Download as pdf or txt
Download as pdf or txt
You are on page 1of 287

Enhancing Existing Health and Safety Processes in Public

Sector Construction Projects within Saudi Arabia using


Building Information Modelling Approaches

Yahya Balgheeth

School of Built Environment


College of Science and Technology
University of Salford, Salford, UK

Submitted in Partial Fulfilment of the Requirements of the Degree of


Doctor of Philosophy

June 2016
Abstract

Abstract

Current statistics on Health and Safety (H&S) outcomes the Kingdom of Saudi Arabia
(KSA) public construction sector demonstrate the need for academic and practical
assessment of the current environment for the purpose of improving outcomes. Even
though the construction public sector in Saudi Arabia has been rapidly expanding, the
H&S record of this industry remains considerably poor, as evidenced by the rising
figures of injuries and deaths. The purpose of this research is to assess the current use of
H&S technologies and, therefore, possibilities for the use of building information
modelling (BIM) in the industry. The research aims to enhance H&S management in
Saudi public sector construction projects by exploring integrated approaches to project
design and delivery using BIM-based technologies and processes

This research uses a mixed method approach to assess the current H&S environment to
develop a framework suitable for the unique environment aimed at improving the current
outcomes. The data collected through a survey and interviews with subject matter
experts has been analysed to outline the major issues facing the implementation of
innovative technologies to improve current business processes and provide a roadmap
to enhance the predominant H&S policies and activities in Saudi Arabia. Challenges
identified through these efforts include the Saudi environment as having high levels of
fragmentation, a low skilled, multilingual and multi-ethnic workforce and inefficient use
of BIM technologies being made.

Based on these findings, a framework, which incorporates BIM to include automated


hazard identification and correction during design and during construction, has been
developed. The framework is initially devised based on a synthesis of the literature and
further refined based on findings from questionnaires. The result of this research is the
identification of 18 factors impacting H&S. The framework is developed and validated
using interpretive structural modelling (ISM). Through these methods, the key driving
factors for improving H&S outcomes in the public construction sector in KSA are
identified. Among these, better enforcement of regulations and laws is identified as the

I
Abstract

key factor needed for improving outcomes. The study concludes with a discussion of the
applications of the proposed framework and recommendations for future research.
Specifically, this research advocates for the inclusion of BIM technologies in H&S
frameworks as a method of addressing the specific challenge of communicating with a
predominately migrant workforce. This new approach for H&S analysis during
construction focuses on the integration of construction simulation, 3D/4D/5D
construction management and safety analysis through the incorporation of technology
for both planning and communication.

II
Acknowledgements

Acknowledgements

In the name of God, the Most Merciful and the Most Gracious, I give praise and thanks to Him
for supporting me with the strength to complete this research and for providing me with
knowledgeable and caring individuals during the study process.

The researcher would like to express his deepest appreciation and gratitude to the research
supervisor, Dr Zeeshan Aziz, whose encouragement, guidance and support from the initial to
the final level, enabled me to develop an understanding of the subject and carry out the research.

Last, but not least, I owe my loving thanks to my wife Amal Almehmadi. I would never have
completed my work and this thesis writing without her support, care, love and encouragement
and that of my daughters Yara, Lara and Ayar. I would like to thank my family – my mother,
my brothers Dr Mohammad and Ahmad and my father-in-law Mohammad Almehmadi – for
providing me with emotional support throughout the writing of this thesis. Without their
encouragement and understanding, it would have been impossible for me to finish this work.

III
Acknowledgements

Table of Contents
ABSTRACT .......................................................................................................................................... I
ACKNOWLEDGEMENTS ........................................................................................................... III
LIST OF TABLES ........................................................................................................................... IX
LIST OF FIGURES ........................................................................................................................... X
ACRONYMS AND ABBREVIATIONS ................................................................................... XII
CHAPTER 1. INTRODUCTION ................................................................................................. 1
1.1 INTRODUCTION ....................................................................................................................... 1
1.2 RESEARCH BACKGROUND ..................................................................................................... 1
1.3 KEY H&S CHALLENGES IN KSA CONSTRUCTION INDUSTRY............................................ 3
1.4 RESEARCH RATIONALE .......................................................................................................... 7
1.5 RESEARCH QUESTIONS........................................................................................................... 7
1.6 RESEARCH AIMS AND OBJECTIVES ....................................................................................... 8
1.7 OUTLINE RESEARCH METHODOLOGY .................................................................................. 8
1.8 ORGANISATION OF THESIS ................................................................................................... 11
1.9 SUMMARY ............................................................................................................................. 13
CHAPTER 2. LITERATURE REVIEW OF H&S MANAGEMENT PRACTICES IN
KSA ................... 14
2.1 INTRODUCTION ..................................................................................................................... 14
2.2 SEARCH STRATEGY AND METHOD...................................................................................... 14
2.2.1 Research databases ............................................................................................................. 14
2.3 KSA AND ITS CONSTRUCTION INDUSTRY .......................................................................... 15
2.3.1 Construction projects and their organisation in KSA .................................................... 16
2.4 CONSTRUCTION CHALLENGES IN BOTH DEVELOPED AND DEVELOPING COUNTRIES .... 18
2.4.1 Delays and organisational challenges .............................................................................. 18
2.4.2 Environment, hazards and injuries ................................................................................... 20
2.4.3 Regulation of H&S .............................................................................................................. 26
2.5 SAFETY CULTURE IN KSA CONSTRUCTION INDUSTRY .................................................... 31
2.5.1 Kafala and working practices ............................................................................................ 33
2.5.2 Concept of safety.................................................................................................................. 35

IV
Acknowledgements

2.6 POSITIVE WAYS FORWARD.................................................................................................. 39


CHAPTER 3. RELEVANCE OF BIM FOR ENHANCING CONSTRUCTION H&S42
3.1 INTRODUCTION ..................................................................................................................... 42
3.2 ICT’S ROLE IN ENHANCING SAFETY AND REDUCING HAZARDS ..................................... 42
3.2.1 Communication and Technology ....................................................................................... 42
3.3 BIM........................................................................................................................................ 47
3.4 BIM AND SAFETY ................................................................................................................. 53
3.5 BIM: PRE-CONSTRUCTION CONSIDERATIONS ................................................................... 55
3.6 CONSTRUCTION SAFETY MANAGEMENT BY VISUALISATION FOR A MIGRANT
WORKFORCE ..................................................................................................................................... 61
CHAPTER 4. EXISTING FRAMEWORKS OF H&S FACTORS .................................... 66
4.1 INTRODUCTION ..................................................................................................................... 66
4.2 CONCEPTUAL H&S FRAMEWORK ....................................................................................... 66
4.3 ADMINISTRATIVE AND MANAGEMENT COMMITMENT ..................................................... 70
4.4 SELECTION AND CONTROL OF SUBCONTRACTORS ............................................................ 71
4.5 ACCIDENT RECORD .............................................................................................................. 72
4.6 SAFETY REVIEW ................................................................................................................... 73
4.7 H&S TRAINING ..................................................................................................................... 74
4.8 LEGISLATIVE CODES AND STANDARDS .............................................................................. 75
4.9 ROLE OF BIM IN H&S OUTCOMES ..................................................................................... 76
4.10 IDENTIFYING GAPS IN THE LITERATURE ............................................................................ 82
4.11 FINDING ..................................................................................................................... 83
4.12 SUMMARY ............................................................................................................................. 84
CHAPTER 5. RESEARCH METHODOLOGY ..................................................................... 86
5.1 INTRODUCTION ..................................................................................................................... 86
5.2 RESEARCH DESIGN ............................................................................................................... 86
5.2.1 Ontology................................................................................................................................ 88
5.2.2 Epistemology ........................................................................................................................ 89
5.2.3 Axiology ................................................................................................................................ 90
5.3 RESEARCH APPROACH ......................................................................................................... 91
5.3.1 Methodological Choices ..................................................................................................... 92

V
Acknowledgements

5.3.2 Mixed/Multi-method Research ........................................................................................... 93


5.3.3 Quantitative Data Collection and Analysis ...................................................................... 94
5.3.4 Qualitative Data Collection and Analysis ........................................................................ 95
5.4 RESEARCH STRATEGY AND APPROACH .............................................................................. 96
5.4.1 The Survey as a Theoretical Approach ............................................................................. 98
5.5 TIME CONSTRAINTS .............................................................................................................. 99
5.6 QUALITATIVE DATA COLLECTION ...................................................................................... 99
5.6.1 Interview Method .............................................................................................................. 100
5.6.2 Interview Sampling ........................................................................................................... 101
5.7 QUESTIONNAIRE METHOD ................................................................................................ 104
5.7.1 Questionnaire Design ...................................................................................................... 105
5.7.2 Questionnaire Layout ....................................................................................................... 105
5.7.3 Questionnaire Administration and Pilot Study ............................................................. 106
5.7.4 Survey Sample ................................................................................................................... 107
5.8 DATA ANALYSIS ................................................................................................................ 111
5.9 QUANTITATIVE DATA COLLECTION AND ANALYSIS METHODS ................................... 111
5.9.1 Data collection .................................................................................................................. 112
5.9.2 Qualitative data ................................................................................................................ 114
5.10 CHOICE OF METHOD OF ANALYSIS .................................................................................. 116
5.10.1 Manual Colour Coding .................................................................................................... 117
5.11 QUALITATIVE AND QUANTITATIVE METHODS COMPARED........................................... 117
CHAPTER 6. QUANTITATIVE AND QUALITATIVE DATA ANALYSIS............. 120
6.1 INTRODUCTION .................................................................................................................. 120
6.2 QUANTITATIVE DATA ANALYSIS ..................................................................................... 120
6.2.1 Descriptive Statistics ........................................................................................................ 120
6.2.2 Factor Analysis ................................................................................................................. 127
6.2.3 Respondents’ Ratings of H&S in their Organisation ................................................... 130
6.2.4 Factors considered responsible for H&S on Construction Sites ............................... 130
6.2.5 Safety Training .................................................................................................................. 132
6.2.6 Impact of Investment in Safety Programmes ................................................................. 132
6.2.7 Risk Assessment ................................................................................................................ 133

VI
Acknowledgements

6.2.8 Using BIM.......................................................................................................................... 134


6.2.9 BIM as an Important Tool for Site Induction................................................................ 137
6.2.10 Integration of BIM into Building Regulation for Management .................................. 137
6.2.11 Benefits Derived from Implementation of BIM in Management of H&S .................. 138
6.2.12 Barriers to Full Implementation of BIM in Management of H&S ............................. 139
6.2.13 Size of Organisation – Cross Tabulations..................................................................... 139
6.2.14 Nature of Business – Cross Tabulations........................................................................ 150
6.2.15 Most important Factors for H&S ................................................................................... 155
6.2.16 OLS Regression Statistical Analysis .............................................................................. 158
6.2.17 ANOVA Statistical Analysis ............................................................................................ 159
6.3 QUALITATIVE DATA ANALYSIS ....................................................................................... 165
6.3.1 Introduction ....................................................................................................................... 165
6.3.2 Regulation .......................................................................................................................... 166
6.3.3 Migrant Workforce ........................................................................................................... 169
6.3.4 Training in H&S ............................................................................................................... 172
6.3.5 Lack of Interest in and Understanding of H&S ............................................................ 175
6.3.6 Safety Equipment, Signage and Precautions ................................................................ 177
6.3.7 Environment ...................................................................................................................... 178
6.3.8 BIM ..................................................................................................................................... 179
6.3.9 Relationship between Qualitative Themes .................................................................... 181
6.4 SUMMARY OF FINDINGS .................................................................................................... 182
6.4.1 Summary of Quantitative Findings................................................................................. 182
6.4.2 Summary of Qualitative Findings ................................................................................... 184
6.5 SUMMARY .......................................................................................................................... 192
CHAPTER 7. ENHANCING THE H&S FRAMEWORK ................................................. 193
7.1 INTRODUCTION .................................................................................................................. 193
7.2 EXISTING H&S FRAMEWORKS ......................................................................................... 193
7.3 ISM .......................................................................................................................... 193
7.4 CHARACTERISTICS OF ISM ............................................................................................... 194
7.5 STEPS IN ISM METHODOLOGY ......................................................................................... 195
7.5.1 Level partitions ................................................................................................................. 196

VII
Acknowledgements

7.5.2 Conical matrix................................................................................................................... 197


7.6 ISM APPROACH AND H&S MEASURES IN CONSTRUCTION INDUSTRY ........................ 197
7.6.1 Model development ........................................................................................................... 197
7.7 INTERPRETATION OF FRAMEWORK .................................................................................. 208
7.8 VALIDATION OF FRAMEWORK .......................................................................................... 214
7.9 SUMMARY .......................................................................................................................... 214
CHAPTER 8. DISCUSSION,
CONCLUSION AND RECOMMENDATION 216
8.1 INTRODUCTION .................................................................................................................. 216
8.2 ACHIEVEMENT OF RESEARCH AIMS AND OBJECTIVES .................................................. 216
8.2.1 Objective 1: Explore existing practice of H&S ............................................................ 217
8.2.2 Objective 2: Identify relationship between BIM and H&S ......................................... 217
8.2.3 Objective 3: Develop integrated framework ................................................................. 218
8.2.4 Objective 4: Test, evaluate and validate framework.................................................... 219
8.3 CONTRIBUTION TO KNOWLEDGE ..................................................................................... 220
8.4 LIMITATIONS ...................................................................................................................... 221
8.5 RECOMMENDATIONS FOR KSA CONSTRUCTION INDUSTRY ......................................... 222
REFERENCES ............................................................................................................................... 224
APPENDICES ................................................................................................................................. 239
APPENDIX 1: ETHICAL APPROVAL ............................................................................................... 239
APPENDIX 2: PRELIMINARY SURVEY – ONLINE QUESTIONNAIRE 2015 ................................... 240
APPENDIX 3: PILOT STUDY ........................................................................................................... 252
APPENDIX 4: INTERVIEW QUESTIONS .......................................................................................... 264
APPENDIX 5: MANUAL CODING BY COLOUR .............................................................................. 271
APPENDIX 6: PUBLICATIONS FROM THE PHD STUDY ................................................................. 279

VIII
List of Tables

List of Tables

Table 1-1: Summary of key research objectives, research questions and outline methods .............................. 10
Table 2-1:Comparative study from 2008 ............................................................................................. 31
Table 4-1:Tabl: Key Health and Safety Factors (adapted from Ng et al., 2005)........................................... 68
Table 4-2: Relation between H&S factors and literature (Ng et al., 2005) .................................................. 69
Table 5-1:Assumptions of research philosophy (Sexton, 2003) ................................................................. 88
Table 5-2: Comparison of nomothetic (realism) and ideographic (idealism) methodologies . ......................... 89
Table 5-3:Contrasting implications of positivism and social constructionism. ............................................. 90
Table 5-4:Differences between quantitative and qualitative research ........................................................ 94
Table 5-5: Strengths and weaknesses of quantitative and qualitative research. ........................................... 95
Table 5-6: Reasons for using mixed method design ............................................................................... 97
Table 5-7: Interviewee information .................................................................................................. 103
Table 5-8: Sample size of questionnaires ........................................................................................... 110
Table 5-9: Distinctions between quantitative and qualitative analysis ..................................................... 111
Table 6-1: Factor analysis.............................................................................................................. 129
Table 6-2: Impact of investment in safety programmes ......................................................................... 133
Table 6-3: Size of organisation and factors considered responsible for H&S ............................................ 148
Table 6-4: Size of organisation and H&S practices ............................................................................. 149
Table 6-5: Size of organisation and perceived barriers to implementation of BIM ..................................... 150
Table 6-6: Nature of business by H&S practices ................................................................................. 152
Table 6-7: Barriers to implementation of BIM by nature of business ....................................................... 154
Table 6-8: Barriers to implementation of BIM by nature of business ....................................................... 155
Table 6-9: Total variance explained ................................................................................................. 156
Table 6-10: Component matrix ........................................................................................................ 157
Table 6-11: Coefficients ................................................................................................................. 158
Table 6-12: Coefficientsa ................................................................................................................ 160
Table 6-13: Factor analysis ............................................................................................................ 161
Table 6-14: Participant information ................................................................................................. 167
Table 7-1: SSIM .......................................................................................................................... 200
Table 7-2: Initial RM..................................................................................................................... 202
Table 7-3: Partition of RM: interaction 1 .......................................................................................... 203
Table 7-4: Partition of RM: interaction 2 .......................................................................................... 204
Table 7-5: Partition of RM: interaction 3 .......................................................................................... 204
Table 7-6: Partition of RM: interaction 4 .......................................................................................... 205
Table 7-7: Partition of RM: interaction 5 .......................................................................................... 205
Table 7-8: Partition of RM: interaction 6 .......................................................................................... 206
Table 7-9: Partition of RM: interaction 7 .......................................................................................... 206
Table 7-10: Partition of RM: interaction 8 ........................................................................................ 206
Table 7-11: Partition of RM: interaction 9 ........................................................................................ 207
Table 7-12: Partition of RM: interaction 10 ....................................................................................... 207
Table 7-13: Partition of RM: interaction 11 ....................................................................................... 207
Table 7-14: Partition of RM: interaction 12 ....................................................................................... 207
Table 7-15: Driving power and dependent power for elements .............................................................. 212

List of Figures

Figure 1-1:KSA map ......................................................................................................................... 2


Figure 1-2:Oil production as a percentage of world total as of 2009 (Euromonitor International from BP Statistical
Review of World Energy) ................................................................................................................... 3
Figure 2-1: Non-Saudi workers in KSA ............................................................................................... 17
Figure 2-2:Accident data for the US construction industry ..................................................................... 22

IX
List of Figures

Figure 2-3: Worker injuries in construction, trade and manufacturing in KSA ............................................ 22
Figure 2-4:Bandura’s theory (1986)................................................................................................... 32
Figure 3-1: On-site information management tools ............................................................................... 44
Figure 3-2: Use and desired use of smart phone features among all mobile users........................................ 45
Figure 3-3: Capital expenditure across a selection of industries .............................................................. 46
Figure 3-4: Mobile-enabled products and services in the developing world ............................................... 47
Figure 3-5: BIM life cycle ................................................................................................................ 49
Figure 3-6: Benefits of BIM .............................................................................................................. 52
Figure 3-7: BIM showing all utilities .................................................................................................. 56
Figure 3-8: Hennesy Centre safety and site logistics planning ................................................................. 62
Figure 3-9: Visualisation of hazard identification using worker avatar ..................................................... 63
Figure 4-1: Organisation level H&S framework ................................................................................... 67
Figure 4-2: Project level H&S framework ........................................................................................... 68
Figure 4-3: BIM and H&S in the Construction Industry ......................................................................... 78
Figure 5-1:Research Process Onion ................................................................................................... 86
Figure 5-2: Research philosophy ....................................................................................................... 91
Figure 5-3: Research choices ............................................................................................................ 92
Figure 5-4: Questionnaire sections .................................................................................................. 104
Figure 5-5: Number of responses from different approaches ................................................................. 113
Figure 5-6: Response rate curve ...................................................................................................... 114
Figure 5-7: Responses from different groups ...................................................................................... 114
Figure 6-1: Awareness of KSA H&S policies...................................................................................... 121
Figure 6-2: Size of construction companies ....................................................................................... 121
Figure 6-3: Nature of business ........................................................................................................ 122
Figure 6-4: Kind of project ............................................................................................................. 123
Figure 6-5: Years of experience....................................................................................................... 123
Figure 6-6: Experience of a H&S accident ........................................................................................ 123
Figure 6-7: Frequency of H&S safety issues ...................................................................................... 124
Figure 6-8: Common H&S hazards .................................................................................................. 125
Figure 6-9: Use of H&S ................................................................................................................. 126
Figure 6-10: Current H&S practices ................................................................................................ 127
Figure 6-11: Provide H&S training .................................................................................................. 130
Figure 6-12: Factors considered responsible for H&S issues ................................................................ 131
Figure 6-13: Safety training – most effective method ........................................................................... 132
Figure 6-14: Organisations preparing formal risk assessment ............................................................... 134
Figure 6-15: Organisations using BIM ............................................................................................. 134
Figure 6-16: Use of BIM technology among AEC ............................................................................... 135
Figure 6-17: Current understanding and knowledge of BIM ................................................................. 136
Figure 6-18: Familiarity with BIM brands......................................................................................... 136
Figure 6-19: Do you consider BIM an important tool for site induction? ................................................. 137
Figure 6-20: Integration of BIM into building regulation to the management of H&S ................................ 138
Figure 6-21: Benefits of implementation of BIM in management of H&S ................................................. 138
Figure 6-22: Barriers to BIM implementation in management of H&S .................................................... 139
Figure 6-23: Size of organisation by nature of business ....................................................................... 140
Figure 6-24: Sector of work by size of organisation ............................................................................. 141
Figure 6-25: Years of experience by nature of business ........................................................................ 141
Figure 6-26: Frequency of H&S issues by nature of business ................................................................ 142
Figure 6-27: Use of BIM by nature of business ................................................................................... 143
Figure 6-28: Understanding of BIM by size of organisation .................................................................. 143
Figure 6-29:Nature of business by frequency of H&S issues .................................................................. 153
Figure 6-30: Factor analysis screen plot ........................................................................................... 157
Figure 6-31:Relationship between qualitative themes .......................................................................... 181
Figure 7-1:H&S framework ............................................................................................................ 208
Figure 7-2: Classification factors .................................................................................................... 213

X
List of Figures

XI
Acronyms and Abbreviations

Acronyms and Abbreviations

2D Two Dimensional
3D Three Dimensional
4D Four Dimensional
BCIM Building Construction Information Model
BIM Building Information Modelling
CAD Computer-aided Design
DBB Design-bid-build model
ECTP European Construction Technology Platform
GCC Corporation Council for the Arab States of the Gulf
GOSI General Organisation for Social Insurance in Saudi Arabia
H&S Health and Safety
ICT Information and Communication Technology
ILO International Labour Organisation
ISM Interpretive Structural Modelling
KPI Key Performance Indicators
KSA Kingdom of Saudi Arabia
OOMT Objective oriented Modelling Technology
OPEC Organisation of the Petroleum Exporting Countries
OSHA Occupational Safety and Health Administration
PPE Personal Protective Equipment
RFID Radio Frequency Identification
RQ1 Research Question 1
SPSS Statistical Package for the Social Sciences
SSIM Structural Self-Interaction Matrix

XII
Introduction

Chapter 1. Introduction

1.1 Introduction

This chapter provides a discussion of the research gap relating to the context of health and safety
(H&S) barriers in the public sector construction industry in the Kingdom of Saudi Arabia
(KSA), as well as an analysis of related variables and considerations. A detailed literature
review is introduced to link all the factors at play in a complex and perhaps interdependent
series of problems and issues that may be discovered and explored in the construction industry
in KSA. A background investigation is used to identify gaps in the literature, from which the
research design is developed and presented, including the aims, objectives, research questions,
data collection and analysis methodologies. The thesis structure is then presented.

1.2 Research Background

The geographic focus of this study is KSA, which is the second largest Arab country (after
Algeria) and the largest in the Arabian Peninsula, with an area of 2,150,000 km2, about one-
quarter the size of the USA (World Factbook, 2016; see Figure 1-1). Originally part of the
Ottoman Empire, KSA has eastern boundaries on the Arabian Gulf and western boundaries on
the Red Sea coast. To the north it is bordered by Iraq, Jordan and Kuwait and to the south by
Yemen, Oman and the United Arab Emirates. Qatar and Bahrain border the country to the east.
Of the country’s 28.83 million residents, 8 million are migrant workers, many of whom are from
the developed world and are managers of global companies, but the majority are labourers from
developing countries, particularly India and Pakistan. The KSA capital, Riyadh, lies on the
central plateau and its second largest city is Jeddah, located on the Red Sea coast. It is primarily
and geologically a desert environment, with three major deserts connected to the Sahara. The
Rub’al Khali Desert—which translates as “the empty quarter” – is the largest continuous body
of sand in the world, occupying the majority of the southeast of the country (World Factbook,
2016).

Historically, KSA was made up of several original tribal settlements and regions, two of which,
Hejaz on the east coast and the most densely populated region, and Nejd on the central plateau

1
Introduction

Figure 1-1:KSA map

and largely nomadic, were taken control of by the Saud dynasty in 1932, who were then declared
monarchs (Saudi Embassy, 2016). KSA was, at this time, one of the poorest countries in the
world and many of the inhabitants, particularly in the southeast, were nomadic and involved in
inter-tribal and familial conflicts. However, in 1938, oil was discovered in the largely
uninhabited desert region of the south and east, giving revenue not only to the newly established
KSA but also to the countries bordering it. KSA is now the largest petroleum exporter in the
world and holds 18% of global petroleum reserves (OPEC, 2013), making it one of the fastest-
growing economies in the Middle East region (see Figure 1-2).

2
Introduction

Figure 1-2:Oil production as a percentage of world total as of 2009 (Euromonitor International from
BP Statistical Review of World Energy)

1.3 Key H&S Challenges in KSA Construction Industry

The construction industry in KSA is plagued by safety related accidents, ranging from minor
trauma to major injuries and death (Alhaadir & Panuwatwanich, 2011). As of 2011, 3.5 million
individuals were employed in the private sector construction workforce, accounting for 45.1%
of the total construction workforce (Saudi Arabian Monetary Agency, 2013); this indicates that
about 55% of KSA construction workforce are employed in the public sector. However, there
is a lack of regulatory measures taken by government agencies to ensure construction safety in
KSA (Alhaadir & Panuwatwanich, 2011). Accidents could have been prevented merely by
implementing and following common safety policies and procedures. This lack of regulation,
coupled with poor safety related training, leads to a high number of accidents (Alhaadir &
Panuwatwanich, 2011).

As highlighted by Haupt and Smallwood (1999), actions and guidelines followed to decrease
construction H&S hazards within developing countries are characteristically unsatisfactory. In
the context of KSA as a developing country, there has been a growing trend for the provision
of safe working settings. Despite this, KSA is still found lacking in aspects of H&S in the
construction industry. While it is known that this industry is particularly dangerous and that
accidents may occur in it, it is also known that there are safety precautions that can be taken to

3
Introduction

reduce the number of deaths and injuries occurring on construction sites. In KSA, 51% of all
workplace accidents occur within the construction industry, a significant percentage for a single
industry (Hamalainen & Saarela, 2006). The exact number of construction related injuries is
difficult to ascertain for KSA, in that many injuries are not reported (Hamalainen & Saarela,
2006). This is often a consequence of poor enforcement and lack of regulations, as referenced
above.

An examination of the literature indicates a prevalence of similar adverse H&S trends in


construction industries across the world (e.g. Lingard & Rowlinson, 2005). According to the
International Labour Organisation (ILO) statistics, an estimated 25%-40% of deaths in
international occupational environments occur in the construction sector (ILO, 2005). Arndt et
al. (2009) argue that in recent years, even though working conditions have been enhanced in a
number of developed countries, some operations are still linked to a high risk of physical harm
because of the physical tasks associated with the sector, such as lifting and carrying of heavy
items and uncomfortable work positions, as well as the environment in which construction
industry work is carried out; these include noisy conditions, vibration, dusty environments and
weather impacts. Thus, the combination of physical labour and the hazardous environment in
which it is performed likely contributes to workers’ deteriorating health and lack of safety.
Hence, It is clear that the construction industry in general could be described as hazardous.

There are established international guidelines, representing consensus on H&S in construction,


which include a common set of regulations, requirements and other considerations in the area
of H&S. Many international human rights documents also address H&S. For instance, ILO
identifies the most basic but necessary guidance to all nations in regard to H&S in the
construction sector (ILO, 1992):

Regulation 2.1.1: The competent authorities should, on the basis of an


assessment of the safety and health hazards involved and in consultation with the
most representative organisation of employers and workers, adopt and maintain
in force national laws or regulations to ensure the safety and health of workers
employed in construction projects and to protect persons at, or in the vicinity of,
a construction site from all risks which may arise from such site.

4
Introduction

Regulation 2.1.2: The national laws and regulations adopted in pursuance of


paragraph 2.1.1 above should provide for their practical application through
technical standards or codes of practice, or by other appropriate methods
consistent with national conditions and practices.

Regulation 2.1.3: In giving effect to paragraphs 2.1.1 and 2.1.2 above, each
competent authority should have due regard to the relevant standards adopted by
recognised international organisations in the field of standardisation (p. 5).

The essential components of H&S provisions on construction sites are, therefore, summarised
as being guided by: 1) regulation in an awareness of hazard; 2) having a code of practice or
technical standards established by law; and 3) provisions that are internationally applicable and
adopted. The most important issue here is that they should be standardised within and across
countries. All H&S practices throughout the world should be the result of international
consensus as to exactly what standards should be adopted.

In the UK, H&S principles are enforced by the Health and Safety Executive (HSE), and its
guiding principle for regulation is that those who create hazards are best placed to control them
(HSE, 2013). This guidance emphasises a very simple understanding that risk management
should be internally controlled by those aware of the risks a process creates and that if self-
management were conducted responsibly through the industry, there would be no need for
external intervention. It also contains the important factor that there should be a degree of trust
towards the leaders of enterprises. In the USA, attention has recently been directed, as it has in
many countries, to the establishment of a safety climate or a safety culture. This is, above all,
built on the issues of communication throughout the industry, emphasising that documentation
and information should be disseminated continually through signage and technology, as
prescribed by internal H&S policies.

The organisation of safety procedures should start at the very top echelon of the industry with
a top-down approach to management, but should include total and continual consultation with
the workforce; and responsibility and accountability should be built in to all processes
(Baxendale & Jones, 2000; Abudayyeh et al., 2006; Anton, 1989; Ng et al., 2005; Chaudhry et

5
Introduction

al., 2007). Safety culture – “shared beliefs, practices and attitudes that exist at an establishment”
(Department of Labor, 2016) – is above all a training culture, but training should have rewards
for those who learn best and operationalise what they have learned. Finally, safety culture
emphasises that safety is an omnipresent concern held by all actors and in all departments.
Zhang et al. (2002) summarise the above in their definition of ‘safety culture’:

The enduring value and priority placed on worker and public safety by everyone in every
group at every level of an organisation. It refers to the extent to which individuals and
groups will commit to personal responsibility for safety; act to preserve, enhance and
communicate safety concerns; strive to actively learn, adapt and modify (both individual
and organisational) behaviour based on lessons learned from mistakes; and be rewarded
in a manner consistent with these values. (Zhang et al. 2002, p. 3).

According to the USA Department of Labor (2016), there are sixteen attributes of building a
strong safety culture to promote H&S in the workplace: 1) obtaining the buy-in of top
management; 2) promoting continuous buy-in; 3) building trust; 4) conducting self-assessments
using benchmarks; 5) providing initial training; 6) establishing a safety steering committee; 7)
developing site-specific safety visions; 8) aligning the organisation to the safety vision; 9)
defining and assigning specific roles; 10) developing an accountability system; 11) develop a
safety measures system; 12) developing policies for rewards and recognition; 13) conducting
awareness training, including a kick-off; 14) implementing process change, 15) continuously
measuring, communicating and celebrating successes; and 16) providing on-going compliance
support. These broad guidelines are suitable across all industries and countries, but given the
high rate of injuries in the construction sector, are particularly needed to promote H&S in
construction.

These sixteen attributes are listed to demonstrate the principal features of a well-organised
company, tuned into a safety culture. However, it should be understood that in order for this to
happen, external impositions of formal regulation might not be necessary. On the other hand,
where an industry is unregulated or has regulations that are rarely applied, especially where
there exists a multitude of beliefs and cultures in general, accidents are more likely. This very
much describes the position in public construction sites in KSA, where multicultural and

6
Introduction

multilinguistic migrant workers with a low socioeconomic and educational level might not
understand “the extent to which individuals and groups will commit to personal responsibility
for safety”. In this case, along with other Arabian Gulf countries, the employment of these
labourers, often uneducated and from poor rural communities in South Asia, working on
temporary worksites might pose a challenge to the theory that within a company or an industry
all employees can cooperatively create a safety culture in the construction industry. Safety
considerations may be more of a priority for native employees in a more developed country, as
these workers have a greater awareness of their contribution to the process, seek and can be
offered promotion in a stable location, and are able to take up offers of training and welcome
communicative approaches.

1.4 Research Rationale

The extant literature presents four issues relating to H&S in the construction industry in KSA:
1) the need to develop a performance measurement approach suited to the Saudi environment;
2) the need to understand better the perception of Saudi contractors; 3) the need for investigation
into the potential of advanced information communication technology (ICT) in improving
construction safety practices within KSA; and 4) the impact of advanced Building Information
Modelling (BIM) tools to enhance construction H&S in the Saudi context needing further
investigation. These four components are considered integral to improvement of H&S factors
in the Saudi construction industry and, as so, are used to outline the research problem presented
herein.

1.5 Research Questions

This research study is being undertaken to answer the following fundamental research questions
relating to the overarching research problem of assessing the contextual phenomenon of H&S
practices, including barriers to implementation, in KSA:

 What are the best practices in terms of H&S management in a broader context?
 What are the current practices in H&S in KSA construction sector? How do these
practices compare to the best practices established in RQ1?

7
Introduction

 What are the existing challenges in construction H&S performance management,


according to public sector construction contractors in KSA?
 How is BIM currently used? How can BIM enhance the continuous improvement of
H&S on construction sites?
 What are the key challenges in terms of BIM adoption for H&S within KSA context?

Using these research questions to develop the research design has provided the guide necessary
to evaluate the safety concerns within the Saudi construction industry and allow for policy
recommendations for the industry in terms of lowering H&S risks associated with it.

1.6 Research Aims and Objectives

The aim of this research is to look to enhance H&S management in Saudi public sector
construction projects by exploring integrated approaches to project design and delivery using
BIM-based technologies and processes. As such, the research objectives are:

 To explore the existing practice of H&S in public sector construction projects in KSA
 To identify the relationship between BIM and H&S in construction
 To develop an integrated framework for using BIM in construction to address safety
issues in contractor organisations
 To test, evaluate and validate the framework developed through expert feedback
 To provide recommendations on best practice for H&S in public sector construction
projects in KSA

1.7 Outline Research Methodology

The research design, developed from the research problem as presented in Section 1.3, dictated
the methods used to collect data and answer the research questions, as well as to clarify the key
steps in the research processes (Table 1-1). This study employs a mixed method study approach,
combining aspects of both qualitative and quantitative data collection and analysis. Mixed
method approaches “permit a more complete and synergistic utilisation of data than doing
separate quantitative and qualitative data collection and analysis” (Wisdom & Creswell, 2013).

8
Introduction

Data will be collected through questionnaires and interviews conducted with those working
within the Saudi construction industry.

The research focused on KSA contracting organisations that are engaged in public sector
construction projects and examined surely you mean “a sample of their employees in several
major construction organisations. Specifically, the sample was selected from those contractor
firms that are classified in the first or second category for buildings and roads, according to the
contractor classification in the Saudi Ministry of Municipal and Rural Affairs (MOMRA 2014).

9
Table 1-1: Summary of key research objectives, research questions and outline methods

(Validation
Literature

Interview

Interview
Objectives Research Questions

Survey
review

)
 To explore the existing practice of H&S  What is best practice in terms of H&S
in the public sector construction projects within management?
KSA.  What are the current practices in H&S in KSA
construction sector? How do these practices compare to
the best practices established in RQ1?
S P P
 What are the current practices in H&S in KSA
construction sites?
 What are the existing challenges in construction
safety and health performance management, according to
public sector construction contractors in KSA?
 To identify the relationship between  How can BIM enhance the continuous
BIM and H&S in construction. improvement of H&S on construction sites?
 What are key challenges in terms of BIM S P S
adoption for H&S within KSA context?

 To develop the integrated framework for


using BIM in construction and address safety
issues in contractor organisations.
 To validate the framework for using  How benefits of construction safety framework
BIM in construction to address safety issues in are perceived by Saudi contractors? P
contractor organisations.
 To provide recommendations for best
practice in public sector construction projects
within KSA
S Secondary data P Primary data
Introduction

1.8 Organisation of Thesis

Chapter 1 In this chapter, the research background, rationale, aims and objectives, and key
research questions are provided, along with a brief outline of the research methodology. In
addition, an overview of KSA is given with specific reference to its construction industry. A
number of challenges encountered by construction workers within KSA are identified and the
rationale behind this research is explained.

Chapter 2 introduces the literature that is relevant to the study, focusing on a review of H&S
management practices within KSA.

Chapter 3 examines the literature relating to BIM in the construction industry in developed
countries, as well as the relationship between BIM and H&S in construction. The chapter
highlights the use of visualisation to promote identification of hazards in the design phase and
eventual construction, including the tools used, to enhance H&S, particularly in KSA. The
majority of the literature is examined in terms of the use of key performance indicators (KPI)
and this concept are explored in greater depth within the literature review. Chapter 4 the finding
from chapter 2&3.

