ch: 3+080 to 3+099 & A6
45 LNT-TP2-AA-RS-ROD-RFI-175565 6:00 PM ROAD FDD Checking for Subgrade @ E1 & A6 Junction Node No- 108 Subgrade 1st - APPROVED 06.02.2021 125 Sqmt
Node No- 108 RHS Ch: 0+013 to 0+022
E1 & A6 Junction E1 LHS Ch: 3+053 to 3+070 & A6
46 LNT-TP2-AA-RS-ROD-RFI-175566 6:00 PM ROAD FDD Checking for Subgrade @ E1 & A6 Junction Node No- 108 Subgrade 1st - APPROVED 06.02.2021 125 Sqmt
Node No- 108 LHS Ch: 0+013 to 0+022
B41/2 BHS Ch: 0+880 to 0+930
47 LNT-TP2-AA-RS-ROD-RFI-175567 8:00 AM ROAD Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ B41/2 & B42 Node No- 71 CTSB TOP Node No- 71 - WRONG RFI Subgrade Top Balance
& B42 RHS Ch: 3+190 to 3+250
FDD & Level Checking for Inner MPC & Service Road Embankment @ G6 Road Offset- 13.0m to MPC & Service Road
48 LNT-TP2-AA-RS-ROD-RFI-175568 4:00 PM ROAD G6 1+180 1+200 LHS APPROVED 06.02.2021 10
23.0m Embankment Top
Field Dry Density , Level & Surface regularity Checking for WMM Laying @ B42 Road Offset- 5.0m
49 LNT-TP2-AA-RS-ROD-RFI-175569 9:00 AM ROAD WMM TOP B42 0+880 1+110 RHS APPROVED 06.02.2021 1.5
to 6.5m
Ch-880 to 1110 (Offset-0.0 to 6.5) & 13.0 &
50 LNT-TP2-AA-RS-ROD-RFI-175570 4:00 PM ROAD Application of Prime coat @ B42 Road Offset- 0.0m to 6.5m PRIME COAT B42 0+880 1+350 BHS APPROVED 07.02.2021 EE HE3
Ch-1110 to 1350 (Offset-0.0 to 6.0) 12.0
Field Dry Density , Level & Surface regularity Checking for CTSB Laying @ B42 Road Offset- 0.0m to
51 LNT-TP2-AA-RS-ROD-RFI-175571 2:00 PM ROAD CTSB TOP B42 1+920 2+000 BHS Not Ready
6.5m
SERVICES
Checking of Reinforcement, Shuttering & Concrete for MPC Slab (3180 x 2500 x 150 - 1 No), (4180 x Reinforcement, Shuttering &
52 LNT-TP2-AA-RS-SER-RFI-175572 5:00 PM SWD PC Yard - - - APPROVED 06-02-2021 EE ST1
2500 x 150 -1 No), (3680 x 2500 x 150 - 2 No) @ PC Yard Concreting
Reinforcement, Shuttering & Concrete Checking for Precast inlet/ Manhole cover slab
Reinforcement, Shuttering &
53 LNT-TP2-AA-RS-SER-RFI-175573 5:00 PM SWD (0.640*0.640*0.175 - 1 No), (0.740*0.740*0.175 - 9 No), (0.740*0.820*0.175 - 2 No), - - - - NOT APPROVED
Concreting
(1.140*0.695*0.175 - 2 No), (1.640*0.425*0.225 - 3 No) @ Precast Yard
UTILITY CROSS Reinforcement, Shuttering & Concrete Checking for UCD (PD) Jointing Raft (1.3m) @ C10 Road Ch: Reinforcement, Shuttering &
54 LNT-TP2-AA-RS-SER-RFI-175574 5:00 PM C10 - - BHS NOT APPROVED
DUCT 0+045 Concreting
UTILITY CROSS Reinforcement, Shuttering & Concrete Checking for UCD (Utility) Jointing Raft (1.8m) @ G4 Road Ch: Reinforcement, Shuttering &
55 LNT-TP2-AA-RS-SER-RFI-175575 5:00 PM G4 - - RHS NOT APPROVED
DUCT 3+915 Concreting
UTILITY CROSS
56 LNT-TP2-AA-RS-SER-RFI-175576 5:00 PM Excavation, Bed level, & PCC Laying Checking for Utility Cross Duct @ B42 Road Ch: 2+025 Concreting B42 - - BHS APPROVED 06-02-2021
DUCT
Reinforcement, Shuttering &
57 LNT-TP2-AA-RS-SER-RFI-175577 4:00 PM SWD Reinforcement, Shuttering & Concrete Checking for Wall @ D9 Road (Part-2) D9 0+165 0+175 RHS APPROVED 06-02-2021 EE ST1
Concreting
58 LNT-TP2-AA-RS-SER-RFI-175578 11:00 AM IE Water Tightening Test of 800mm Dia.DI, K-7 Pipe Line for Insdutrial Effluent @ G-4 Road TEST-WATER TIGHTENING G-4 2+160 2+190 RHS APPROVED EE HE2
