MAINTENANCE BOILER DAILY REPORT

No Date Crew Activities Picture Note


1. Mr Liu Bin Quan 1. Maintenance of pump gas 1. Tightening the bolt
2. Mr Sun Shi Yi exhausting valve at ESP #1. 2. 2 unit spear.
3. Mr Wang Wei 2. Making spear for coal 3. By pass pipe.
4. Mr Wang Ming bunker.
5. Achmad Taufiq 3. Installing insulation pipe at
1 02-Oct-21 6. Fadli Daeng 12.5 pipe floor.
7. Marno
8. Muh Sawir W
9. Yanrikson labaka
10. Edwar Palaudi
11. La Arwan Ridwan

1. Mr Sun Shi Yi
2 03-Oct-21 2. Muh Sawir W off day Stand by man

1. Mr Liu Bin Quan 1. Installing insulation pipe at 1. By pass pipe


2. Mr Sun Shi Yi 12.5 m pipe floor.
3. Mr Wang Wei 2. Ceramic installation at 2nd
4. Mr Wang Ming floor building.
5. Achmad Taufiq 3. Loading scaffolding pipe
6. Fadli Daeng to chimney area.
3 04-Oct-21 7. Marno
8. Muh Sawir W
9. Yanrikson labaka
10. Edwar Palaudi
11. La Arwan Ridwan
1. Mr Liu Bin Quan 1. Uninstalling insulation on 1. Use boom lift.
2. Mr Sun Shi Yi the air pipe line from IDF to 2. in the park.
3. Mr Wang Wei chimney. 3. Adding oil on roller
4. Mr Wang Ming 2. Connecting water pipe at 4. Adding glue.
5. Achmad Taufiq caol handling area.
4 05-Oct-21 6. Fadli Daeng 3. Checking coalfeeder
7. Marno condition.
8. Muh Sawir W 4. Overcome leaks Cyclone
9. Yanrikson labaka main hole.
10. La Arwan Ridwan 5. Ceramic installation at 2nd
floor building.
1. Mr Liu Bin Quan 1. Scaffolding installations at
2. Mr Sun Shi Yi chimney area.
3. Mr Wang Wei 2. Creating and installing
4. Mr Wang Ming door latch at conveyor #3
5. Achmad Taufiq room.
6. Fadli Daeng 3. Installing the door at 2nd
5 06-Oct-21 7. Marno floor building
8. Muh Sawir W
9. Yanrikson labaka
10. Edwar Palaudi
11. La Arwan Ridwan
1. Mr Liu Bin Quan 1. Scaffolding installations at 2. Rusty
2. Mr Sun Shi Yi chimney area. 3. Seal replacement.
3. Mr Wang Wei 2. Repairing exhausting valve
4. Mr Wang Ming on bin pump #3.
5. Achmad Taufiq 3. Overcome leaks on Shoot
6 07-Oct-21 6. Fadli Daeng blow G3, G5, G7, at boiler #1
7. Yanrikson labaka
8. Muh Sawir W
9. La Arwan Ridwan
10. Edwar Palaudi

1. Mr Liu Bin Quan 1. Scaffolding installations at 6. Adding Seal.


2. Mr Sun Shi Yi chimney area.
3. Mr Wang Wei 2. Uninstall insulations on air
4. Mr Wang Ming pipe lane.
5. Achmad Taufiq 3. Checking coalfeeder at
6. Fadli Daeng conveyor #1.
7 08-Oct-21 7. Marno 4. Reconnecting water pipe at
8. Muh Sawir W cooling tower area.
9. Yanrikson labaka 5. Greasing exhausting valve
10. Edwar Palaudi on bin pump at ESP #1.
11. La Arwan Ridwan 6. Overcome leaks on Shoot
blow G7, at boiler #1