Chapter 5 discuses aspects pertaining to the philosophy of methodology, and the paradigms and
theoretical approaches considered for this study. Moreover, this chapter examines the methods
of data collection and analysis employed to address the research questions; it also explains the
rationale for choosing a mixed methods approach that collects both interview and survey
questionnaire data. It explores sampling decisions, ethical considerations and an overview of
how the methods are operationalised.

Chapter 5. Quantitative and Qualitative

First, Chapter 5 presents the results of the quantitative analysis performed on the data obtained
from the questionnaires, which is expressed in statistics and illustrated by graphics. Second, the
results of the qualitative data analysis are presented, in a narrative form that interprets the
emergent themes drawn from verbatim interview transcripts. The latter include supporting
extracts from the questionnaires to elucidate findings. Finally, as is the pattern of mixed

11
Introduction

methodology, the two sets of analyses are considered collectively in addressing the research
questions.

Chapter 7. Develop ISM Framework for KSA Construction Industry

Chapter 7 focuses on the development of a framework for enhancing H&S in the public
construction sector in KSA. In this section, the rationale for framework development is
examined with reference to the literature review and through results obtained from the
questionnaire survey and interviews. Crucially, the study takes account of the contributions to
this framework that could be made by BIM technology. The framework was built by using by
ISM to support the evaluation of H&S measures in the construction industry.

The discussion of results creates the possibility of a framework built by ISM for construction
projects to enhance the current H&S practices by means of a sustainable technology-driven
system developed through industry consensus.

Chapter 8. Discussion, Conclusions and Recommendations

The final chapter interprets the data by seeking aspects of both sets of data that support each
other and those that fail to do so within the overarching context. Building from this secondary
analysis, this chapter discusses the emergence of a possible framework for creating a basis for
a consensual agreement regarding the ability of the Saudi construction industry to restructure
its practices. A special focus is given to agreements that exist regarding the adoption of new
technology, particularly BIM and its perceived contribution to H&S practices. The conclusions
and recommendations offer insight to H&S practices and advance the current state of knowledge
relating to the construction industry in KSA. This chapter presents and discusses the
considerations of validity and integrity in the study. It also includes a discussion on reliability
and offers details on how the study uses the concept of triangulation to demonstrate its findings.
Moreover, the concept of “transferability” is explored as an alternative to generalisability. The
limitations of the study are also noted and discussed critically, with suggestions for further
study. Finally, the contribution of this study to existing knowledge and projections of practical
applications is recorded.

12
Introduction

1.9 Summary

This chapter has set out the background to the research, justified the rationale for the thesis and
presented the research aim, objectives and questions. In addition, the research strategy has also
been introduced. The next two chapters review the literature relevant to the general construction
industry in KSA, construction specific-literature in H&S and the possible role of technology in
advising, enhancing and permitting development H&S in construction in KSA.

13
Literature Review of H&S Management Practices in KSA

Chapter 2. Literature Review of H&S Management Practices in KSA

2.1 Introduction

This chapter discusses the strong economic position of KSA, which drives the construction
industry, focusing on the current status of that industry and the issues that affect its projects. In
this chapter, previous research is reviewed as it pertains to H&S in construction management in
general and H&S in KSA in particular. Both positive and negative aspects of H&S within the
construction industry are presented. In addition, this chapter presents a discussion of the
importance of communication and personal behaviour on construction work sites, as these relate
directly to an employee’s ability to remain safe and follow H&S regulations.

2.2 Search Strategy and Method

The main aim in carrying out the literature reviews is to gather information on the research
topic. As will be mentioned in the references at the end of the dissertation, the principal sources
are journal papers, seminar and conference articles, as well as archive material and
governmental reports. The study begins with a detailed literature review. The nature and
rationale of the Saudi Arabian construction industry is discussed, focusing firstly on its nature,
scope and composition, and regulation and bureaucracy, as well as the activities involved in the
workplace worldwide. The specific and unique challenges posed in KSA are examined. After
investigating the scope, meaning and adoption of H&S precautions and regulations by countries
in the developed and developing world, the literature review moves on to discuss possible
documented challenges to H&S matters in construction management practices within KSA. It
is hoped that the research questions develop through a rigorous examination of the literature
and that these can also inform methodology chosen for the study.

2.2.1 Research databases

The main databases chosen were Science Direct, Google Scholar and university online library.
This is because of their very wide range of searchable data in the construction field, as well as
in other areas like H&S in construction and BIM, which could perhaps have some bearing on
the subject of the review. The terms “health and safety” and “BIM” were also accessed. It was

14
Literature Review of H&S Management Practices in KSA

discovered that the journals referenced in these databases were available through the university.
There was also considerable crossover between many online resources.

The bibliographic software chosen was Mendeley. One reason for this choice is that it allows
direct export from the resources that were saved in the Mendeley account. Data can be exported
as “abstract plus references”, so that the abstract can be read easily through accessing the
references. Another advantage of using bibliographic software such as this is that it saves
considerable time and permits far more extensive searches. Using Mendeley enables “hand-
searching” through certain journals, for providing that these exist in electronic form, the journal
itself can be searched electronically. Further, in contrast to the traditional method of preparing
a list of likely titles, then accessing the abstracts of some of them and finally choosing a
collection of abstracts, which process requires a full text version, the first two stages in a
traditional search are bypassed. These electronic data were supported by inter-library loans and
books borrowed and bought.

2.3 KSA and its Construction Industry

KSA is among the fastest-developing Arabian countries in the Middle East. It is the world’s
largest oil exporter; therefore, its economy is growing day by day and the country is developing
every industry, especially construction, in order to house, educate and provide for its population.
Since 1970, KSA has established and implemented both medium- and long-term development
plans to foster economic and population growth (Al-Farsy, 1990). Its medium-term plans are
segmented into five-year-plans, the ninth of which has recently ended (Al-Farsy, 1990). The
long-term aim is to reduce the nation’s reliance on its oil revenues and to build infrastructures
that will diversify trade and provide options for economic, technological and educational
enhancement. One major feature of current plans is the development of a high level of these
programmes. As the population grows, due in part to immigration by foreign nationals who now
form 30% of the population (Alhaadir & Panuwatwanich, 2011), the government is focusing on
a large number of local and international construction companies that are engaged in the
building of various new housing projects. Along with this remarkable economic growth, there
is also the establishment of six economic and industrial cities across the country, new transport
links and the building of schools and hospitals to support and extend the economic growth of a

15
Literature Review of H&S Management Practices in KSA

non-oil economy. The Saudi government is committed to major spending on the public
construction sector, with investments of up to $91.9 billion from 2012 to 2014. In addition,
$16.5 billion has been spent to have the transport network in Mecca renewed and improved
(GCC Powers of Construction, 2013).

2.3.1 Construction projects and their organisation in KSA

There are both public and private construction projects currently under tender or in the design
or build phase. Public building projects account for over 60% of all building in the country
(Bubshait & Al‐Musaid, 1992). This study focuses on the public sector of the construction
industry only. The country employs a design-bid-build model (DBB). Major projects can be
designed by large, often multinational, design and engineering companies, then the drawings,
specifications and quantity surveys are sent out to a number of contractors, usually in computer
aided design (CAD) format which is two-dimensional (2D) or three-dimensional (3D).
Contractors, if their classification allows it, bid for the work. Contractors are classified by the
Ministry of Public Works and Housing into differently numbered groups based mainly on their
financial capability. A classification of ‘1’ represents those allowed to undertake the largest
projects that could be offered – any building contracts in excess of USD74.66M – but a grade-
5 company is limited to projects no higher in allocation than USD1.86M. (Al-Khalil & Al-
Ghafly). The classification system also subdivides construction works into 12 categories,
depending on the size of the project and its importance. The figures quoted above are for
building construction but are different for all types of construction work. In KSA, regulations
demand that the lowest bid is accepted and secures the contract (Shash & Abdul-Hadi, 1992).
Then the project enters a construction phase, generally employing a variety of subcontractors.
The bureaucratic issues surrounding the DBB process will, at this point, add another
governmental ministry to the complexities involving building projects in KSA. The Ministry of
Labour is the next route the contractors must navigate through.

The Ministry of Labour is the regulatory body that rules on who can work on construction
projects. As discussed later in this chapter, for its labour-intensive civil constructions KSA tends
to rely on migrants mostly from the South Asian continent (see Figure 2-1). These labourers are

16
Literature Review of H&S Management Practices in KSA

from rural communities suffering serious socio-economic deprivation. They are usually
educated to a basic level only and many are barely literate.

NON-SAUDI WORKERS IN SAUDI ARABIA


number of workers
2400000

1500000

1500000

1500000

1500000

1000000

900000
750000

670000

550000
450000

275000

160000
Figure 2-1: Non-Saudi workers in KSA
(Source: de Bel-Air, 2013)

They are employed on short-term contracts of three years or less and leave families behind in
their own countries to take on this work that supports them. A recent review study by Salminen
(2011) finds that immigrant workers, in a multi-country study, suffer disproportionately more
injuries than native workers for the first five years of their tenure. After that, their accident rate
drops and can be even more positive than expected and better in some cases than for native
workers. One of the findings of that study was that immigrant workers appeared to be placed in
the riskiest jobs (Lee & Wrench, 1980).

The Ministry of Labour has an additional responsibility that runs alongside the issue of visas to
migrant workers. It is the issue of “Saudisation”. This policy (named Nitaqat), to support
unemployed Saudi nationals to find employment, is said to place certain additional, quota-based
demands on the private sector both of construction and other industries (Hertog, 2014). KSA
has a particular unemployment problem with young people. The under 25s now compose over
50% of the population (de Bel-Air, 2013). If a work culture is embraced by these young adults
and suitable employment becomes available, that will place KSA in a demographically positive
position in comparison with developed countries and China, which is experiencing problems of

17
Literature Review of H&S Management Practices in KSA

the opposite kind, namely, that the elderly and retired, those who contribute least to the national
economy, are becoming the highest proportion of the population.

2.4 Construction Challenges in both Developed and Developing Countries

The construction industry, with this complexity of demands and the number of interwoven
responsibilities created through various ministries and contractors, may face challenges. These
include the problems created by the bureaucracy, outlined above, required to navigate through
the construction process. There are two interdependent results of this confusion: delays and
accidents. Delays often lead to unsafe and hurried decision-making and behaviours as
constructors try to make up for lost time. The carelessness resulting from this haste, in turn, can
lead to accidents, which then create further delay. Sidawi (2012) highlights that the Saudi
construction industry is liable to face many shortcomings, including mistakes in construction
work, changes to the project’s scope and specifications, cost overruns and delays. Commonly
cited challenges include factors such as ineffective planning and control, poor site management,
labour productivity, communication and coordination problems, and material procurement. In
all industries that might be regarded as dangerous, statistics reveal that the majority of
workplace deaths and accidents are in the construction industry, well above what might be
expected from the percentage of construction workers in the workforce. Although many of these
problems may be highlighted in KSA, they are counted among challenges to the viability of the
construction industry worldwide. It is believed to be one of the most hazardous globally, despite
a regulatory climate in many developed countries.

2.4.1 Delays and organisational challenges

A detailed analysis of causes of delays in Saudi public sector construction projects was
undertaken by Alkharashi and Skitmore (2009). They drew up the top five reasons for owner
related causes of delays, which included those in revising and approving design documents by
the owner and the owner’s poor communication with the construction parties and government
authorities. In addition, there may be slow decision-making and delays in the progress of
payments by the owner, and delays in finishing and delivering the completed site.

18
Literature Review of H&S Management Practices in KSA

In addition, as revealed in the questionnaires employed by many of the researchers in the Saudi
construction industry field, there appears to be a broad consensus of the importance of active
communication and management to maintain construction processes. Nevertheless, it has also
been highlighted in the literature (Salleh et al., 2012). That issues resulting from the disjointed
nature of construction processes, poor data exchange and interoperability, as well as
overdependence on documents and the written word to guide the workforce. Changes to the
project’s scope and specifications during the construction itself are common but counter-
productive. Also, cost overruns were emergent factors in the results obtained. All factors
constitute challenges to working activities that may lead to delays in project completion.

Worldwide, the construction industry faces similar challenges, and governments are the biggest
clients of the construction industry, as they sponsor huge infrastructure projects, particularly in
developing countries. As identified by Jaselskis et al. (1996), there are several characteristics of
the construction industry in developing countries, including long procedural requirements,
evident in the Saudi Arabian context, interruptions to the work and a shortage of materials. In
addition, Thomas (2002) underlines specific issues encountered by construction industries in
emerging economies, which include failures to use technology, ineffective methods, complex
cultural settings and the absence of regulatory systems. Further, as highlighted in several studies
that pinpointed failed construction projects and delays, are performance related issues and
failings (e.g. Government Construction Strategy, 2011; Ugwa & Haupt, 2007; Navon, 2005;
Karim & Marosszeky, 1999).

One common cause of project delay identified by all project stakeholders is “change orders”.
Also, Alsuliman et al. (2012) observe that variation of order management is not fully understood
nor well applied in the Saudi construction industry. Other factors contributing to project delays,
they claim, include delays in the progress of payments by the owner; and on the part of the
contractor, ineffective planning and scheduling of the project, poor site management and
supervision, shortage of labourers and difficulties in financing the project. Also, all three parties
agree that the following factors are the least important cause of delays: “changes in government
regulations and laws, traffic control and restrictions at job site, effect of social and cultural
factors and accidents during construction” (Assaf & Al-Hejji, 2006, P365).

19
Literature Review of H&S Management Practices in KSA

Al-Khahil and Al-Ghafly (1999) conducted a survey in the Saudi Arabian construction industry
with questionnaires about delays in building projects sent to owners, engineers and contractors.
The frequency of delays ranged from 16% in grade-2 companies surveyed to 56% in
classification grade 4. The authors conclude that factors causing delay were principally cash
flow problems and difficulties in obtaining work permits, but an important part of the discussion
of results was: “… the government practice of assigning contracts to the lowest bidder without
regards to qualification. The lowest bidder may not be able to work with the increased project
complexity, or the increased demand on management expertise for large public utility projects”
(Al-Khahil and Al-Ghafly 1999, P 102).

A similar conclusion on a major element in the KSA’s record of construction delays is reflected
in the study undertaken by Albogamy et al. (2012), which concludes that “low performance of
the lowest bidder contractor in the KSA government tendering system” was the most important
factor in construction delays. Kartam et al. (1998) point to similar problems in Kuwait that
concentrated, above all, on the safety of construction sites. Administration and organisation
were poor, construction companies were often too small and, being subject to competitive
tendering, had limited profit margins and, therefore, by-passed some responsibilities that might
impact on cost effectiveness. This report reflects many of the concerns that occupy researchers
in KSA.

This conclusion is important in developing aspects of the research questions in the current study,
as it shows up a major problem in the DBB model that is widely used in the construction industry
worldwide. Interestingly, too, this study cited “delay in preparation of shop drawings” and
“design changes by the owner” as other delaying factors (Albogamy et al., 2012). The issues of
design changes and “preparation of shop drawings” are discussed later in this chapter, which
now moves to examining the challenges provided by the environment of construction sites.

2.4.2 Environment, hazards and injuries

The environment includes the workplace, where people perform their duties; and a construction
site is considered a very dangerous workplace, where the ratio of hazards is always at its peak.
Different hazards, including physical and psychological hazards, can be experienced at

20
Literature Review of H&S Management Practices in KSA

construction sites. Physical hazards are almost unavoidable when it comes to working in fields
such as construction and mining. However, with the passing of time, people have developed
different methods to prevent as well as manage these hazards. A major reason for physical
hazards is the employment of younger workers and the unskilled because often they cannot
handle critical situations or lift heavy materials safely. The major causes of accidents are related
to the unique nature of the industry, human behaviour, difficult work-site conditions and poor
safety management (Jannadi et al., 2002).

Even in developed countries, deaths and accidents occur in the construction industry. Davies
and Tomasin (1996) state that there are many reasons why the rate of accidents in the
construction industry is higher than expected, compared to accidents and injuries in other
manufacturing industries. According to Zhang et al. (2013), the last two decades have seen more
than 26,000 employees in the USA lose their lives in construction projects, which is equivalent
to five people per day. There was an average of 1,089 deaths annually in the American
construction industry between 1992 and 2012. During the same time period, the construction
industry suffered an average of approximately 19% of all workplace related deaths, as shown
in Figure 2-2 (Bureau of Labor Statistics, n.d.). These statistics make construction one of the
most dangerous professions in the USA and it is consistently in the top five most dangerous
professions in terms of deaths per capita. Moreover, 120 people died on construction sites in the
UK, one of the safest and best-regulated construction industries in the world, while about 3,000
site workers experienced severe accidents on construction sites (Barnard, 1995).

It is suggested in some research studies that there are several different factors for high injury
rates within the Saudi construction sector, including the fact that the majority of these H&S
related incidents were brought about by a considerable lack of governmental H&S management.
Another factor that contributes to the high injury rates is that most of the work (95%) is carried
out by migrants and expatriates, who are likely under-experienced and under-trained (Alasamri
et al., 2012; Jannadi & Assaf, 1998; Al Haadir & Panuwatwanich, 2011).

21
Literature Review of H&S Management Practices in KSA

Figure 2-2:Accident data for the US construction industry


(Source: Bureau of Labor Statistics, n.d.)

In developing countries such as Saudi Arabia, as recorded by the General Organization for
Social Insurance (2010, 2011), worker injuries in the construction sector is the highest amongst
the compared sectors, topping at almost 60% (GOSI,2010-2011)(see Figure 2-3).

Construction Trade Manufacturing


36.367

19.385
11.921

Number of Injuries

Figure 2-3: Worker injuries in construction, trade and manufacturing in KSA


(Source: GOSI, 2011)

22
Literature Review of H&S Management Practices in KSA

Several studies have been conducted over decades to identify further the different general causes
of accidents on construction sites. While some studies share similar views on certain causes of
accidents, some views differ completely. According to Wolf and Brick (1996), accidents occur
due to poor project design, poor choice of materials, unsuitable equipment, poorly organised
workplace, poor coordination of workers, simultaneous activities, poor training, non-
observance of regulations and non-compliance with safety regulations. Similarly, Sawacha et
al. (1999) suggest that the poor safety performance of the construction industry is due to a lack
of knowledge, poor training, lack of supervision, lack of means to carry out the task safely,
errors of judgment, carelessness, lack of concern and recklessness. They also cite the nature of
the construction industry, the lack of a controlled working environment, the complexity and
diversity of the organisations, unsafe behaviour, poor safety culture and poor management
action. Nevertheless, the study by Bashir (2013) views the low level of education and lack of
adequate safety training of workers as the main contributory factors. Ndekugri and Corbett
(2004) further identify the fragmented nature of the industry as one of the causes of poor safety
performance.

Machines commonly used in various industries, such as manufacturing, agriculture, mining and,
more specifically, construction, can be very harmful to workers if not operated properly. Some
machines consist of moving parts, hot surfaces and sharp edges that are a necessary part of the
machine but dangerous to workers, thousands of whom have lost limbs (Fang et al., 2004). In
2008, the USA Bureau of Labor Statistics reported 64,170 injuries caused by machines whereby
the operative remained absent from work for many days. Over 25% of cases required more than
a month’s recuperation at home or hospital. In the same year, more than 600 work related deaths
were reported that were directly or indirectly caused by machines (USA Bureau of Labor
Statistics,2008). H&S is often not taken into consideration when deciding what equipment and
machinery is to be used. High-rise construction projects require workers to climb to the
particular floor that is the current location of operations. It is the duty of the site manager to
choose between a self-climbing machine and a framework climbing system. Each has properties
and benefits, but if any fails to perform as expected and predicted, the lives of workers could be
endangered. It is important to consider all aspects because workers are the main power of any

23
Literature Review of H&S Management Practices in KSA

organisation and must feel safe at work, if the organisation is to be successful (Lin & Mills,
2001).

Globally, hazards include a high number of falls from a height that cause injuries and sometimes
deaths. In Kuwait, construction is the most hazardous industry, with accidents accounting for
48%, 38% and 34% of all disabling injuries and 62%, 38% and 42% of all deaths in 1994, 1995
and 1996, respectively, with falling from a height the main injury (Kartam & Bouz, 1998). A
study of the admission rates for falls in a hospital in Benin, Nigeria, included the statement that
“falls at construction sites and off the top of a moving lorry recorded in this study were not
unconnected with alcohol consumption”. The consumption of alcohol on construction sites is
allowed in Benin. In a study in that country, falls on construction sites from the top of a building
accounted for 9.5% of hospital admissions in a 12-month period in 2007-2008 (Osifo et al.,
2010). Falls are the cause of many serious injuries and deaths. More than half of falls in
construction are related to environmental factors involving, to some extent, the working surface
or facility layout conditions. Inadequate or inappropriate use of fall protection personal
protective equipment (PPE) and removed or inoperative safety equipment contributed to more
than 30% of falls (Huang & Hinze, 2003).

In addition to these, other factors that are associated with accident causation include poor
supervision, poor communication of information, poor training and poor selection of contractors
(Anumba et al., 2004; Hughes & Ferrett, 2008). Kletz (2001) suggests that important causal
agents were a lack of training, motivation, physical or mental ability, and slips and lapses of
concentration. Human actions and functional limitations is the summation of McClay’s (1989)
study of the cause of accidents, while Abdelhamid and Everett (2000) hold management
deficiency responsible. Poor training and workers’ attitudes are cited by Molenaar et al. (2002),
while Toole (2002) places the blame for accidents on problems that could be averted with a
properly managed code of practice and H&S training, He cites a lack of proper training,
inadequate safety equipment and poor enforcement of safety requirements as major causes of
accidents. Management failures are held strongly responsible for accidents and hazards
(Maloney et al., 2004; Fang et al., 2004). Hughes and Ferrett (2004) concentrate on
communication problems, with poorly communicated procedures and poor verbal

24
Literature Review of H&S Management Practices in KSA

communications highlighted; and in the same vein, Donaghy (2009) notes missing or incorrect
signs and attributes blame for this to a lack of knowledge.

In a survey of the safety issues on construction sites in KSA, Jannadi and Assaf (1998) examine
practices at 14 randomly selected sites of projects undertaken by the Saudi Arabian Oil
Company (Saudi Aramco). Results show that larger construction sites pay more attention than
small sites to safety issues. Of the small sites surveyed, none had any means of fire protection,
while on large sites this was also the most neglected area. Smaller sites also showed problems
with health and welfare, and with safety administration. Al-Haadir and Panuwatwanich (2011)
quote Berger’s (2008) results that 25% of construction sites surveyed provided no PPE. In a
similar study to that conducted by Janaddi and Assaf (1998), Kumar and Kumar (2012) report
on construction sites in Sri Lanka:

Usage of personal protective equipment is very minimal. Helmets are not familiar in most
of the sites. Awareness among the workers regarding the usage of PPE is lacking. The
contractor / employer is not providing the PPE to the labourers at their site. In some sites,
even though workers are provided with PPE, workers are not using it properly. For
example, workers are using their helmets for storing and carrying oil (p. 30).

A similar study (Choudhry et al., 2007) examines the safety issues of Hong Kong’s construction
industry, examining, through interviews, the question of why operatives engage in activities on
building sites that are hazardous to their health. One important conclusion reached is that there
are deep psychological reasons for these practices, besides obvious practical problems like lack
of safety training and those that involve self-esteem issues, “acting out”, fears about job security
and performance pressure. Research indicates that in several developing countries, serious
challenges can be posed to the organisation of construction processes that share characteristics
with the construction industry in KSA. Similar studies have been conducted in, for instance,
China (Tam et al., 2004), Thailand (Aksorn & Hadikusumo, 2008), Singapore (Ling, Liu, &
Woo, 2009), India (Vinodkumar & Bhasi, 2010), Taiwan (Cheng et al., 2013), and Nigeria
(Osifo et al., 2010) . While some of these certainly involve elements of administration and
bureaucracy, many involve H&S issues.

25
Literature Review of H&S Management Practices in KSA

This review now touches on the process and performance of H&S in the construction sector,
including an overview of H&S management and recognition of other current management
practices that may have an impact on and led to the establishment of H&S management in the
construction industry. This section concludes by emphasising the issues and gaps in the current
body of research, which has been utilised to explain and shape the course of the study.

2.4.3 Regulation of H&S

H&S in construction has been described by a number of researchers as the carrying out of work
duties and activities following H&S guidelines which are aimed to minimise or remove hazards
in the workplace. For example, Anton (1989) states that the adoption of H&S practices is
decreasing work related injuries in the workplace by regulating working conditions. In addition,
safety culture can impinge on professional behaviour in terms of increasing or decreasing the
hazards faced by businesses. Decision-makers in the industry have favoured H&S programmes,
since they protect workers and can be cost effective in terms of money and time. In the last ten
years, a key aim of construction industry management has been to minimise the number of
people injured, loss of life and sickness as a result of risks in that sector (Choudhry et al., 2007).
As such, H&S is now one of the most important subjects for scholars, as its understandings can
be responsible for avoiding serious threats to health in the workplace.

In developed countries, there is typically a governmental organisation that oversees H&S in the
workplace. This organisation creates the safety standards for all industries, not only the
construction industry. The latter, unsurprisingly, has more safety standards than any other
industry. This organisation, no matter in which country it is located, has responsibility for
ensuring that these safety regulations are met. This is effected through on-site inspections that
are unannounced and through a system of leveraging fines and possible site shut-down if the
regulations are being violated in an extremely dangerous manner (Kohler & Hassler, 2002).
However, the construction industry appears to be specifically hazardous in relation to the
percentage of the workforce employed in the industry. This is why many developed nations
have set up a wide-ranging regulatory body to oversee the industry’s H&S practices.

26
Literature Review of H&S Management Practices in KSA

In the USA, the Occupational Safety and Health Administration (OSHA) oversees workplace
safety in the construction field. This organisation was established in 1970 and provides training
and training documentation, as well as instituting complete policies and regulations that all
construction companies and their employees are expected to follow. OSHA also conducts
unannounced inspections of construction sites to ensure all regulations are being followed. The
majority of these regulations are focused on safety. Companies not following these regulations
can receive fines which are sometimes quite large. They even run the risk of having their entire
construction site shut down as presenting an unsafe environment.

The UK established construction safety and health regulations under the Health and Safety at
Work Act, 1974. One of the most important aspects of this act is that when the regulations are
not followed and there is a serious accident, it is considered a criminal offence. There are
different levels, but the fines imposed can be unlimited. All this is enforced by HSE, which was
set up in 1974 following the above act. A construction division was established in April 2002.
While a company itself can be considered at fault and face the consequences, an individual, a
director, a manager or another person found responsible can be held accountable for their
actions (HSE, 2013). In construction, HSE is also responsible for training and site inspections.
The UK H&S regulations have been modified a little in recent years to allow for an additional
level of input from contractors. The regulations are currently more proactive and cooperative
than they have been for many years.

H&S regulation, requirements and recommendations in these and other developed nations
usually contain most of the following requirements within the remit of a H&S framework:

 H&S guidelines issued through all industries


 Training frameworks established, inspected and examined with designated trade
requirements
 Practice codes established in agreement with professionals and workers in the industry
 An awareness of hazard situations understood and communicated throughout the
workforce
 Regular site inspections carried out though the industry
 Safety equipment made mandatory

27
Literature Review of H&S Management Practices in KSA

 Information and guidance provided by a central trade body


 KPI agreed on, established and integrated into performance assessment
 Regulation, where it applies, can be backed by legislative powers if necessary
 Medical care and first aid supplied on site
 Management-worker communication on all safety issues, including safety notices and
signage, safety warnings, safety meetings, safety equipment supplied, lines of
communication established if emergencies should arise
 Awareness by labourers of the layout and accessibility of the site
 Site kept clear of all hazards
 Training on the operation and maintenance of all machinery by those who might operate
it

H&S situation in developing countries

One of the major reasons behind the high number of incidents and accidents recorded, especially
in the developing world, is a failure to apply stringent regulation of H&S standards. There is, it
is claimed, an absence of H&S management in construction in some developing countries
(Chaudhry et al., 2007). As referred to in previous sections, KSA has a confused and confusing
range of ministerial responsibilities, with little evidence that approved H&S frameworks and
recommendations are enforced on a regular and consistent basis; and there may be a number of
irregularities on H&S grounds, especially in the practice of applying any national guidelines to
H&S regulation on construction sites, particularly in those managed by smaller construction
firms (Jannadi & Assaf, 1998).

In China, H&S is considered a major concern because of the increase in construction projects.
Numerous workers have been subject to injuries and health problems. The National Bureau of
Statistics of China states that of 35 million workers in different industries, about 3,000 workers
are killed in work related accidents each year in the construction field only. In this regard, China
has taken various steps to ensure the safety of workers in the workplace (Kenrick, 2012). It uses
a safety benchmarking approach to evaluate the condition of physical safety at the construction
sites. Now, China uses a ‘standard of construction safety inspection’ to evaluate the safety
conditions on construction sites. If a company is providing H&S protection, the authors claim,

28
Literature Review of H&S Management Practices in KSA

no matter if it is paying less, workers will remain in that that company. Internationally, every
company is currently considering appointing H&S professionals in order to maintain the H&S
of valued workers.

The construction industry is specifically different all over the world and standards are not
uniform. It should be taken into account that the construction industry plays a vital role in the
developing economy of a country. It provides the infrastructure – transport, homes and business
premises – required for other sectors of the economy to flourish. According to Coble and Haupt
(1999), the construction industry reflects the level of economic development within the country.
That sector, like any other, has its own challenges and problems. However, in the case of the
developing economies, problems are more serious due to the vulnerability of the economic and
social environment (Ofori, 2000). The construction industry is also the major source of
employment, as it can employ those with a wide variety of skills, from labour, to semi-skilled,
to skilled and specialised workers. However, research and development in this particular area
is very poor and the training provided to the employees for safety and client satisfaction is
increasing the costs of the industry while reducing the profit margin of the contractor.

As identified by Jaselskis, and Ashley (1991), there are several negative characteristics of the
construction industry in developing countries, including long procedural requirements,
interruptions and shortage of materials, as has been noted in other sections of this review. In
addition, Thomas (2002) underlines specific issues encountered specifically by construction
industries in emerging economies, which include the failure to use technology, ineffective
methods, conflicting cultural settings and the absence of regulatory systems. Also highlighted
in several previous studies when pinpointing failed construction projects are performance
related issues and failings (Government Construction Strategy, 2011; Ugwa & Haupt, 2007;
Navon, 2005; Karim & Marosszeky, 1999). In the case of KSA, there are several construction
developments that fail to deliver in terms of performance. Moreover, current performance
assessment systems are either absent or ineffectual.

The construction industry in developing economies cannot meet the standards of developed
economies; it often fails to meet the needs of the modern competitive business model and does
not provide value to the client (Datta, 2000). Furthermore, the sector has a high rate of accidents,

29
Literature Review of H&S Management Practices in KSA

due to the absence of H&S laws. According to ILO (1987), the main reasons for the poor safety
record in the construction industry of developing countries is the high number of self-employed
workers, the very short life span of construction sites, very high labour turnover and a very high
number of the seasonal and migrant workers.

According to Kim et al. (2013), in construction sites in most developing countries there are no
training programmes for staff and workers; therefore, no orientation for new staff or workers is
conducted, hazards are not pointed out and no safety meetings are held. Employees are left to
learn from their own experience and the mistakes they make. This is very different from the
situation in developed economies. The two main differences between the developing and the
developed economies, as referenced in the previous section, are the developed nations’ strict
laws, regulations and hazard awareness. Furthermore, in those countries, proper training and
H&S equipment are provided to employees. There is a nominated H&S officer who provides
training sessions to employees on how to be safe on site. However, in the case of developing
countries, these laws are often ignored, with H&S practices used that are out of date, ineffective
and based on conditions that prevailed while the country was still being colonised. Additionally,
the regulatory authority is usually very weak in implementing rules effectively, and work
hazards are either not perceived at all or to be less dangerous than they actually are (Larcher &
Sohail, 1999; Hinze et al., 1999).

With its increasing economic progress, the Saudi construction industry has expanded
enormously. It attracts millions of employees, not only from KSA but also from all corners of
the globe. As highlighted by Haadir et al. (2011), despite its economic progress and financial
growth, H&S in construction within KSA remains extremely poor, as referenced earlier. Table
2-1 presents the result of a comparative study indicating that Saudi injury rates are the highest
amongst comparable countries.

As evidenced by Alasamri et al. (2012), as regards safety the Saudi construction sector has
recorded the highest number of injuries and deaths in a comparative study of eight developed
and Arab countries. Many construction sites in KSA have been built without any form of
protective parameters, which provide no security for pedestrians. For instance, Berger (2008)
reports that, in 2006, 25 people lost their lives while a building was being demolished in the

30
Literature Review of H&S Management Practices in KSA

holy city of Makkah. Applying a countrywide policy regarding construction H&S would
certainly reduce accidents and injuries but, in addition, would bring additional revenue into the
country in the forms of fines. However, like in the UK, such a policy would require the country
to be consistent in enforcing the regulations. Multiple inspectors, their enforcement of laws and
cooperation among them are possibly needed.

Table 2-1:Comparative study from 2008


Labour No Rates of major injuries/ Rate of fatal Date
Country (Thousands) No. injuries
deaths 100,000 employees/year injuries/100,000
Employees/Yr. issued
United Major 3286 254.1
Kingdom 2404 Minor 6789 53 524.9 3.4 2008
Major 1621 175
Australia 926 Minor 13118 55 1416 5.9 2008

United Arab
Emirates 1349 Serious 20* 233.03* 6.7* 2008
United States Major 164900 1200
Of America. 13735 Minor 316800 975 1500 9.7 2008
Job 207900
Transfer 23000

Kuwait 127 Serious 1257 13 1013 10.4 2008

*Jordan 374 Serious 2306 - 615.9 - 2008

Bahrain 133 Serious 475 - 357.1 - 2008

Saudi
Arabia 1248 Serious 38929 - 3117 28.19 2008
Max Rate of Non-Fatal injuries (major) 3111 per 100,000 (Saudi Arabia)

Max . Rate of Fatal injuries 28.19 per 100,000(Saudi Arabia)

(Source: Alasamri et al., 2012)

2.5 Safety Culture in KSA Construction Industry

As this review has focused on the environment as the source of safety hazards, attention is now
turned to other factors. Cooper (2009) adapts a three-way model from Bandura as he attempts
to explain the meaning of safety culture (see Figure 2-4). Bandura (1986) was the first to suggest

31
Literature Review of H&S Management Practices in KSA

that when looking at a social process, one should understand that no element in it operates just
as a single force. He creates the notion of the triangular relationship between person, behaviour
and environment in which each element has a bidirectional effect on the other two. He calls this
reciprocal determinism (Cooper, 2009). This is a useful model to look at when trying to
understand what exactly a safety culture is. Bandura (1986) sees these three elements as crucial
to a group understanding of what contributes to any process and Cooper adapts this basic model
to explain the difficult idea of “safety culture”.

Figure 2-4:Bandura’s theory (1986)

The environment in which construction takes place in KSA, as has been described, is a major
factor in considering hazard and risk. Large earth-moving machinery operates on construction
sites; workers may be operating nail guns and climbing to heights but may not be fully protected
in this work. Sometimes, as stated, protective clothing is not issued or, it has been claimed, is
issued but then sold by the worker; also, long hours must be worked, sometimes in blistering
heat, sometimes without breaks (Berger, 2008).

Here one can see how the environment can impact upon behaviour and how the behaviours
caused by this have an impact on the people hired to do the job. It is also put forth that this
impacts the people who are trying to complete a project in a given time. Any delay caused by
giving break times or insisting that correct safety procedures are followed, will cause financial

32
Literature Review of H&S Management Practices in KSA

penalties to the contractor or owner; if his business is small, he may then be unable to pay wages
to the workers. In a research study by Al-Khalil and Al-Ghafly (1999), results of a questionnaire
on building delays indicate that contractors blame owners for delays and that owners blame
contractors. Delays in the KSA construction sites they studied appear extreme in most cases,
with an average time overrun of 70% on public projects. Overruns inevitably lead to financial
loss and this means that people suffer threats to their security and wellbeing, which
consequently may be reflected in the way they behave at work.

2.5.1 Kafala and working practices

This is the dynamic that underlies working practices in KSA. But there is another major factor,
often ignored in research, which has a very significant effect on the construction industry and
those who work as labourers, unskilled or semi-skilled workers. It is that in KSA and in some
other Gulf countries, expatriates from Western countries may be part of management-level
contracting and design teams, but there is the kafala in operation, a visa system that brings in
labourers from other countries. This system may undermine efforts to design and implement
safety procedures, as construction labour is largely made up of migrants. Those non-nationals
are said officially to number 9.5 million, but there are estimates that a further 5 million may
have settled and now work in KSA, some of whom have entered the country for Hajj and others
who have crossed the border from Yemen, in particular (de Bel-Air, 2013). Migrant labour
accounts for 30% of the population and 50% of the workforce (FIDH, 2003). Therefore, it is
important to note that not all threats to a safety culture arise only from environmental forces. It
is the focus of this section of the review to place the threats posed by the kafala system to the
individual labourer in KSA as central to the considerations, barriers and challenges around H&S
management in the unique environment of KSA.

