Download as pdf
Download as pdf
You are on page 1of 16
Rye ME. a fey geceiveo, [THE CONSTRUCTION MANAGER: King Abduacs international Arport | ‘tema or Development roel Phase Jaan Ks | 2! ae REQUEST FOR MEP TESTING (RMT) z Discipline x]ererat Tein [_oter: Ll Fonctiona Test L]Opeatona Test [contractors Name Saud Bitadn Group RTREt No. a2 RWT-OTRO-Ea00ET contract Name: ioa229r9 Rev.No.: 0001 sut-Con Name. IcaD Date anos Iotiieaton of works! — The ooning works re end) rong SH Faclty: C130 Cental Swen Mall - Load Ceter © (C120) Zone Foor (te: FOS Tine: 1000 A “rede: ELECTRIGAL ype of Testing: ELC Siva Work Ready FrTesting [LOOP 0¢ TESTING FOR TRENGHB UNAM FAGPS.CMFINPHFLLAD No, MECHOSTT SS tachment: a 1 ote Drawingl Sketch Related ITP and Method Statement(Reference Oniy) Tn of instalnion RINT RUT ForSO wo) IW No, RMF Wo. Rev No. | Discitne Situs ena won [ea-cranernsse | or | © [approved Aen ona [ez-crane-rin.isoes | or © [arrroved Avot 0a) | 1058-15906 02 | € [Anmroved ashes a) | 0ra-10ra-ire e270 | 00 | E | ppprovea notes 205) 209) iste Applicable Projet Spocticaion Far SEG ume) Spec. Section Cinuse | SpeciiedTestng [ Accoptance Grea Remarks oon [te ar Frenne | RBEDES STH oe) a 263 228 oe Tesifeeal Foro) ‘cM Conments ENSTOCAT L$ AN) TP whe MT Been APpleven Sa e y Jol quested by SG. ‘Witnessed by the CM [SB6.GC Manager esscin [ow Engineer Jou Represent, Name: S0USTAFA EL KARRA name: IName Sonate Date: ge err: ae g /y [Test Status ol ant [Failed ican 09 Nov 2016 RECEIVED 10 NOV 2016 ieee [rae GONSTRUCTION NANAGER: TRE CON « [ [REQUEST FOR INSPECTION OF WORKS (Rif) Sarathendasch | ouiopmen Peel Phare aceon KSA | Sage Sect A Th ection hal be iden by he Gonraiors Rapeionaee ewcnine [Joon [Jou [Jorene [Joctecwns [rlevnes [Jocrnes []icsane [-Jomer ‘Gonraire Rare ‘Sead Bian Group Ri Ret Na Eta EWA [conc Na ssoazeer-0 Fevno- of sue-con Nave IcaD ate saan0e WNowcauone was The long wes aa Congien ad bern Tr PapecanACtng =e [be zane “ie 106 AM Tiade eLECTRICR Tne L2cton: C130 See Gaia Ture -Lase Carer € (C10) Lecaton Delis LEVEL 6] SUEY: 09 SE TURAEL C SOEE rk Rend For apacton fo espe sec SAS Oevces Tr FA Aol (SEIS SEEGER pt he Ranged on fe Mind Gang WFR Ray [atachme Ci Ware Suomta Rete Tl Grecian al ncnne - agnosnrsemane eee a fiery ath was have ban enacted accordance wit he Cantal, THe WW Was wRleied Toe OS Teper and Taw BOOP ccordnatee win ure works ener aden Reqaesesby. san Rane Preiepectty —— MuahalsEKdany (2c Manager /20C Eng aquest Aspeved by Aan Arn Consrcson Manager SERS B Ts ection sal be lod by a CW Rapier reson tee eet 1 Pretnpesion Ta oso ssa inte 1g Lane. 03 To fttahal > CF Dey, or bh fais 2 beatng des tondn fe ads Sor belieny Fl ba senhtang Pere ert ye Pes Rare oper asinct (sasha ee aes ») mene a a tare Pauses Pbk! Sonic: Yen aE tne oy wos amen We Reresetava Comment coved wth tonmeds oo Cele 2 daeg. ae | fits above wo at bo waned it loony Sat LD veers Gomved Aeneas CI vareneatrekeMony