59 LNT-TP2-AA-RS-SER-RFI-175579 1:00 PM IE Water Tightening Test of 800mm Dia.DI, K-7 Pipe Line for Insdutrial Effluent @ G-4 Road TEST-WATER TIGHTENING G-4 2+190 2+220 RHS APPROVED
HYDROSTATIC PRESSURE
60 LNT-TP2-AA-RS-SER-RFI-175580 9:00 AM POTABLE Checking of Hydrostatic Pressure testing of HDPE 160 mm Dia. HDPE For Potable Water @ B-42 Road B-42 2+080 2+900 CENTER NOT APPROVED EE HE3
TEST
Reinforcement & Shuttering Checking & Concreting (M40) for Casing for Potable Water @ B-42
61 LNT-TP2-AA-RS-SER-RFI-175581 9:00 AM POTABLE-PC CASING B-42 2+125 2+540 CENTER NOT APPROVED
Road (CENTER ) Pipe Line Crossing @ CH.2+125, 2+300, 2+540 (Property Connection) Length-20m
Checking of Excavation, PCC (M20) Laying & Top Level Checking for Potable Water @ C-9 Road CENTER to
62 LNT-TP2-AA-RS-SER-RFI-175582 8:00 AM POTABLE-PC EXCAVATION & PCC C-9 1+055 1+490 APPROVED
(CENTER to LHS ) Pipe Line Crossing @ CH.1+055, 1+230, 1+490 (Property Connection) Length-10m LHS
Reinforcement & Shuttering Checking & Concreting (M40) for Casing for Potable Water @ B-48 CENTER to
63 LNT-TP2-AA-RS-SER-RFI-175583 10:30 AM POTABLE-PC CASING B-48 0+770 0+770 NOT APPROVED
Road (CENTER to RHS) Pipe Line Crossing @ CH.0+770 (Property Connection) Length-5.4m RHS
Reinforcement & Shuttering Checking & Concreting (M40) for Casing for Potable Water @Recycle
CENTER to
64 LNT-TP2-AA-RS-SER-RFI-175584 10:30 AM RECYCLE-PC Water @ B-48 Road (CENTER to RHS) Pipe Line Crossing @ CH.0+785 (Property Connection) Length- CASING B-48 0+785 0+785 NOT APPROVED
RHS
4.4m
Reinforcement & Shuttering Checking & Concreting (M40) for Casing for Recycle Water @ G-4 Road
65 LNT-TP2-AA-RS-SER-RFI-175585 3:00 PM RECYCLE-RC CASING G-4 7+016 7+016 LHS (MPC) APPROVED
LHS ) MPC Pipe Line Crossing @ CH.7+016 (Road Crossing) Length-0+000 to 0+021.5
Checking of Excavation & BC Cutting for Recycle Water @ CPR-2 Road Pipe Line Crossing @ Ch-
66 LNT-TP2-AA-RS-SER-RFI-175586 8:00 AM POTABLE EXCAVATION -BC CUTTING CPR-2 0+380 0+405 CENTER APPROVED
0+380, 0+405
Reinforcement & Shuttering Checking & Concreting (M40) & Top Level Checking for Raft of Power
67 LNT-TP2-AA-RS-SER-RFI-175587 8:00 AM PD RAFT & TOP LEVEL A-6 0+134 0+160 LHS APPROVED
Duct Size 2.7m*1.8m @ A-6 Road
Reinforcement & Shuttering Checking & Concreting (M40) Checking for Wall of Power Duct Size
68 LNT-TP2-AA-RS-SER-RFI-175588 10:00 AM PD WALL A-6 0+155 0+180 LHS APPROVED 0+160 0+180
2.7m*1.8m @ A-6 Road
Reinforcement & Shuttering Checking & Concreting (M40) & Top Level Checking for Raft of Power
69 LNT-TP2-AA-RS-SER-RFI-175589 9:00 AM PD RAFT & TOP LEVEL E-3 2+035 2+035 RHS NOT APPROVED
Duct Size 2.2m*1.8m @ E-3 Road (Bridge Connectivity) Length-8.8m
Reinforcement & Shuttering Checking & Concreting (M40) &Wall of Power Duct Size 2.2m*1.8m @ E-
70 LNT-TP2-AA-RS-SER-RFI-175590 11:00 AM PD RAFT & TOP LEVEL E-3 2+017 2+017 RHS APPROVED
3 Road @ Ch-2+017 (Bridge Connectivity) Length-8.9m
Reinforcement & Shuttering Checking & Concreting (M40) & Top Level Checking for Raft (Manhole &