The kafala system basically limits the entry of any worker to KSA unless they have been
individually sponsored. The sponsor is made responsible for recruiting this person from an
agency for a definite job, for a minimum of two years; for that time, the worker must do the job
for which s/he is sponsored and is not free to work elsewhere or travel out of the country. The
sponsor pays the recruitment fee (Khan & Harroff-Tavel, 2011). However, those wishing to
work may be asked to pay high sums of money to the recruitment agency in their home country

33
Literature Review of H&S Management Practices in KSA

and some may not be paid for the work they do at the end of the two years (Human Rights
Watch, 2013).

Although this system can be seen as helping KSA to achieve its goals in building the
infrastructure of the nation, and although many foreign nationals welcome the opportunity to
work and earn wages in a more lucrative workplace than at home, there are said to be many
abuses of the system (de Bel-Air, 2013). Amnesty International, in a report in 2013, also points
out that these migrant workers could be housed in sleeping places that are too small and lack
basic amenities; then having slept in these cramped dormitories all night, workers are still
expected to work for excessive hours in temperatures of 45°C (Amnesty International UK,
2013).

Those entering the country come principally from the Indian subcontinent – India, Pakistan and
Bangladesh (de Bel-Air, 2013). There are also many from Indonesia and the Philippines and
KSA’s near neighbours, Egypt, Syria, Jordan, Lebanon, Yemen, Sudan, Somalia and Ethiopia
(see p. 18). One of the important factors that unite this group of workers is that they have arrived
from rural areas, rather than from cities. They may know nothing about high-rise construction
in urban settings and may never have seen it. Some may be leaving countries that are engaged
in civil war. A percentage of these people are women, entering the country to work as domestic
servants. But many are men employed in the construction industry and some are subject to
threats if they report safety breaches:

My arm was cut off while I was working at the controls of a heavy machine … An Indian
worker drove me to the hospital. I heard the Saudi boss tell the Indian over the phone to
tell the police I was in a car accident, which he did (Human Rights Watch, 2015, p. 4).

This large workforce, representing one-third of the population of the country (de Bel-Air, 2013),
was originally seen as essential to KSA growth. However, there are now some doubts about the
advisability of this number of migrant workers when there are many unemployed youths in
KSA. As aforementioned, there has been a drive since 2011, Nitaqat, to limit foreign workers
through quota targets, so that the country’s young men can find work. The underlying reason
for this is that the Saudi population has been increasing, yet since 2004 appears to have reached

34
Literature Review of H&S Management Practices in KSA

a plateau and is now decreasing, so there are now many 15-19 years-olds. The population rate
of youth, boys and girls has now reached over 20% (de Bel-Air, 2015, p. 4). Therefore, there is
a need for jobs to be made available to young people.

In 2015, many migrant workers who had outstayed their visa and had not left the country during
a two-year amnesty were rounded up and expelled. A Human Rights Watch paper (2015)
detailed the work of researchers in interviewing 60 of these workers, many of them from Yemen
and Ethiopia, from November 2013 to February 2014. During this period, KSA was said to have
deported almost 400,000 people.

Following this, in 2015, Saudi labour laws were amended, creating new workers’ rights. These
encouraged the employment of Saudi nationals and training for them. The rights of most male
migrant workers were increased, too, as were enforcement fines, which is an important step
forward in creating a safety culture.

2.5.2 Concept of safety

The establishment or the definition of a safety culture assumes or suggests that those people
within a safety-seeking workplace have similar cultural beliefs, attitudes, experiences and goals.
This applies to any workforce that is segregated into their own bands as regards their level of
satisfaction, goals and sharing. Those at the same socio-demographic level may share similar
understandings and goals. They may be willing to work up to the next level in physiological,
social and psychological terms. The migrant workers in KSA do not conform to this pattern. As
referenced by Mearns and Yule (2009), human needs and aspirations and the way human needs
are shaped have been demonstrated by Maslow in his goal-driven, progressive ‘hierarchy of
needs’ (1943).

The first need for humans, Maslow said, was to have enough to eat and drink, to sleep and feel
warm or cooler when that was necessary, and have all basic needs met as far as the body is
concerned. These, in total, are named in the diagram as physiological and are the first step in
the pyramid of needs that should be satisfied (see Figure 2-5). Unless those needs are met, one
cannot progress to considering higher things. It is very rarely taken into account that there is a
need to make sure that these physiological needs are met first before a workforce safety culture

35
Literature Review of H&S Management Practices in KSA

can be created. No H&S understanding, design or research to date has dealt with that simple
issue. H&S research has generally taken a developed world perspective that may not be
appropriate in some settings, environments or workplaces. Therefore, working practices in KSA
and states that employ workers on temporary visas, sometimes housed in poor conditions, often
working long hours and living apart from the support of family and spouse, make these cases
particularly unique, even when studying H&S in the construction industry in the developing
world.

Figure 2-5: Progressive hierarchy of needs


(Source:Maslow1943)

Barriers to social support and solidarity

One of the key ingredients in formulating a code of safety in a working environment is building
on the fact that trust between members of the workforce makes a strong foundation for
agreements about mutual protection. Most workers experience a strong sense of solidarity, a
sense that however difficult the tasks and demands may be, a belief that everyone can offer
support to others is paramount. Safety codes often operate through workers looking out for each
other and prompting others to be safety conscious (Friend & Kohn, 2014). However, in a
workforce as diverse as that found in KSA construction sites, there may be barriers to this kind
of mutual support developing.

One reason for mistrust may be the fact that construction sites, by their nature, are temporary
and that the workforce has high mobility, as it moves from one place to another when the project
is complete. Some may work for subcontractors employed for only a short time in a phase of

36
Literature Review of H&S Management Practices in KSA

the programme; hence, there is little time for labourers to get to know each other in these
conditions. The multicultural nature of the migrant workforce is also a barrier to the easy
friendships that often develop in a fixed workplace in the developed world where there may be
some diversity, but perhaps not major cultural differences. In most countries, there would be
some migrant labour, but almost the entire labouring workforce in KSA is composed of
members of very many culturally diverse nations.

It may be interesting and useful to define various cultures in this way, which does give us some
means of classifying certain cultural qualities, although its validity has been questioned. The
dimensions were developed from on-going surveys of international IBM employees for six
years. The theory is widely accepted within organisational behaviour research; but in this
current study, it is only used to point out that there are some claims that the values, beliefs and
attitudes that appear to define a society or a nation can be thought of as national cultural
attitudes. In this respect, labourers from different societies may have different cultural beliefs.
Some of these may be barriers to a close and mutually trusting attitude that is thought to
characterise many workplace behaviours that can lead to collective responsibility for safety
procedures, especially if contact with representatives of other cultures is superficial and
temporary.

Cultural differences may play an additional part in attitudes to safety. Some people from rural
societies, with little education and where societal advancement is rare, may adopt the belief that
no one has control over their personal future and that their own circumstances may be
determined not by themselves but by chance. This attitude, called “fatalistic” by psychologists
and also termed an “external locus of control”, may involve certain religious beliefs. In
conditions like this, a safety culture may be poorly received. The predominant cultural view
may be that what occurs may be predetermined. Littlewood and Dein (2013), in writing about
this issue, refer to the use of “inshallah” that was constantly present in the interviews they held.
Meaning “if Allah is willing”, they say it is often a feature of the culture they were researching.
It could be said that a strong belief in that view may work against safety culture. If members of
the workforce believe that there is a predetermined route to survival, then a safety culture may
be threatened, as there could be a cultural assumption that there is no means to escape what is
not and has never been, under their own personal control, life and death. This section of the

37
Literature Review of H&S Management Practices in KSA

review has surveyed the various barriers to acceptance of a safety culture but it now explores
the most significant of barriers – that of communication. In the Phua et al. (2010) survey, 34%
of managers said that communication problems decreased safety standards, which indicates that
language barriers are an important factor when considering H&S.

Language barriers

Cultural barriers can certainly cause failures of communication, especially regarding the usual
ways that people of different nations can demonstrate different behaviours. Bovee and Thill
(2005) appear to understand them: “Today’s increasingly diverse workforce encompasses a
wide range of communication challenges, including skills, traditions, backgrounds, experiences,
outlooks and attitudes toward work, all of which can affect communication in the workplace”
(p. 64). But the most obvious way in which communication can create problems for H&S
practices in a multinational workplace is the language barrier, especially if the language of the
host country is complex and difficult for non-nationals to understand. In KSA, because of
migrant workers, there can be 16 different languages spoken on construction sites, not merely
English and Hindi. The latter does not feature in the world’s 12 top languages, in general, but
English is the world’s leading language (Coulmas, 2013).

A multilingual workforce presents problems in the hazardous setting of a construction site. As


early as 2004, Chan claimed that language, cultural barriers and misunderstandings could get in
the way of effective communication and create safety complications in the workplace. Ways
have to be found to warn workers of dangerous situations, to lead them towards the next working
location and remind them to wear protective clothing. Signage in 16 languages may be
impossible. One way of dealing with this challenge is to adopt a “language of work”, and in
many workplaces this is usually English, as it is the most widely used throughout the world and
is the language of the media. Signage could be in this language and the two other most-used
languages in the team. In some workforces in the construction industry, inductions are given
through video recordings in all languages (Phua, 2010). Another alternative suggested in the
literature is to use visual signage on construction sites (Tutt et al., 2011), while “replacing
written notices with clearly understood symbols or diagrams” is the instruction given in the
Health and Safety at Work Act (cited in Bust et al., 2008).

38
Literature Review of H&S Management Practices in KSA

Phua et al. (2010, p. 418) claim that “managers rely on multilingual supervisors, workers and
alternative language signs”. Some contractors in their survey would not discuss work with
foreign nationals unless there was an interpreter, but the main interpreters were “the supervisors
of subcontracted workers”. Yet, 31% of workers said that they did not interact with those from
a different ethnic background and “32% of operatives and 21% of supervisors believed that
different groups should stay away from each other on construction sites” (Phua et al., 2010, p.
416). The percentage of supervisors supporting that belief is exceptionally high, but it is
important to understand that the study was undertaken in Australia and that in this group of
workers, there were many Australian members of the labouring team who may have been more
intolerant of migrant workers, who did not understand English, working beside them. In KSA,
very few, if any, Saudis work in this capacity.

There are other safety considerations, apart from the obvious ones of working as part of a team
but not understanding each other perfectly or the rules of engagement. There may be majorities
speaking together in one language, perhaps laughing and joking while in the company of others
who do not understand but might assume that they are being talked about. There may be social
difficulties among members of the team, as some from the same background and culture may
form what is known as an “in-group” (Tajfel, 1981), leading to others feeling disrespected and
resentful. This can create arguments and even intergroup fighting. There may even be personal
security issues because of the language barrier. If one signs a document that is written in a
language one does not understand, then it is unlikely that the terms of the document are known
in full to both parties.

The language barrier is a real problem if a construction site wishes to increase measures to
improve H&S awareness. Yet, the situation is not as negative as might be thought and new
research points to some positive considerations.

2.6 Positive Ways Forward

There are steps that can be taken towards creating a safety culture on construction sites, even
those sites that are environmentally, personally and physically considered the most challenging
– those using a migrant and multilingual workforce. The first one is that although these issues

39
Literature Review of H&S Management Practices in KSA

discussed may weigh heavily on the operative and labouring workforce, recent research
suggests and agrees, that the establishment of an H&S code that works for all is successful when
management takes this as a priority. The message is that if managers can understand H&S needs
and implement a procedure to put best practice into effect, it is likely to succeed. Arastoo et al.
(2013), Alasmari et al. (2012) and Awad (2013) all highlight the importance of H&S issues
being understood and communicated by management to the entire workforce. It seems to be
important for management to take the lead in establishing H&S programmes, based on best
practice, which is supported by current research. This is seen as the most productive and
effective route.

There is another step that can be taken; it is hoped this will be supported by this current research
study. What has arisen through this first part of the review is to identify what questions need to
be asked of contractors who play a part in KSA’s future growth and the regulation of its building
industry. These are the questions chosen, as they appear to reflect the concerns and challenges
evident in a review of the literature. The important issues are to question whether those involved
in the construction industry on a day-to-day basis hold similar views on H&S as those made
evident in research studies. Therefore, the first three questions this study addresses are:

1. What are the current H&S practices in KSA construction sites?


2. What are the existing challenges in construction safety and health performance
management, according to public sector construction contractors in KSA?
3. How can BIM enhance the continuous improvement of H&S on construction sites?

These questions are designed to produce a view on what is now the practice regarding H&S
issues. Despite its leading position, in many respects the construction industry in KSA relies on
outdated methods and practices that are losing their relevance in this world of globalisation,
migration and communication. The easiest way to facilitate a H&S programme in Saudi
construction sites may be through the use of technology of various kinds. Visual presentation
cuts across the barriers of language, but perhaps video screens in the workplace or hand-held
technology may produce the safety message in a visual, non-verbal and, therefore, non-
threatening way. New technology can cross the barrier between management and worker and
offer instant translation. Workers can also perhaps use translation technology to remain in touch

40
Literature Review of H&S Management Practices in KSA

with each other. It is surprising that KSA has not yet fully accepted the opportunities that
technology can offer to the current workforce and play to the strengths of a multicultural
workforce.

With that in mind, the literature review now moves to examining the literature on BIM as the
subject of the final research question in this study – how can BIM enhance the continuous
improvement of H&S on construction sites?

41
Relevance of BIM for Enhancing Construction H&S

Chapter 3. Relevance of BIM for Enhancing Construction H&S

3.1 Introduction

This chapter introduces the role of ICT in enhancing safety and reducing hazards in the
construction industry, as well as the benefits of BIM that has become widely adopted in the
world. The relationship between BIM and H&S in the construction projects is also discussed,
and the involvement in current construction projects is not enhancing H&S.

3.2 ICT’s Role in Enhancing Safety and Reducing Hazards

In the previous section, it was noted that the main problems facing the Saudi construction
industry are: failures in identifying hazards on construction sites; delays in building projects
that cause careless attitudes to develop in the haste to catch up; and the problems of
communication between and within groups in the industry, given that the workforce is
multilingual and multicultural. One of the communication problems is that methods tend to rely
on the written word. Section 3.1.1 discusses communication issues in the industry in KSA and
the delay in take-up of technology. Advancements in tools and approaches can create many
chances for the Saudi construction sector to better its current H&S framework. Regrettably,
there has been an elevated annual accident and death rate in this country for a decade, and the
need for a unified structure to H&S is very obvious. It makes sense to use ICT to aid in this
goal, and the following chapter explores the mind-set and techniques used to accomplish this.

3.2.1 Communication and Technology

ICT has been adopted in the developed world to assist better communication and provide better
cooperation between individuals and businesses. The manner in which building ventures work
is that they inevitably comprise a large number and range of employees and interested parties
who share information to lower the chances of accidents and injuries and encourage better
choices being made with fuller, more detailed data. Despite this, there has not been a particularly
big improvement in H&S within the construction sector, even with the advance and advantages
of computerisation (Aguilar & Hewage, 2013). Therefore, pragmatic and useful technology is
needed to begin rectifying this situation, at least partly.

42
Relevance of BIM for Enhancing Construction H&S

Overall, the majority of building ventures in KSA use outdated and conventional approaches to
the sharing of information and general cooperation at work. Alternatives include telephoning,
faxing and using email to send or receive information or updates (Dave et al., 2010).
Furthermore, in several building processes, these old-fashioned techniques are used for the
sending or receipt of information, even in construction locations that are difficult to reach, with
data that often takes a long time to unearth and process, or which may be extremely cumbersome
to send physically (Bringardner & Dasher, 2011; Chen, 2008; Bowden et al., 2005).
Additionally, Garza and Howitt (1998) point out that the traditional approach of using paper at
the construction location means that the most up-to-date or urgent information cannot
immediately be sent and received in the manner that computerisation allows; this creates both a
backlog of paperwork – which, inevitably, may be irrelevant by the time it is actually received
– and leaves the employees physically exhausted and drained from the burden of such
paperwork.

Nourbakhsh et al. (2012) examine 22 nations’ current communication technology for


supervising locational data, as presented in Figure 3-1. It is observed that of the 99 responses
received, the majority used mobile telephones, with a little over 22% comprising the use of
Dictaphones, handheld cameras or walkie-talkies. Yet, a study of Saudi building firms (Sidawi,
2012) shows that 89% were utilising conventional methods of communication. As mentioned
above, this could include the use of mobile telephones and faxing, but also location visits,
regular updates being provided and meetings. Interestingly, though, it is noted that 93% of those
responding did not utilise any mobile communication tools apart from mobile telephones
(Sidawi, 2012). In contrast, it is clear that outdated paper communications are seldom used
globally these days and Garza and Howitt (1998) suggest that this sort of communication at
building locations is becoming increasingly less common.

43
Relevance of BIM for Enhancing Construction H&S

22% 15%
Computer
Cell Phone
PDA
23% 40% Other

Figure 3-1: On-site information management tools


(Source: Nourbakhsh et al., 2012)

Over the last few years, there have also been rapid advances in mobile computing. This type of
computing can be described as that which enables the owner to use their device in any location,
or even whilst travelling between different locations, and without the need necessarily to be
connected to a power supply or use a cable. Regarding smart phones, the Oxford English
Dictionary (2013) describes these as “a mobile phone that is able to perform many of the
functions of a computer, typically having a relatively large screen and an operating system
capable of running general-purpose applications”. Given their capabilities, memory and speed,
smart phones are now essentially mini laptops (Muto, 2012), with the addition of GPS mapping,
supremely responsive touch screens, cameras with pixels that match many high-end digital
cameras and the capability of fast transfer of data. Furthermore, Mobile Life (TNS, 2012), a
worldwide survey of 48,000 people across 58 nations, demonstrated the adoption and need of
these high-end elements in the majority of modern mobile phone owners (see Figure 3-2).

44
Relevance of BIM for Enhancing Construction H&S

Figure 3-2: Use and desired use of smart phone features among all mobile users
(Source: TNS, 2012)

Owing to the rapid advancements in smart phone technology, it is difficult to predict with any
accuracy what will happen next or how the market may develop. Table 3-1 demonstrates the
abilities of smart phones as they currently stand. Kim et al. (2013) observe that such
advancement has meant the modern generation of contractors and employees can now use this
technology for better supervision at the construction location and employ site-based ordering,
real-time sending and receiving of data and digital imaging via the smart phone.

Mobile computing has grown hugely over the last few years. The overall mobiles’ sector is one
of the wealthiest and most successful industries of this generation, and Figure 3-3 shows how it

45
Relevance of BIM for Enhancing Construction H&S

is now second to the electricity and marine sectors in the generation of wealth. In 2012 alone,
the worldwide mobile sector created US$200 billion – 35% more than that of the world’s mining
industry (GSMAK & Kearney, 2013). GSMAK (2013) observes how during the last five years,
the number of individuals purposely purchasing or at least using mobile devices in developing
nations has grown at an annual rate of more than 10%.

Figure 3-3: Capital expenditure across a selection of industries


(Source: GSMAK & Kearney, 2013)

Furthermore, GSMAK and Kearney (2013) suggest that data is the primary factor in this global
expansion, owing to the very high level of mobile broadband data being exchanged. This has
increased by 100% year on year, rising to 1,577 petabytes each month of 2013. As provided in
Figure 3-4, mobiles are usually utilised by several sectors to improve consumer access to their
most important services – this is seen in banking, utility service provision and billing, and even
in the provision of healthcare and education.

46
Relevance of BIM for Enhancing Construction H&S

Figure 3-4: Mobile-enabled products and services in the developing world


(Source: GSMAK, 2013)

In other sectors and in other nations in the developing world, as in KSA and its construction
industry, insufficient knowledge of the potential utility of mobile uptake can still be observed.
This could be generalised into three primary elements:

1. An insufficiently specific value chain that is an established value for users in every phase
of this process – for example, the service providers, retailers or mobile operators
2. A maintainable corporate framework that provides the service but is also capable of
becoming independent
3. Being seen in different markets or industries with the understanding of parallel
associations within that sector and the capacity to link to areas that can grow the worth
and reach of the service

3.3 BIM

The delay in take-up of cutting-edge technology in KSA means that technological advances are
not readily understood or fully utilised. Within the architecture, engineering and construction
sectors, there has been rising support for the use of BIM, as part of the construction process.
Difficulties in the area of design bid and build have caused the continued development of
methods that aim to facilitate quicker and more practical ways of creating, constructing,
developing and managing construction projects. Simplifying the project by pre-construction in
a digital form could be the answer, as possible hazards, shortcomings, schedules and costs can
be identified and clashes detected.

47
Relevance of BIM for Enhancing Construction H&S

BIM is a form of computer-generated design. However, CAD tended to be 2D originally and


was created in the form of drawings that sometimes contain human error. This design may not
have meshed well with the engineering, or the construction, leading to enforced delays.
Additionally, it is difficult for even an experienced contractor to identify hazardous possibilities
from a 2D drawing. BIM works on a minimum of 3D, in a form of parametric modelling that
can create a virtual representation of the design and can incorporate all the engineering material,
too. To create this model, there is a need for designer and engineer to work cooperatively,
leading to all considerations of the build being discussed, including how it will be run and even
decommissioned (Kymmell, 2008). For projects that dispense with the bid element of
conventional tendering in KSA, the contractor can also be involved. Specifications can be
agreed upon and any challenges jointly discovered. Furthermore, regarding the viewpoint of
accepted global guidelines, BIM comprises both the real and utilitarian elements of a building
venture, upon which accurate and thus advantageous decisions can be taken. In addition to these
advantages, the model can include a fourth dimension (4D), that of time taken for the elements
of the build, the building construction information model (BCIM), Specifically, it is one of these
additions and helps to plan a timescale for the project. This timescale can be regarded as one of
the many products of BIM, and similar products like a fifth dimension (5D), that of costing, can
be integrated. The awareness of both timescale and projected costs could ease the challenge of
delays in KSA construction business, as it provides the opportunity for time and funding
management before the build begins, in an integration of drawing and virtual modelling, with
schedule and costs.

The modelling itself can be described as being part of the overall construction process, as it is
contributing to the operational process in a vital way (Wong et al., 2009). BIM purely
emphasises the earliest stages of development – the designing, conceptualising, engineering and
wider aspect of amalgamated provision of construction ventures (see Figure 3-5). Over the last
few years, study in this area has moved from the previous “life cycle” stages to one looking at
building upkeep, renovation and dismantling, including “end of life” concerns, especially in
regard to highly complex buildings that require special attention and skills (Li et al., 2012). The
possible applications of BIM could facilitate total infrastructure development and management.

48
Relevance of BIM for Enhancing Construction H&S

Figure 3-5: BIM life cycle


(Source: Green BIM Engineering)

BIM is able to offer the provision of possible data to the contractors or other employees, so that
they better understand their role within the project; furthermore, if one or more individuals
believe there ought to be modifications or additions to the modelling, then the software used is
able to alter the model quickly and easily. Over time, leading companies are increasingly using
BIM to facilitate improved cooperation. Joint working has become essential for any building
project and for contractors it is now a vital element of their work. It is highly advantageous
during any of the stages of construction, from the earliest tendering and pre-production through
to the work itself and even its follow-up procedures, that construction, in particular, should
respect and include all parties in making decisions.

As explained above, BIM is utilised to enhance the devising of a project, its design and the
building itself. This type of design involves the formulation and imaging of building ventures
through the use of unified and interrelated assessment modelling, and it is very useful in
assisting construction projects in both the public and private sectors (Jannadi & Assaf, 1998).
BIM also comprises numerous additions that provide the contractor with a deeper
comprehension of the venture. Such integration of the modelling products is extremely
advantageous, as it enables the creation of a more comprehensively detailed process and set of

49
Relevance of BIM for Enhancing Construction H&S

specifications than might otherwise have been possible (Group, 2014). The older systems did
not offer contractors and their employees such precise knowledge; therefore, the process and
outcomes of current construction projects could, in theory, be improved with the utilisation of
BIM.

Building information models are fed designated aspects of the project and are then able to
formulate these into procedures and results. Such a list of procedures and expected outcomes
provides information at every stage involved, such as mandatory and fundamental requirements,
the timescale of the project, the materials needed, mathematical data and quantity take-offs.
Whenever required, any of this information can be input, altered or totally removed, and any
one of these actions are extremely important to the creation of the ultimate design and
construction plan and, therefore, its anticipated execution (Alasamri, Chrisp, & Bowles, 2014).
When creating a building information model, all required elements of the contractor’s needs are
fed into the system.

The construction outline is noted before the contractor’s specifications are added to it. The
construction outline, for example, will often explain what sort of structure is to be erected and
its location, but the specifics of how it should be constructed, with what materials and the
anticipated timescale are usually provided by the contractor, in a DBB model particularly.
Through the merging of a data, the computer will produce a model that enables the contractor’s
labour force to see and comprehend the project with clarity ahead of time. This modelling, if
acknowledged and adhered to at every stage, will make sure that there is no limitation of space
in which to operate and that all employees have ample space and are given a personal schedule
of works. In each stage of the construction, a building information model outline will be created
that correlates to the specifications.

This outline is presented as an image, table or a graph that displays every stage visually, so that
each and every employee fully comprehends the desired aims and outcomes of the project. The
outline framework may comprise various stages, including the design, construction and overall
running of the project. Once every element of the venture has been achieved, the building
information model outline will assist in accurately describing every stage involved, the
timescale of these individual elements and the overall project (Li et al., 2012). Furthermore, if

50
Relevance of BIM for Enhancing Construction H&S

BIM pays specific attention to the overall running of the project – that is to say, its managerial
and supervisory areas – in combination with the details of the building site itself, this provides
additional important benefits, not least the ability to exert better command and observation over
the project. Autodesk (2012) presents the benefits or adopting BIM to help better choices be
made, including aspects such as the development and research into other possibilities, and their
being examined, particularly in relation to a comparison with the specified aims, knowing the
impact of trade-offs and utilising the findings to discover reliable solutions.

As construction gets under way, the contractor needs constantly to input new data into the model
as employees, architects and/or engineers provide updates on the stages of construction. For
example, this information may necessitate certain materials or machinery, or an alteration to the
speed of the work. Overall, this sort of data could be crucial both to the project’s initial
calculations and anticipated timescale; additionally, it could help to formulate several
requirements that emerge during the work itself. It is interesting to note, too, how BIM provides
an alternative set of concepts or theories in the architecture, engineering and construction
industries, especially when these improve the roles or responsibilities of stakeholders. It has the
capacity to provide efficiency and integration between stakeholders who, prior to this, may have
been adversaries (Salminen, 2011).

Circumstances that heralded this development can be found in BIM’s adoption across much of
Scandinavia – Norway, Finland and Denmark – with the same being somewhat true of
Singapore, which greatly supports its state-sector construction projects. These nations have the
luxury of average populations and geographical area and, therefore, their administrations are
able to enforce their plans nationwide more easily than those with a large population and/or a
vast geographical area. More importantly, however, these nations are both highly developed
and extremely skilled with mechanised and automated production systems, which are utilised
in house building, as well as the building industry in general (Wong et al., 2009). The benefits
of BIM, as highlighted in Figure 3-6, are best suited for such an environment.

51
Relevance of BIM for Enhancing Construction H&S

Figure 3-6: Benefits of BIM


(Source: Eastman et al., 2011)

Full and thorough utilisation of BIM, it is suggested (BIM Task Group, 2012), can also move
the UK into a highly modernised era of building projects and help turn it into the epicentre of
BIM. However, the adoption of BIM is a very complicated area and needs wide-scale support,
integration, good relationships and clear aims and specifications, in order to be truly successful.
It is important that this support comes from both the private and state sectors. Needless to say,
government backing is a vital factor in BIM’s adoption or chances of successful use. However,
despite this type of support being a critical factor within the sector, one cannot say with certainty
what its benefits would be, as the exact state of the sector is unknown. Interestingly, such
backing is widespread in the formulation of an atmosphere that improves the H&S elements
within the adoption of new technology in BIM formulation.

The UK government regards international collaboration in BIM as bringing both advantages


and disadvantages. Experts in this field have explained that the main hazards are to be found in

52
Relevance of BIM for Enhancing Construction H&S

the tendency of adaptable and technologically sophisticated nations to “leapfrog” existing


hardware and software and improve on the original model, thereby dominating the market. The
retailing of both the BIM operation system and the hardware that utilises it is conducted in a
recognisable global framework that is subject to the known advantage but also disadvantages
of a market-driven neoliberal economy. Although the operating system is, by nature, very
adaptable, the sector will always have the ability to impact on and profit from its evolution or
modification. None the less, it would serve as an aid to increasing the country’s competitive
nature if the UK expanded its use of the latest modifications to BIM, in order to enable what is
called “lean construction” in the public sector (Cabinet Office, 2011).

In comparison with state-run projects, the huge support the private sector has afforded BIM is
founded on nationwide schemes that aim to generate fresh business strategies and improved
association between the relevant parties, rather than, it is hoped, encourage competitive tactics.
The involvement of the private sector could undoubtedly improve the formulation of strong and
vital business implements that may be utilised in the design of new operating systems and
technologies for BIM. It is important to understand, however, that the committed backing of the
state sector could well be required, even when a country has an equally strong and influential
private sector supporting nationwide BIM adoption. This understanding suggests that weak or
limited backing from either of these two sectors will not necessarily facilitate successful
adoption of such modelling. In other words, it is only with the strong and consistent support of
both the public and private sectors that the implementation of BIM stands the best chance of
being successful and proving beneficial to the architecture, engineering and construction
industries (Wong et al., 2009).

3.4 BIM and Safety

Using BIM in building project H&S considerations has been suggested by numerous academics
(Eadie, 2013; Yalcinkaya & Arditi, 2013). One piece of research, in particular, argues that there
are data suggesting that adopting BIM may assist in H&S frameworks (Wan et al., 2013).
Academics in this discipline have shown that BIM is suitable for use in computerised safety
assessments founded on current safety criteria (Melzner et al., 2013a; Zhang et al., 2012).
Efforts are currently being made for companies to utilise BIM officially when formulating their

53
Relevance of BIM for Enhancing Construction H&S

projects’ H&S frameworks (Melzner et al., 2013b; Zhang et al., 2012). BIM has been utilised
for H&S education and to demonstrate the dangers within the context of digital imagery (Chen
et al., 2011), but has also been adopted in the planning stages of ventures in order to lessen the
risk of accidents or mishaps in the physical building stages (Qi et al., 2013). Regrettably, over
the last few years, the building sector has seen more employee deaths or serious injuries than
any other area of the private sector. This is due in part to developers lacking detailed
understanding of H&S considerations; therefore, numerous dangers can inadvertently be
designed into modelling and planning diagrams.

Rajendran and Clarke (2011) show how the adoption of BIM could assist greatly in finding
anchorage points to improve H&S. BIM utilisation, along with cloud computing software, has
been recommended as a method of ensuring continued safety within the engineering and
building industries (Bennett & Mahdjoubi, 2013). Furthermore, the use of such information
modelling to examine the safety of employees in small workspaces is currently being assessed
(Arslan et al., 2014). When BIM is observed in the H&S environment, this is evidence both of
its success and level of uptake by construction companies. Additionally, BIM adoption, such as
digital imagery, is recommended by experts as a means of further H&S improvements in the
building sector (Li et al., 2012), with the work of Cheng and Teizer (2013) and Park and Kim
(2013) providing assessments of radio frequency identification (RFID) and digital imagery
software’s utility within H&S structures. As the adoption of BIM is becoming increasingly
valued, and given the fact of its use in numerous areas of the construction sector, it is entirely
logical for BIM to contribute to H&S considerations and regulation for all construction
companies.

Studies appear to show the following areas as the primary factors of BIM in enhancing
construction safety: BIM-orientated design, hazard assessment and H&S risk examination, with
BIM assistance and 3D and 4D digital imagery for H&S induction presentations. Regarding
BIM-orientated design, this aspect incorporates the construction area blueprint design and
accident avoidance forethought. In many places – for example, Finland – this is mandatory.
Moreover, BIM can be utilised to assist in the design and development of construction duties
that aim to minimise certain hazards at the construction site. For hazard assessment and H&S
risk examination with BIM assistance, the technology may be utilised for the assessment of

54
Relevance of BIM for Enhancing Construction H&S

potential hazards and dangers, either through traditional physical outlines and diagrams or, as
anticipated in the next few years, more computerised hazard assessments at the design stage as
BIM allows and take4s account of the entire construction environment. 3D and 4D digital
imagery for H&S induction presentations are a step towards bridging the communication gap
caused by verbal barriers. 3D demonstrations help with a clear explanation of each phase of
building ventures, which is especially important when dealing with KSA’s migrant workforce.
Verbal direction and multiple interpreters can be substituted by digitally created visualisation
in site induction. From a H&S perspective, such as presenting the upcoming task to employees,
this could be outlining the safety rules and specifications for a particular stage or element of the
project and an explanation of potential risks and dangers.

3.5 BIM: Pre-construction Considerations

This section formulates and outlines the research utilised in the creation of a unified BIM
approach, in order to provide excellent H&S for all employees at every stage of the building
process. It should be noted that this is also a great chance to enhance the H&S of the industry
overall. Over the years, the building, engineering and construction industry has gradually
become more complex and wide-ranging; therefore, BIM, as a vital resource that helps to ensure
safety through the continuous and robust supervising of data and project management, is
crucially important in the entire overseeing of all stages of a construction venture, whether this
is the initial pre-planning or the very last phase (Skibriewski & Ghosh, 2009). Operating
systems pertinent to a project’s supervision had been utilised previously to assist managerial
teams in the smooth operation of their building ventures.

Older BIM, known as object oriented modelling technology (OOMT), was first utilised as part
of design planning work before its recognition led to its being used in both the engineering and
construction industries (John & Ganah, 2011). Owing to the success and utility of OOMT within
the design of architecture, it became more prevalent and adopted in construction itself.
Moreover, as outlined by Khosravi et al. (2014), many chances to utilise BIM, the successor to
OOMT, have been taken. Maloney and Cameron (2004) note how, in the UK, developers did
not always have a full and thorough comprehension of their role in construction safety and,
therefore, at times, failed in their duty of formulating and delivering the highest levels of H&S.

55
Relevance of BIM for Enhancing Construction H&S

Moreover, they may have squandered the chance to adopt BIM within the safety frameworks,
which in turn would have decreased the opportunities for technological development in devising
H&S approaches, as well as preventing the assistance of developers, communication channels,
the formulation of new danger supervision and the opportunity of there being novel ways to unify
the physical side of construction and H&S dilemmas.

Currently, BIM has become a suitable and respected tool for all aspects of formulating H&S
procedures and frameworks, especially in relation to building sites. Data relating to design and
build can be presented and updated as BIM. Owing to its use of multi-dimensional data, an
assessment can be undertaken on the real-time state of the project and, equally importantly,
provide solutions to any issues relating to the construction itself, the speed with which the work
was being complete, or the dangers that existed.

Many studies have shown that information modelling software can offer a fresh and modern
approach to resolving construction site issues. Moreover, with this information being presented
to every staff member regularly, overall comprehension of the hazards and dangers at various
location can potentially be enhanced (Kiviniemi et al., 2011). Pre-construction preparation
provides numerous opportunities to utilise BIM within the building industry and Figure 3-7
offers a good representation of this preparation. With this example, the project required the
installation of building utilities; by being able to view all aspects of this digitally, staff could
more clearly see the dangers and management decisions required to facilitate quick and safe
delivery of the project.

Figure 3-7: BIM showing all utilities


(Source: Rajendran & Clarke, 2011)

56
Relevance of BIM for Enhancing Construction H&S

BIM certainly has the capability of being utilised in the H&S development stages, especially
when these are related to building sites. The site teams will change regularly, owing to the
differing needs and specifications of the project and the use of subcontractors with different
areas of experience or expertise. In some ways, every building site is a unique entity that carries
its own particular dangers and risk levels; new workers can join a team whilst lacking the full
knowledge required to comprehend the potential dangers of that particular site. The safety
approaches in use on site might not be sufficient to prevent harm, even though both the
employee and their employer make the best effort to avoid such an outcome. Therefore, the
early development stages of a build can offer the best chances to eradicate, or at least greatly
minimise, dangers and risks before they have a chance to occur on an actual construction site.
Prior study in this area suggests that there have been insufficient methods or mechanisms to
help developers confront this problem (Ku et al., 2010). Kiviniemi et al. (2011) draws attention
to the fact that BIM has essentially been able to create the desired structure digitally using
computerisation, before the actual process has even begun. This facilitates predictions of issues
and flaws and examines virtually the possible implications of all of these factors. It has the
capacity to bring on board various streams emanating from specifications, timescales,
environmental issues and the handling of machinery. Before the build is begun, turning spaces
for cranes or dumpers, for example, can be factored into the likely site characteristics, so that
operatives can be aware of hazardous areas and the space they will have to work in during
different stages of construction.