C]wonnarReesy C1 Reena lane Some owe 30 AG 2 ‘he Convactr outhe necessary maton, actheaion, cemolhing dm ena coe tie, [ste prorat by eG aha nat vleaa Te Contctor Te Em 7d Tnliloe unde he Conta. ease cf any Uavrapacy DeTwee FRET TEST a “eG RECEIVED fh “CONSTRUCTION MANAGER ing Abduazi Internationa Airport { apap Gzralhandassh | oeveiopment rreict Phase) Jecdanc KSA [REQUEST FOR WVSPECTION OF WORKS [RI ‘Selon NTs ation salt Ween bys Conadiors Repeat fosieine [Jone [Jew [Jawa [Joeman Px}enaran [Jiecenet [Joanne [Jones [Sonate nas Saudi rind Grows FivRar Fo RCROE RW TS leone are: sopra Fern: ot Iswsonnsre 1x0 it 5002016 oieation of Wea Tha elon wot ae ong a wilbe oO RapeSapienng o> [Gne: aupuanre Tire: 1000 0 ‘ee ELECTRICAL aa Sesion: 130 SesCavie Tune! Len Comer 6( 6130) ‘Locavon Onis LEVEL 1 SHEET 02 SEO TUNNEL ODED om Ready Forinepecton: To epct sag SAS Des FR Ao | SEGHS-BEGIB) Apo’ hahighedon re sed Tanna WE FRGETESAT aa sae toon ae So eS eo ESE G7 meio See = Pee aa Reaves! Assoved by: Asian Anion San ‘ fe Censracton Manager ‘Sion ils con ha be en by Ci rena a a a tr nik is done at oT itt ving wk pest der eb eal, preted newts coche Ba a seit es fie senate pipe jue exhowal pipe fed Spans Former ins Representative comments fh ones 2 day. ae | [eect ttromcentoe Civamuoyhaghagh, Cwarenny —_ Unqan [es Representative name Spue noe 20 AUG 206 |sste: Approval the GW anal not elas be Contactor oi Tales wide Conia cae any Tataparcy Ealnean Inspected works end ina spprovedcsign, he Contras necessary reed, recent, demalshig [ecostuctin ceoring tothe fia spor scout 8 tne Ta Cana Tara The Caner King Abdulaziz International Airport | ROMNEE Development Project asa ol Sgn (Phase |) Jeddah, KSA SAS DT CF "Saudi Binladin Group Do- Fel No APtA7EDCSMST.Y-0620001 (act No_J-10-421-PF-0 & J-10-422-PF-0 [Dale | | Terminal Complex, Control Tower and Suppor 30-Juk16 Facilities (421) Aprons, Taxiways, Roads, Tunnels, Bridges, Load Centers and Infrastructure, t “Transportation Center and Supporting Facilities (422) Commissioning Method Statement For Fire Alarm System Package ~ 421 / 422 Submitted By: HCAD of-ot- tol | olay = THE EMPLOVER i TE CONSTRUCTION King Abdulaziz International Airport | Kiawacen BGACA Deriepment Pe ject dar The CM's Reply to Submittals (CRS) Submial Ret. No. | +] 421-422-DCS-MST-Y-05204-01 | Date: | 20 August 2016. ‘Submittal Tile: _ Commissioning MST for Fire Alarm System Conair Ware | Saud Binladin Group 7 10-427-PF-0- Tarminal Carpi, Cantal Tower and Stpporing Facies Corwvact No/Tila || -10-420:PF:0- Aprons, Taxinaye, Roads, Tunal, Bridges, Lead Centers and | intastructure, Transporation Conlar and Supporting Fates ‘ation Code (ick as appropriate: Se TF 1 Pepreved, woremay proceed gh alps Se : Seyaee tog 2. Approved as noted, work may proceed subjectto incofporatiér ct &amimenis and fesubmIe to graht Code (1) F 8 Revise and resubmit, work mayo! proceed be 19 OCF 1G ih, TF 4,Rojoced 5. Review not required RECEIVED Review Comments: F Far Drawing!besign Submitals, please raterto the ata 1. Fire Alarm loop testing depends on the number of devices and quality of work at site Loop Resistance and voltage crop tests cannot be completed unless all devices on laop | ‘are connected, 70% strategy is to be revised accordingly. 