Saudi Aramco Inspection Checklist: Fire Alarm System - Pre-Commissioning Inspection SAIC-B-6108 24-Jul-18 Inst
Saudi Aramco Inspection Checklist: Fire Alarm System - Pre-Commissioning Inspection SAIC-B-6108 24-Jul-18 Inst
Saudi Aramco Inspection Checklist: Fire Alarm System - Pre-Commissioning Inspection SAIC-B-6108 24-Jul-18 Inst
00 30-Jun-18
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Fire Alarm System - Pre-Commissioning Inspection SAIC-B-6108 24-Jul-18 INST
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
Equipment/ EQUIPMENTS ID NUMBERS GENERAL BOX, ENCLOSURE AND ACCESSORIES ENCLOSURE CODE SYSTEM ID. PLANT NO.
DESCRIPTION
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
A Document Review, Certification
Contractor to Provide: Certified, as-built drawings for the fire alarm SAES-B-014
A5
system. Sec. 7.9(a)
SAES-B-014
A11 Contractor to Provide: Commissioning procedures.
Sec. 7.9(g)
B Visual Inspection of Different Accessories of the System
Conform that the insulation resistance test record for all instrument wire
SAEP-1636
B1 and cable are carried out, certified and recorded for both before and after
Sec. 5
cable installation as per Attachment 1.
The equipment arrangement shall be inspected and checked against the SAEP-1636
B2
relevant Planned Layout and General Arrangement Drawings. Sec.5
Particular attention shall be paid to the alignment of the panel face to SAEP-1636
B3
ensure correct matching of instruments and where fitted, mimic diagrams. Sec. 5
The Fire Alarm System shall be inspected to ensure all identifying labels
SAEP-1636
B4 and tags are installed in accordance with the schedule and layout
Sec. 5
drawings.
Interconnecting wiring of control panel sections shall be checked against SAEP-1636
B5
the detailed wiring diagram. Sec. 5
Power supply from normal and UPS sources shall be checked as per SAEP-1636
B6
connection wiring schedule. Sec. 5
Function Test of "Fire Alarm Panels": All relevant checks, activities and SAEP-1636
C5
test should be certified and recorded as per attachment 5. Sec. 5
Grounding: Check grounding and functionality for the cabinet, as per all
SAEP-1636
C6 relevant checks, activities and test should be certified and recorded as per
Sec. 5
attachment 6.
Functionality checks for all features of the system including the simulation
SAEP-1636
C7 of all types of I/O signals and all relevant sequences of Alarm, Signaling
Sec. 5
and Actuation as required.
SAEP-1636
C8 Manufacturer performance test procedures shall be followed
Sec. 5
Power Supply Input cable(s) shall be checked from the Power Distribution
SAEP-1636
C9 panel, providing to switch-off, the cabinet Switching system, switch-on
Sec. 5
power supply from P.D.P and verify it at cabinet input terminal strip.
REMARKS:
REFERENCE DOCUMENTS:
1. Schedule G - Material, Tools and Equipment (Pro Forma MP-IK-LS Contract)
2. Schedule Q - Quality Requirements (Pro Forma Contract)
3. NFPA 13 - Standard for the Installation of Sprinkler Systems 2013 Edition
4. NFPA 70 - National Electrical Code (NEC), 2017 Edition
5. NFPA 72 - National Fire Alarm Code, 2013 Edition
6. SAES-B-014 - Safety Requirements for Plant and Operations Support Buildings, 2 January 2018
7. SAES-M-100 - Saudi Aramco Building Code, 01 Jan 2018
8. SAEP-1636 - Installation Check out Plan -16 October 2017
ATTACHMENTS:
1. Attachment 1: Cable Insulation Resistance Test Before Installation
2. Attachment 2: Visual Inspection of the Installation of Junction Boxes and Cable ways
3. Attachment 3: Visual Inspection of Instruments Installation
4. Attachment 4: Visual Inspection of the Installation of Local and Control Room Panels
5. Attachment 5: Function Alarm of Fire Alarm Panel (as one system)
6. Attachment 6: Ground Rod Network Earth Resistance Measurement-
NOTES:
3. Listed - Equipment and materials included in a list published by an approved qualified organization concerned with evaluation of products or
services, that maintains periodic inspection of production of listed equipment or materials or periodic evaluation of services, and whose listing states
that the equipment, material, or services either meets appropriate designated standards or has been tested and found suitable for a specified purpose.
4. Labeled - Equipment or materials to which has been attached a label, symbol, or other identifying mark of an approved qualified organization
concerned with product evaluation, that maintains periodic inspection of production of labeled equipment or materials, and by whose labeling the
manufacturer indicates compliance with appropriate standards or performance in a specified manner.
Attachment 2: Visual Inspection of the Installation of Junction Boxes and Cable Ways
Attachment 4: Visual Inspection of the Installation of Local and Control Room Panels