BIM has the capability of being utilised during the building stage, too, thus offering a digital
representation of the structure that matches the progress up to that point (Watson, 2010). The
development of building and virtual reality can run side by side, so as the build develops, this
is reflected in the changing representation available for all to see. New risks that might arise can
be identified. Therefore, this modern capability does not merely offer vital software to
construction companies that assists in the physical side of their work; rather, it can now provide
enhanced fulfilment of a venture through its ability to help ensure hazards and dangers are
minimised for all employees involved throughout the timescale of the construction (Ku & Mills,
2010). 4D digital imaging, adding the dimension of time to a conventional 3D design, has been

57
Relevance of BIM for Enhancing Construction H&S

shown to be an excellent method of presenting numerous development and building flaws or


dangers, owing to its ability to present challenges that arise during the construction.

As Gibbs et al. (2010) explain, the building sector is infamous for its numerous hazardous and
risky construction environments. Therefore, ensuring the highest safety possible on building
sites is of vital importance for any construction firm and not just for the sake of individuals who
may be harmed. An atmosphere of excellent safety breeds confidence and reassurance amongst
staff and this, in turn, raises the speed and quality of the work undertaken (Zhang et al., 2012).
Additionally, several studies suggest that targeted improvement of staff safety mechanisms at
the actual time of the danger occurring can be adopted. Technology can pre-warn an employee
of an imminent danger. As Giretti et al. (2009) outline, one example could be an audible warning
sound that warns a member of staff that they are close to static electricity. Fullerton & Wempe
(2009) suggests a real-time warning mechanism that uses its own initiative to foresee and alert
employees to a particular danger or set of dangers that have arisen. Additionally, he claims that
safety measures could be enhanced by the use of an after-the-event tool, which collates
information for examination so as to understand better what had occurred in the hazardous
situation and offers potential suggestions for future safety management.

Regarding 4D software, it can be utilised to connect a construction work’s remit in 3D with the
anticipated building timescale, in order to present digitally the overall construction
development. Labour tasks at the location can be generated into a 4D computer-generated
model, where that created by the developer is adopted initially. Prior research in this field
discovered that there are particular types of operational aspects at building sites, as outlined
above; for example, certain movements like those of a tower crane, a cherry picker or the driving
of trucks and lorries. As Zhang and Li (2010) note, this can allow the software to present the
building operations more accurately and authentically.

An analysis of BIM was conducted by Harty et al. (2010) to understand better the ability of
incorporating new software and technologies within a specific H&S aspect – the dangers of
falling or tripping over an object. The use of 4D BIM methods could enhance H&S at work by
better integrating the various problems at hand. Work related dangers and risks do suggest that
confronting risks and dangers to employees in the development stage is a crucial element to

58
Relevance of BIM for Enhancing Construction H&S

decreasing the number of accidents seen in the building sector (Gambatese et al., 2005). In this
development stage, adopting BIM can allow its potential on a construction venture to be utilised
fully because its capacity to impact the expenditure is at its greatest. Employees can intuitively
formulate methods and approaches to resolve problems before they even have the chance to
destabilise the task. Achieving this requires the full understanding and support of every
employee working on the particular venture and, understandably, it is absolutely vital to have
an excellent working environment with high levels of cooperation. Without this, the aims may
not be met and problems could still arise (Hergunsel, 2011).

The latest research into H&S has focused on how computer-generated imaging could be adopted
as a way of unifying the issues found in the management by laws, rules and guidelines. As
explained by Khosravi et al. (2014), BIM cannot merely be described as a computer package or
operating system; rather, it is an entire digitally created mind-set and process that needs staff to
operate within a pre-determined structure and adhere to its requirements. Productive adoption
of BIM depends on three primary aspects: firstly, the creation of the knowledge and data;
secondly, keeping this knowledge secure; and thirdly, utilising this data to produce the best
outcomes. One of the most important worldwide outcomes is enhanced safety of construction
sites.

As the build has been planned in detail and as all this detail has been holistically managed in
BIM, it is possible for contractors to see the most cost-effective and safest practice for certain
operations. It offers the possibility of prefabrication, which can eliminate many workplace
hazards (Chelson, 2010). As the author explains:

"Another saving due to BIM is improved safety brought about by the ability to
prefabricate pieces that are safer to install and reduce work in hard to access places.
Southland Industries reports that it is fabricating material at waist height in the shop and
installing bigger pieces that cannot be picked up by one person. Therefore, proper
equipment is planned for and used to hoist up the bigger pieces and the final connections
are made in a safer way. The advantages of BIM in building H&S has been examined
by numerous experts in this field" (p. 275).

59
Relevance of BIM for Enhancing Construction H&S

The use of prefabrication is one that has rarely been exploited but could result in savings of
safety, time and costs. There has been much research undertaken on the possibility of adopting
the “Design for Safety” (DfS) initiative within BIM, with Taiebat (2011) narrowing the remit
of the study to incidents of employees falling from a height. Using DfS, the study offers a
structure by way of flowcharts to show the dangers and risks for potential use in updated
information models. This would help software engineers implement danger and risk
understanding into the system for future use.

A computerised safety mechanism was formulated by Zhang et al. (2013), designed with the
capability of notifying building engineers, supervisors and the managerial team of all the
specifics of the H&S aspects required and, importantly, how and why these are required, in
order to reduce the risk of falls, prior to the construction work commencing. Benjaoran and
Bhokha (2010) outline a framework of regulations that could quickly predict a height related
danger or risk in real time and take the necessary steps to prevent this occurring.

Bust et al. (2008) point out that another challenge posed to the construction sector is that it does
not have a rigid, pre-set flow of production and, therefore, may lack the ability to test the product
– the building – before constructing it. However, many commentators have pointed out that
BIM provides superb advances in this regard and can be highly beneficial. Researchers claim,
therefore, that its adoption can offer the following advantages, as outlined above, including the
following:

 Reduction of expenditure in development and utility, as this could be a seamless


cooperative initiative involving all stakeholders
 Through the use of 4D digital interfaces, an enhanced understanding of all the stages of
the build and their issues
 This offers the ability to foresee hazards and dangers at a much earlier phase of
construction
 H&S dangers could be eradicated, or at least minimised, in the development stages,
meaning that developers will not need to oversee dangers left over from a poorly
executed construction stage

60
Relevance of BIM for Enhancing Construction H&S

 The minimising of mistakes or human oversights could occur through the use of
visualisation in both 3D and 4D
 The ability to solve problems or dilemmas prior to on-site commencement, to include,
problems arising from hazards that might arise and, using 5D, costs that could escalate
as a result
 The primary constructors having a full and thorough comprehension of the venture and
its related aspects, whilst facilitating simple but thoroughly specified oversight and
management of the entire construction task
 It stands to provide a necessary decrease in injuries and accidents. BIM is excellent in
ensuring a lowering of the number of work related incidents and injuries. This is thanks
to its ability to collate and update information to sites and their workers regarding the
possibility of unforeseen accidents in real-time, thus enhancing both the construction
site’s H&S itself and the employees’ understanding of how and why such an incident
had been likely but was averted

3.6 Construction Safety Management by Visualisation for a Migrant Workforce

Flaws and inadequacies in the conventional, and now outdated, supervision of H&S has led
experts to design novel methods and approaches for this area of construction. As discussed
extensively in this paper, digital imaging is a key approach that has been examined by experts;
a good outline of its advantages can be found in the work of Chiu and Russell (2010). Overall,
BIM is a superb method for achieving this important visualisation, not only because graphically
it is comprehensive and every employee can understand what he or she are seeing, but also
because of its full and thorough analysis of the whole construction process.

Chiu and Russell (2010) argue that the adoption of visualisation tools can enhance
communication between the employees and the choices they make, improve their understanding
of the information provided to them and produce more thorough and detailed data, offer a better
ability to understand and convey the data, reduce the chance of misunderstandings, convey the
project’s drift as regards time and budget, and examine the standard of the project timescale.

61
Relevance of BIM for Enhancing Construction H&S

Furthermore, it affords the team a 3D image of the structure whilst also offering a clearer
comprehension of how the completed structure will look. Additionally, because this digital
imaging is able to be shown to both the developer and the proprietor, it means that all important
parties have access to a tool that helps in the understanding of the project and in the choices
made to decrease dangers and risks associated with the construction (Chiu and Russell (2010).

Hadikusumo and Rowlinson (2002) observe the chances of utilising a DfS technology to
enhance understanding in construction’s H&S, surmising that it can be achieved for the
following reasons:

 The provision of 3D modelling allows the user to gain a simpler comprehension than
that offered by outdated 2D graphics (see Figure 3-8)
 The computer generation of the building project’s stages can teach users more
comprehensively than conventional 2D graphics and writing
 The technology includes a pool of information that aids H&S developers and employees
in recounting their past encounters regarding danger, risk management and
implementation

Figure 3-8: Hennesy Centre safety and site logistics planning


(Source: Cooins, 2011)

The current issues regarding anticipating danger and risk have been remarked upon by several
authors, as a result of the continued use of 2D graphics and insufficient knowledge of the
building development stages. Several experts recommend using digital imaging software as a
means of solving this issue (see Figure 3-9). Chau et al. (2003), for example, argue that 4D

62
Relevance of BIM for Enhancing Construction H&S

presentation offers a more detailed and thorough understanding of such a project than
conventional 2D graphics and timescales. Jongeling and Olofsson (2007) concur, noting that
4D imaging offers its clients a simple and comprehensible visualisation of the project’s
anticipated timescale, as well as assisting in the communication between the many stakeholders
of the construction at hand. Thus, 4D BIM can also be adopted as a method to foresee dangers
or risks that may arise during the work.

Figure 3-9: Visualisation of hazard identification using worker avatar


(Source: adapted from Park & Kim, 2013)

Using this data, short-term features like guardrails or danger signs can be input into the model,
with the H&S aspects amalgamated into the timeframe (Hergunsel, 2011). Being able to see
project data in this manner has previously been shown to be very helpful in the planning of
projects and their supervision, and this has been demonstrated by the ubiquitous use of BIM
within the building sector.

Owing to the uptake of and respect for 3D, 4D tools have become the ultra-modern technology
to bring the project’s information to an even higher level. Studies have shown the possibilities
of 4D in building preparation and supervision; however, so far, this has mostly been adopted in
H&S, rather than the construction stage itself. Furthermore, a method known as construction
virtual prototyping (CVP) is adopted to show the utility of a 4D method for the digital imaging
of project dangers at each stage (Chiu & Russell, 2010).

The work of Hadikusumo and Rowlinson (2002; 2004); Chantawit et al. (2005) and Benjaoran
and Bhokha (2010) had, at the time of this study, failed accurately or thoroughly to visualise
this development sufficiently. Through use of the CVP approach, the decision-making of

63
Relevance of BIM for Enhancing Construction H&S

construction industry employees and the projected building stages seen in short-term projects
have been visualised for the first time. Computer-generating the actions of employees so
intricately as part of H&S considerations enables better understanding of the dangers and risk
levels posed by a hazardous work environment or hazardous decision-making in the
development phase. As can be seen, this is highly innovative work in the building sector and is
anticipated greatly to enhance the sector’s understanding of dangers and risks.

But perhaps the greatest benefit to the Saudi Arabian construction industry is that BIM
technology could better inform the migrant workforce that forms almost all of the unskilled and
semi-skilled labour on construction sites in KSA and may encounter a language barrier. No
research studies have looked a BIM as a possible aid to these labourers and, therefore, to the
efficiency and safety of the country’s construction industry. Poorly educated rural dwellers from
South and East Asia and Africa may find the acquisition of a new language very difficult and
the reading of H&S signage and induction material additionally challenging. In a study by
Loosemore and Adonakis (2007), 13% of participants said that language was a barrier to H&S
in the construction industry. Bust et al. (2008) echo this:

Managers need to know how effective these (audio) visual communications are, there
does not appear to be any sign that the methods have been evaluated. Indeed, research
about communication and second language speakers in the construction industry found
that supervisors were not aware that the 1996 EC Safety Signs Directive in fact requires
employers to explain unfamiliar signs to their employees and to tell them what to do when
they see a safety sign; word-signs were found on most sites and one site used only these
(p. 589).

The Bust et al. (2008) study, in light of increasing globalisation in many industries, involved a
wide-ranging survey of problems of communication for construction migrant workers in China,
Hong Kong, Thailand, Nigeria, Poland, South Africa, India, the United Arab Emirates and
Qatar. It aimed to discover how important information on H&S could be communicated, and it
concluded that visual signage was mostly helpful and that interpreters, too, were widely used
by construction companies.

64
Relevance of BIM for Enhancing Construction H&S

Pransky et al. (1999) studied the occupational risks for immigrant day labourers in construction,
noting that short-term work of this nature was often undertaken as an unskilled job in high-risk
environments. They claim that levels of illness and safety knowledge were higher amongst those
who could not understand the language, especially with signage, and who tended to
underestimate and not report accidents.

However, a study by Hare et al. (2012) claims that pictorial aids might not be totally effective.
The team discovered that of the H&S images it developed, 23 were not understood and that
workers from India and Africa were more confused than those from European countries by the
meaning of images. The use of visual imagery has been thought to aid understanding of complex
issues for those with language difficulties, but it may be that there is a cultural or dimensional
problem in the use of 2D imaging. Some cultures, for example, have problems in understanding
emoticons. It is possible that migrant workers in the construction industry may need to use what
the Bust et al. (2008) study terms “experiential” knowledge gained in their everyday work on a
number of different construction sites over time. Those authors refer to a study by Pink (2004),
who suggests a video-tour approach may be better suited to create an awareness of H&S issues
for those with limited language skills.

This is, in fact, a use for BIM that has not as yet been studied in Saudi Arabia. BIM could be
used as a virtual reality system that migrant workers could “walk” through. In this way they
would use the experiential knowledge that it is said that they largely rely on. They would also
be able to judge the area in which they can work, the timing they need to adopt, the areas where
hard hats and boots will be used, and they can note the provision at design stage to avoid
accidents like falling from heights. BIM provides the workers with the actual experience, rather
than inductions in a number of different languages, interpreters and 3D images that they may
be culturally unfamiliar with.

65
Existing Frameworks of H&S Factors

Chapter 4. Existing Frameworks of H&S Factors

4.1 Introduction

Chapters 2 and 3 have reviewed literature on H&S and BIM, respectively, and related it to the
stated research problem regarding the H&S issues in KSA construction industry. Although the
findings of the literature review that BIM has the ability to enhance safety and reduce hazards
in the construction industry. BIM, for instance, could improve H&S across many industries, but
in the construction industry in particular. Moreover, these findings are tied to specific needs of
KSA, based on economic standing and construction industry growth, as well as characteristics
of KSA construction employees. In identifying both the vulnerabilities of KSA construction
industry to H&S issues and the value of BIM in addressing many of the known issues in the
construction industry, the findings of the literature review demonstrate the need for this present
study. Essentially, it is known that BIM has value for improving H&S environments and it is
also known that KSA has to address H&S issues in its construction industry. The purpose of
this study is, therefore, to assess the intersection of these concepts in assessing the current use
of BIM in KSA construction industry, in order to build upon the literature reviewed.

4.2 Conceptual H&S Framework

H&S regulation, requirements and recommendations in developed nations usually contain most
of the following current elements within the remit of a H&S framework:

 H&S guidelines issued through all industries


 Training frameworks established, inspected and examined with designated trade
requirements
 Practice codes established in agreement with professionals and workers in the industry
 An awareness of hazard situations understood and communicated throughout the
workforce
 Regular site inspections carried out though the industry
 Safety equipment made mandatory
 Information and guidance provided by a central trade body

66
Existing Frameworks of H&S Factors

 KPI agreed on, established and integrated into performance assessment


 Regulation, where it applies, can be backed by legislative powers if necessary
 Medical care and first aid supplied on site
 Management-worker communication on all safety issues, including safety notices and
signage, safety warnings, safety meetings, safety equipment supplied, lines of
communication established if emergencies should arise
 Awareness by labourers of the layout and accessibility of the site
 Site kept clear of all hazards
 Training on the operation and maintenance of all machinery by those who might operate
it

Ng et al (2005) provide frameworks of H&S factors for both the organisational and the project
level (see Figures 4-1 and 4-2). These frameworks demonstrate the factors associated with the
development of safety systems, safety procedures and practices, the establishment of safety
policies and committees, communication of policies, monitoring of policies and participation of
all stakeholders.

Figure 4-1: Organisation level H&S framework


(Source: Ng et al., 2005)

67
Existing Frameworks of H&S Factors

Figure 4-2: Project level H&S framework


(Source: Ng et al., 2005)

At the organisation level, this framework presents the following factors of importance for H&S
(see Table 4-1).

Table 4-1:Tabl: Key Health and Safety Factors (adapted from Ng et al., 2005)
Main H&S Factors Sub H&S Factor
Administrative and management Safety policy
commitment Safety rules
Safety organisation
Safety responsibility
Safety management system
Selection and control of subcontractor Safety induction and performance monitoring
Selection of subcontractor
Accident record Resources for training
Organisational safety plan
Safety review Safety audit
Organisational safety policy review
Safety and health training Accident happened
Legislation, codes and standards Compliance with legislation

68
Existing Frameworks of H&S Factors

Next, each of the factors presented in the above framework is further explored through Table 4-
2, demonstrating how each is defined within this research and how the authors addressed them.

Table 4-2: Relation between H&S factors and literature (Ng et al., 2005)
H&S Factor Meaning (adapted from Ng et al., 2005) Governing Literature
Administrative H&S must be priority at the administrative Baxendale and Jones (2000);
and management level to have measures effectively Abudayyeh et al. (2006); Anton
commitment implemented at the policy and project (1989); Ng et al (2005); Choudhry
levels. Commitment on the part of et al. (2007)
management includes safety policies,
rules, organisation, responsibility and a
management system.

Selection and Policies and practices must also consider Ng et al (2005); Pink (2008); Phau
control of the control of H&S in subcontracting et al. (2010); Al-Khalil and Al-
subcontractor selection and training. Ghafly (1999)

Accident record To monitor and improve H&S, it is Ng et al (2005); Lin et al. (2014);
important to keep a record of all OSHA (2002); Lawton and Parker
construction related accidents, including a (2002)
system for accident recording and
reporting, as well as conducting
investigations to analyse the accidents.
Safety review Safety should be monitored, even when Lin et al. (2014); Aksorn and
accidents do not occur, through frequent Hadikusumo (2008); Abudayyeh
and regular safety audits of the safety et al. (2006); Ng et al (2005)
management policies and system
implementations, which includes
organisational safety policy reviews.

Safety and health To communicate H&S policies and best Kartam et al. (1998); Hallowell
training practices to all involved actors, companies (2010); Sulankivi et al. (2010);
must incorporate training programmes and Berger (2008); Arastoo et al.
methods for communication between (2013); Alasmari et al. (2012);
trainings. Hassanein and Hanna (2008);
Awad (2013); Abudayyeh et al.
(2006); Ng et al (2005)

Legislation codes Governments must provide H&S Ng et al (2005); Cotton et al.


and standards oversight and companies must comply (2005); OSHA (2002); Anton
with occupational H&S legislation, codes (1989)
and standards.

(Source: Ng et al., 2005)

69
Existing Frameworks of H&S Factors

These factors are presented in order of importance for impact of H&S, with administrative and
management commitment designated as the most important factor for ensuring H&S, which
aligns with the findings of Toore & Ogunlana (2010) and others. The measures associated with
each of these factors are outlined in the next section as KPI needed to implement the factors in
the framework for optimal outcomes.

This framework (Ng, et al., 2005) provides insight into the KPI that are essential to the
development of H&S policies in KSA. These indicators have already been proven to be effective
at keeping those working within the construction industry safe, so it only makes sense that they
are used as the basis for H&S policy creation. The indicators are introduced in the order of
performance designated in the framework, beginning with administrative and management
commitment. A seventh dimension has been added as the final sub-section to introduce the role
of BIM to the framework factors as an additional performance indicator.

4.3 Administrative and Management Commitment

H&S is viewed within the literature as a top-down process. Thus, it is essential for action to be
taken at the administrative level to improve H&S outcomes. If managers can understand H&S
needs and implement a procedure to put best practice into effect, it is likely to succeed. Arastoo
et al. (2013), Alasmari et al. (2012), Hassanein and Hanna (2008) and Awad (2013) all highlight
the importance of H&S issues being understood and communicated by management throughout
the workforce. This relates to the ability of managers to respond to key issues in a timely and
effective way. A widely held view is that most accidents are not instigated by an inconsiderate
or thoughtless workers, but rather through the failure to be largely in control, which can be
eventually blamed on the management of a project (Baxendale & Jones, 2000).

The roles and responsibilities of stakeholders (e.g. construction manager) cover a wide range of
areas in the construction process. Management should ensure that sufficient resource is
allocated for safety activities and that regular safety meetings and training are in place
(Abudayyeh et al., 2006).

H&S in construction has been described by a number of researchers as the carrying out of work
duties and activities following H&S guidelines that are aimed to minimise or remove hazards

70
Existing Frameworks of H&S Factors

in the workplace. For example, Anton (1989) states that the adoption of H&S practices is
decreasing work related injuries in the workplace by regulating working conditions.

Management must seek to change the safety culture in order to impact H&S outcomes.
According to Phillips (2005), behaviour can be defined as the approach people take in situations
when they are exposed to the effects of the outer environment. In the case of the construction
industry, Lunt et al. (2008) report that to alter people’s behaviour, barriers should be overcome,
including complex work settings and the diversified aspects of the construction site, which can
be home to a mixture of cultures and tongues. Despite this diversity, the senior members of the
management team can be extremely influential and inspirational in terms of maintaining a
positive attitude about H&S behaviour, an absence of which can lead to adverse effects. In fact,
unsafe work behaviour can result in around 80%-90% of all accidents (Phillips, 2005). As such,
a behavioural approach has become of a particular importance in dealing with safety issues, as
it sheds light on the psyche of the workforce in the workplace.

One area in which management must seek to impact culture and improve H&S outcomes is
incident reporting. As learning from H&S incidents is key to improving the quality of life of
those working in KSA construction sector, administration must seek to promote an incident-
reporting culture, which also aligns with the accident record component of the above
framework. However, research suggests that as human error is a factor in about 80% of
accidents, there is a complex culture surrounding reporting, as this can often imply wrongdoing
on the part of the reporter (Lawton & Parker, 2002).

4.4 Selection and Control of Subcontractors

KSA regulations provide that the lowest construction bid is accepted and secures the contract
(MFNE, 1985). Projects generally employ numerous different subcontractors in the
construction phase, the result of which is that there is often a lack of oversight of the H&S
policies and measures adopted by these subcontractors. For this reason, Ng et al. (2005) argue
that it is important for management and administration also to consider oversight of
subcontractors, both in selection and management, in H&S policy and implementation. This
might include training and communication being delivered in the same manner as the company

71
Existing Frameworks of H&S Factors

would do internally or it could take the form of including H&S considerations in the selection
criteria, such as ensuring the subcontractors have their own H&S policies and implementation
system, as well as ensuring they are in compliance with any established legislation.

4.5 Accident Record

It is imperative to keep a record of accidents to understand vulnerabilities and the procedures


needed to reduce these accidents. There are trends in H&S accidents that are important to note
for improving outcomes. For instance, falls are the cause of many serious injuries and deaths.
More than half pf falls in construction are related to environmental factors, involving to some
extent the working surface or facility layout conditions. Inadequate or inappropriate use of fall
protection PPE and removed or inoperative safety equipment contributed to more than 30% of
the falls (Huang & Hinze, 2003).

For accidents, many factors should have recorded, such as the nature of the accident, details
about the firm and the work site and precautions that were taken to prevent the accident. Smaller
sites also showed problems with health and welfare and in safety administration. Al-Haadir and
Panuwatwanich (2011) quote Berger’s (2008) results that 25% of construction sites surveyed
provided no PPE. In a similar study to that conducted by Janaddi and Assaf (1998), Kumar and
Kumar (2012) reported that in their study, of construction sites in Sri Lanka:

"Usage of personal protective equipment is very minimal. Helmets are not familiar in
most of the sites. Awareness among the workers regarding the usage of PPE is lacking.
The contractor / employer is not providing the PPE to the labourers at their site. In some
sites, even though workers are provided with PPE, workers are not using it properly. For
example, workers are using their helmets for storing and carrying oil" (p. 30).

Huang and Hinze (2003) lay the blame for accidents on problems that could be averted with a
properly managed code of practice and H&S training. They cite a lack of proper training,
inadequate safety equipment and poor enforcement of safety requirements as major causes of
accidents. Trends in these factors should be indicated in the reporting process to implement risk
averse policies.

72
Existing Frameworks of H&S Factors

4.6 Safety Review

Regular site safety audits are orderly and feasibly independent investigation to decide if
operations and related findings comply with scheduled measures and whether these
arrangements are carried out effectively in a manner that is appropriate to meet organisational
goals and objectives. Reviews of system management safety (SMS) audits should be carried out
at least once a year to identify each of the critical elements of the SMS and decide whether
matters are going well and if any changes need introducing. The major aim of the research was
to provide a method to be utilised by inspectors within the construction industry in assessing
H&S performance/improvement over a period of time within a specific sector.

In the US, safety regulations, in particular the “general duty clause” from the Occupational
Safety and Health Administration (OSHA), require that employers provide their employees with
safe and healthy working environments, free from recognised hazards. To meet this
requirement, contractors typically adopt a mix of safety approaches, such as regular safety
meetings, substance abuse programmes, task-specific safety training and pre-project safety
planning (Lin et al., 2014)

Aksorn and Hadikusumo (2008) suggest that safety inspections are very effective in preventing
accidents. In any given working environment, safety inspection teams in the organisation should
identify a number of hazards that have to be tackled. In addition, the chief
contractor/construction manager should carry out and note down the results of regular daily and
weekly safety inspections of the work site that can be either formal or informal, in order to
ascertain the legality and consistency of practices and those of the subcontractors/trade
contractors employed by the organisation. For inspectors to make the most of these benefits and
to maximise their potential, a methodology has been introduced to address the current inspection
practices and operations from an organisational point of view. This tool is intended to offer a
structure for full utilisation of the current inspector’s skills, knowledge and experience. Through
an approach grounded on skills and experience, one can rest assured that the measures chosen
will be not only significant but also wide-ranging.

73
Existing Frameworks of H&S Factors

Proactive approaches to H&S could identify risks before accidents occur. In developing
countries, the first step to the creation of an acceptable H&S framework in the construction
industry is to be proactive and protective, not reactive and restrictive. Information modelling
has been utilised for H&S education to demonstrate the dangers within the context of digital
imagery (Chen et al., 2013), but has also been adopted in the planning stages of ventures in
order to lessen the risk of accidents or mishaps in the physical building stages (Qi et al., 2013).
Regrettably, over the last few years, the building sector has seen more employee deaths or
serious injuries than any other area of the private sector. This is due somewhat to the developers
lacking detailed understanding of H&S considerations and, therefore, numerous dangers being
inadvertently designed into modelling and planning diagrams.

4.7 H&S Training

According to Kartam et al. (1998), in most developing countries’ construction sites, there are
no training programmes for staff and workers. Therefore, no orientation for new staff or workers
is conducted, no hazards are pointed out and no safety meetings are held. Employees are left to
learn from their own experience and mistakes. In order to reduce the frequency and severity of
construction accidents, firms implement safety programmes and procedures that include written
safety plans and training (Hallowell, 2010). Nevertheless, lack of safety training and practices
were identified as key factors behind many construction accidents (Sulankivi et al., 2010). New
employees usually come on board without prior knowledge of hazards they may face during the
work on a construction site. A recent study on safety among many construction projects across
KSA shows that 38% had no trained safety personnel (Berger, 2008). A highly trained
workforce can operate in a more efficient and safe manner to ascertain the various obstacles or
barriers to successful and effective implementation of BIM in the management of H&S in an
organisation.

Regular on-site safety meetings and training enable global construction companies operating in
KSA to have an input from their experts throughout the world who can see the 3D model. It
enables the designer to feed information to the contractor throughout the build phase. It removes
the need for paper 2D drawings to be carried around the construction site. The model can be
electronically transmitted to a hand-held device that several people can access at the same time.

74
Existing Frameworks of H&S Factors

It can be electronically transmitted to screens placed at important point on the site. Another
advantage of this is the facilitation of communication between contractors and subcontractors,
and between contractors and their workforce. This presentation of information in the most
accessible manner, in visual terms, can scale the language barrier which, as was seen in the
literature review is one of the greatest challenges to safety where a migrant labour force is
employed. It can enable a spread of information at induction safety meetings and at regular
meetings held by the site safety officer, either for the entire staff or for those who might be
involved in a specific task.

Therefore, according to this study, there exists a division between intelligence and knowledge,
and it is emphasised that there is a need not merely to exchange product and process information,
but also to include a coordination of the opinions, concerns and specific issues present.
Knowledge, it could be said, is a qualitative matter. In order to share knowledge, there should
ideally be a joint understanding of culture, safety climate, expertise, environment and
technology. Therefore, in order to use BIM technology to its fullest extent, there has to be some
experiential input, perhaps over time, no matter how short. BIM technology may be able to be
used more innovatively and usefully when it becomes more widespread. The understanding of
safety aided by design technology may not be fully realised until there has been some diverse
and multicultural experience of what it can offer, when fully understood and when that
understanding can be shared. However, until there is widespread education relating to how BIM
works and how it can provide a visual, immediate and sequenced insight into how a building
can be perceived and projected, and how those who work on it can be protected, the unique
safety features available holistically through BIM may not be recognised by contractors
operating on sites in KSA.

4.8 Legislative Codes and Standards

Cotton et al. (2005) conclude their paper on labour standards on construction sites in developing
countries by noting that "more regulation is not the urgent issue; incorporating existing
legislation into construction contracts and making clauses operational is a priority" (p. 5).

75
Existing Frameworks of H&S Factors

This view, that contracts should include existing legislation on H&S so as to make contractual
agreements dependent on compliance, was foregrounded by several interviewees in that study,
and sanctions or bonuses were also mentioned. In 2014, Dubai made it a contractual issue that
new builds must use BIM to secure national building approval. The fact here is that there are
existing regulations in KSA, but contractors largely ignore them. “Labour law” includes
additions in the last year to cover most of the concerns raised in this study about H&S of
construction site workers. They include the mandatory wearing of safety equipment, safety belts
for those who work at heights of six feet and over, and having a paramedic on site for sites
employing more than 50 workers. Additionally, a new regulation was created: ‘it is generally
prohibited to let a worker work outdoors between the hours of 12 pm to 3 pm from 15 July to
15 September of each year’. However, there are some doubts as to whether these laws will be
obeyed.

In addition to those regulations and the legislation passed by the government, there are other
forms of regulation that are or should be on site. According to the literature review, these are
very frequently ignored. They include the collection of incident reports, on-site training, the
services of a site manager and notifications of accidents. As has already been mentioned, the
UK intends to incorporate building regulations into BIM, so that architects can see whether the
planned building is compliant with these. That appears to be a very positive step, but where
building regulations are unknown or ignored, and where there is insufficient monitoring of H&S
compliance, the best solution may be that contracts should be signed only when H&S matters
are fully incorporated into the plan of the proposed works. However, there are other ways in
which BIM could assist H&S practices to establish themselves on the construction sites of KSA.
These could be proactive rather than reactive. This is certainly the first and most important item
for the framework.

4.9 Role of BIM in H&S Outcomes

ICT has been adopted in the developed world to assist in better communication and provide
better cooperation between individuals and businesses. The manner in which building ventures
work is that they inevitably comprise a large number and range of employees and interested
parties, who share information to lower the chances of accidents and injuries and to encourage

76
Existing Frameworks of H&S Factors

better choices being made with fuller, more detailed data. Despite this, there has not been a
particularly large improvement in H&S within the construction sector, even with the advance
and advantages of computerisation (Aguilar & Hewage, 2013). Therefore, pragmatic and useful
technology is needed at least partly to begin rectifying this situation.

Over the last few years, there have also been rapid advances in mobile computing. This type of
computing can be described as that which enables the owner to use their device in any location,
or even whilst travelling between different locations and without the need, necessarily, to be
connected to a power supply or have any cables with them.

BIM offers possibilities for improved H&S outcomes: visual presentation cuts across the barriers
of language, but video screens in the workplace or hand-held technology may produce the safety
message in a visual, non-verbal and, therefore, non-threatening way (see Figure 4-3). New
technology can cross the barrier between management and worker and offer instant translation.
Workers can also perhaps use translation technology to remain in touch with each other. It is
surprising that KSA has not yet fully accepted the opportunities that technology can offer to the
current workforce and play to the strengths of a multicultural workforce. Chiu and Russell
(2011) argue that the adoption of visualisation tools can both enhance communication between
the employees and the choices they make, improve their understanding of the information
provided to them and produces more thorough and detailed data, a better ability to understand
and convey the data, reduces the chance of misunderstandings, conveys the project’s drift as
regards time and budget and examines the standard of the project’s timescale.

BIM allows safety measures to be incorporated in the design phase of construction project: over
the years, the building engineering and construction industry has gradually become more
complex and wide-ranging; therefore, BIM as a vital resource that helps to ensure safety through
the continuous and robust supervising of data and project management and is crucially
important in the entire overseeing of all stages of a construction venture, whether this is the
initial re-direct or the very last phase (Skibriewski & Ghosh, 2009).

Therefore, the early development stages of a build can offer the best chances to eradicate, or at
least greatly minimise, dangers and risks before they have a chance to arise on an actual

77
Existing Frameworks of H&S Factors

construction site. Prior study in this area suggests that there have been insufficient methods or
mechanisms to help developers confront this problem (Ku et al., 2010). Skibriewski and Ghosh
(2009) point out that another challenge posed to the construction sector is that it does not have
a rigid, pre-set flow of production and, therefore, may lack the ability to test the product, the
building, before constructing it.

Regulating

1. In developing countries the first step to an acceptable H&S framework in the construction industry is to be proactive and protective, not reactive and restrictive.
2. In establishing a proactive and protective H&S system, designers and contractors should embed these issues into the initial design of the construction projects and
adopt the working practice of safety in design.

Communicating

3. Safety in design must be communicated through to safety in construction, preferably though a seamless system of a single contractor within a safety climate, but
where this may not be possible, communicating information could be facilitated by technology
4. BIM information technology is able to communicate directly in a non-verbal manner, to offer management teams and managers and the workforce, so they can
understand the safety implications of a task before it is carried out.

Managing

5. If inputted correctly the most reliable and valid management system for the H&S of the workers on a construction site is a complex, developmentally-aware data
management system like BIM. It can produce outcomes of any changes made to the initial plan over time.
6. BIM could be a vital instrument in breaking down the language and cultural barriers of a migrant workforce by enabling H&S messages to be embedded in every
aspect of the daily routine through screening virtual presentations of all aspects of the build and the workers’ roles, schedules, safety instructions and progress on a loop
system throughout the site.

Figure 4-3: BIM and H&S in the Construction Industry

Kiviniemi et al. (2011) report that 44% of deaths on construction sites worldwide are related to
design issues and could have been prevented in the initial design. Informed by these statistics,
designers and architects who work with BIM have adopted the strategy of identifying probable
hazards and resolving H&S problems at the design stage. It has been said that in the past, and
in some cases in the present also, safety has been considered as separate from construction
planning. Currently, those who adopt BIM methodology are operating from the standpoint that
design should be capable of protecting its constructors and preventing accidents. This view and
strategy has been named “safety in design”. One of the major advantages of BIM is that the
design can adapt seamlessly to design faults that have the potential to create hazards.

78
Existing Frameworks of H&S Factors

However, there are two practical barriers to the adoption of safety by design in a country where
the DBB tradition operates, as it does in KSA. This often has the effect of separating the design
stage from the building phase. This means that the construction is already planned before a
contractor bids for the build itself. This effectively is a barrier to safety by design and the use
of BIM because the use of the technology must continue throughout the build. Additional
considerations include the ability of BIM to enter 4D (scheduling) and 5D (ongoing costs). It
makes little sense for the 3D, 4D and 5D design elements not to be available as a tool for
deciding on the successful bid. It is clear, however, that the DBB choice of awarding the project
to the lowest bidder and the false division between design and build is not always applied in
KSA. If it had been awarded to the AECOM company, they would have had to separate their
own design and contracting services with the possibility that their BIM adoption in design with
its built-in safety features might have been disregarded in the build stage. In this instance, one
company took on both roles.