2. The maximum number of horns/strobes on the NAC loap depends on the voltage drop calculation and is directly related to the type of connected devices on loop. 3. The FACP cannot be free of trouble if detectors are missing from loop. Configuration of | FACP should be done and final at testing stage. FACP testing shall be strictly done on, SAT2 phase, when all the system installation is completed | | 4. All interfaces are to be tested in SAT3 without any exception. | ‘SAT2 of any panel shall not start until the SAT3 ofall devices related to this fre alarm panel are completed. 6. SATi shall demonstrate that the configuration of device on FACP is correctly done when it comes to type of device and location only. Functionality tests are part of SAT2. 7. Tools and procedure for testing aspirating system are to be provided. 8. List of devices to be tested in SAT3 is not accurate. 9. NAC circuit testing cannot start if all the devices on the loop are not installed. Separate device testing only can be done at 70% stage, 10.Fix all typo mistakes. As an example refer to paragraph 5.1.2 11. This document shall demonstrate that the installation of fire alarm system was done as per the approved method statement of the system and that the installation will be accepted by AH). 12. The testing and commissioning shall be undertaken with all the facilities that are part of the contract specification and that are to be cannected to the fire alarm ring 13. Testing cannot start unless stable/trusted power are available, Prerequisite for SAT2 shall be that the power connections is provided, stable and properly labeled, 14. 70% or more of the SLC devices are not as per contract specification and contracicts THE EMPLOVER as THE CONSTRUCTION King Abdulaziz International Airport | {RACOST Development Project wos dar The CM's Reply to Submittals (CRS) ] (Submit Ret Na @i-479-DCS-MST-Y-05204-01 | Dats | 20 August 2016 Sita Ti Commissioning MST for Fire Alarm System Contre Nene Said Brian Go Contract No/Tile 5J-10-422-PF-0-Aprona, Taxiwaye, Roade, Tun T10421-PF-0- Terminal Compex, Gontol Tower and Supporing FASS vidges, Load Centers and infrastructure, Traneporation Center and Supporting Facies with document description. This document shall comply with Doth specification section 270200 and 283112 15.All test reports shall be printed and provided via specific panel printer. 16. Annunciation devices such as horns, flashers and combined flasher and horns shall be part of SATI. 17.All SAT1 test scenarios to be adjusted as per the fleld devices to be tested. 