71 LNT-TP2-AA-RS-SER-RFI-175591 10:00 AM PD-MH RAFT & TOP LEVEL G-6 2+975 2+975 LHS NOT APPROVED
Airvet) of Power Duct Size 2.7m*1.8m @ G-6 Road Ch-2+975
STRUCTURE
Checking of Reinforcement, Shuttering & Concreting for Bus Shelter Starter (C1, C2, C3, C4, C5, C6,
Reinforcement, Shuttering &
72 LNT-TP2-AA-RS-STR-RFI-175592 5:00 PM BUS SHELTER K2 - - LHS APPROVED 06-02-2021 EE ST3
C7) @ K2 Road Ch: 0+190 Concreting
Reinforcement, Shuttering &
73 LNT-TP2-AA-RS-STR-RFI-175593 5:00 PM BUS SHELTER Checking of Reinforcement, Shuttering & Concrete for column casting (C2-C6) @ K2 Road Ch: 0+470 K2 - - RHS APPROVED 06-02-2021 EE ST3
Concreting
Checking of Reinforcement, Shuttering & Concrete for Top Beam (C1, C2, C3, C4, C5, C6, C7) @ E1 Reinforcement, Shuttering &
74 LNT-TP2-AA-RS-STR-RFI-175594 4:00 PM BUS SHELTER E1 - - RHS APPROVED 06-02-2021
Road Ch: 1+324 Concreting
Excavation, Bed level, & PCC Laying Checking for Approach Slab @ F1A Bridge (C7/2 road side) up
75 LNT-TP2-AA-RS-STR-RFI-175595 4:00 PM MJB Concreting F1A Bridge - - - NOT APPROVED
stream.
Checking for Reinforcement, Shuttering & Concreting for Abutment-3 Wall final lift (16m to 30m) Reinforcement, Shuttering &
76 LNT-TP2-AA-RS-STR-RFI-175596 12:00 PM OUTFALL OUTFALL-2 - - - APPROVED 06-02-2021 EE ST3
@ Outfall-2 Concreting
ELECTRICAL
Reinforcement & Shuttering Checking & Concreting (M40) & for Pole Foundation of Street Light @ G-
77 LNT-TP2-AA-RS-ELE-RFI-175597 10:00 AM SL POLE FOUNDATION G-4 4+210 4+420 RHS APPROVED
4 Road
Checking of Excavation, PCC (M20) Laying & Top Level Checking for Foundation of High Mast (SA-08-
78 LNT-TP2-AA-RS-ELE-RFI-175598 10:00 AM HM PCC & TOP LEVEL B-53 0+020 0+020 RHS APPROVED
MDB-N261-HM-1 ) @ B-53 Road Ch-0+020
Checking of Excavation, PCC (M20) Laying & Top Level Checking for Foundation of High Mast (SA-02-
79 LNT-TP2-AA-RS-ELE-RFI-175599 10:00 AM HM PCC & TOP LEVEL B-56 & C-16 2+365 1+510 LHS & LHS APPROVED
DBI-N266-HM-1 ) @ B-56 Road LHS Ch-2+365 & C-16 Road LHS Ch-1+510
Checking of Excavation, PCC (M20) Laying & Top Level Checking for Foundation of High Mast (SA-08-
80 LNT-TP2-AA-RS-ELE-RFI-175600 10:00 AM HM PCC & TOP LEVEL J-1 0+660 0+620 RHS APPROVED
MDB-N254-HM-1 & 2 ) @ J-1 Road Ch-0+660 , 0+620
Checking of Excavation, PCC (M20) Laying & Top Level Checking for Foundation of High Mast (SA-08-
81 LNT-TP2-AA-RS-ELE-RFI-175601 10:00 AM HM PCC & TOP LEVEL H-2 0+630 0+650 RHS & LHS APPROVED
MDB-N255-HM-1 & 2 ) @ H-2 Road Ch-0+630 (RHS) , 0+650 (LHS)
OTHERS
Reinforcement, Shuttering & Concrete Checking for Pile Cap (Over Head Gantry Foundation) @ H1 Reinforcement, Shuttering &
82 LNT-TP2-AA-RS-OTH-RFI-175602 5:00 PM PILE H1 - - RHS NOT APPROVED EE ST1
Road (MPC) Ch: 2+200 Concreting
83 LNT-TP2-AA-RS-OTH-RFI-175603 10:00 AM CALIBRATION WMM Pugmil Calibration of Plant No:6 @ DSIR TP 2E CALIBRATION DSIR-TP2E - - - APPROVED EE QAQC2
NCR
84 LNT-TP2-AA-RS-NCR-RFI-175604 9:00 AM NCR NCR CLOSING NO -611 Checking for Application of Tack Coat & BC laying @ G7 Road NCR CLOSING NO -611 G7 1+195 1+198 LHS APPROVED EE HE2
Annexure III
RFI submission with all attachment for EE signature
03-02-2021

04-02--2021