Another barrier to the use of safety by design is the division of responsibility in the DBB model.
When this is used and strongly adhered to, responsibility for all safety aspects of the build itself
lies entirely with the contractor. This would mean that the design team is not fully committed
to safety, as it is possibly not something they need to concern themselves with at that early stage
before bids have been accepted. Therefore, a seamless system of procurement that uses BIM
throughout its coordinated design and construction stages would enable safety by design to
operate. The division of labour and responsibility appears to threaten the basic H&S needs of
those working on construction sites in KSA. It is very important for designers and builders to
communicate if the highest standards of safety and wellbeing are to become a reachable goal.
And this is only one of a number of issues that involve barriers to safety being created through
failures in communication.

BIM provides opportunities for 3D/4D/5D visualisation/simulation: 3D and 4D digital imagery


for H&S induction presentations is a step towards bridging the communication gap caused by
verbal barriers. The 3D demonstrations help with a clear explanation of each phase of building
ventures, especially when dealing with KSA’s migrant workforce. Verbal direction and multiple
interpreters can be substituted by digitally created visualisation in site inductions. From a H&S
perspective, such as presenting the upcoming task to the employees, this could be outlining the

79
Existing Frameworks of H&S Factors

safety rules and specifications for a particular stage or element of the project and an explanation
of potential risks and dangers. Aguilar and Hewage (2013), for example, argue that 4D
presentation offers a more detailed and thorough understanding of such a project than
conventional 2D graphics and timescales. Jongeling and Olofsson (2007) concur, noting that
4D imaging offers its clients a simple and comprehensible visualisation of the project’s
anticipated timescale, as well as assisting in the communication between the many stockholders
of the construction at hand. Thus, 4D BIM can also be adopted as a method to see the dangers
or risks that may arise during the work.

These can be viewed in 3D as information is added to the on-going visualisation. Rather than
using 2D paper designs and outlines that may be difficult to read and certainly difficult to use
in communicating a hazard, the creation of a 3D model makes the project visible in all its
aspects. Therefore, it can be seen quickly where scaffolding, safety rails, work space where
heavy machinery is operating and where safety equipment must be used. Interestingly and
usefully, BIM does not incorporate all building safety codes and regulations from all nations.
Instead, these codes are input manually according to the specific H&S regulation operating in
that country. This, in short, means that possible H&S problems arising on building sites that are
environmentally or culturally specific and covered by building codes or regulations for that
country can be added to the design characteristics that should be considered. For instance, the
high temperatures in the summer months in KSA that impact on worker comfort and work
efficiency are now embedded in KSA H&S regulations, and from there can be entered as input
to BIM. Kiviniemi et al. (2011) have written about the holistic nature of BIM, in that rather than
a drawing, this system is basically a simulation, in which everything necessary can be
incorporated as the building presents all its features simultaneously.

BIM improvise opportunities for strong and clear communication links between all
stakeholders: at its worst, communicating can be top down in a hierarchical and dogmatic
manner, or bottom up in a disempowered and disengaged manner. At its best, it is a cooperative
interchange of ideas and experience that most resembles a transaction. But it need not involve
one-to-one and person-to-person interchanges. Communication can be a process in itself, such
as the medium of technology and the kinds of information this can enable. On a macro level, it
can also be an exchange of vital information between one organisation and another or between

80
Existing Frameworks of H&S Factors

one section of a sequence and the next, within a system. It can exist through words, pictures,
sounds and touch, amongst other means and methods. However, without its full employment,
no organisation of any kind could exist or make progress.

A computerised safety mechanism was formulated by Zhang et al. (2013), designed with the
capability of notifying building engineers, supervisors and the managerial team of all the
specifics of the H&S aspects required; and, importantly, how and why these are required, in
order to reduce the risk of falling incidents, prior to the construction work commencing.
Benjaoran and Bhokha (2010) problem out that could be the limited, if developing, use of
advanced information technology in KSA, as referenced in the literature review and evidenced
in the results. The use of personal technology and a technophile culture assists with
communication in a very basic way, limiting the need for excessive verbal material. The use of
emoticons, of instagrams, “selfies”, txtspk and memes enables a cultural understanding that
communication can be non-verbal or shorthand and that information can be shared instantly
with thousands of others. It is this constant use of alternatives to words that can make for an
easier and rapid exchange of information between one part of a building project and another, or
one member of a construction team and another. Traditional understandings of what is
understood by information sharing can be overtaken by the ease and more focused use of
technology, like BIM.

BIM improves the management of data: one of the most important issues in H&S is to learn
about what management means. Essentially, it involves looking at data of whatever kind,
placing them in appropriate locations and learning from what they then convey. It is one of the
most important features of management that if data are entered and saved correctly, then
accurate results will be provided. The same is true of any research study and of any decision-
making process. The outcomes are enabled by two factors. One is the clarity of the data
collection and input; the second is the ability of a software program or storage space to manage
that and provide a result when asked for it. This is the most important feature of BIM as a
technological development. If the data are correctly collected and uploaded, they can be
managed by BIM, and the results obtained will be the most reliable. As with all data-dependent
programs, depending on the accuracy of the input, the outcome will be accurate.

81
Existing Frameworks of H&S Factors

In the past, and even recently, the ability of a simulation program to weigh all input, coordinate
it with other input and give a reliable result was limited. With BIM, the data are combined
within the program and will produce not only a result but also a visualisation of the construction,
depending on the data provided. It is clear, therefore, that the collection and input for BIM must
use all tried and tested methods currently at the disposal of researchers in fields including
architecture, surveying, designing, construction, engineering, material management,
accountancy, human resources and H&S. If this is done well, what will be produced will be
something that can be relied upon; therefore, the BIM simulation itself becomes the project
management process. That applies to materials, process and construction itself, the non-human
elements of management. However, if human needs are input into the data, then results will
manage the best means of ensuring their efficacy and safety. Furthering reliability is the fact
that this is a program that allows changes over time and that visualisation can continually update
end results of changes and developments.

4.10 Identifying Gaps in the Literature

This research study is exploratory. Its objective is to discover more about the understanding of
H&S issues in the construction industry workforce in KSA and to examine the nature of the
challenges presented to it. In a review of literature on this subject, it has examined what has
been studied and identified to date and any conclusions that may have been arrived at by
researchers. Three research questions have arisen from the first part of the literature review, that
part investigating current practices in the industry and the views of those engaged in the
construction industry in KSA as far as H&S are concerned.

Crucially the study will take account of the contributions to the framework that could be made
by BIM technology. It is important to recognise that although BIM is a new tool within the
construction industry, it can facilitate the and enable solutions to many of the problems that
have been seen to present themselves both in Saudi Arabia and in many other developing
countries that are attempting to build an infrastructure for present and future growth

82
Existing Frameworks of H&S Factors

4.11 Finding

In the literature review, H&S regulation, requirements and recommendations in developed


nations usually contain; H&S guidelines, Training frameworks, Practice codes, Regular site
inspections, Safety equipment and Information and guidance provided by a central trade body.
Reviews of system management safety (SMS) audits should be carried out at least once a year
to identify each of the critical elements of the SMS and decide whether matters are going well
and if any changes need introducing. The major aim of the research was to provide a method to
be utilised by inspectors within the construction industry in assessing H&S
performance/improvement over a period of time within a specific sector.

The findings on H&S is viewed within the literature review as a top-down process. Thus, it is
essential for action to be taken at the administrative level to improve H&S outcomes. If
managers can understand H&S needs and implement a procedure to put best practice into effect,
it is likely to succeed. It is observed that co-workers’ safety norms have a significant influence
on the at-risk behavior of an individual. It was also found out that the fellow workers’ perception
on health and safety affects an individual’s level of compliance towards safety.

The roles and responsibilities of stakeholders (e.g. construction manager) cover a wide range of
areas in the construction process. Management should ensure that sufficient resource is
allocated for safety activities and that regular safety meetings and training are in place. Influence
of the Supervisors is the immediate hierarchical position for the worker, play a pivotal role in
company health and safety practices. Majority of safety procedures, monitoring means which
come from the senior management are implemented by supervisors. In a study conducted on
employee attitudes towards safety, Cheyne, et al. (2002) found the physical working
environment as a key factor contributing to safety activities of organizations.

Role of BIM in H&S Results It is seen that in the past, and even recently, the ability of a
simulation program to weigh all input, coordinate it with other input and give a reliable result
was limited. With BIM, the data are combined within the program and will produce not only
aresult but also a visualisation of the construction, depending on the data provided. It is clear,
therefore, that the collection and input for BIM must use all tried and tested methods currently

83
Existing Frameworks of H&S Factors

at the disposal of researchers in fields including architecture, surveying, designing, construction,


engineering, material management, accountancy, human resources and H&S.

ICT has been adopted in the developed world to assist in better communication and provide
better cooperation between individuals and businesses. The manner in which building ventures
work is that they inevitably comprise a large number and range of employees and interested
parties, who share information to lower the chances of accidents and injuries and to encourage
better choices being made with fuller, more detailed data. However, there are two practical
barriers to the adoption of safety by design in a country where the DBB tradition operates, as it
does in KSA. This often has the effect of separating the design stage from the building phase.
This means that the construction is already planned before a contractor bids for the build itself.
Additional considerations include the ability of BIM to enter 4D (scheduling) and 5D (ongoing
costs). It makes little sense for the 3D, 4D and 5D design elements not to be available as a tool
for deciding on the successful bid.

BIM offers possibilities for improved H&S outcomes: visual presentation cuts across the
barriers of language, but video screens in the workplace or hand-held technology may produce
the safety message in a visual, non-verbal and, therefore, non-threatening way. New technology
can cross the barrier between management and worker and offer instant translation. Workers
can also perhaps use translation technology to remain in touch with each other.

4.12 Summary

This chapter has examined the literature addressing the use and possibilities of BIM in the
construction industry in developed countries, as well as highlighting the relationship between
BIM and H&S outcomes. To demonstrate the value of BIM in H&S, emphasis has been placed
on how and why BIM can and should be used for visualisation in the design phase, as well as
in construction. In particular, Chapter 3 puts forward three ways in which BIM stands to
enhance H&S outcomes in KSA construction industry, focusing on the development of hazard
assessments and 3D/4D imagery.

84
Existing Frameworks of H&S Factors

To address this gap, Chapter 5 outlines the research design, including the methodology for
data collection and analysis. It discusses paradigms and theoretical approaches that governed
the study considerations. Moreover, it presents the alignment between the research problem,
the research questions, the data collection and analysis processes and how these relate back to
the stated aim.

85
Research Methodology

Chapter 5. Research Methodology

5.1 Introduction

The methodology in this chapter has been adopted in order to achieve the aim and the objectives
of this research. This chapter starts by clarifying the research design used in this study. This is
followed by a discussion of the research philosophy, explaining various methods and means to
achieve the objectives and aims of the research. Finally, chosen subtitle methods and techniques
used to achieve the aim and the objectives of this research are presented.

5.2 Research Design

Mingers (2001) defines methodology as a set of guiding rules or activities that help to generate
accurate research findings. Fellows and Liu (2004) explain that it consists of methods and
principles that generate rational thinking. Saunders et al. (2003) use the analogy of a six-layered
onion (see Figure 5-1) to explain the research process. They highlight the importance of
ascertaining the philosophy of the research work; planning the research methods; following a
specific method to carry on the research work; maintaining a timetable and choosing the best
methods to collect and analyse data.

Figure 5-1:Research Process Onion

86
Research Methodology

(Source: Saunders et al., 2009)

The most important task in the first layer of the research onion is to understand one’s
philosophical stance in relation to the research question(s) posed, which generally dictates a
location within a paradigm. Remenyi and Williams (1998) highlight that researchers’ ideas
about the nature of the world and what constitutes knowledge have been an important factor in
the development of scientific methods of research. Easterby-Smith et al. (2012) identify two
“poles” of the philosophical spectrum (positivism and phenomenology) that can be usefully
employed to reflect on one’s research approach. However, the majority of researchers do not
use “phenomenology” in this way but class it as a form of interpretivism, the paradigm most
usually considered as the opposing paradigm, as Saunders et al. (2009) do in the above graphic.
Choosing or understanding one’s philosophical position in answering the research questions
requires very careful consideration, as this has important implications for structuring data
collection and analysing research data: “It is the researcher’s understandings and associated
decisions in relation to these outer layers that provide the context and boundaries within which
data collection techniques and analysis procedures will be selected” (Saunders et al., 2009).

Consistent with the position of Saunders et al. (2012), Easterby-Smith et al. (2012) also give
three important reasons why the researcher should understand their philosophical position,
Firstly, they argue that the philosophical position helps to explain the methods of the research;
secondly, they maintain that the researcher gains knowledge of the designs that will work the
best in the chosen paradigm; and thirdly, they point out that, through considering their
philosophical position, the researcher can consider designs they may not have been previously
familiar with.

Saunders et al. (2012) illustrate this relationship as follows:

A researcher who is concerned with observable phenomena, such as the resources


needed in a manufacturing process, is likely to have a very different view on the way
research should be conducted from one concerned with understanding the subjective
meanings of the feelings and attitudes of the workers in that same manufacturing
process.

87
Research Methodology

Although Saunders et al. (2009) do not specifically include ontology, epistemology and
axiology in the onion model, they are implicit in each of the philosophies which they do include
(positivism, interpretivism, realism and pragmatism). This is the case since each of these
philosophies (with the possible exception of pragmatism which posits a choice of research
methods driven by the research question rather than allegiance to a particular paradigm)
includes, to a greater or lesser extent, beliefs about how knowledge is acquired about the world,
the nature of reality and value judgments. Saunders et al. (2012, pp. 109-110) considers that
ontology, epistemology and axiology are, in fact, dimensions within which competing
philosophies can be evaluated, compared or understood.

Bryman and Bell (2007) support the argument that the epistemological and the ontological
positions adopted by the researcher are of great importance, as they affect the selection of the
research methodologies and also structure the interpretation of the data which the research
generates (see Table 5-1).

Table 5-1:Assumptions of research philosophy (Sexton, 2003)


Epistemology (the “how?”) General set of assumptions about knowledge about the world is
acquired and accepted

Ontology (the “what?”) Assumptions made about the nature of reality


Axiology (the “why?”) Assumptions about the nature of values and the foundation of
value judgments
(Source: Sexton, 2003)

5.2.1 Ontology

Ontological assumptions can be dived into nomothetic (realism) and ideographic (idealism), as
argued by Gill and Johnson (2010) and shown in Table 5-2. Sexton (2003) defines idealism as
an unknowable reality perceived in different ways by individuals and realism as a commonly
experienced external reality with a predetermined nature and structure. According to Burrel and
Morgan (1979, as quoted by Gill & Johnson, 2010), nomothetic (realist) methodologies place
an emphasis on the importance of research using rigorous systematic protocols and deductive
techniques that focus on testing hypotheses. In contrast, ideographic (idealism) methodologies

88
Research Methodology

emphasise analysis of subjective accounts that allow the researcher to get inside situations in
the everyday flow of life without disrupting them (Burrel & Morgan, 1979, as quoted by Gill &
Johnson, 2010). Accordingly, idealism might be identified as the most appropriate ontological
philosophy for this study because the H&S management practices in the Saudi construction
projects are not known. In employing inductive reasoning to use emerging data to develop a
framework, this research is ideographic in that it seeks to understand the phenomenon of BIM
in H&S without the controls or limitations of testing existing theories.

Table 5-2: Comparison of nomothetic (realism) and ideographic (idealism) methodologies .


Nomothetic Ideographic
1 Deductive testing of theory Inductive development of theory
2 Explanation via analysis of causal Access to subjective meaning systems and
relationships and explanation by explanation of behaviour through understanding
covering-laws
3 Generation and use of quantitative Generation and use of qualitative data
data
4 Use of various controls, physical Commitment to research in everyday settings, whilst
or statistical, so as to allow the minimising the disruption caused by the research to
rigorous testing of hypotheses those being investigated, so as to preserve the natural
context in which their behaviour arises
5 Highly structured research Minimise structure to ensure 2-4 above
methodologies to ensure
replicability of points 1-4 above
(Source: Gill & Johnson, 2002)

5.2.2 Epistemology

Epistemological assumptions can be divided into two categories – those corresponding to the
philosophy of positivism and those corresponding to the philosophy of social constructionism
(interpretivism), as Easterby-Smith et al. (2012) indicate (Table 5-3). In positivist philosophy,
there is a general belief that the world conforms to fixed laws. Such approaches have
traditionally been popular amongst natural and physical scientists. Positivist researchers may
argue that “the world exists externally and that its properties should be measured through
objective measures rather than being inferred subjectively through sensation, reflection or
intuition. They use the deductive approach for the research” (Easterby-Smith et al., 2012). This
study employs assumptions of social constructionism in that it is collecting data on the
phenomenon to advance the situation, accounting for stakeholder perspectives for the purpose

89
Research Methodology

of theoretical abstraction. In other words, while BIM usage in H&S in KSA construction
industry is to be studied, the purpose of understanding it is to gain the ability to improve it.

Table 5-3:Contrasting implications of positivism and social constructionism.


Assumptions about Positivism Social Constructionism
The observer Must be independent Is part of what is being observed
Human interest Should be irrelevant Are the main drivers of the science
Explanations Must demonstrate causality Aim to increase general
understanding of the situation
Research progress Hypotheses and deduction Gathering rich data from which ideas
through are induced
Concepts Need to be operationalised, so that Should incorporate stakeholder
they can be measured perspectives
Units of analysis Should be reduced to the simplest May include the complexity of
terms “whole” situation
Generalisation through Statistical probability Theoretical abstraction
Sampling requires Large numbers selected randomly Small numbers of cases chosen for
specific reasons
(Source: Easterby-Smith et al., 2012)

Interpretivism, by contrast, involves an epistemology that “is directed at understanding


phenomena from an individual’s perspective, investigating interaction among individuals as
well as the historical and cultural contexts which people inhabit” (Creswell, 2009). Moreover,
“it is necessary to explore the subjective meanings motivating the actions of social actors in
order for the researcher to be able to understand these actions” (Saunders et al., 2009, p. 111).
They argue that an interpretivist paradigm may often be highly appropriate in business and
management research, particularly in such fields as organisational behaviour, marketing and
human resource management.

5.2.3 Axiology

Saunders et al. (2009) consider that that how the researcher deals with value judgments is the
third aspect of the research philosophy (see Figure 5-2). Axiology can be seen as having two
poles, namely “value free” and “value laden”. The choice of the subject and method of study is
different in each of these axiological positions. In “value free” studies, the selection of topic, as
well as the method of study, depends on the aim criteria; but in “value laden” research, what to
study depends on experiences and beliefs of humans (Easterby-Smith et al., 2012) (Fig. 5-3).

90
Research Methodology

This research is value laden, as it focuses on the current state of a phenomenon, H&S in KSA
construction industry, for the purpose of improving outcomes.

Figure 5-2: Research philosophy


(Source: Sexton, 2003)

5.3 Research Approach

In the second level of onion research, the essential choice to be made is between deductive and
the inductive approaches. The deductive method centres on theory testing, particularly through
testing hypotheses using some form of quantitative procedure (e.g. inferential statistics), while
the inductive approach aims to build up new concepts and develop new theories from the data
collected (Gabriel, 2013). Deduction is usually associated with quantitative research work,
whereas inductive research is associated mostly with qualitative research; but these are
associations rather than rules, so that either deduction or induction can be part of qualitative or
quantitative research (Gabriel, 2013).

This research study, although using a mixed method combination of a survey and semi-
structured interviews, utilises an inductive approach. Inductive reasoning is appropriate for this
study, as data collection focuses on specific observation, from which broader generalisations
are drawn to develop the framework. While deductive research is aimed at testing theory,
inductive research is used to generate theory from emerging data. In the context of this study,
the theory takes the form of a new framework. Research questions are being addressed in this
study, in order to build up explanation and theory. Specific hypotheses are not tested.

91
Research Methodology

5.3.1 Methodological Choices

This section refers to the selection of appropriate research methods adopted to collect the data.
Saunders et al. (2012) present this in diagrammatic form (Figure 5-3), classifying the research
choices into two sections: mono method (using a single data collection technique and
corresponding analytical procedures) and multiple methods (using more than one data collection
technique and corresponding analytical procedures to answer the research question).

Figure 5-3: Research choices


(Source: Saunders et al., 2012)

Mixed methods are chosen to answer these research questions using the strengths of quantitative
and qualitative research. Mixed methods are appropriate for this study, as they allow the
researcher to address the phenomenon from more than one relevant angle for the purposes of
collecting ample data and developing a robust framework. Quantitative research may be
employed to plug the gaps in a qualitative study that arise because, for example, the researcher
cannot be in more than one place at any one time. Alternatively, it may be that not all issues are
amenable solely to a quantitative investigation or solely to a qualitative one” (Saunders et al.,
2012). Moreover, Tashakkori and Teddlie (2003) argue that multiple methods are useful if they
provide better opportunities for answers to research questions and where they allow better

92
Research Methodology

evaluations of the extent to which research findings can be trusted and inferences made from
them.

5.3.2 Mixed/Multi-method Research

The term ‘multi-method’ refers to studies where data collection techniques are combined within
a study but the two are not integrated with each other, i.e. quantitative data gathered are analysed
within a quantitative framework only and qualitative data is analysed within a qualitative
framework only (Tashakkori & Teddlie, 2003). Many recent research studies, the latter claim,
are adopting different aspects of both the qualitative and quantitative systems. It is suggested
that several researchers have benefited considerably from these strategies that connect usefully
to each of the systems and, by doing so, have been able to shed light on drawbacks that may be
revealed in one or other of the approaches (Mingers, 1997; Morgan, 2006). Saunders et al.
(2009) indicate that mixed method research uses quantitative and qualitative data collection
techniques and analysis procedures either at the same time or sequentially, but are not
necessarily combined. Qualitative data are analysed qualitatively and quantitative data are
analysed quantitatively. Differences and strengths and weaknesses between them are presented
in Tables 5-3 and 5-4, respectively.

Strauss and Corbin (1990), the researchers who developed grounded theory, offer the opinion
that any research that is based on a qualitative method is more appropriate than that which
involves quantification or statistical methods. They further explain that qualitative research
offers results that are simple and general in nature, whereas qualitative researchers are in search
of understanding and the relation of this situation to others. However, the quantitative method
of research is more than generating numbers and statistics. It usually tests a pre-chosen
hypothesis by use of quantitative concepts, including analysis and evaluation of significance. In
quantitative research, experiments may sometimes be used (Strauss & Corbin, 1990). However,
it is not necessary for a study to be restricted by the two aforesaid methods. According to
research philosophy, both the qualitative and quantitative approaches can be used in a mixed
methodology, which Patton (1990) feels is the most appropriate method. In other words, a
research study can adopt any of the paradigms and employ either qualitative or quantitative
methods for data collection and analysis, or a combination of the two, according to its overall

93
Research Methodology

requirements and the information needed to answer the research question(s). However, there are
some rules that should be followed in mixed methodology. The study can be complete only if
there is scope for using both methods for analysis and evaluation of the data.

Table 5-4:Differences between quantitative and qualitative research


Quantitative Qualitative
Role Fact-finding based Attitude measurement based
on evidence or on opinions, views and
records perceptions measurement
Relationship between Distant Close
researcher and subject
Scope of findings Nomothetic Idiographic
Relationship between Testing/confirmation Emergent/development
theory/concepts and research
Nature of data Hard and reliable Rich and deep
(Source: Bryman, 1998, as quoted by Naoum et al. 2007)

This study adopts a mixed methods approach, which in terms of Saunders et al. (2009)
taxonomy is mixed methods research (see also Table 5-5):

"Mixed method research uses quantitative and qualitative data collection techniques and
analysis procedures either at the same time (parallel) or one after the other (sequential)
but does not combine them. This means that, although mixed method research uses both
quantitative and qualitative worldviews at the research methods stage, quantitative data
are analysed quantitatively and qualitative data are analysed qualitatively. In addition,
often either quantitative or qualitative techniques and procedures predominate" (pp. 152-
3).

5.3.3 Quantitative Data Collection and Analysis

The philosophical origin of quantitative research methods is physical science; hence, it has to
depend on the objectivists’ presumptions and insight about society as a whole. Research studies
utilising these methods are carried out through dispassionate systems of gathering data and
analysing it quantitatively by means of numbers. It employs “empiricist” or “positivist”
paradigms; it adopts the stance that there is a sole existing reality in the world, which is enforced
by natural laws and is, therefore, unquestionable and is not dependent on human explanations

94
Research Methodology

(Creswell, 2013). Moreover, quantitative research is dependent on two study methods, namely
experimentation and research on surveys (Bashir, 2013; Creswell, 2013).

Table 5-5: Strengths and weaknesses of quantitative and qualitative research.


Quantitative Qualitative
Strengths Can provide wide coverage of a Data gathering methods seen as more
range of situations. natural rather than artificial.
Can be fast and economical. Ability to look at change process over
Where statistics are aggregated time.
from large samples, may be of Ability to understand people’s
considerable relevance to policy meaning.
decisions. Ability to adjust to new issues and
ideas as they emerge.
Contributes to theory generation.
Weaknesses The methods used tend to be Data collection can be tedious and
rather inflexible and artificial. require more resources.
They are not very effective in Analysis and interpretation of data
understanding processes or the may be more difficult.
significance that people attach to Harder to control the pace, progress
actions. and end-points of research process.
They are not very helpful in Policy-makers may give low
generating theories. credibility to results from qualitative
approach.
(Source: Easterby-Smith et al., 2012)

A survey within a positivist paradigm is a method of collecting data systematically from a


chosen number of individuals. It involves distributing questionnaires to those participating in
the study or conducting generally closed-question online, face-to-face, email, postal or
telephone questionnaires to participants sampled from the population of interest; these may be
self-administered or interviewer-administered. Each survey mode has particular advantages and
disadvantages (Fowler, 2009).

5.3.4 Qualitative Data Collection and Analysis

Qualitative research methods are based on the importance of the subjective perception of the
real world and acknowledging how it is idiosyncratically experienced. Unlike the employment
of quantitative methods, most qualitative methods are used within an interpretivist paradigm in

95
Research Methodology

which there are no instrumental measures. Instead, the researcher is the instrument through
which data is collected and analysed. It is a subjective rather than an objective stance, and while
this is regarded by its critics as being unreliable for this reason, those conducting this research
are encouraged to undertake a practice of reflexivity and constant self-examination that can be
one of the strengths of its paradigm.

Social constructivism is a form of interpretivism. Its guiding principle is that truth is not “out
there” and realistic, but is constantly and fluidly socially constructed by populations and groups.
According to Creswell (2013), when the qualitative method is the means of data gathering and
analysis, there are chances of meeting with different realities; these are the concepts and ideas
of various individuals belonging to different cultural, political or socio-economic groups who
have expressed their beliefs and understandings in different environmental conditions. Hence,
the researcher takes note of all information gathered and different views, then reports these
truths but does not seek to decide directly which idea is the “truth” or the nearest to reality
(Bashir, 2013).

Practically, qualitative research is dependent on two techniques – field research that involves
fieldwork and the research system that is non-reactive. In the first method, direct contact with
persons is involved and first-hand knowledge is collected; while the latter uses observational
instruments that are unobtrusive or study materials, archived accounts and official statistics
related to previous social life (Brewer & Hunter, 2006). In this type of study, the researcher
does not seek to test hypotheses but, rather, to utilise questions to guide them to reach the
primary goals and complete the tasks required.

In this study, it is clear that there should be a qualitative aspect to enable the researcher to answer
the research questions in a reliable and rounded manner. This can perhaps produce results that
are transferable rather than replicable, and this type of data collation and analysis can add depth
and understanding.

5.4 Research Strategy and Approach

According to Naoum et al. (2007), research strategy is defined as the way in which the research
objectives can be most comfortably questioned. This is the fourth level of the research onion,

96
Research Methodology

which is one of the most important stages in this study. Choosing an appropriate theoretical
approach is difficult because it has to provide direction and act as vehicle when attempting to
address the research questions and objectives within the time available, as well as in the chosen
paradigm. In order to avoid confusion and obtain clarity about the methodology and how it can
meet the research questions, this researcher adopted a survey theoretical approach (see Section
5.4.1) because this approach, above all others, provides a fit with the research objectives and
questions.

A mixed methods strategy has been chosen for this research study. The utility of using both
qualitative and quantitative methods simultaneously is that information is collected and
analysed in two different but parallel ways, whereby information generated by one method can
be seen to inform the other collection and analysis method (Creswell, 2013) (see Table 5-6).

Table 5-6: Reasons for using mixed method design


Reason Explanation

Triangulation Use of two or more independent sources of data collection methods to


corroborate research findings within a study

Facilitation Use of one data collection method or research strategy to aid research using
another data collection method or research strategy within a study (e.g.
qualitative/quantitative providing hypothesis, aiding measurement,
quantitative/qualitative participant or case selection)

Complementarity Use of two or more research strategies in order that different aspects of an
investigation can be dovetailed (e.g. qualitative plus quantitative questionnaire
to fill in gaps quantitative plus qualitative questionnaire for issues, interview
for meaning)

Generality Use of independent source of data to contextualise main study or use of


quantitative analysis to provide sense of relative importance (e.g. qualitative
plus quantitative to set case in broader context; qualitative x quantitative
analysis is to provide sense of relative importance)

Aid interpretation Use of qualitative data to help explain relationships between quantitative
variables (e.g. quantitative/qualitative)

Study different aspects Quantitative to look at macro aspects and qualitative to look at micro aspects

Solving a puzzle Use of an alternate data collection method when the initial method reveals
inexplicable results or insufficient data

(Source: Saunders et al., 2009, p. 154)

97
Research Methodology

5.4.1 The Survey as a Theoretical Approach

Saunders et al. (2009) state that the survey approach when located entirely in the positivist
paradigm is usually associated with deductive rather than inductive reasoning and is common
in business and management research. It is most frequently used to answer questions to do with
“who”, “what”, “where”, “how much” and “how many”, rather than “why” and “how”, and also
concentrates on testing hypotheses.

Fellows and Liu (2008) report that survey approaches of this kind operate mainly on the basis
of statistical sampling and only extremely rarely are full population surveys (such as a census)
possible, practical or desirable. The advantages and disadvantages of the quantitative elements
in surveys are highlighted below (Fellows and Liu ,2008).

Potential advantages of surveys include:

 With an appropriate sample, surveys may aim at representation and provide generalised
results
 Surveys can be relatively easy to carry out and need not require any fieldwork or data
entry (e.g. if they are self-administered online)
 Surveys may be repeated in the future or in different settings to allow comparisons to be
made
 With a good response rate, surveys can provide substantial data relatively quickly

Potential disadvantages of surveys include:

 Data in the form of tables, pie charts and statistics may become the main focus of the
research report. This may sometimes be seen as excessively reductionist or abstract and,
therefore, there may be a loss of linkage to real human experiences or wider theories and
issues
 The data provide static snapshots of points in time rather than a focus on the underlying
processes and changes
 The researcher is often not in a position to check first-hand how well the respondent
understands the questions. Issues of truthfulness and accuracy are thereby raised

98
Research Methodology

 The survey relies on breadth rather than depth for its validity. This is a crucial issue for
small-scale studies
 Sampling error or bias may mean that the findings from the sample do not accurately
reflect the population from which it is drawn

Response bias is often a feature of questionnaire participants: "Response bias occurs in survey
research when the responses do not actually reflect the views of the sample and the population.
For example, the individuals who return a questionnaire may be overly negative or positive "
(Creswell, 2005, p. 368). Moreover, participants, being anonymous, can sometimes appear to
falsify their response for a variety of reasons, most of them psychological.

Other survey studies using elements of the interpretative paradigm and inductive reasoning
attempt to find relationships between the characteristics of the respondents and their reported
behaviours and opinions. Marczyk et al. (2005) explain that many survey studies ask large
numbers of people questions about their behaviours, attitudes and opinions, although some
surveys merely describe what people say they think and do.

5.5 Time Constraints

Saunders et al. (2009) opine that the cross-sectional approach is a snapshot, while the
longitudinal approach would be shown, for example, in a diary. This study is cross-sectional, as
the data are collected once, relating to a particular phenomenon at a given point in time from
the viewpoint of a number of participants. As the above authors acknowledge, most research
studies undertaken for academic courses are necessarily time-constrained and, in any event, it
is unlikely that firms would have consented to participate in a longitudinal study.

5.6 Qualitative Data Collection

The data collection methods in this study includes face-to-face interviews with several
stakeholders, including construction managers and site supervisors, to identify the current status
of management of and obstacles to H&S issues in KSA construction projects. As well as primary
data, numerous secondary data were gathered from the literature review, including journal

99
Research Methodology

articles and conference reports, government reports, statistical data and several other internet
resources and websites for relevant governmental agencies.

5.6.1 Interview Method

The interview method involves questioning or discussing issues with people (Saunders et al.
2009)). Different techniques are used for interviews, like telephone, Skype or direct interviews
and focus meetings. The latter method is employed when direct interaction is necessary, so that
the situation can be handled in more detail. De Vaus (2002) is of the opinion that face-to-face
interaction can be carried out singly or as a part of a group. The current study, however, utilises
the one-to-one interview system.

Saunders et al. (2009) indicate that in adopting an interpretivist epistemology, the researcher as
interviewer will be concerned to understand the meanings that participants ascribe to various
phenomena. This method involves collaboration between the researcher and the participant, to
gain the necessary information. According to Fellows and Liu (2003), the interview has many
advantages. It provides an opportunity for close interaction between the interviewer and the
respondent, allowing for high level of control of the interview process (Naoum et al. 2007). There
is also a higher chance of obtaining detailed and in-depth information that is of high quality. Other
advantages lie in the accuracy of the answers, speed, a high response rate, the flexibility to reframe
the questions in order to give the researcher a chance to seek further clarification of the issues and
obtain more details (Naoum et al. 2007).

Interviews can be in an unstructured, structured or semi-structured format (Creswell, 2013). The


unstructured interview is similar to a conversation directly related to the research, where the
interviewee is allowed to develop ideas and follow their sequence of thought, in the style of a
sharing of views, thus the use of the word “interview”. In a structured interview, the different
interviewees are presented with questions in the same order and virtually the same wording in
a tightly controlled format of questions and answers (Marczyk, 2005). It is like a face-to-face
administered questionnaire (Denscombe, 2007). However, a semi-structured interview, though
the interviewer has a list of issues to be discussed, is flexible in terms of the order in which the
questions are answered and allows the respondent to develop ideas and speak widely on them.
Saunders et al. (2009) contend that semi-structured interview schedules should have a list of

100
Research Methodology

themes and questions to be covered but that the order of questions may also be varied depending
on the flow of the conversation, which allows for additional questions that may be needed to
explore aspects of the research questions further. A semi-structured design has been adopted in
the qualitative data collection for this study.

The semi-structured interview schedule is divided into five sections:

1. Information about the organisation.


2. Understanding the nature and the processes of construction projects.
3. Current H&S practices of the organisation and its challenges.
4. The current experience, skills and culture of site-based staff.
5. The use, if any, of BIM.

5.6.2 Interview Sampling

This sampling strategy explains the processes and methods of choosing suitable elements
(people and organisations), as shown in Table 5-7. As can be seen, the total number of
interviews was ten, comprising one official from the General Directorate of Civil Defence in
KSA, two ministry consultants, three contractors from the ministry and four engineers from
international companies. After the semi-structured interviews were designed, they were piloted
with three respondents from the target population to ensure that they found it easy to understand
the questions. The participants for the semi-structured interviews were recruited from
construction contractor companies in KSA. It can be seen from the above table that all
interviewees were given a letter of the alphabet to preserve their anonymity and to make the
data analysis easier to conduct.

The contractor companies, which are large and complex, mainly use a large number of local
and international contractors to carry out their projects. KSA ministries mainly use consultants
to supervise and monitor a project and contractors’ progress and performance.

According to the Saudi Ministry of Municipal and Rural Affairs (MOMRA, 2014), there are
currently 309 engineering companies and 2,785 construction companies registered in the AEC
industry. Despite these numbers being substantially lower than those recorded by the Saudi

101
Research Methodology

Council of Engineers SCE, which reports 2,000 registered architecture firms and more than
170,000 registered construction specialists, the MOMRA numbers are considered to be more
official than those provided by the SCE as any company accredited through MOMRA is eligible
to work in the KSA (MOMRA, 2014). Based on this evidence, this research targeted MOMRA
registered firms and construction companies as the target population.