18, Several failure reason/conaition of tests are nat mentioned, 19. FAAST testing scenarios are to be revised. FAAST panel Is to be included in testing with all its modules and parts, 20. Linear heat detector testing scenarios are to be revised. Include all system component testing in the checklists. All devices listed under SAT1 shall have specific test scenarios under section 5.1.3. 21. Device test scenarios shall cover all possible scenarios. | 22. Proper equipment schedule and riser diagram to be submitted together with every SAT1 inspection. All devices part of this list shall be tested separately and included as pert of the checklist, Checklist shall consider having several devices for each testing activity, 23. SAT2 scenarios shall consider all Functional tests conditions listed under the cause and effect matrix anc proper checks to be dane for all the expected outputs. 24. Checklists for SAT2 are completely rejected and shall be revised. The Censiucton Manager's aprovl shal rt ny ay eve fhe Contactor fer a eomptance wih contractual obigwans ‘Commented by Tosued by sh 19 OCT 2018 PP_R.K.J0€ MMUK 19 October 2016 Kifah Ghraizi Teal vSigiature Over Printed Name Dale Desuiy Project Mana Tae wr on SS aeceiven RUCTION MANAGER: [fae Contadron.? © ing Abeusete arestioat port | 2 ie aralnandesch | coven Prope Pheve season KSA | 8256al We acgods i SAUDT aNTADIC ROLE, ee REQUEST FOR INSPECTION OF WORKS (RIW) ‘ais Ale ain shalt enya Ceclors Repeseaia earwie [Jone Clon [Joman [Jeotcnnt [alten [Jonomun [Juman TJome (cena are ‘aus Bria Gre TiN a” Gece ERE Isut-corhane ico ae: seow2018 [evcason f Wana” The lanng we au Senge on wire ay TupeToORTG on ie aE Tine TOA Tage BLECTRIEN Za Lecter 130 Ga Cain Tuna -Lone Carer € (C130). esion Deis LEVEL 6) SHEET 0) SEO TNNELCSRED Teper rates SAS Devas a FAA Sau (SEG BEGHE TAG ers NGMGNEG on SOG TGGT TAF Sa [atc CE) wate! Sacra Ret. a [E] Dngtieenne (RENEE ENOD Cl mew cess leary enh wks Rave Bn xesntndin accordance wth is Conn Th Was We RUG Ta Wa BU apeGTon ard Ta Ba Requaie by Esmom Rane) se ess ~ Zales Prelnped by ha Eatony son (0 Manaper/ 86 Eng agape hat Aan son SS comicwetige Siok Bea ha Oa Mad yi GH Rarer 1 Preinapection Th atechnans are mica wh esi apred Gl maop scare Jems: i oO pint ae a Dep ar sie ig COA i Se tate oe gl Ellon ber sonyng pipe, gue ewbonst repens Gane apie innct (sofabed by fee: tone Yousseg Pebak? some Geen Ban ope IL tae 04; anim ne sve won tn ban mangaed wine ng a DD asrues ceenved Ei imsengghetigy Ul sist Chin 30 Aus 206 King Abdul Intron Aegon Development Projet [Phase eed, KSA Pe oe |e a | Foes Cleow Clon CJimene CJeemecn Paloenee [fumes [homes Jaa [eos tam Tasca Sp BWA ie> GEeRPERATRE (accor G180- Se SUNT Land © 1TSG penn Genie (VECO BRETT [9EE OREO HOT [Wer at a et a ise 5 bv YA A SEGE” GEO Ap Be TINT Ba SDS SSCS (TATA TORT [arteciment= Ty Weert Sutra ato TI cnt os ee a SS a aT RR RT TA oT aa ae oer Tastee mentor tatatsabo == mp6 9 