102
Table 5-7: Interviewee information
Participant Age Position Expertise Level of Area of Years of
education work experience
IA 39 Project manager Construction Master Public sector 12
management
IB 35 Lecturer Architecture PhD University 5
IC 33 Manager and university lecturer Architecture and PhD Public sector 6
management
ID 33 Head of engineering Engineering Master Civil service 10
IE 34 Supervisor of public projects Engineering Master Civil service 8
IF 45 Project manager, international Engineering Bachelor Private 19
company (Chinese) sector
IG 44 Civil defence captain Engineering Master Public sector 20
IH 52 Site manager Engineering Bachelor Private 25
sector
II 31 Contractor Architecture PhD Public sector 6
IJ 29 Contractor Architecture Master Public sector 5
management
Research Methodology

5.7 Questionnaire Method

This study adopted a survey as a theoretical framework, to include both the interview and
questionnaire methods, with the intention of understanding behaviours, attitudes and opinions
of the participants in the construction industry. These need to be answered from different
positions, locations and experiences to obtain reliability and transferability. Its aim is to find
relationships between the characteristics of the respondents and their reported behaviours and
opinions. The proposal of this survey is to classify and gauge the critical issues that might
restrict the ability to improve the running of H&S operations in KSA construction industry.
Moreover, the survey aims to identify the most important critical factors which have an impact
on improving H&S in construction projects. Also, the survey seeks to understand barriers to the
adoption of BIM within the H&S in construction industry.

The questionnaire developed for this study is divided into five sections: respondent background;
factors related to construction projects; current communication practice in construction projects;
construction information needs on site; and challenges that affect the adoption of mobile
computing technology (see Figure 5-4).

Respondent
background

Factors related
The H&S
to
information
construction
needs on site The projects
questionnaire

The current
challenges that Health and
effect the Safety practice
adoption BIM. in construction
projects

Figure 5-4: Questionnaire sections

104
Research Methodology

5.7.1 Questionnaire Design

The questionnaire was mainly designed with a five-point Likert rating scale “often used to
collect opinion data” (Saunders et al., 2009, p. 387), which attempts to measure attitudes and
opinions. The response options range from “extremely good” to “not good at all”, from “very
important” to “not important at all” and from “most used” to “not used at all”. Possible responses
to rating questions should be presented in a straight line rather than in multiple lines or columns,
as this is how respondents are most likely to process the data (Dillman, 2011). Moreover, in
delivery and collection questionnaires, the five agreement points on the rating scale should
allow respondents to tick the middle “neutral” option, as it is less threatening than admitting
they do not know. Using this type of scale facilitates the research into determining and assessing
the impact of KPI as a method of evaluating improvement in H&S.

5.7.2 Questionnaire Layout

The design of the questionnaire is based on the research objectives and presented in four sections
(A-D), which are groups based on the type of information collected in the section. Questions in
Section A collect background information on the respondent and their experience in the
construction industry, more specifically, size of company and type of construction projects it
handles.

Section B collects information on the current H&S issues faced by respondent in the
construction industry, including H&S hazards experienced at construction sites. This helps to
analyse the current H&S challenges faced by construction companies.

In Section C, the researcher tries to gain an understanding of the current H&S measures
undertaken at construction sites. This helps in understanding the extent of its integration into
the current safety programmes, as well as the importance of integrated safety programmes and
the number of H&S hazards. An organisation with a fully integrated system should have a low
number of H&S incidents. Furthermore, this section helps to explore the current precautions
taken by the construction industries to avoid H&S hazards. This also enables the researcher to
understand the perception of construction site managers regarding the importance of different
factors for H&S programmes. This can contribute to analysis of the factors that contribute to

105
Research Methodology

H&S hazards at the construction site. This can offer insights and information relating to research
question 2 – existing challenges in the construction H&S and the safety management practices
implemented and perceived by Saudi contractors.

In addition, this section provides understanding on the current risk assessment method followed
by the organisations=. This helps the researcher to judge whether it has any formal strategy in
place to determine risks and hazards on site. This section also collects information on the H&S
training provided by the organisations, in order to avoid any H&S hazard at the construction
site. This aims to assist understanding the perception of the manager on what is the most
effective method for providing training to workers.

Section D is related to BIM and the perception of the respondent regarding its use in reducing
H&S risks at the construction site. This helps the researcher to collect data on the current
awareness of BIM in the Saudi construction industry and whether, if used, what are main
purposes of using BIM other than for H&S. Furthermore, it assists in the exploration of
managers’ perceptions of BIM regarding whether it can add to existing H&S programmes. This
can assist with answering research question 3, on how BIM can enhance improvement of
existing H&S programmes on construction sites (see Appendix 2 for a sample of the
questionnaire).

5.7.3 Questionnaire Administration and Pilot Study

In piloting the questionnaire, the researcher adopted the advice of Saunders et al. (2009)
regarding administering delivery and collection questionnaires:

 Ensure that all questionnaires are sent to participants by email


 Ask all participants to confirm receipt of the email
 Send his comment about the questionnaires
 Ensure that participants place there completed the questionnaires

However, the actual questionnaires were eventually issued online through Survey Monkey and
the procedure quoted above was only used in the pilot study.

106
Research Methodology

Pilot study

The pilot study enabled the researcher and the pilot group, made up of colleagues, to discuss
and judge the difficulty and relevance of the proposed questions. All questions were thought to
be easy to understand and reflected the information sought in the research questions.
Furthermore, they gave an opportunity to analyse the results using SPSS software and assist
with ease of analysis.

This was found to be satisfactory and the consensus of the group was that, apart from some very
minor alterations, the questions were assessed as suitable for this study (see Appendix 2).

5.7.4 Survey Sample

The strategy for selecting people for the survey was a snowball sampling strategy. This requires
the support of other people to participate in the recruitment process by approaching potential
participants on behalf of the researcher. For this study, it was often a number of professional
colleagues who were involved in the recruitment process. Although snowball sampling is a non-
probability method, it was suitable for this study, as no comprehensive list of the target
population was available to the researcher. In all, the questionnaire was distributed to 300
participants (see Table 5-8).

107
Table 5-8: Sample size of questionnaires

Numbers Number Number Number Number Overall number Overall number


identified (total) contacted (total) contacted from contacted from contacted from not of completed
government private public sector responding/refu questionnaires
register companies (and companies (and sing to take part obtained
number number
completed in completed in
brackets) brackets)

Invited to
named person 250 250 28 126 (45) 96 233 51
via email

Via generic web Random


link distributed Not applicable Not applicable Not applicable Not applicable
at these sites On twitter @ Random (generic web (generic web (generic web (generic web 129
Saudi Council of link) link) link) link)
Engineers

Overall total 250 180


Research Methodology

5.8 Data Analysis

This is a critical phase in any research after primary and secondary data have been collected.
This phase contains several key stages which help to obtain a comprehensive understanding of
the information requirement, current practices and the surrounding issues, all of which is
essential to develop the framework. This step describes how the data collected from the
interviews and questionnaires was transformed into useful and reliable information, in order to
meet the research objectives and answer the research questions. As this research adopted mixed
methods for data collection, there are different techniques in terms of data analysis. Table 5-9
displays the distinctions between quantitative and qualitative data.

Table 5-9: Distinctions between quantitative and qualitative analysis


Quantitative data Qualitative data
Based on meaning derived from numbers Based on meanings expressed through words
Collection results in numerical and Collection results in non-standardised data
standardised data requiring classification into categories
Analysis conducted through the use of Analysis conducted through the use of
diagrams and statistics conceptualisation, verbally
(Source: Hair et al., 2007)

In most research studies, data analysis includes a number of steps, such as preparing the data
for analysis, analysing it and interpreting it. Preparing data includes checking and entering them
into the computer and transforming them. It should also be remembered that data analysis is not
a direct route to interpretation. First, some way must be found of organising the data before that
can occur.

5.9 Quantitative Data Collection and Analysis Methods

In quantitative data interpretation and analysis, the issue is relatively direct, in that the numbers
obtained from questionnaire results can be immediately input into SPSS and interrogated to
create a variety of tables and charts that display the data according to ranking, percentage or
another form of numerical grading. This procedure was followed in this case, with data analysed
in SPSS version 21. Descriptive statistics and normality testing were performed. Cross
tabulations were carried out to investigate particular aspects of the survey data that the

111
Research Methodology

researcher considered to be of key importance. Selected analysis was provided in graphic and
tabular forms, bearing in mind the recommendations of Saunders et al. (2009):

 Type of data (scale of measurement)


 Format in which the data will be input to the analytical software
 Impact of data coding on subsequent analysis (for different data types)
 Need to weight cases
 Methods intended to be used to check data for errors

5.9.1 Data collection

One of the main objectives of this study is to identify the significant factors that have an impact
on H&S performance. Data are needed to develop a framework for measuring and evaluating
the H&S performance in KSA public construction industry. The questionnaire was designed to
investigate and evaluate these factors, and this section presents and analyses them.

The distribution of the questionnaire used four different approaches: social networks, web links,
email invitations and manual entry. The highest number of responses was 109 from the web
link, which used communication apps such as WhatsApp and Blackberry chat to distribute the
link. The second highest response was the email invitation, with 45 respondents. More than 200
construction company owners and managers, as well as employees, received an email from the
researcher containing information about the research and three links. The first was specific to
the recipient and when Survey Monkey got a response, the result appeared with his/her
information. That helped with the reminder email sent to those who had not fully completed the
questionnaire.

The survey was designed and distributed using Survey Monkey. It had 250 responses within six
weeks of its distribution. One hundred and eighty respondents agreed to complete the
questionnaire, nine refused and 61 provided no answer. In terms of descriptive statistics, the
data were presented using tabulations and figures.

The second most popular method was the web link used to ask the recipient to share the
questionnaire with colleagues or to unsubscribe if they do not wish to participate and thereby
stop receiving emails (see Figure 5-5). The social network link, using Facebook and LinkedIn,
saw the third highest number of responses (25). The last was manual entry, which was based on

112
Research Methodology

the same number of structured questionnaires; these were distributed to high-profile


construction industry sector players. Six of the ten questionnaires were given to construction
company owners who have advanced experience of using BIM in their companies and perfect
understanding of KSA H&S policies and guidelines. The other four questionnaires were given
to construction industry H&S professionals.

109

45

25

4.5

Social Network Web Link Email Manually Entry

Figure 5-5: Number of responses from different approaches

The response rate started from the highest number in week one and the curve dropped
dramatically to four responses in week six (see Figure 5-6). To increase the response rate, after
each week an automatic email was sent to remind those who had not responded to the
questionnaire. This technique was applied in the email invitation, which had more than 200
invitations. 109 out of 140 respondents completed the questionnaire, which represents almost
78% completed and 22% partial responses.

As the questionnaire was targeting three different groups, company owners, managers and
employees within the construction sector in KSA, the questionnaire has different responses from
the three groups (see Figure 5-7). More than half of the responses were from employees,
followed by managers then owners.

113
Research Methodology

90

40
30
15
10
4

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Figure 5-6: Response rate curve

56.50%

32.50%

11%

Construction Companies Managers Employees


Owners

Figure 5-7: Responses from different groups

This review of the quantitative data collection method and analysis is complete. The resulting
analysis appears in Chapter 6. This study now moves on to considering the methods of
qualitative data analysis.

5.9.2 Qualitative data

Interviews were used to collect the qualitative data needed to meet the aims of this research.
These were conducted generally at the participant’s place of work. Among the ten, there was a
range of management position and expertise, deliberately chosen from a list of personal

114
Research Methodology

contacts, to reflect the many different areas of experience and knowledge of the construction
industry in KSA. As referred to, the interviewees were chosen carefully, rather than being
randomly invited in a snowball manner. While the quantitative data was planned and designed
to offer large numbers of participants, the qualitative data was guided by the need for input from
specific experts and, therefore, the sample size was small.

Interviews were first arranged through email contact; this specified the ethical considerations
applicable to those who would take part in this study – consent, anonymity, confidentiality,
secure storage and permission to withdraw at any time. There was an attachment with this email,
which the participants were required to sign and send back to the researcher as permission to
allow the interview to proceed. Further permission had to be sought to record the interviews, as
it is unethical and generally illegal to use an audio recording without the interviewee’s
knowledge or consent. These precautions were applied.

Method for interviews

Interviews began with the recorded question about permission being granted for the recording.
Then the interview continued with the schedule of questions that are included in Appendix 3,
although as in all semi-structured interviews there was the possibility that a participant might
like to introduce and discuss issues that were not necessarily part of the agenda. Equally, there
could be some small variation in the order of questions asked and some could occasionally be
omitted if it appeared that answering them would be outside an interviewee’s experience.

In addition to the audio recorder, a notebook was taken into the interview room, so that any
important body language could be noted down, either at the time or immediately afterwards.
Interviews were conducted in Arabic, which was the common language of all, including the
researcher. After completion of each interview, the participant was thanked and the audiotape
taken away for transcription. In this study, the researcher did both the transcription and
translation. This is always an advantage in qualitative data, and repeated exposure to the
interview, in this case both through transcription and translation, constantly familiarises the
researcher with the core details of the interview. In qualitative data collection and analysis, the

115
Research Methodology

examination of texts should be constant and repeated. This enables the themes of the case in
general and each in its turn to emerge.

5.10 Choice of Method of Analysis

At this point of the data examination, the researcher should make a choice between using a
software program to help analyse the data or doing so manually. NVivo is the principal program
used for qualitative analysis. Some researchers prefer to work with this program and its analytic
tool, as it enables storage and breakdown of the patters to be entered under various thematic
headings and subheadings. These can then form the basis of the qualitative results. NVivo is
particularly useful if there is a large amount of data, as it has exceptional storage facility for
different types of data, but the program has to be learned and that can delay the analysis itself,
especially where there are time constraints as in a PhD. Another weakness of NVivo is that in
order to code in a particular way and “save” the few words that might contribute to a theme, the
text itself is broken up and away from the context it occurred in. It is often valuable when dealing
with smaller amounts of data to keep the texts as complete as possible. That also helps with
constant examination of and familiarisation with the texts themselves. In a small group of
interviewees, all of whom have a different life and work experience on construction sites in
KSA, keeping the texts intact enables the researcher to value the individuality of each
contribution to the data. It was, therefore, decided to code the data manually.

There are a number of ways to achieve this, but the important issue right at the beginning is to
have read the interviews so often while “mining” the data for themes to feel confident in one
chosen method, as it is said that any method that the researcher has personally identified and is
comfortable with is likely to produce good analysis and results. These data were analysed by
the use of colour coding. Seven specific themes were common to all transcripts and, therefore,
needed to be grouped in a way that was visually recognisable but that would still preserve the
transcript as a document which, if necessary, could be analysed a second time in a different
way. This is often a requirement when using mixed method, as there may be a need to link the
results of the qualitative analysis in some way with those of the quantitative analysis.

116
Research Methodology

5.10.1 Manual Colour Coding

There is a procedure for the use of colour coding in this type of analysis. Examples of each stage
can be found in Appendices 4 and 5.

 Recognise the themes common to all transcripts and designate one colour for each
 Colour code each transcript to the colour coding that could be applied to each statement
in the transcript. Not all statements need to be colour coded. A balance has to be found
between the weight of different statements, and the strongest and clearest should be
chosen
 Develop new documents of analysis, each dedicated to one of the themes
 Copy and save each of these documents (Stage 2)
 Use stage-2 documents to create the primary level of analysis

Levels of analysis can be decided at any point in the study. For this particular study, it was
decided that the primary qualitative analysis should be conducted first, so as to bring forward
those personal views and attitudes that may not have been fully explored in the quantitative
analysis and that might further elucidate or contest issues in that analysis. In this mixed method
study, the researcher chose to explore these questions by the theoretical model of survey, so as
to reveal the knowledge, understanding, attitudes and beliefs of those in the KSA construction
industry. It was hoped to provide some evidence on which a suggested framework for H&S
could be built.

5.11 Qualitative and Quantitative Methods Compared

Surveys often rely completely on the results garnered from questionnaires. This is because this
is a method that can collect the largest input in the most efficient way, particularly if those
questionnaires can be remotely produced and administered online, where they are always
available and where it is simple to log on for those intending to participate. All questionnaires
are the same, so the researcher can be sure of standardisation across the analysis of results;
moreover, using this as the primary research method can be cost effective, as there are no
transport or set-up costs. The use in this study of the Survey Monkey facility added to efficiency
and efficacy.

117
Research Methodology

On the other hand, there are known limitations to the questionnaire method; some of these have
been discussed previously, with response bias named as a possible problem. Those filling in an
online questionnaire may have attitudes and intentions that are complex. Some may want to
impress the reader with their knowledge and there may be evidence in this particular study that
this could have happened. Others may wish to challenge, or may have a grudge, so unlike the
false positives produced in the earlier challenge, they can produce false negatives. There are
always challenges to validity in using this method. Some may not know or remember the
answer, but feel they have to complete the questionnaire. The challenge to validity is more likely
to occur if the option of “don’t know” is not included as an acceptable answer. Some may rush
to fill in the questionnaire and their answers may be careless. And finally, one of the strongest
challenges when using a Likert scale, as here, is that the definition of the word “extremely” may
differ according to personality.

This is why, in this study, a qualitative element has been introduced, in this case in the form of
interviews. The second method of analysis also has its weaknesses, not least the possibility of
researcher bias. The latter is sometimes thought to be a strength of the interpretivist paradigm,
as it acknowledges and provides for some of the subjectivity that is often present in the
participants in quantitative methods but cannot easily be dealt with, whereas researcher bias is
under the control of the researcher. Quantitative data collection and analysis, in this case, was
very useful, for it enabled comparisons. Also, it provided time and understanding. Sometimes
the participants need to have questions rephrased to avoid misunderstandings; sometimes they
like to add their own perceptions to those of the researcher and enter into greater detail or move
to a slightly different topic. Interviews can be personalised by the researcher, as he can change
the order of the questions at will using his judgement, interpret body language and can also, if
necessary, add probes and prompts (Gabriel, 2013).

The qualitative and quantitative methods used in this study provided several discrepancies in
the results arising from the difference in data collection and analysis, others arising from the
strengths and weaknesses of the different methods, as discussed above, and some reflecting the
sample itself, which was different in each case.

118
Research Methodology

Summry

One of the strong advantages of a mixed method study is that its results, produced in the
positivist and the interpretivist paradigms, can support or contest the findings located in the
other paradigm. This can lead to a number of interesting and complex discoveries with the
possibility of forming a strong basis for the generation of theory, insight and practical
applications. This, it is hoped, is the outcome here. Chapter 6 provides the results of the
questionnaire survey and provides the results of the interviews and Chapter 7 demonstrates how
the literature and findings were brought together to develop the proposed framework. It is hoped
that this joint analysis adds richness and depth to the subject under study. This forms the initial
section of the discussion. The second and final part of the discussion chapter examines the
possibilities of using the combined findings to create a framework to support the development
of H&S procedures in the construction industry in KSA.

119
Quantitative and Qualitative Data Analysis

Chapter 6. Quantitative and Qualitative Data Analysis

6.1 Introduction

This study employs a mixed method approach, combining aspects of both qualitative and
quantitative data collection and analysis. This chapter first presents the qualitative data analysis,
including descriptive statistics and cross tabulations (based on size and nature of firm) of the
survey data, followed by factor analysis, ANOVA analysis and OLS regression analysis. The
quantitative data analysis is then presented.

As the first step in analysing the survey data, the descriptive statistics are presented in narrative
and chart form, including the survey question, the response rate and the percentage of
respondents selecting the various options in answering each question. Following the provision
of descriptive statistics, three tests of statistical analysis are performed. First, factor analysis
was used to lower the number observed factors associated with H&S in the construction industry
in KSA. Using one component and loadings of less than 0.8, the four remaining factors are used
to conduct ANOVA and OLS regression analysis.

6.2 Quantitative Data Analysis

6.2.1 Descriptive Statistics

To ascertain the participant’s general/basic knowledge of KSA H&S policies and guidelines,
and to adhere to the highest ethical standards and research guidelines, the research questions
were designed to elicit responses from participants with respect to questions asked with a bid
of making a contribution to the study through “enhancing existing H&S processes in public
construction sector projects within KSA using virtual design and construction approaches”. The
survey received 189 responses from business managers and public construction sector workers
and employees, as well as the general public. No respondent skipped the first question.

From the survey, it was established that 95.24% (n= 180) indicated that they have general/basic
knowledge of KSA H&S policies and guidelines, while 4.76% (n=9) gave a negative response
(see Figure 6-1).

120
Quantitative and Qualitative Data Analysis

95.24%

4.76%

Yes No

Figure 6-1: Awareness of KSA H&S policies

General information

To understand the size of the organisation and group into which a company handling different
public construction sector projects falls, the questionnaire was structured to capture this
information by asking about organisation size. The results indicate that 11.86% (n= 21) of the
sample size represent micro-sized companies, 15.25% (n= 27) represent small-sized companies,
18.64% (n= 33) represent medium-sized firm, whereas more than 50%, specifically 54.24% (n=
96), of the sample represent large firms (see Figure 6-2). Large firms in KSA are mostly
responsible for handling public construction sector projects and dominate the construction
industry.

54.24%

18.64%
15.25%
11.86%

Micro Sized Small Sized Medium Large Firm (


(1 to 9 (10 to 50 Sized Firm 250 or more
Employees) Employees) (51 - 250 employees)
Employees)

Figure 6-2: Size of construction companies

121
Quantitative and Qualitative Data Analysis

To elicit and understand the organisation’s business orientation, a question asked business
owners and managers about the nature of their organisation’s business; it is found that most
construction companies in KSA are either involved in general contracting, designing,
consulting, specialist or subcontracting. The responses in percentage are as follows: 37.70% (n=
69) of KSA’s construction companies, which was the dominant business activity, are in general
contracting, 21.31% (n= 39) are in designing and 13.11% (n= 24) are in consulting, 18.03% (n=
33) are in specialist contracting, while the remaining 9.84% (n= 18) are in other type of business
services.

To ascertain the kind of projects construction companies in KSA are involved in and group them
accordingly, this question was put to business owners and managers. The results indicate that
41.67% (n=75) of respondents are involved in a combination of private and public sector
projects, while 31.67% (n=57) are exclusively involved in private sector projects and 26.67%
are exclusively involved in public sector projects (see Figures 6-3 and 6-4).

37.70%

21.31%
18.03%
13.11%
9.84%

General Designing Consulting Specialist sub- Other


contracting contracting

Figure 6-3: Nature of business

41.67%
31.67%
26.67%

0.00%

Specify % of type of Public Sector Projects Private Sector Projects Combination of Public
projects you have 100% 100% and Private Sector
been involved in. Projects

122
Quantitative and Qualitative Data Analysis

Figure 6-4: Kind of project

31.67%
30.00%

20.00%
18.33%

0-5 years 6-10 years 11 - 15 years 15 years +

Figure 6-5: Years of experience

Regarding years of experience in the construction industry, 31.67% (n= 57) of the sample have
less than five years, 20.0% (n= 36) have 5-10 years, 30.0% (n= 54) have 10-15 years and 18.33%
(n= 33) have been in the construction sector for more than fifteen years (see Figure 6-5).

Experience with H&S

To understand the nature of the landscape in which construction companies operate in KSA,
construction company managers and staff were asked if they have ever experienced H&S issues
in their construction projects. The vast majority of respondents (85%) (n= 163) said that they
had experienced H&S issues in construction projects, 15.0% (n= 27) said that they had not and
nine respondents did not answer this question (see Figure 6-6). This finding confirms that
construction companies’ operational landscape in KSA is not safe and is in serious need of H&S
guidelines and policies, as demonstrated by the study with 85% (n= 153) of the study’s sample
having experienced H&S issues in their construction projects.

85.00%

15.00%

Yes No

Figure 6-6: Experience of a H&S accident

123
Quantitative and Qualitative Data Analysis

57.89%

21.05%
15.79%
5.26%

Always Sometimes Rarely Frequently

Figure 6-7: Frequency of H&S safety issues

This question was asked to ascertain the frequency of H&S safety issues in construction projects
in KSA. The responses received from construction company owners, managers and staff
members show that 21.05% (n= 36) of the study’s sample said that they always experience H&S
issues during their public construction sector projects, 57.89% (n= 99) said sometimes, while
15.79% (n= 27) said rarely and 5.26% (n= 9) said frequently (see Figure 6-7). Hence, this study
finds that more than 50% of public construction sector project have experienced H&S issues,
which implies the need for an adequate and effective H&S policy guideline to regulate KSA
public construction sector.

Common H&S hazards

The next question was asked to determine the H&S hazards common to workers in the public
construction sector. It was discovered that the most common H&S hazards are slips, trips and
falls, 63.79% (n = 111), followed by heat exhaustion, 56.90% (n = 99), hazardous substances,
51.72% (n = 90) and structural collapse and accident in excavation, 48.28% (n = 84). Other less
common forms of hazards are also identified, such as manual handling, 43.10% (n = 75), noise
and vibration, 43.10% (n = 75), plant and equipment, 41.38% (n = 72), fall from height, 36.21%
(n = 63), electrical hazard, 36.21% (n = 63), crane collapse and falling off load, 27.59% (n =
48), asbestos and chemical exposure, 24.14% (n = 42) and fire outbreak, 22.41% (n = 39). These
results indicate that many different hazards are common in the industry (see Figure 6-8).

124
Quantitative and Qualitative Data Analysis

fire outbreak 22.40%

asbestos and chemical exposure 24.10%

crane collapse and falling off load 27.60%

electrical hazard 36.20%

fall from height 36.20%

plants & equipment 41.40%

manual handling 43.10%

noise and vibration 43.10%

structural collapse / accident in… 48.30%

hazardous substances 51.70%

heat exhaustion 56.90%

slips, trips, falls 63.80%

0% 10% 20% 30% 40% 50% 60% 70%

Figure 6-8: Common H&S hazards

Safety Practice

This question was asked to ascertain the use of H&S safety policies and practices. It was
discovered that companies with construction safety policies and practices fully integrated and
widely observed account for about 31.67% (n= 57) of the study sample, while many other
construction companies which have construction safety policies and practices in place, but lack
full integration, account for 50.0% (n= 90) of respondents (see Figure 6-9). Moreover, some
other companies with ad hoc approaches to construction safety and no formal policy, but that
have occasional construction safety reviews, account for about 13% (n= 24), whereas some
companies have no construction safety policies and programmes at all, 5.00% (n= 9). Thus, a
strong majority of respondents (68.33%) express the opinion that their firms do not implement
H&S policies. This finding indicates that the KSA construction companies sampled lack
integration and implementation of safety policies and programmes but use an ad hoc approach
to combat H&S issues. This also shows that the Saudi Arabian government has failed in its

125
Quantitative and Qualitative Data Analysis

responsibility to monitor and ensure standardisation in the public construction sector, as the lack
of H&S policies in these companies portrays the government commitment and attitude to the
effectiveness of H&S in the construction sector in a bad light.

Fully integrated and widely observed


construction safety programme

Construction safety programme exists


50.00% but is not fully integrated

31.67% Adhoc approaches to construction safety


- no formal policy however, occasional
13.33% conduct of construction safety review
5.00% No construction safety programme

Series 1

Figure 6-9: Use of H&S

To identify the different H&S policies and practices currently in use, this question was put
owners, managers and employees. It was found that companies whose site workers undertake
induction training represent 68.33% (n = 123) of the sample. This was followed by companies
that have due process in place to investigate all reported H&S incidents, 66.67% (n = 120),
companies that maintain an on-site register to record any hazards reported by workers, 58.33%
(n = 105), then companies that have designated project safety personnel to manage on-site
safety, 56.67% (n = 102). Companies that analyse site safety hazards in the pre-construction
stage represent 55.00% (n = 99), others that follow the "safety by design" process by analysing
safety hazards in the pre-construction stage represent 36.67% (n = 66) (see Figure 6-10).

126
Quantitative and Qualitative Data Analysis

We have regular training programme for our site staff


13.30%
and su

We have clearly defined Safety KPIs 23.30%

We follow "safety by design" process by analysing safety


36.70%
hazards

We analyse site safety hazards in pre-construction stage 55.00%

We have a designated project safety personnel to


56.70%
manage ??

Maintain an on-site register to record any hazards report 58.30%

There is a due process in place to investigate all reported 66.70%

Construction site workers undertake induction training 68.30%

0% 10% 20% 30% 40% 50% 60% 70% 80%

Figure 6-10: Current H&S practices

There are also companies that have clearly defined safety KPI, representing 23.33% (n = 42) of
the study sample, while those that organise regular training programme for site staff and
subcontractors represent 13.33% (n = 24). The results indicate that most construction companies
in KSA lack the integration of H&S policies and guidelines, but through their ad hoc safety
approaches have some basic or partial H&S policies in place. This study also established that
most of the construction companies surveyed do not have a full integration of the complete and
standard H&S policies and guidelines governing public construction sector companies in KSA.

6.2.2 Factor Analysis

Construction company owners, managers and employees were asked to rate factors with respect
to their importance to H&S policies and programmes. The respondents were provided with 18
factors to rate using the five-point Likert scale. The 18 factors related to H&S are as follows
(with the variable name used for analysis shown in parenthesis):

 Better enforcement of regulation and laws (BetEnfor)

127
Quantitative and Qualitative Data Analysis

 Cost of implementing H&S measures (Cost)


 3D, 4D and 5D visualisation/simulation (DVis)
 Safety measures incorporated into design phase (SafMeas)
 Proactive approaches, e.g. hazards assessment and safety planning (Proactive)
 Management of data of all processes, including H&S (DataMan)
 Better communication devices for efficient information sharing (GoodCom)
 Strong and clear communication link between all stakeholders (StakeCom)
 Safety training programme available to all staff across organisation (SafTrainProg)
 Simpler modes of information exchange (InfoExch)
 Good safety leadership abilities in site supervisors (SafLead)
 Regular site safety audits (RegSafAudit)
 Regular on-site safety meetings (RegSafMeet)
 Employee education and training (Knowledge)
 Personnel’s responsibility (PerResp)
 Safety equipment and gear in hazardous environments (Equip)
 Changing behaviour of employees towards H&S measures (ChangeBeh)
 H&S incident reporting culture (HSIncidRep)

The factors are presented using descriptive statistics, including frequencies of the responses and
weighted means of the responses. In the next step of analysis, these 18 factors were subjected
to factor analysis for dimension reduction and the results used for ANOVA and OLS regression
analysis. The purpose of using factor analysis in this study is to assess patterns in the data
provided by the respondents in regard to these 18 factors, in an effort to reduce the number of
factors to be studied. Thus, factor analysis is used to determine which, among the 18 factors,
have the most significance in regard to the phenomenon being studied. The responses for each
factor are provided in the tables below, in which 1-5 represent a scaled response with 1 being
“extremely low” and 5 “extremely high”.

For a better comparison of the importance of these variables, the weighted mean was calculated
for each response. To calculate the weighted mean, the number of responses was multiplied by
the associated weight of the response (from 1-5). This process allowed the researcher to

128
Quantitative and Qualitative Data Analysis

compare the importance of the 18 factors. As Table 6-1 below shows, most items received a
reasonably high rating and the range of means was quite limited, with the lowest being 3.53 for
“Better enforcement of regulation and laws” and “Safety measures incorporated into design
phase”, and the highest mean rating being 3.9 for “Better communication devices for efficient
information sharing”.

Table 6-1: Factor analysis

Safety Programme Factors Std.


N Min Max Mean
Deviation
Better enforcement of regulation and laws 1.221
180 1 5 3.53
(BetEnfor)
Cost of implementing H&S measures (Cost) 180 1 5 3.82 1.193
3D, 4D and 5D visualisation/simulation (DVis) 180 1 5 3.70 1.246
Safety measures incorporated into design phase 1.336
177 1 5 3.53
(SafMeas)
Proactive approaches, e.g. hazard assessments and 1.226
177 1 5 3.78
safety planning. (Proactive)
Management of data of all processes, including 1.295
177 1 5 3.58
H&S (DataMan)
Better communication devices for efficient 1.047
180 1 5 3.90
information sharing (GoodCom)
Strong and clear communication link between all 1.180
177 1 5 3.85
stakeholders (StakeCom)
Safety training programme available to all staff 1.269
177 1 5 3.58
across organisation. (SafTrainProg)
Simpler modes of information exchange (InfoExch) 177 1 5 3.66 1.275
Good safety leadership abilities in site 1.280
174 1 5 3.66
supervisors (SafLead)
Regular site safety audits (RegSafAudit) 181 1 5 3.61 1.249
Regular on-site safety meetings (RegSafMeet) 180 1 5 3.68 1.119
Employee education and training (Knowledge) 185 1 5 3.75 1.154
Personnel’s responsibility (PerResp) 181 1 5 3.64 1.265
Safety equipment and gear in hazardous 1.159
180 1 5 3.74
environments (Equip)
Changing behaviour of employees towards H&S 1.148
176 1 5 3.81
measures (ChangeBeh)
H&S incident reporting culture (HSIncidRep) 178 1 5 3.87 1.115

129
Quantitative and Qualitative Data Analysis

6.2.3 Respondents’ Ratings of H&S in their Organisation

Most items in this question were ranked highly (there was a very narrow range of rankings from
3.53 to 3.90). Better communication devices for efficient information sharing (GoodCom) was
considered the most important factor for H&S on construction sites (mean 3.90), followed by
strong and clear communication link between all stakeholders (StakeCom) with a mean of 3.85.
Cost of implementing H&S measures (Cost) was the third most important with a mean of 3.82.
The items ranking lowest were safety measures incorporated into design phase (SafMeas) and
better enforcement of regulation and laws (BetEnfor), each with 3.53.

6.2.4 Factors considered responsible for H&S on Construction Sites

Next, respondents were asked about providing H&S training for their workers. 89.47% (n =
153) said that they provide this H&S training, while 10.53% (n = 18) said that they do not (see
Figure 6-11). This study finds that most construction companies in KSA provide H&S training
for their employees but that a gap exists, which is the lack of proper implementation and
utilisation of H&S policies and guidelines in construction projects on site by employees.

89.47%

10.53%

Yes No

Figure 6-11: Provide H&S training

Respondents were asked to identify factors which they consider responsible for H&S issues on
site. 35.00% (n = 63) consider a lack of effective communication highly responsible for most
H&S issues, followed by 28.33% (n = 51) agreeing that lack of effective site planning was also
highly responsible for H&S issues, followed by 32.76% (n = 57) revealing that poor
implementation of H&S implementation procedures were responsible for H&S issues. 27.12%
(n = 48) believe that lack of regulation is responsible for H&S construction site issues, while
25.00% (n = 42) regard human error as a high contributory factor to H&S issues, 29.31% (n =

130
Quantitative and Qualitative Data Analysis

51) indicate that a lack of H&S reporting culture was a high contributing factor, followed by
37.29% (n = 66) who believe that lack of consideration of H&S in planning and design stages
is responsible for H&S issues in construction sites in KSA.

Next, 35.59% (n = 63) record that the Saudi Arabian multicultural system is highly responsible
for H&S issues, while others, representing 33.33% (n = 60), assert that a low education level
was responsible for H&S issues; finally, 27.12% (n = 48) believe the multilingual nature of
KSA construction sector is highly responsible for H&S issues encountered (see Figure 6-12).
This study finds that Saudi Arabian construction companies lack full knowledge of the public
construction sector landscape and also that most construction company employees are unaware
of H&S policies and practices, and do not adhere to H&S policies and guidelines when carrying
out construction projects. This is shown by their lack of consideration of H&S in planning and
design stages and their poor implementation of H&S procedures. Other factors were inherent in
the geographical setting and the people’s ideology, as established by their multilingual nature,
multicultural landscape and human error.

Lack of Regulations 3.62


Human Errors 3.73
Multilingual 3.81
Multi culture 3.86
Low Education 3.86
Lack of H&S reporting culture 3.88
Poor implementation of H&S… 3.91
Lack of effective site planning 3.95
Lack of effective communications 3.95
Lack of consideration of H&S in planning… 4.05

1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0

Figure 6-12: Factors considered responsible for H&S issues

131
Quantitative and Qualitative Data Analysis

6.2.5 Safety Training

In assessing the training methods employed and their level of effectiveness, 73.33% (n = 132)
of the study sample reveal that on-site safety training and education is the most effective method
of training their employees on H&S rules, policies and guidelines; 16.67% (n = 30) reveal that
the most effective H&S training method is online training; and 10.00% (n = 18) believe that a
certification programme for site safety is the most effective method of training their construction
site workers and employees (see Figure 6-13). This study finds that most of the sample chose
on-site safety training and education as the most effective method of training in H&S policies
and guidelines.