rea asa en coon nape EE a a yO ap oo romana enna i ‘ce Sat ST when EE op oe a wee Ts Ne Repoy; FA DevTES He Uae prune [px fed Resemen: 3 SoS os sa tavbon nionak on bu aang SSE 77 Crowns versions Claman iy’ Erwsiteay _Ononens castro ari at SS THAT wa Ca in i Sen ney Sp ah nope rt ahtspprre nl ona om racer medi, ctoorcon, eemalonrn [Sete ane ncn sends swt gsm ee rman "RECEWVED | tower 0 aus 206 "TON WANAGER ing Abas trata laralhandassh | oempmart ratel Phase sesden KSA REQUEST FOR INSPECTION OF WORKS [RW : Sa eine [Joe [le [Jonave [Juomare [alenciee [Jowenees [Jansen [Jorn eoramcara ha Saud Baan Group Tie he GRER RE RW THT sncon nave 0 ite senza INetesven cl Wersl — Tho Wing ers cori Sr wlfa ead) renee = fate zane Tne 1000 AM Tas FESTA calor: C190 - Ses Cale Torn Lve Gra CCT) ator Osa (EVEL 8) SHEET 02 SEE TUNNEL © GOED [respect state SKS Dover Tar FRAT (SECIS. SEGDA apr heWGNGNnd o SchedOATGT TO FAGOTCET Icinent ) taearsanasinee Ty Grane: GH] onwmsanenne: gagagorva mine DD rem Ol oe Prolene by: Mahala Katy see "Sn BT aaa be UCC y iC pana 7 Perapecin. The alnchrets 8 maehrg wn gt Spp aves CH rt oxevren/ ge ea Ov re om ipahcaterameene! Sear SiG wm Mos cate Representative Comment vue c0 ee Aegaltovony:_ At dn er Lf couaroriaoner Hina, Unde Sprved nes: Contaattin fe Ymoke. sure Rais pits somphcte eee exhowal pipe ee Contiah\ si senna od Sahege | [Recover ster pices ont Goce caus 7 DD Arprves ‘asp As Noe ee Wom norneaty C2 Rance ieee Sone on _90 AUG 206 necessary temas, ecient, deme [inspected work natal approves esis he Contra [sonaieten secersing otha tal sprees dein hous ste: parva Chant aaa ie Caan Ty Ze nis under th Cont cast an] Tacepanay TTT pian’ oC VED Jo aus ang ees ee Liew Teen Cees alee Chee lee Ce neh C19 SOG Worl aed ur TH ee arco Fo Sa Rosy foapector pee Ae Des KrF A SHBDS- CEREUS Dang DPN faccanere otc St ET Seana TE] ommgsienne: seeeerrseanete: ee ci eee Fas Sa Sac nae HSC CRT OU BOTS Tenney Ee Roe a ta Pet, Ray ere maa co eng pees neatee at la peste Ta ST oR 1 ietpion Te Sones os nea we Ca oars enor Te te sip aor [uisk wok neatly on 29-9-Ul , 18. *-1e dO etnola te Bir mablvenes of devine and es Poesisen £ freneeoscee Daliiah’ sumone Ye a Ope TL tm OF, o> wan iewoee ts Net Qenoy, fA DEVTKEs Haus Umene AUDIE| TX AND QeseoesT SS" 7 —— Ihsan Cleon he CHCvaner Ome —— fea" sone cme 01 At ogee Tene Sheath remeae Sienna asnsttuaeeion RECEIVED j ~ Oy AUG 2006 i A aAGACA gem Pt Ss a KING ABDUL AZIZ INTERNATIONAL AIRPORT DEVELOPMENT PROJECT (PHASE 1) JEDDAH, KSA [The Construction Manager: gasr "The Contractor sersenncrsecricyaon SD ee SRopraNLADcROUr ACI Stape [Facility] Sub Facility Reference and Name: (€130- SECTUNNEL BASEMENT & GF Plant Location (Room No) [Plant Ref. TestsheatRet. [Sheet Jor [Rev system/Sub System FIRE ALARM, “Test Desripton: Panel Reference Drawing No! Date PANELREF. | Loop NO | DEVICE ADDRESS | DEVICE TYPE FA DEVICE FUNCTION ‘Anca | ROOM NO ROOM NAME SR REMARKS Faris 4 007 Mv. ‘MONITOR MODULE Bi TUNNEL TRENCH FACP-13, 4 02 MM. MONITOR MODULE BL TUNNEL TRENCH-B FACP-13, 4 NA FCPS FIELD CHARGER POWER SUPPLY (FCPS 03) BL “TUNNEL TRENCHB, FACP-13, 4 (003 MMi MINI MONITOR MODULE BI TUNNEL TRENCHB FACP-13, 4 (04 RM RELAY MODULE BL “TUNNEL TRENCH-B FACP-13, 4 NA LHD TINEAR HEAT DETECTOR (LHD -02) Bt TUNNEL TRENCH FACP-13, 4 (005 MM MONITOR MODULE BL TUNNEL TRENCH FACP-13 4 06 MM. MONITOR MODULE BL TUNNEL TRENCH FACP-13 4 07 RM RELAY MODULE BL TUNNEL TRENCH-B FACP-13 4 NA FcPs FIELD CHARGER POWER SUPPLY (FCPS 02) Bt TUNNEL TRENCHB FACP-13 4 008 MMM MINI MONITOR MODULE Bt TUNNEL TRENCH-B FACP-13 4 og MP MANUAL PULL STATION at TUNNEL TRENCH-B FACP-13 4 NA ¥cPs FIELD CHARGER POWER SUPPLY (FCPS-03) Bt TUNNEL TRENCHB, FACP-13 4 010 MMM ‘MINI MONITOR MODULE Bt TUNNEL TRENCH S: FACP-13 4 oat M, CONTROL MODULE Bt TUNNEL TRENCH-8 FACP3 4 NA HEL SOUNDER WITH FLASHING UGHT (CM-033/HFL-O3) 81 TRENCH-B FAcP3 4 NA HFL SOUNDER WITH FLASHING UGHT (CM-012/HFL-02) BI TRENCH-B Fach3 4 NA, HFL SOUNDER WITH FLASHING LIGHT (CM-011/HFL-03) BL TUNNEL, TRENCHB FAcP-a3 4 NA. FCPS FIELD CHARGER POWER SUPPLY (FCPS -04) Bt TUNNEL TRENCH-B Facha3 4 o12 MMM MINI MONITOR MODULE BL TUNNEL TRENCH: FACP-a3 4 013 RM RELAY MODULE Bt TUNNEL TRENCH: Facha3 4 NA. Fees FIELD CHARGER POWER SUPPLY (FCPS -05) et TUNNEL TRENCHS FacP-a3 4 14 MMM "MINI MONITOR MODULE Bt TUNNEL TRENCH-B Fach-a3 4 01s MM ‘MONITOR MODULE et TUNNEL TRENCH-B FACP-a3 4 16 MM MONITOR MODULE BL TUNNEL TTRENCH-B Fach-a3 a NA FL FAULT ISOLATOR (F1-O1) Bi TUNNEL TRENCH-B FaCPas 4 NA, THO LINEAR HEAT DETECTOR (LHO-04) Bt TUNNEL TRENCH-B FACPA3 4 7 RM, RELAY MODULE BI TUNNEL TRENCHB FACP-13 4 NA FPS FIELD CHARGER POWER SUPPLY (FCPS -06) Bt TRENCH-B FACP-13 4 018 MMM MINI MONITOR MODULE Bt TRENCH-S FACP-13, 4 as MM MONITOR MODULE BL TRENCHB FACP-A3 4 020 MM MONITOR MODULE BL TUNNEL TTRENCH-B FACP-13, 4 NA FPS FIELD CHARGER POWER SUPPLY [FCPS 07) BL TUNNEL TRENCH: FACP-13 4 oa MMM ‘MINI MONITOR MODULE BL TUNNEL TTRENCH-B FACP-13 4 072 MP. MANUAL PULL STATION Bi TUNNEL TRENCH B FACP-A3, 4 23 cM (CONTROL MODULE Bi TUNNEL TRENCH-B FACP-A3 4 NA HEL, “SOUNDER WITH FLASHING LIGHT (CM-023/HFLOT) Bi TUNNEL TRENCH-B FACP-13, 4 NA, HEL, “SOUNDER WITH FLASHING LIGHT (CM-023/HFL-02) BL TUNNEL TRENCH-B FACP-13 4 NA, HL SOUNDER WITH FLASHING LIGHT (CM-023/HFL-03) BL TUNNEL TTRENCH-B FACP-AB 4 024 cma ‘CONTROL MODULE BL TUNNEL TRENCH-B FACP-A3, 4 NA HAL SOUNDER WITH FLASHING LIGHT (CM-0247HFL-O3) BL TUNNEL TRENCH FACP-A3, a NA, HAL SOUNDER WITH FLASHING LIGHT (CM-024/HFL-02) BL TUNNEL TRENCH-B FACP-A3 a NAL res FIELD CHARGER POWER SUPPLY (FCPS -08) BL TUNNEL, TRENCH-B FACP-A3 4 025 MMM [MINI MONITOR MODULE BL TUNNEL, TRENCH-B FACP-AB 4 026 iM RELAY MODULE BL TUNNEL TRENCH: FACP-A3 4 NA, ro FIELD CHARGER POWER SUPPLY (FCPS-09) BL TUNNEL TRENCH FACE a or MMM ‘MINI MONITOR MODULE BL TUNNEL TRENCH-B Page tof? a GACKA The Construction