78.90%
Certification Programme for
site safety
onlint traning

13.20%
7.90% Onsite Safety Training and
Education
For safety training, what is the most effective method

Figure 6-13: Safety training – most effective method

6.2.6 Impact of Investment in Safety Programmes

91.67% (n = 165) of respondents agree that investment in safety programme will positively
impact project schedule and 73.33% (n = 132) agree regarding project budget (see Table 6-2).
Next, 81.67% (n = 147) agree that it will positively impact company profitability and project
quality 77.97% (n = 138), while 78.33% (n = 141) agree that it will positively impact safety
KPI (e.g. injuries) and 76.67% (n = 138) agree that earlier involvement of contractors in design
and construction stage will positively impact construction projects. 78.33% (n = 141) agree that
BIM will positively impact on-site construction safety and 75.00% (n = 135) agree that use of
off-site construction techniques and processes will positively impact construction safety, while
67.80% (n = 120) agree that the use of mobile tools, such as phones and tablets, could positively
impact construction safety. This study finds that there is a significant and direct positive impact

132
Quantitative and Qualitative Data Analysis

Table 6-2: Impact of investment in safety programmes


Questionnaire item Type of impact N %
How will investment in safety programmes impact Positive impact 165 91.70%
project schedule? Negative impact 9 5.00%
No impact 6 3.30%
How will investment in safety programme impact Positive impact 132 73.30%
project budget? Negative impact 27 15.00%
No impact 21 11.70%
How will investment in safety programme impact Positive impact 147 81.70%
company’s profitability? Negative impact 21 11.70%
No impact 21 6.70%
How will investment in safety programme impact Positive impact 138 78.00%
project quality? Negative impact 18 10.20%
No impact 21 11.90%
How will investment in safety programme impact Positive impact 141 78.30%
safety KPI (e.g. injuries)? Negative impact 15 8.30%
No impact 24 13.30%
What impact earlier involvement of contractors in Positive impact 138 76.70%
design and construction stage can make on Negative impact 9 5.00%
construction projects? No impact 33 18.30%
How can BIM impact on-site construction safety? Positive impact 141 78.30%
Negative impact 24 13.30%
No impact 15 8.30%
How does use of off-site construction techniques and Positive impact 135 75.00%
processes impact construction safety? Negative impact 21 11.70%
No impact 24 13.30%
How could use of mobile tools (e.g. phones and Positive impact 120 67.80%
tablets) impact construction safety? Negative impact 21 11.90%
No impact 36 20.30%

of investment on H&S on construction projects in KSA construction sector. This was


established by the responses received, while studies have shown that investment in H&S can
greatly impact construction projects.

6.2.7 Risk Assessment

To ascertain the attitude of respondents to H&S policies and guidelines, they were asked if they
prepare formal risk assessment and a method statement for any of their projects. 63.33% (n =
114) said yes, while 36.67% (n = 66) said no (see Figure 6-14). Hence, this study finds that a

133
Quantitative and Qualitative Data Analysis

large portion of the Saudi Arabian construction sector does not adhere to H&S policies and
guidelines.

63.33%

36.67%

Yes No

Figure 6-14: Organisations preparing formal risk assessment

6.2.8 Using BIM

To ascertain the use of technology and the advantages that technological advancement has on
H&S, respondents were asked if they used BIM tools and technology in carrying out their
construction projects. The majority, 61.02% (n = 108) said yes, while 38.98% (n = 69) said no
(see Figure 6-15). The study finds that more than one-third of construction companies in KSA
do not take advantage of computer and technological advancement in carrying out their various
projects. This shows that they are either unaware of the advantages that BIM technology has to
offer their organisation or are lacking the wherewithal to use the tool/technology properly.

61.02%

38.98%

Yes No

Figure 6-15: Organisations using BIM

The survey solicited the purpose of BIM within their business. 21.57% (n = 33) said that their
organisation uses BIM for project planning purposes, 13.73% (n = 21) for visualisation, while
13.73% (n = 21) said that their organisation uses it for design purposes (see Figure 6-16).

134
Quantitative and Qualitative Data Analysis

Additionally, 13.73% (n = 21) said that their organisation uses BIM for sustainability purposes,
9.80% (n=15) for site planning purposes, while 5.88% (n = 9) said that their organisation uses
it for estimation purposes. Finally, 1.96% (n = 3) said that their organisation uses BIM for clash
detection in their construction projects, with 1.96% (n = 3) doing so for pre-fabrication or off-
site manufacturing purposes. None of the respondents use BIM for facility management
purposes. This study finds that most respondents use BIM tools for project planning, while some
do so for visualisation, design and for sustainability purposes. BIM is a multipurpose tool that
can be used for all of the above-mentioned purposes, but most construction companies in KSA
only use it for just a single purpose, thereby limiting its ability to make a difference. The study
also finds that most construction companies in KSA do not use the BIM tool for all of their
construction needs because they lack the technical know-how of the functionality of the tool.
21.57%

17.65%
13.73%

13.73%

13.73%
9.80%

5.88%
1.96%

1.96%
0.00%

OR OFF-SITE…
DETECTION

OTHER
DESIGN

FABRICATION
PLANNING

VISUALISATION

ESTIMATING

SUSTAINABILIT

MANAGEMENT
SITE PLANNING
PROJECT

CLASH

FACILITY

PRE
Y

Figure 6-16: Use of BIM technology among AEC

The next question was asked to understand current understanding and knowledge of BIM.
46.30% (n = 75) said that they had basic understanding of BIM, 31.48% (n = 51) a good
understanding and 11.11% (n = 18) advanced understanding, while 11.11% (n = 18) had no
understanding of BIM at all (see Figure 6-17). Therefore, the results indicate that only very few
construction companies have advanced knowledge and understanding of BIM, with almost half
of the study sample having basic knowledge only. This finding aligns itself with previous
assertions made within this study that most construction companies in KSA do not utilise the
full functionality nor take advantage of the BIM technology because they lack the technical
know-how and understanding to do so.

135
Quantitative and Qualitative Data Analysis

46.30%

31.48%

11.11%
understanding 11.11%

understanding

understanding

understanding
Advanced

Good

Basic

No
Figure 6-17: Current understanding and knowledge of BIM

73.58% 58.49%
50.94% 41.51% 35.85%
15.09%

Figure 6-18: Familiarity with BIM brands

The next question elicited responses on the organisations knowledge of the various BIM
software’s and application packages available. The results indicate that 73.58% (n = 117) are
familiar with Revit, while 58.49% (n = 93) are familiar with Archicad and 50.94% (n = 81) are
familiar with Tekla (see Figure 6-18). Another 41.51% (n = 66) is familiar with Vectorworks,
35.85% (n = 57) is familiar with Microstation and 15.09% (n = 24) is familiar with some other
BIM software and packages. This finding shows that most KSA construction companies have a
general knowledge of BIM or at least at the level of being familiar with it.

136
Quantitative and Qualitative Data Analysis

6.2.9 BIM as an Important Tool for Site Induction

The next question solicited opinions of the use of BIM as an important tool for site induction,
considering the multilingual and multicultural nature of the Saudi Arabian construction sector.
37.29% (n = 66) strongly agree that BIM is an important tool for site induction, regardless of
the multilingual and multi-cultural nature of the sector, while 50.85% (n = 90) agreed, 8.47%
(n = 15) were indifferent, 1.69% (n = 3) disagreed and 1.69% (n = 3) gave other reasons (see
Figure 6-19). No one strongly disagreed with the importance of BIM as a site induction tool,
regardless of the cultural and lingual landscape of KSA. This study finds that the BIM software
and packages are very important tools for site induction, regardless of the cultural and lingual
landscape of KSA construction sector.

50.8
37.3

8.5
1.7 1.7

Strongly agree Agree Neither agree not Disagree Other


disagree

Figure 6-19: Do you consider BIM an important tool for site induction?

6.2.10 Integration of BIM into Building Regulation for Management

The next question was asked to understand the importance of BIM integration into building
regulation as a positive development to the management of H&S and also to assess the potential
BIM has to check for compliance with regulations on H&S risk. The results indicate that 32.20%
(n = 57) strongly agree that the integration of BIM into building regulation is a positive
development to the management of H&S and also has the potential to check for compliance
with regulations on H&S risk, 55.93% (n = 99) agree, 8.47% (n = 15) are indifferent to the
question and 3.39% (n = 6) state other reasons (see Figure 6-20). This demonstrates that the
integration of BIM into building regulation is a positive development to the management of
H&S and also has the potential to check for compliance with regulation on H&S risk in KSA
construction sector.

137
Quantitative and Qualitative Data Analysis

55.93%
32.20%
8.47% 3.39%
0.00% 0.00%
Agree
Strongly

Disagree

Disagree

Other
agree not

Strongly
disagree
Neither
agree

Figure 6-20: Integration of BIM into building regulation to the management of H&S

6.2.11 Benefits Derived from Implementation of BIM in Management of H&S

Owners and managers were asked how they would describe the benefits they have derived from
the implementation of BIM in the management of H&S within their organisation. 70.91% (n =
117) said that BIM eliminates lost man-hours, 78.18% (n = 129) said it eliminates accidents,
74.55% (n = 123) said it improves communication, 70.91% (n = 117) said it improves
construction safety, 50.91% (n = 84) said it reduces cost and 5.45% (n = 9) gave some other
reasons for the benefit derived from the implementation of BIM in their organisation (see Figure
6-21). This study finds that a majority of the study sample sees benefits in the use of BIM in
eliminating accidents and improving communication.

78.18% 74.55%
70.91% 70.91%
50.91%

5.45%
Eliminates

communication

construction

Reduce Cost

Other:
Eliminates lost

accidents
MANHOURS

Improves
Improves

safety

Figure 6-21: Benefits of implementation of BIM in management of H&S

138
Quantitative and Qualitative Data Analysis

6.2.12 Barriers to Full Implementation of BIM in Management of H&S

Respondents were asked to identify the barriers to BIM implementation in the management of
H&S in an organisation. 86.44% (n = 153 said that education and training, 69.49% (n = 123)
said behavioural change, 62.71% (n = 111) said cost of implementation, 55.93% (n = 99) said
information exchange, 45.76% (n = 81) said the time required to train staffs and 5.08% (n = 9)
stated other reasons (see Figure 6-22). This study finds that the greatest challenge and obstacle
to the successful and effective implementation of BIM as a tool for the management of H&S in
an organisation is education and training, followed by behavioural change and cost of
implementation.
86.44%
69.49% 62.71%
55.93%
45.76%

5.08%
Education and

Information

Time required
Implementation

Other:
Behavioural

to train staff
Exchange
change

training

Cost of

Figure 6-22: Barriers to BIM implementation in management of H&S

6.2.13 Size of Organisation – Cross Tabulations

In this section, some of the key questions in the survey are broken down according to size of
organisation, to examine whether that factor is an important variable in relation to attitudes and
experiences in relation to BIM.

Size of Organisation and Type of Work

Micro-sized organisations were largely carrying out general contracting (57%) and “other”
(29%). Small-sized organisations were carrying out a mixture of all types of work, with the two
largest (“general contracting” and “consulting”) each representing about one-third of their work

139
Quantitative and Qualitative Data Analysis

(see Figure 6-23). Medium-sized firms also had a mixture of work, with the two largest shares
being general contracting and specialist subcontracting (each around 27%).

Total 12% 15% 19% 54%

Other 40% 60%


Micro Sized (1 to 9 Employees)

Specialist sub-contracting 9% 27% 64%


Small Sized (10 to 50 Employees)
Consulting 38% 38% 25%
Medium Sized Firm (51 - 250
Designing 8% 17% 17% 58% Employees)

Large Firm ( 250 or more


General contracting 17% 13% 13% 57% employees)

Figure 6-23: Size of organisation by nature of business

Size of Organisation and Sector of Work

Public sector projects make up nearly half of the work (44%) for small-sized firms, but only
around one-third of the work for firms of other sizes (see Figure 6-24). Private sector work was
most important for micro-sized organisations, making up 43% of their work. Private sector work
made up just over a quarter of the work of large and medium-sized firms, but just 11% of that
of small-sized firms.

140
Quantitative and Qualitative Data Analysis

All 32% 27% 41%

Large Firm (… 31% 28% 41% Public


Sector
Medium Sized… 27% 27% 46% Projects
100%
Small Sized… 44% 11% 44%

Micro Sized (1… 29% 43% 29%

0% 20% 40% 60% 80% 100%

Figure 6-24: Sector of work by size of organisation

Size of organisation and years of experience

Respondents from medium-sized firms (51-250 employees) have the longest experience (36%
with 15+ years’ experience and the same proportion with 10-15 years’ experience). Respondents
from micro-sized firms have the least experience, with 57% saying that they have less than five
years’ experience (see Figure 6-25).

0-5
Total 32% 20% 30% 18% years
Other 40% 20% 40% 5-10
years
Specialist… 27% 9% 27% 36%
10 - 15
Consulting 13% 38% 50% years

Designing 39% 23% 31% 8% 15


years +
General… 35% 17% 22% 26%

0% 20% 40% 60% 80% 100%

Figure 6-25: Years of experience by nature of business

141
Quantitative and Qualitative Data Analysis

Size of organisation and frequency of H&S issues

Micro organisations were least likely to say that they experience H&S issues (no respondents
in this category said “always” and 55% said “rarely”). Firms with 10-50 employees were most
likely to say that they “always” have H&S issues but medium and large firms do not vary greatly
in this respect, with 27% and 22%, respectively, saying that they “always” have H&S issues
(see Figure 6-26).

Total 21% 58% 16% 5% Always

Other 60% 20% 20% Someti


Specialist sub-… 36% 46% 9% 9% mes
Rarely
Consulting 13% 88%
Designing 25% 42% 33% Frequen
General… tly
19% 62% 14% 5%

0% 20% 40% 60% 80% 100%

Figure 6-26: Frequency of H&S issues by nature of business

Size of organisation and use of BIM

There is a clear relationship between size of organisation and use of BIM, with nearly three-
quarters of large firms using BIM and just over half of medium- and small-sized firms using it.
Less than one-third of micro-sized firms are using BIM (see Figure 6-27).

142
Quantitative and Qualitative Data Analysis

Total 61% 39% Use BIM


Other 75% 25%
Specialist sub-contracting 64% 36%
Consulting 63% 38% Do not
Designing 85% 15% use BIM

General contracting 44% 57%

0% 20% 40% 60% 80% 100%

Figure 6-27: Use of BIM by nature of business

Size of organisation and (self-rated) understanding of BIM

Small firms are most likely to report having a good or advanced understanding of BIM (63% in
total). Micro-sized firms have the lowest level of understanding of BIM. Larger firms have the
highest levels of use but not the highest levels of understanding (see Figure 6-28). It is perhaps
interesting to note that there is not as a simple relationship between use and understanding as
might be expected.

Advance
Total d
11% 32% 45% 11%
understa
Large Firm ( 250 nding
14% 31% 41% 14% Good
or more…
Medium Sized understa
9% 27% 55% 9% nding
Firm (51 - 250…
Small Sized (10
13% 50% 38% Basic
to 50…
Micro Sized (1 to understa
20% 60% 20% nding
9 Employees)
0% 20% 40% 60% 80% 100%

Figure 6-28: Understanding of BIM by size of organisation

143
Quantitative and Qualitative Data Analysis

Size of organisation and factors considered responsible for H&S

Respondents were asked to score a number of factors, from 1 to 5 with regard to what they
consider responsible for H&S issues on construction sites. The items are shown below, from
left to right in descending order of importance. The most important is lack of consideration of
H&S in planning and design stages (mean 4.05), followed by lack of effective communications
and lack of effective site planning (both on 3.95), poor implementation of H&S implementation
procedures; low education, multicultural aspects, multilingual issues, human factors and lack of
regulations.

There was some variation according to firm size: “lack of effective planning” was joint top for
micro-sized firms along with “poor implementation; “multiculture” was joint top for small
firms, with lack of consideration of H&S in planning” (both on 4.11); lack of effective planning
was the top item for medium-sized firms, along with “lack of H&S reporting”.

Size of Organisation and H&S Practices

The top eight factors were used for comparison by size. Larger firms are more likely to have
construction workers undertake induction training (78.10%), followed by medium-sized firms
(63.6%). Small- and micro-sized firms had similar proportions undertaking induction (see Table
6-3). Large firms were most likely to undertake all of the H&S practices mentioned in the
question, while micro-sized firms are least likely to be undertaking most of the H&S practices
listed (see Table 6-4).

144
Quantitative and Qualitative Data Analysis

Table 6-3: Size of organisation and factors considered responsible for H&S
Size of
construction

Lack of consideration of

Poor implementation of

Lack of H&S reporting


company

H&S in planning and

H&S implementation
Lack of effective site

Lack of regulations
Lack of effective
communications

Low education

Human error
design stages

Multiculture

Multilingual
procedures
planning

culture
Micro Mean 3.71 3.86 4.14 4.14 3.71 4.00 3.57 3.86 3.50 3.43
sized N 21 21 21 21 21 21 21 21 18 21
(1-9
employees SD 0.95 1.35 1.07 1.07 0.95 1.41 0.98 0.90 1.05 1.72
)
Small Mean 4.11 3.78 3.44 3.22 3.89 3.89 4.11 3.44 3.38 3.44
sized N 27 27 27 27 29 27 27 27 24 27
(10-50
employees SD 0.78 1.09 0.88 0.67 0.78 1.05 0.93 1.13 1.30 1.13
)
Medium Mean 3.91 3.91 4.00 3.70 4.00 3.82 3.64 3.64 3.73 3.60
sized (51- N 33 33 33 30 27 33 33 33 33 30
250
employees SD 1.22 0.83 0.45 0.95 1.12 0.75 0.81 1.03 1.10 1.51
)
Large Mean 4.16 4.03 4.03 4.13 3.88 3.84 3.94 3.97 3.87 3.72
(250 or N 93 96 96 93 96 96 63 93 90 96
more
employees SD 0.90 1.03 1.03 0.92 1.07 1.17 1.15 1.11 1.04 0.81
)
Total Mean 4.05 3.95 3.95 3.91 3.88 3.86 3.86 3.81 3.73 3.62
N 174 177 177 171 171 177 176 176 165 174
SD 0.94 1.02 0.94 0.95 1.00 1.09 1.03 1.07 1.08 1.11

148
Quantitative and Qualitative Data Analysis

Table 6-4: Size of organisation and H&S practices


1* 2* 3* 4* 5* 6* 7* 8* Number

Micro sized (1-9 12 9 6 6 0 3 0 6 21


employees) 57.10% 42.90% 28.60% 28.60% 0.00% 14.30% 0.00% 28.60%
Small sized (10-50 15 12 15 12 15 3 0 6 27
employees) 55.60% 44.40% 55.60% 44.40% 55.60% 11.10% 0.00% 22.20%
Medium sized (51-250 21 24 15 18 18 0 6 9 33
employees) 63.60% 72.70% 45.50% 54.50% 54.50% 0.00% 18.20% 27.30%
Large (250 or more 75 72 66 63 66 18 33 45 96
employees) 78.10% 75.00% 68.80% 65.60% 68.80% 18.80% 34.40% 46.90%

Total 123 117 102 99 99 24 39 66 177


69.49% 66.10% 57.63% 55.93% 55.93% 13.56% 22.03% 37.29%

1* Construction site workers undertake induction training 2* There is due process in place to investigate all incidents reported
3* Maintain an on-site register to record any hazards reported 4* We analyse site safety hazards in pre-construction stage
5* We have designated project safety personnel to on-site issues 6* We have a regular training programme for our site staff
7* We have clearly defined safety KPI 8* We follow the "safety by design" process by analysing safety hazards

149
Quantitative and Qualitative Data Analysis

Size of organisation and perceived barriers to implementation of BIM

There does not appear to be large differences between respondents’ attitudes toward factors
considered responsible for H&S, based on the size of their organisation’ but medium and large
firms were more likely to identify “behavioural change” as a factor (see Table 6-5).

Table 6-5: Size of organisation and perceived barriers to implementation of BIM


Size of organisation

implementation

Time required
Education and

to train staff
Behavioural

Information
exchange

Total (N)
training

Cost of
change

Other
Micro sized Count 36 36 9 9 9 0 63
(1-9 % 57.10% 57.10% 14.30% 14.30% 14.30% 0.00%
employees)
Small sized Count 45 72 45 45 36 0 81
(10-50 % 55.60% 88.90% 55.60% 55.60% 44.40% 0.00%
employees)
Medium Count 81 99 72 72 54 0 99
sized (51- % 81.80% 100.00 72.70% 72.70% 54.50% 0.00%
250 %
employees)
Large (250 Count 198 243 162 198 135 18 279
or more % 71.00% 87.10% 58.10% 71.00% 48.40% 6.50%
employees)
Total Count 360 450 96 324 234 18 522
68.9 86.2 55.17 62.06 44.82 3.4

6.2.14 Nature of Business – Cross Tabulations

Cross tabulations were carried out in relation to the nature of the business (i.e. general
contracting, designing, consulting, specialist subcontract or other) carried out by the
respondent’s firm, to examine whether attitudes or experience in relation to BIM vary according
to the nature of the business.

Nature of business by H&S Practices Used

There were some differences in H&S practices, according to the nature of the business (see
statements in Table 5-6). While a majority of respondents in every type of business said that

150
Quantitative and Qualitative Data Analysis

they carry out induction training for construction workers, this figure is relatively low for
specialist subcontractors (54.5%). Those in consulting were much less likely to say that due
process is followed to investigate all reported incidents. General contractors were least likely to
say that they analyse site safety hazards in pre-construction stages. Regular training for site staff
and supervisors is not carried out at all by specialist subcontractors or others and only by a fairly
small minority of all categories, including general contracting (21.7% say they do this
regularly). Safety by design is much more likely to be used by those whose main business is
design, general contracting or consulting (see Table 6-6).

151
Table 6-6: Nature of business by H&S practices
1* 2* 3* 4* 5* 6* 7* 8* Total
General 54 42 36 30 33 15 12 27 69
contracting 78.30% 60.90% 52.20% 43.50% 47.80% 21.70% 17.40% 39.10%
Designing 24 30 27 21 24 6 18 12 39
61.50% 76.90% 69.20% 53.80% 61.50% 15.40% 46.20% 46.20%
Consulting 15 12 15 15 18 3 6 9 24
62.50% 50.00% 62.50% 62.50% 75.00% 12.50% 25.00% 37.50%
Specialist 18 24 21 24 18 0 3 9 33
Subcontracting 54.50% 72.70% 63.60% 72.70% 54.50% 0.00% 9.10% 27.30%
Other 12 12 6 9 9 0 3 3 15
80.00% 80.00% 40.00% 60.00% 60.00% 0.00% 20.00% 20.00%
Total 123 120 105 99 72 24 42 66 180
68.33% 66.67% 58.33% 55.00% 56.67% 13.33% 23.33% 36.67%

1* Construction site workers undertake induction training 2* There is due process in place to investigate all incidents reported

3* Maintain an on-site register to record any hazards reported 4* We analyse site safety hazards in pre-construction stage

5* We have designated project safety personnel to manage on-site 6* We have a regular training programme for our site staff and subcontractors

7* We have clearly defined safety KPI 8* We follow the "safety by design" process by analysing safety hazards
Quantitative and Qualitative Data Analysis

Use and understanding of BIM by nature of business

Use of BIM is highest amongst those whose main business is designing (85%), followed by
other (75%), specialist subcontracting (64%) and consulting (63%). General contracting
businesses are the least likely to use BIM (a majority, 57%, do not do so) (see Figure 6-29).

Advanced
understa
Total 11% 32% 46% 11% nding
Other 75% 25% Good
understa
Specialist sub-contracting 9% 64% 27% nding
Consulting 13% 50% 38% Basic
understa
Designing 33% 42% 17% 8% nding
No
General contracting 5% 37% 53% 5%
understa
0% 20% 40% 60% 80% 100% nding

Figure 6-29:Nature of business by frequency of H&S issues

Respondents who said that designing was their main business are most likely to have a good
or advanced understanding of BIM, followed by those whose main business is consulting
and those whose main business is general contracting. Specialist subcontractors have the
lowest level of understanding of BIM.

Factors considered responsible for H&S Issues by Nature of Business

Respondents were asked to rate a range of factors (from 1-5). Nearly all factors were rated
as responsible for H&S issues by most types of business, with a relatively narrow range of
means (see Table 6-7).

153
Quantitative and Qualitative Data Analysis

Table 6-7: Barriers to implementation of BIM by nature of business

subcontracti
contracting

Consulting
Designing

Specialist
General

Other
ng
Lack of effective Mean 3.91 4.08 4.13 4 3.4
communications SD 1.12 0.76 0.83 1.1 1.34
Total N 69 39 24 33 15
Lack of effective site planning Mean 3.91 3.92 3.88 3.82 4.2
SD 1 0.76 0.99 1.08 1.3
Total N 69 39 24 33 15
Poor implementation of H&S Mean 3.91 4.08 3.75 3.5 4.6
procedures SD 0.97 0.86 1.04 0.97 0.55
Total N 69 39 24 33 15
Lack of regulations Mean 3.26 3.92 4 3.7 4
SD 1.21 1.04 1.07 1.06 0.71
Total N 69 39 24 33 15
Human error Mean 3.65 4 3.75 3.3 4
SD 1.04 0.91 0.89 1.49 1
Total N 69 39 24 33 15
Lack of H&S reporting culture Mean 3.5 4.23 4.43 3.73 4.2
SD 1.01 0.6 0.79 1.1 1.3
Total N 69 39 24 33 15
Lack of consideration of H&S in Mean 3.91 4.23 4.13 3.9 4.2
planning and design stages SD 0.95 1.01 0.83 1.2 0.45
Total N 69 39 24 33 15
Multiculture Mean 3.7 3.92 4.13 3.8 3.8
SD 1.18 1.04 0.83 1.14 0.84
Total N 69 39 24 33 15
Low education Mean 3.65 4.08 4 3.91 4
SD 1.27 1.19 0.76 0.94 0.71
Total N 69 39 24 33 15
Multilingual Mean 3.52 4.17 3.88 3.91 4
SD 1.27 0.94 0.99 0.83 0.71
Total N 69 39 24 33 15

Consulting businesses are most likely to say that behaviour change is an important barrier to
implementation of BIM (87.5%). A large majority of all group consider this important, with
the exception of specialist subcontractors where just over half believe this is the case (see
Table 6-8). Education and training is considered an important barrier to implementation by

154
Quantitative and Qualitative Data Analysis

all types of business, but particularly consulting (100%), designing (92.3%) and specialist
subcontracting (90%).

Table 6-8: Barriers to implementation of BIM by nature of business

Time required to
implementation
and training
Behavioural

Information
Education

train staff
exchange

Total (N)
Cost of
change

Other
General 45 54 30 36 21 3 69
contracting 65.20% 78.30% 43.50% 52.20% 30.40% 4.30%
Designing 27 36 21 27 24 3 39
69.20% 92.30% 53.80% 69.20% 61.50% 7.70%
Consulting 21 24 18 18 12 0 24
87.50% 100.00% 75.00% 75.00% 50.00% 0.00%
Specialist 18 30 24 21 18 3 33
subcontracting 54.50% 90.90% 72.70% 63.60% 54.50% 9.10%
Other 12 9 6 9 6 0 12
100.00% 75.00% 50.00% 75.00% 50.00% 0.00%
Total 123 153 99 111 81 9 177
69.49% 86.44% 55.93% 62.71% 45.76% 5.08%

6.2.15 Most important Factors for H&S

To conduct factor analysis, the one-tailed significance of Pearson correlation coefficients


between all 18 of the factors was first assessed. As all factors seek to measure H&S in KSA
construction industry, it would be expected that they would correlate with each other. Based
on this assessment, the following factors were eliminated from the analysis for high
significance values (>.450): DataMan, Knowledge, ChanceBeh, Equip, InfoExch, SafMeas,
Cost and BetEnfor. The data indicate an issue of multicollinearity between InfoExch and
RefSafMeet (correlated at 0.97), as well as between Knowledge and RegSafAudit (correlated
at 0.99). For this reason, InfoExch has been excluded from the factor analysis. No variables
need to be excluded based on the second instance of multicollinearity, as knowledge has
already been excluded. This leaves the following variables for consideration in factor
analysis: RegSageMeet, SafTrainProg, Proactive, GoodCom, HSIncidRep, SafLead,
PerResp, Dvis and StakeCom.

155
Quantitative and Qualitative Data Analysis

Factor analysis, conducted in SPSS, first produced a Kaiser-Meyer-Olkin Measure of


Sampling Adequacy of .771, which indicates a moderate pattern of correlation in the data
and that this data set is appropriate for factor analysis. According to Kaiser (1974), values
greater than .05 are acceptable for factor analysis, while values between 0.7 and 0.8 are
“good”. Moreover, the significance of Barlett’s Test of Sphericity is highly significant
(p<.000), which also indicates that this factor analysis is an appropriate test for factor
analysis.

The results of the factor analysis (see Table 6-9) indicate that factor one explains 30.037%
of the total variance. Factor analysis has been set up to produce the factor of most importance
and, for this reason, only one factor is presented on the right side of the table, as having an
eigenvalue greater than 1. This is presented in the screen plot in Figure 6-30. As the plot
trails off after the first four factors, this indicates that the first four factors would have been
retained for analysis if the settings had not been established to limit the output to the single
most important factor.

Table 6-9: Total variance explained

Initial Eigenvalues Extraction Sums of Squared Loadings


Compone
nt

% of Cumulative % of Cumulative
Total Total
Variance % Variance %
1 5.407 30.037 30.037 5.407 30.037 30.037
2 3.248 18.047 48.084
3 1.907 10.597 58.680
4 1.120 6.223 64.903
5 .873 4.847 69.750
6 .831 4.619 74.370
7 .723 4.015 78.384
8 .663 3.684 82.069
9 .634 3.522 85.590
10 .496 2.757 88.348
11 .467 2.592 90.939
12 .341 1.896 92.836
13 .318 1.764 94.600
14 .296 1.642 96.241
15 .236 1.313 97.555
16 .177 .984 98.539
17 .150 .832 99.371
18 .113 .629 100.000
Extraction Method: Principal Component Analysis

156
Quantitative and Qualitative Data Analysis

Figure 6-30: Factor analysis screen plot

The most significant factor is composed of the variables in Table 6-10. The table is set to
show loadings less than 0.4. From these factors, common these are assessed to determine the
similarities that contribute to the factor.

Table 6-10: Component matrix

Component
1
Proactive .862
SafLead .851
GoodCom .831
HSIncidRep .819
RegSafMeet .800
RegSafAudit .746
PerResp .724
SafTrainProg .722
Dvis
Cost
SafMeas
Knowledge
StakeCom
Equip
InfoExch
BetEnfor
DataMan
ChangeBeh
Extraction Method: Principal Component Analysis
a. One component extracted

157
Quantitative and Qualitative Data Analysis

6.2.16 OLS Regression Statistical Analysis

As the factor analysis has narrowed down the 18 factors to the eight more significant factors
(i.e. those that are more representative of the perceptions of respondents in regard to H&S),
these eight are now subject to further statistical analysis. The data were tested using the
following regression models:

Regression Model 1:

HandSExp = β0 + β1 Proactive + β2 SafLead+ β3 GoodCom+ β4 HSIncidRep + β5


RegSafeMeet + β6 RegSafeAudit + β7 PerResp + β8 SafeTrainProg + β9 firmsize +
β10SExpHandSIss +ε

Regression Model 2:

H&SFreq = β0 + β1 Proactive + β2 SafLead+ β3 GoodCom+ β4 HSIncidRep + β5


RegSafeMeet + β6 RegSafeAudit + β7 PerResp + β8 SafeTrainProg + β9 firmsize +
β10SExpHandSIss + β11 HandSUse +ε

In the first model, the dependent variable is use of construction safety policies and practices,
and the independent variables are the eight that comprise factor one in the factor analysis
presented herein, controlling for firm size (micro, small, medium or large) and experience
of H&S issues (binary).

In the second model, the dependent variable is the frequency of H&S issues; the independent
variables are use of construction safety policies and practices, as well as the eight variables
that comprise factor one in the factor analysis presented herein, controlling for firm size
(micro, small, medium or large) and experience of H&S issues (binary).

These models were run in SPSS using the survey data. For the first model, the correlation
between the observed and predicted values, R, is .511 and the R-squared is .261. The F-
statistic for the model is 1.805 and the associated p-value is 0.93. This research has
established alpha at 0.05. Therefore, the first model is not statistically significant. This is
confirmed by the correlation table below, in which only one variable, proactive (p≤0.05),
has a statistically significant impact on use of construction safety policies and practices (see
Table 6-11).

Table 6-11: Coefficients

158
Quantitative and Qualitative Data Analysis

Coefficientsa
Unstandardised Standardised
Model Coefficients Coefficients t Sig.
B Std. Error Beta
(Constant) .364 .206 1.766 .084
FirmSize .006 .046 .021 .139 .890
Proactive .123 .054 .459 2.254 .029
Saflead -.003 .058 -.011 -.054 .958
Goodcom .088 .055 .321 1.592 .118
1
Hsincrep -.006 .058 -.024 -.104 .917
Regsafemeet -.014 .076 -.052 -.183 .856
Regsafesaudit -.027 .057 -.106 -.465 .644
Perresp -.041 .075 -.132 -.546 .587
Safetrainprog .017 .051 .059 .325 .747
a. Dependent Variable: HandSExp

Similarly, the regression analysis for the second model cannot be concluded to be significant.
For the second model, the correlation between the observed and predicted values, R, is .511
and the R-squared is .406. The F-statistic for the model is .807 and the associated p-value is
0.567. This research has established alpha at 0.05. Therefore, the second model is not
statistically significant. This is confirmed by the correlation table below, in which only one
variable, ‘firmsize’ (p≤0.05), has a statistically significant impact on use of construction
safety policies and practices (see Table 6-12).

6.2.17 ANOVA Statistical Analysis

Although the two models used in regression analysis were not found to be statistically
significance, in the second model, one variable—firm size—was concluded to be statistically
significant. To assess further the role of firm size, analysis of variance (ANOVA) was used
as a statistical model to determine the differences in responses among firms of different sizes.
While the cross tabulations presented previously in this chapter are useful for providing
descriptive statistics to compare firms by size, ANOVA is useful for applying a measure of
statistical significance to the cross tabulations.

159
Quantitative and Qualitative Data Analysis

Table 6-12: Coefficientsa


Coefficientsa
Unstandardised Standardised
Model Coefficients Coefficients t Sig.
B Std. Error Beta
(Constant) 2.136 .680 3.142 .003
FirmSize .294 .144 .332 2.035 .048
Proactive -.074 .185 -.097 -.398 .692
Saflead .006 .181 .008 .034 .973
Goodcom .117 .176 .150 .667 .508
1 Hsincrep -.126 .181 -.176 -.699 .488
Regsafemeet .184 .237 .240 .774 .443
Regsafesaudit .158 .179 .220 .887 .380
Perresp -.401 .233 -.453 -1.725 .092
Safetrainprog -.083 .159 -.103 -.523 .604
HandSExp .117 .502 .038 .233 .817
a. Dependent Variable: HandSFreq

Using an alpha of 0.05, the results indicate that firm size is statistically significant in the
differences for two variables: 1) better communication devices for efficient information
storage (p=.038); 2) H&S incident reporting culture (p=.018). Specifically, the Tukey post-
hoc test results presented in Table 6-13 indicate that there is a statistically significant
difference between the means for micro-sized and large-sized firms.