Manager: The Contractor. ae ‘ ; KING ABDUL AZIZ INTERNATIONAL AIRPORT DEVELOPMENT PROJECT (PHASE 1) EDDAH,KSA cj es sinpeutcrsucstcyese CD ao re ae f NCO iC stage [Faciity/ Sub Faclity Reference and Name: ‘G30. SEC TUNNEL BASEMENT & GF rant Location (Room Wo) [Plant Re. system/Sub System FIRE ALARM Test Description: Test Sheet Ref, Sheet _for,_fev Panel Reference Drawing No Date STATUS panevrer. | Loop no | vevice anpress | pevice TvPE FA DEVICE FUNCTION ‘area | ROOMNO ROOM NAME ae aL REMARKS meas 4 on i MONITOR MODULE a TUNEL TRENCHES raceaa_| 4 029 MMi MONITOR MODULE BL TUNNEL TRENCH-E racra3_| 4 030 MP, MANUAL PULL STATION a1 TUNNEL TRENCH-E facra3_| 4 NA THD) TINEAR HEAT DETECTOR (LHD-O5] BL TUNNEL TRENCH raceaa_ [4 034 MW ‘MONITOR MODULE BL TUNNEL TTRENCH-B raceaa_[ 4 032 MW MONITOR MODULE BL TUNNEL TTRENCH-® facraa_[ 4 NA fi FAULT ISOLATOR BL TUNNEL TRENCH raceas [4 033 RM RELAY MODULE BL TUNNEL TRENCH 8 faceaa [4 WA FcPs FIELD CHARGER POWER SUPPLY (FOPS-I0) a1 "TUNNEL TRENCH-B races [4 034 wn ‘MINI MONITOR MODULE oo TUNNEL TRENCH-B races [4 NA FCPS FIELD CHARGER POWER SUPPLY (FCPS-I3) aL TUNNEL TRENCH:E paceas [4 035 iM MINI MONITOR MODULE aL TUNNEL TRENCHB faceaa [4 036 CM CONTROL MODULE aL TUNNEL TRENCH faceaa [4 NA HL SOUNDER WITH FLASHING UGHT (CMCO36/HFL-I) aL TUNNEL TRENCH-S rachaa_[ 4 NA HL ‘SOUNDER WITH FLASHING LIGHT (CM-036/HFL-02) aL TUNNEL TRENCHB racpaa_| 4 037 om CONTROL MODULE BL TUNNEL TRENGH-B rac.aa_[ 4 NA HFL ‘SOUNDER WITH FLASHING LIGHT (CMLO37/HFL-OR) B TUNNEL TRENCH racpaa_| 4 NA HFL ‘SOUNDER WITH FLASHING LIGHT (CM-037/HFL-02) Bi TUNNEL TTRENCH-B racras[ 4 NA HL SOUNDER WITH FLASHING LIGHT (CN-O37/HFL-03) rm TUNNEL TRENCH. racpas_| 4 NA FOPS FIELD CHARGER POWER SUPPLY (FOPS-12) BL TUNNEL TRENCH-B Faceas | 4 038) MME MINI MONITOR MODULE aL TUNNEL TRENCH-B Faceas_| 4 039 RM RELAY MODULE BL TUNNEL TRENCH-B Facaa_[ 4 NA FoPS ELD CHARGER POWER SUPPLY (FCPS 13) mH TUNNEL TRENCH-B Faces | 4 040 MME MINI MONITOR MODULE a TUNNEL TRENCH Faceas_| 4 04 MM MONITOR MODULE a TUNNEL TRENCH rachis 4 042 MMi MONITOR MODULE BL TUNNEL TRENCH Faceaa_| 4 043 RM AELAY MODULE TUNNEL TRENCH-B racraa_| 4 NA FoR FIELD CHARGER POWER SUPPLY (FCPS-14) 61 TUNNEL TRENCH-B Facras_| 4 04 MMINE MINI MONITOR MODULE 8 TUNNEL TRENCH-B rachis 4 045 MM MONITOR MODULE a TUNNEL TRENCH Faceas_| 4 046 MM MONITOR MODULE rm TUNNEL TRENCH. Faces 4 NA LAD. TINEAR HEAT DETECTOR (LHD 06) BL TUNNEL TRENCH Faceas_| 4 NA FL FAULT ISOLATOR {F1-03) BL TUNNEL TRENCH-B Faces 4 A Fors FIEID CHARGER POWER SUPPLY (FOPS-15] BL TUNNEL TTRENCH-B rachis 4 047 MIM ‘MINI MONITOR MODULE BL TUNNEL TRENCH: Fachaa_[ 4 048 MP MANUAL PULL STATION TUNNEL TRENCH -B Tested By Iwame Name Name Dates Tested signature signature signature Instruments Used ate oate ate Page 2of 2 oO | coca, nemanrn,, Sospt en oyna SET pate bate FE ALAMM SYSTEM rereanunnarassesusswenes a ‘ts abt | ERE onevaearmle ‘mmonoanvacono= 0

You might also like