160
Quantitative and Qualitative Data Analysis

Table 6-13: Factor analysis


Tukey HSD
95% Confidence Interval

(J) FirmSize
(I) FirmSize
Dependent

Std. Error
Difference
Variable

Mean

(I-J)

Sig.
Lower Bound Upper Bound

1 2 -.063 .175 .983 -.53 .40


3 -.195 .168 .653 -.64 .25
4 -.192 .145 .550 -.58 .19
2 1 .063 .175 .983 -.40 .53
3 -.131 .156 .834 -.54 .28
HandSExp

4 -.128 .131 .760 -.48 .22


3 1 .195 .168 .653 -.25 .64
2 .131 .156 .834 -.28 .54
4 .003 .121 1.000 -.32 .32
4 1 .192 .145 .550 -.19 .58
2 .128 .131 .760 -.22 .48
3 -.003 .121 1.000 -.32 .32
1 2 -.714 .525 .530 -2.11 .68
3 -.558 .475 .645 -1.82 .70
4 -.723 .410 .302 -1.81 .36
2 1 .714 .525 .530 -.68 2.11
3 .156 .475 .988 -1.10 1.42
HandSFreq

4 -.009 .410 1.000 -1.10 1.08


3 1 .558 .475 .645 -.70 1.82
2 -.156 .475 .988 -1.42 1.10
4 -.165 .344 .963 -1.08 .75
4 1 .723 .410 .302 -.36 1.81
2 .009 .410 1.000 -1.08 1.10
3 .165 .344 .963 -.75 1.08
1 2 -.651 .603 .703 -2.25 .95
proactive

3 -1.065 .578 .265 -2.60 .47


4 -1.241 .499 .073 -2.56 .08

161
Quantitative and Qualitative Data Analysis

2 1 .651 .603 .703 -.95 2.25


3 -.414 .538 .867 -1.84 1.01
4 -.590 .451 .562 -1.79 .61
3 1 1.065 .578 .265 -.47 2.60
2 .414 .538 .867 -1.01 1.84
4 -.176 .418 .975 -1.28 .93
4 1 1.241 .499 .073 -.08 2.56
2 .590 .451 .562 -.61 1.79
3 .176 .418 .975 -.93 1.28
1 2 -.444 .588 .874 -2.00 1.11
3 -.636 .565 .674 -2.13 .86
4 -1.156 .487 .094 -2.45 .13
2 1 .444 .588 .874 -1.11 2.00
3 -.192 .525 .983 -1.58 1.20
4 -.712 .441 .378 -1.88 .46
Saflead

3 1 .636 .565 .674 -.86 2.13


2 .192 .525 .983 -1.20 1.58
4 -.520 .408 .583 -1.60 .56
4 1 1.156 .487 .094 -.13 2.45
2 .712 .441 .378 -.46 1.88
3 .520 .408 .583 -.56 1.60
1 2 -.619 .603 .735 -2.22 .98
3 -.740 .579 .580 -2.27 .79
4 -1.379* .500 .038 -2.70 -.06
2 1 .619 .603 .735 -.98 2.22
3 -.121 .538 .996 -1.55 1.30
goodcom

4 -.760 .452 .342 -1.96 .44


3 1 .740 .579 .580 -.79 2.27
2 .121 .538 .996 -1.30 1.55
4 -.639 .419 .429 -1.75 .47
4 1 1.379* .500 .038 .06 2.70
2 .760 .452 .342 -.44 1.96

162
Quantitative and Qualitative Data Analysis

3 .639 .419 .429 -.47 1.75


1 2 -.839 .660 .584 -2.59 .91
3 -1.260 .616 .185 -2.89 .37
4 -1.621* .532 .018 -3.03 -.21
2 1 .839 .660 .584 -.91 2.59
3 -.420 .592 .893 -1.99 1.15
4 -.781 .504 .415 -2.12 .55
hsincrep

3 1 1.260 .616 .185 -.37 2.89


2 .420 .592 .893 -1.15 1.99
4 -.361 .446 .850 -1.54 .82
4 1 1.621* .532 .018 .21 3.03
2 .781 .504 .415 -.55 2.12
3 .361 .446 .850 -.82 1.54
1 2 -.607 .648 .785 -2.33 1.11
3 -.675 .606 .682 -2.28 .93
4 -.763 .523 .468 -2.15 .62
2 1 .607 .648 .785 -1.11 2.33
3 -.068 .582 .999 -1.61 1.47
Regsafemeet

4 -.156 .495 .989 -1.47 1.16


3 1 .675 .606 .682 -.93 2.28
2 .068 .582 .999 -1.47 1.61
4 -.088 .438 .997 -1.25 1.07
4 1 .763 .523 .468 -.62 2.15
2 .156 .495 .989 -1.16 1.47
3 .088 .438 .997 -1.07 1.25
1 2 -.804 .665 .625 -2.57 .96
3 -1.156 .622 .258 -2.80 .49
4 -1.210 .536 .122 -2.63 .21
Regsafesaudit

2 1 .804 .665 .625 -.96 2.57


3 -.352 .597 .935 -1.94 1.23
4 -.406 .508 .854 -1.75 .94
3 1 1.156 .622 .258 -.49 2.80

163
Quantitative and Qualitative Data Analysis

2 .352 .597 .935 -1.23 1.94


4 -.054 .449 .999 -1.25 1.14
4 1 1.210 .536 .122 -.21 2.63
2 .406 .508 .854 -.94 1.75
3 .054 .449 .999 -1.14 1.25
1 2 -.746 .515 .474 -2.11 .62
3 -.403 .494 .847 -1.71 .91
4 -1.045 .426 .079 -2.17 .08
2 1 .746 .515 .474 -.62 2.11
3 .343 .459 .877 -.87 1.56
4 -.299 .385 .865 -1.32 .72
Perresp

3 1 .403 .494 .847 -.91 1.71


2 -.343 .459 .877 -1.56 .87
4 -.642 .357 .285 -1.59 .30
4 1 1.045 .426 .079 -.08 2.17
2 .299 .385 .865 -.72 1.32
3 .642 .357 .285 -.30 1.59
1 2 -.238 .588 .977 -1.80 1.32
3 -.171 .575 .991 -1.70 1.35
4 -.696 .487 .487 -1.99 .60
2 1 .238 .588 .977 -1.32 1.80
3 .067 .536 .999 -1.36 1.49
Safetrainprog

4 -.458 .441 .727 -1.63 .71


3 1 .171 .575 .991 -1.35 1.70
2 -.067 .536 .999 -1.49 1.36
4 -.525 .423 .604 -1.65 .60
4 1 .696 .487 .487 -.60 1.99
2 .458 .441 .727 -.71 1.63
3 .525 .423 .604 -.60 1.65
*. Mean difference is significant at the 0.05 level

For good communication, there is a mean difference between micro sized firms (indicated
by “1” in the second and third column of the above table) and large sized firms (indicated

164
Quantitative and Qualitative Data Analysis

by “4” in the table) of -1.379 (p=.038). This indicates that micro-sized firms have statistically
significant better communication devices than do large-sized firms. Moreover, there is a
mean difference between micro-sized and large-sized firms of -1.621 (p=.018) for incident
reporting culture. This also indicates that micro-sized firms have a statistically significant
better incident reporting culture than do large-sized firms. For the remainder of the variables,
no statistically significant differences are concluded based on firm size.

6.3 Qualitative Data Analysis

6.3.1 Introduction

The quantitative data collected and analysed, used a structured survey instrument that was
developed by the researcher for the purpose of statistical analysis. While this is a useful
means of answering research questions, by producing numerical data that can be analysed
and presented in visual format, as referred to in the Methodology section, there is often a
further dimension added by collecting data through interviews and then analysing it. This is
the strength of mixed methodology, in allowing some triangulation, to add validation to the
data analysed quantitatively and to support reliability.

Moreover, although interviews in this case were semi-structured, the answers were verbal
and open-ended, allowing for more explanation and individuation in the data. The data, as
described in Chapter 3, were collected then examined for recurring themes that would make
a more rigorous and detailed contribution to answering the research questions, one that might
allow a deeper insight into the attitudes and beliefs that underlie behaviours.

This section presents the seven themes that emerged from the interview data, including
supporting quotes from interviewees, followed by a conceptual model of the relationship
between these themes. The following themes were identified through thematic analysis of
the interview data, with BIM having a section of questions in the interviews designed to
elicit the data needed for this study:

 Regulation
 The migrant workforce – culture and communication
 Training
 Understanding of H&S matters

165
Quantitative and Qualitative Data Analysis

 Provision of safety equipment


 Environmental challenges
 BIM

Table 6-14, with data coded to each of these themes, provides demographic information on
the participants, including age, position, expertise, educational attainment, area of work and
years of experience. These data are used to provide contextual information to the interview
data. To this effect, the participant ID provided in the first column of the table is included
with quotes presented as part of this data analysis.

6.3.2 Regulation

There are many different beliefs and attitudes expressed by the participants, but what
emerges is that it is difficult for them to decide on where exactly to place the blame for the
lack of regulation. Many have decided that it is the government that is at fault:

The biggest challenge in implementing HEALTH AND SAFETY is compliance


with the international standards. The reason is that there is no clear standard with
which you can carry out your assessment. IG

“International standards” are also emphasised by IE, while IB calls them “rules which have
been modelled from other countries”, although IJ explains that regulation is inadequate if
compared to the UK, but that in KSA the standards are “under development”. Other
participants also take up the issue of clarity. IA calls the rules “unclear” and II also states
that the regulations are “not clear”; IF goes further, claiming that lack of H&S clarity in
governmental standards, regulation and enforcement leads to a situation where “the company
owner and the workforce feel as if there is no law to safeguard their lives”.

166
Quantitative and Qualitative Data Analysis

Table 6-14: Participant information

Area of work
Participant

experience
education
Expertise

Years of
Position

Level of
Age

Construction Public
IA 39 Project manager Master 12
management sector
IB 35 Lecturer Architecture PhD University 5
Manager and university Architecture and Public
IC 33 PhD 6
lecturer management sector
Civil
ID 33 Head of engineering Engineering Masters 10
service
Supervisor of public Civil
IE 34 Engineering Master 8
projects service
Project manager,
Private
IF 45 international company Engineering Bachelor 19
sector.
(Chinese)
Public
IG 44 Civil defence captain Engineering Master 20
sector.
Private
IH 52 Site manager Engineering Bachelor 25
sector
Public
II 31 Contractor Architecture PhD 6
sector
Architecture Public
IJ 29 Contractor Master 5
management sector

ID and others believe that the government should insist on making H&S issues contractual:

The governmental bodies do not include the conditions and obligations


concerning HEALTH AND SAFETY as mandatory parts of a contract. Even if it
is included, there is no commitment for its implementation. ID

IB agrees, saying that “for acquiring permission for construction, a set of conditions should
be met” and IA supports this suggestion:

(There should be) adherence by the workforce and anyone else that works on the
site to all the HEALTH AND SAFETY rules and regulation. This obligation should
be registered and clarified in the contract with them. Also there should be no
negligence about it. IB

167
Quantitative and Qualitative Data Analysis

Many participants approach the issue from the sanctions perspective, rather than suggesting
a contractual clause that would be enforced before construction began. ID proposes “heavy
fines” for anyone failing to abide by whatever regulation there might be. IE also supports
the “application of fines”, while IB, in addition to advocating fines, appears to believe that
sanctions should involve cancellation of insurance:

I suggest in order that health and safety regulations be observed, a third party
be responsible for supervising the workers … They warn the workers who are
negligent towards safety regulations and if this issue continues, they would
cancel their insurance. My suggestion is that, if an accident happens to the
worker, the company should bear the responsibility and the company should pay
the insurance. In this way, the company will be forced to supervise its workforce
on this issue. IB

However, some participants seem to suggest that failure to abide by H&S regulations,
however inadequate and not enforced, has other outcomes for construction companies, some
of which may impact the company itself or the build that is taking place. IF draws attention
to the damage that H&S failures can cause:

When a significant accident occurs, the police, civil defence forces and medical
teams swarm in, resulting in the shut-down of the operation. This in turn will
delay the date of the delivery, resulting in extra expenses. Furthermore, it
hinders our credit and the company’s commitment to its contracts. IF

The “market forces” argument is also supported by IG, who, without producing evidence,
claims that “observation of the rules and regulations lowers the expenses”; although these
practical or pragmatic observations are not taken up by others, there may be some validity
to his argument.

Further, while claims made on this subject may come from one participant only, this may be
a specific understanding of the issue given from a personal standpoint. Hence, it can be
contested, as it is only a personal view with no support. However, it is important to include
these comments in the analysis, as they may offer alternative views in this examination of
perspectives on H&S regulation in KSA from an experiential although unsupported

168
Quantitative and Qualitative Data Analysis

viewpoint. For instance, ID suggests that adherence to regulations may be less stringent in
contractors in public construction than in private companies:

The section under government control; here, even if the issue of HEALTH AND
SAFETY is mentioned in the contract – it is totally ignored. The private sector
here, in contrast to the governmental section – HEALTH AND SAFETY
regulations are adhered to much more, although it is far from acceptable. ID

There is no evidence to support this judgment and none is offered; therefore, it must remain
conjecture. Another individual claim can be better explained as possibly cultural. IH, a
foreign contractor working in a foreign company, appears to have adopted the company’s
collectivist practices in the views and solutions he presents. The company’s view appears to
be that in the case of a safety infringement by a member of the workforce, the following
procedure is to be adopted:

The most important issue to ensure the implementation of H&S is to compile a weekly
report in regard to each of the workers. This report is an assessment of the worker’s
compliance with the safety regulations. The report will give marks from 1 to 10 and if
a worker obtains 6 he will be called for a disciplinary meeting; and if this continues,
part of his wages will be deducted as a fine. IF

The personal contribution to a collectivist company is a cultural issue – that each member of
the workforce is responsible for their actions and, therefore, for the success of the project.

6.3.3 Migrant Workforce

It is unsurprising that “migrant workforce” should emerge as one of the major themes
because there were several questions in the semi-structured interview schedule that
specifically asked about this subject. However, some of the responses were very interesting
and attitudes to the overwhelmingly migrant workforce were, in general, negative.
Participant IA describes the composition of the workforce in his construction company:

Saudi, Yemeni, Egyptian, Syrian, Jordanian, Palestinian, Sudanese, Malian,


Ethiopian, Pakistani, Bengali, Indian, Turkish and Chinese. IA

The challenges of the migrant workforce are said to fall into two categories, the problems of
communication and those created by different cultures. As far as language is concerned,

169
Quantitative and Qualitative Data Analysis

some of the interview responses are difficult to interpret. The following series of questions
and answers appear in the interview with IA:

How many formal languages are used in within the organisation?

The official language in our transactions and communications is Arabic. IA

Are there any people in your workforce that are not fluent in Arabic?

Yes, there are people who can’t speak Arabic. IA

IA does not say what means had been put in place to accommodate those who could not
speak Arabic understand the instructions they might be given in what, to them, would be a
foreign language. IG points out that communication difficulties result in a workforce that
“don’t understand all the warning signs, safety procedures and the regulations”. And IJ notes:

Yes, some of the labour force don’t follow instruction on construction sites
because they misunderstand verbal and written site instructions. It’s a lack of
communication between them and us. IJ

However, other participants refer to solutions they have found to the communication
problem. ID and IF had come up with the same idea, to divide the workforce into groups
who share a common language. ID also employs supervisors who can also act as interpreters
for these different groups, while IF notes:

Their supervisor should be able to speak the group’s language in addition to English
and Arabic. IF

The language barrier may also come between the workforce and supervisors, causing
relationship difficulties. According to ID:

Language plays an important role because the worker is left in the dark about
what is required from him. He cannot speak Arabic and his English is weak. More
so, even in some cases the supervisors, engineers and directors face the same
problem. Therefore, relationships between them become difficult and they have to
resort to the language of signs and gestures to communicate with each other. ID

170
Quantitative and Qualitative Data Analysis

This problem is not evident in all companies, as IH explains: “As we are a Chinese company,
most of our workers come from China and countries where they speak English”. The nature
of many global companies is similar and IH said that his company had been operational in
KSA for very many years and generally carries out projects in countries outside China.

Apart from written and verbal communication challenges, many participants mention a
cultural difference in members of the workforce. IB observes:

The variety of cultures and languages has an enormous aftereffect in the


construction sector. In KSA, workers come from different countries and their
cultures differ greatly; and as a result, cooperation between them is very low. IB

ID suggests that cultural difficulties are emphasised because there is a general low level of
education in the diverse groups and “for this reason, they would face many difficulties
between themselves”. lH also refers to this lack of cooperation between the groups
themselves: “Unfortunately, cooperation between them is poor and this issue results in the
increase of accident rates”. And IB is more specific on the issue of cultural difficulties and
the matter of H&S:

The main challenge that we face in implementing safety rules is the divergence of
the workers’ languages and their lack of knowledge about the importance of health.
This problem is exacerbated by the fact that the majority of the workers come from
poor Asian countries where health and safety is of no importance. Therefore, the
workforce from these countries has no obligation towards health and safety rules.
IB

According to site manager IH, one of the companies has made a decision that could perhaps
solve the problem of communicating with a migrant workforce that makes up 85% of
construction site workers. The company is Chinese, but it embodies what is meant by
globalisation in that it operates internationally. Where companies operate in this way, there
is often said to be a positive outcome that is referred to by participant IC: “If managed
properly, having a multicultural/multilingual workforce would result in knowledge transfer
to the Saudi context”. IC is an academic and is emphasising the academic argument that
knowledge from one culture can by shared by others in multinational companies; in KSA,
this may result in an enhancement of skills, as more advanced and developed technology can

171
Quantitative and Qualitative Data Analysis

be transferred in this way. It is, therefore, interesting to record what IH observes regarding
his company’s solution to the cultural and communication issues evident in this migrant
workforce:

Since we are an international company and engaged in different countries, it


has been our policy to lower the variety of nationalities in our workforce. By
this policy, we have decreased the negative impacts created by the diversity of
languages and cultures causing discord between the workers. IH

This attitude appears to defy the assumption that globalisation operates almost solely on
knowledge transfer. Perhaps if the migrant workforce were capable of sharing superior
knowledge in an industry in which they specialise, the issue of knowledge transfer might be
relevant. Interestingly, too, the behaviours of IH’s company seem to reflect, in some ways,
the ‘Saudisation’ policy adopted by KSA through limiting the nationality of its workforce to
assist its operating strategies. Where there has been a need for a migrant workforce, it may
be more useful to try to recruit from KSA population. This issue is further explored in the
discussion chapter.

6.3.4 Training in H&S

The interview question answered to the third level of importance was training. Although this
lies at the heart of all H&S practice in developed countries, it is the importance of training
in H&S issues. Therefore, it is interesting to explore whether participants feel that there is
sufficient training offered in this crucial aspect of KSA construction industry. Generally
speaking, all participants recognise the importance of training, although most assume that
training on H&S to be carried out by the workforce. As IH says, the issue here is:

[Accidents are] very high this year and all of the victims were from countries that
I mentioned Therefore, we need to elevate the level of their knowledge by
implementing training courses so that they learn to prioritise HEALTH AND
SAFETY, enabling them to save their own lives in the workplace. IH

Others appear to support this perspective. Yet, IE, in response to the question “Do you train
your workers in health and safety?” replied “no”. This may have been because of a
misunderstanding about the specifics of the question, given that IE is a civil defence captain
and not someone with hands-on experience of a construction site, but there are several

172
Quantitative and Qualitative Data Analysis

examples of breaches or carelessness in training the entire workforce to be aware of H&S


issues. IA is clear that every member of the workforce should be trained: “[What is important
is] educating all the workforces and everyone else connected with the work on the site on
the matter of health and safety”. IB agrees and is specific in stating the importance of the
training agenda reaching all levels of the workforce, but especially the foremen and on-site
managers (supervisors), whom he classifies as those who “control the workforce”:

The important point is that the supervisor should be competent in this


responsibility and should have the necessary skill and ability. For this very
reason, it is paramount that tutorial courses be held to increase the level of their
competence, enabling them to control the workforce. IB

The problem here is that few of the respondents are willing to state who are regarded as the
workforce and who might be thought of as leaders. Engineers, for example, may be thought
of as those sufficiently educated and experienced to lead others, but ID, an engineer in the
civil service, claims:

In the circle of engineers, there is no understanding about health and safety.


Also, there have not been any educational courses conducted in this field. I am
not the first person who has no knowledge of the significance of health and safety
and has not received any training about it. More so, I have not come across any
of the engineers or staff who mentioned this issue in building construction.

No, I have not passed any training course and I think this is something which is
unknown in the government sector.

…. courses should be conducted for all staff, including the workers, engineers
and the clerical personnel. ID

It may be suggested here that engineers who perhaps should lead others towards
understanding of and compliance with basic H&S requirements may not be in a position to
do so, as they are not, themselves, trained. This could, of course, be a totally individual
understanding and experience with no possibility of generalisation in this survey. This often
occurs in qualitative data analysis, especially in those with a small sample size like this.
Moreover, IF claims that, contrary to ID’s experience, “the engineers working for our
company have passed health and safety courses”.

173
Quantitative and Qualitative Data Analysis

In IF’s company, there is a H&S officer, a qualified engineer who has attended and passed
H&S courses. This officer guides the entire workforce in H&S matters. Among his
responsibilities are organising regular explanatory courses, printing leaflets and putting up
signage. His role is to ensure that all workers are aware of and abide by the rules and
regulations that may be set out and to raise awareness of H&S.

At the outset of each project, a meeting is held with all the individuals involved in
the site. In this meeting, observance of health and safety regulations is emphasised
and the safety officer is asked to brief them on these matters. In addition, a course
is held for the workforce about actions which should be undertaken in an
emergency situation at the site. IF

In the light of this statement regarding emergency situations, it is interesting to compare the
management in his company with the regulatory requirements as claimed by IG who, as a
captain in the civil defence, is responsible for guidance on behaviours in emergency
situations:

Yes, there are special training courses in relation to evacuation procedures during
fire or accidents. But these are only for universities, hospitals and ministries. IG

There does appear to be a degree of confusion regarding training and the role played by H&S
officers in construction companies, if one is employed at all. There is also some confusion
about the degree of qualification necessary to work in this role. IH claims that there are
engineers who have fake educational qualifications and “therefore they have no experience
at all in health and safety”. Yet, IG appears to believe that there need be little educational
qualification held for the role of H&S officer:

Yes, we allocate a person responsible for health and safety on project sites. But
we do not specify a certain level of education for him. The one and only important
matter for us is that he should be capable of executing his duties. IG

This seems to be a denial of his stated belief about the crucial importance of H&S issues.
That someone with limited qualification could take on the role suggests that contractors may
not take matters as seriously as they claim they do with regard to what IC calls
“disseminating the culture of safety”.

174
Quantitative and Qualitative Data Analysis

The question of who might be held accountable for safety breaches and training, and the
reasons for the neglect that might persist in some construction companies is a topic that IF
seems to be particularly concerned with:

In my opinion, the first body responsible for all accidents is the high executive
committee of the company, which is mainly concerned about the profits rather
than the health and safety of the workforce. They are looking for cheap,
unqualified workers and never organise training courses to teach them how to
safeguard their lives. IF

He clearly has views on the lack of importance given to H&S issues and also points to a
reason for this – that unqualified labour is available and cheap – and, he implies, more
attention should be paid to the lives of those so employed. He is not alone in this summary
of why H&S matters are often ignored. In reply to the question “What are the major
challenges in enforcing health and safety standards in construction sites in KSA?”, II gives
a blunt answer: “Cost issues related to training sessions for the new workforce”.

The next section takes up an examination of an emergent theme that is closely related to this
one. It is a general lack of knowledge of and lack of interest in understanding H&S matters.

6.3.5 Lack of Interest in and Understanding of H&S

One of the most notable aspects of attitudes to H&S is summed up by IA: “Our engineers do
understand H&S but unfortunately they do not comprehend its real importance”. This is the
crucial point and one that is repeated in different ways throughout these interviews by
different participants. The lack of understanding of the real necessity of these matters is
evident throughout several of the other themes, which is why, here, any further issues can
be seen. Of all the interviewees, ID, a civil servant, is the most passionate about protecting
the labour force:

I repeat, the main challenge for all of us is ignorance towards the importance of
safeguarding the lives of the workers in this sector. ID

ID obviously expresses a belief in the importance of human life and also the necessity for
the industry to take over full responsibility for the welfare of its workers, many of whom
may be unsure about how to ensure their own safety and may put themselves in dangerous

175
Quantitative and Qualitative Data Analysis

situations without being fully aware of the possible consequences. IF draws attention to the
youngest of the migrant workers, those between the ages of 18 and 22, who have little
knowledge of safety matters He says that they “try to accomplish the job without paying
attention to using safety equipment”. Rather than drawing attention to the age of these
workers, IG, while supporting the beliefs of IF, also cites the lack of experience in many of
the migrant workers:

Also, some of the workers employed don’t even know the ABC of safety issues.
They learn as they start work on the site; therefore, they have no idea of how to
safeguard their own health. IG

IB is also in agreement about the lack of understanding amongst the workforce, noting that
the majority of workers come from poor Asian countries where H&S is of no importance.
This, then, he is saying, may be a cultural issue, as has been pointed out by other interviewees
in previous sections of this analysis.

However, these three participants here focus on the workers themselves. ID and others also
focus on the arguably lax standards on construction sites in the public sector, as this is where
he is employed:

Regrettably, on the sites and projects which I supervised the number exceeds 30
and I didn’t see any health and safety officers there … During the 10 years at this
job, I have not witnessed any consideration by the director of the project or the
workers on the issue of health and safety. ID

Considering ID’s position, this is a very damning statement about responsibility of care on
the sites he was in charge of; therefore, one may assume that this observation may possibly
be true of other construction sites in KSA.

The question, however, is – what do participants believe or imagine might be the reason for
the ignorance and neglect of H&S matters? IE believes that “senior management as they look
to profits more than the consideration of maintaining the safety of workers” is the problem,
that the need for profit means that, on many sites, costs will be cut in ways that might damage
workers’ safety. IG agrees that this is a major issue: “Observance of H&S standards and not
thinking of just earning money in expense of quality should be practised”.

176
Quantitative and Qualitative Data Analysis

Yet, IG also points out the short sightedness of this attitude:

Many of the managers think of health and safety as something trivial; this leads
to many big losses in future. IG

This is perhaps the crux of this matter. If there is a careless attitude to the H&S of the
workforce, as argued in previous sections, particularly by IF and IH, both of whom work in
private companies, short-term savings on something as essential as H&S can lead to
workplace accidents that can cause delays and impact on reputation and profit. To ensure
that the workforce remains safe, it is important, the interviewees say, to raise awareness of
H&S matters as perhaps a practical necessity. In the next section, participants offer their
views on site safety, safety equipment and its life-saving nature. It is another emergent
theme.

6.3.6 Safety Equipment, Signage and Precautions

IB, who cites a much-publicised tragic accident that occurred in recent months, most forcibly
creates the discussion on this subject:

We have had many examples of neglect concerning the safety regulations. One
example was the death of 40 workers in the tower in front of the shrine in Mecca
during the month of Ramadan. All the workers died in the ventilation part of the
building where only a piece of wood was put for the workers to pass over. As a
result, they fell to their death. IB

The accident he refers to occurred at one of the main building sites of one of the biggest and
most successful construction companies in the Middle East, but ID explains that “naturally,
the larger the project, the higher the number of workers involved, resulting in more
accidents”. It is a very discouraging picture that does little to suggest that accidents are not
a routine and expected part of the construction industry.

IA speaks about the basic issues of what should occur in order to make a construction site
safe for those who work on it; therefore, the solutions to workplace accidents are known but
perhaps not implemented:

There should be the installation of pillars and preventive stands to protect the
workforce from falling stones or piles of earth. Contractors should make sure of

177
Quantitative and Qualitative Data Analysis

the presence of skilled technical staff for installation of cranes and lift. The role of
management in keeping the work area nice and tidy is very important … briefing
all personnel on the warning and educational signs put up in the workplace. IA

This comment underlines what was discussed in the previous section, where it became clear
that although there is some ignorance of the nature of a safety culture, a more important issue
perhaps is the failure to comply, even when safety rules are known. IC claims that some of
the workers, themselves, ignore the rules of safety, preferring to go about their tasks in their
own way: “Some site workers and sometimes engineers ignore some of the essential safety
precautions, as they consider their tasks as routine work”. IB says that it is not unusual for
workers to be on the site without boots and hard hats. an observation also noted by IF. IB
continues:

Also, we witness that the workers don’t make use of safety belts when working at
height. In addition, the workers secure themselves using primitive facilities. IB

The matter of workers not adhering to safety standards may be, as discussed in the literature
review, a cultural issue within communities where fatalistic attitudes may predominate.

6.3.7 Environment

As has been discussed previously, the working conditions in KSA can be as dangerous as a
poorly managed construction site. The issue here may be health rather than safety; and
although this challenge to H&S is the least mentioned in the interviews, those who mention
it try to draw attention to how serious this concern is. IH raises most of the important issues:

Also, the other important issue which affects the health of the workers is the weather
condition of the country. The companies ask the workers to work at temperatures
above 50 degrees Centigrade, despite the fact that the government has prohibited
work at these temperatures. Regrettably, the companies force their workforce to do
so. The challenge that our company faces is to adapt our workers to the climate here
in Saudi Arabia. The high temperature is the cause of many serious accidents
because our workers are not used to working in such a climate. Wearing a special
suit, safety hat and boots in temperatures above 50 degrees, up to 60 sometimes, is
very demanding. IH

178
Quantitative and Qualitative Data Analysis

IH is part of a Chinese international company and many of its workers could be from the
colder northern regions of China and find it difficult to acclimatise to the Saudi heat. But the
climate is a major problem for building sites. If, during several months of the year,
temperatures are so high and safety equipment so heavy, it is not only irresponsible for
companies to expect a workforce to operate in these conditions, when the regulations state
that this should not happen, but is likely to cost lives, as IH says. It should also be noted that
working in temperatures of this kind during Ramadan, when the intake of food and,
particularly, drink is limited to the hours of darkness, may play some part in endangering
health on construction sites.

IA is also very concerned at the insistence that work on construction sites continues in the
most adverse conditions:

The other important factor is the high temperatures and sandstorms in the area
which greatly affect the health of the workforce. [There should be] prevention of
work during unfavourable weather conditions, such as high temperatures or high
winds and sandstorms. IA

The final section focuses on a part of the interview that was specific and direct. It concerns
the use of BIM.

6.3.8 BIM

As several questions were asked on this topic, it had a degree of response, although generally
few people had used the system that replicates in 3D, 4D or even 5D the progress of the
design of a building (see Chapter 3). Sadly, none of these interviewees had used BIM, but
several were very enthusiastic about its possibilities as a technological system that could
enable designers, architects, engineers and all the workforce to view the construction stages
up to completion and see the build in a time and costs format. The implications for such a
programme are very important for the issues of H&S on a construction site.

I think we could use augmented realty to present issues within H&S for workers.
That could help them to understand the situation of the location. The link between
health and safety and BIM can be developed further to cover this issue. BIM can
be developed further to cover this issue. By viewing the model in a 3D

179
Quantitative and Qualitative Data Analysis

environment, workers can understand the situation of health and safety and what
they should do in case of emergency. IB

Augmented or virtual reality is a major tool for those who have a language barrier and cannot
easily visualise the layout of the site or their role and routes. This can, therefore, perhaps
contribute to the solution of one of KSA’s most serious challenges in attempting to set up a
construction industry to supply the country with an infrastructure, but an industry manned
by a migrant workforce with a variety of languages and understandings. IB has seen perhaps
the biggest contribution offered by BIM to developing nations in their pursuit of H&S in the
construction industry.

Not all interviewees were so positive about the advantages to H&S that BIM might give.
Some had not heard of it. IC had heard of it but had no interest, even claiming that he could
not see the need for BIM in site induction for migrant workers who had language problems.
IB, despite his understanding of augmented reality and its use in induction, was very specific
about BIM and the KSA construction industry, giving a response that was totally
oppositional to what many who answered the questionnaire had said. This matter is explored
in the discussion section:

Unfortunately, we did not intend to utilise BIM for health and safety. In fact, we
use Revit for architecture drawings only. Then we export the file from Revit to
AutoCAD. The concept of BIM has not been fully implemented within the first
stage of the design process yet … and, as far as I know, none of the construction
companies in KSA have used it within the construction phase. IB

Evidence from the interviews is that BIM may have been something the participants know
about and some are positive about what they hope it might do for their companies. IA says:
“I don’t think we can use it now, as it needs educational provisions and facilities that may
be costly”, while IC states: “We do not intend to use BIM for health and safety”. ID agrees
with IB that the use of BIM was limited in KSA: “I have not worked with it and during my
work experience in this sector I have not come across it”. IF also notes that his company
does not use BIM, although it may be used some time in the future: “I believe that
implementing this system will improve health and safety in our company and in the work
place”. IH, too, claims that his company might use BIM “soon”:

180
Quantitative and Qualitative Data Analysis

So far it has not been used but we will consider it seriously, since it has a direct
impact on progress of the job, reduction of time and lowering the number of
mistakes. It will also connect the company to a system that would make the
execution of the job easier and ensure the progress of the project. IH

In general, IH shows considerable enthusiasm for and detailed knowledge of BIM. However,
in summary, none of these participants have ever used BIM and few appear to have a real
understanding of its use and potential.

These observations conclude the results section of this study. It now continues to the
discussion section, after which suggestions are put forward for creating a H&S framework.

6.3.9 Relationship between Qualitative Themes

Although the seven themes thus far have been presented as independent concepts relating to
H&S in the construction industry in KSA, one must acknowledge that they are intimately
intertwined. To this effect, the concept map in Figure 6-31 has been developed to present the
relationships between the seven themes (shown in yellow). The arrows are used to indicate
the causal direction. For instance, that from ‘lack of training’ to ‘not using BIM’ indicates
that the lack of training of the interviewees is one reason they are not using BIM for H&S
issues. Note that the lack of government regulation is demonstrated to be the likely cause of
many of the issues that emerged: lack of training, not using BIM, lack of understanding and
poorly managed conditions.

Figure 6-31:Relationship between qualitative themes

181
Quantitative and Qualitative Data Analysis

6.4 Summary of Findings

6.4.1 Summary of Quantitative Findings

The aim of Section 6.2 was to carry out a quantitative analysis of the data collected from the
field study, with a view to buttressing the aim of the study. In this section, a chronicle
analysis has been carried out which has examined the use of BIM in the management of
H&S in KSA construction sector and the impact of BIM on H&S in its public construction
sector. The section has also examined the level of knowledge and usage of both BIM and
H&S policies and has highlighted the factors that affect effective implementation of H&S
policies.

The survey data reveal broad H&S trends in KSA public sector construction industry. The
data indicate that 85% of respondents have experienced H&S issues in their projects. The
most common of these hazards are slips, trips and falls (63.79%), heat exhaustion (56.90%)
and hazardous substances (51.72%). However, the hazard with lowest frequency—fire
outbreak (22.41%)—still occurs in almost a quarter of construction sites. Yet, less than one-
third of respondents reported to have policies and practices fully integrated and widely
observed (31.67%), and an additional 50% of respondents have policies in place but not
integrated and fully implemented. Despite these findings, 89.47% of respondents reported
providing H&S training for employees, which is most often on-site safety training and
education courses. When given a list of factors that have been verified to have a strong
impact on H&S outcomes, the majority of respondents did not recognise these factors as
essential or critical for implementation. The lack of consideration of H&S in planning and
design stages was considered the item most responsible for H&S issues on construction sites,
followed by lack of effective communications and lack of effective site planning. Moreover,
findings reveal that KSA construction companies often lack full knowledge of the public
construction sector landscape and that employees are often unaware of H&S policies and
practices; therefore, these are not followed. This finding was further emphasised by their
lack of consideration of H&S in planning and design stages, as well as their poor
implementation of H&S procedures. However, respondents recognise the benefits of
advancing H&S initiatives in terms of project schedule (91.67%), project budget (73.33%),
company profitability (77.97%) and KPI (78.33%). Moreover, the majority of respondents
(67.80%) agree that the use of mobile tools and technologies will positively impact the

182
Quantitative and Qualitative Data Analysis

construction sector. Yet, none of the sample uses BIM for facility management purposes.
The study found that most respondents that use BIM do so as a tool for project planning,
while some use it for visualisation, design and for sustainability purposes. BIM is a
multipurpose tool that can be used for all of the above-mentioned purposes, but most
construction companies in KSA only use it for a single purpose, thereby limiting its ability
to make a difference. This study also finds that most construction companies in KSA do not
use BIM for all of their construction needs because they lack the technical know-how of its
functionality.

Next, responses were compared by firm size to assess differences in micro-sized, small,
medium and large firms. The larger the firm, the more likely it is that they make construction
workers undertake induction training, with large firms most likely to carry these out. Small
firms were most likely to report having good or advanced understanding of BIM (63%), but
micro-sized firms have the lowest level of understanding. Large firms have the highest level
of usage, but not the highest level of understanding. Thus, findings indicate that use is
perhaps more of a factor of resources than of understanding. Despite these noted differences
in firm size in the areas of training and BIM knowledge and usage, there did not appear to
be large differences between respondents’ attitudes towards factors considered responsible
for H&S based on the size of the firm. However, medium and large firms were more likely
to identify behavioural change as a mitigating factor.

Cross tabulations were also conducted based on the nature of the firm. The existence of H&S
issues was fairly consistent across firm types, with consulting businesses having the highest
rates of experiencing H&S issues on construction sites (100% reporting either “always” or
“sometimes”). However, differences were observed in the use of BIM by firm type. Usage
was highest for designing firms (85%), followed by other (75%) and consulting (63%), with
general contracting businesses least likely to use BIM (57%). In so far as understanding of
BIM is concerned, a difference by firm type in which designing firms exhibited the greatest
understanding is also observed.

As regards statistical analysis, factor analysis, regression and ANOVA were conducted.
Factor analysis was used to narrow the factor list from 18 to the eight most significant
factors. These were then included in two regression models, one in which the dependent
variable was use of construction safety policies and practices, and the second in which the

183
Quantitative and Qualitative Data Analysis

dependent variable was frequency of H&S issues. Although these two models are not found
to be statistically significant in explaining the dependent variable, one variable (firm size)
was concluded to be statistically significant. Based on this finding, ANOVA was used to
assess the difference in mean between the first size in relation to the factors. This study finds
that there is a statistically significant difference in mean between micro-sized and large firms
in two factors – 1) better communication devices for efficient information storage (p=.038)
and 2) H&S incident reporting culture (p=.018).

6.4.2 Summary of Qualitative Findings

The interviews were analysed using thematic content analysis to ascertain the in-depth
perceptions of H&S in the construction industry in KSA. The following seven themes were
identified through analysis of the interview data: regulation; the migrant workforce – culture
and communication; training; understanding of H&S matters; provision of safety equipment;
environmental challenges; and BIM. Regarding regulation, there were many different beliefs
and attitudes expressed by the interviewees, but many discussed the difficulties of trying to
decide where to place the blame for the lack of regulation. Most indicated that it was the
government that was at fault. Next, issues associated with the migrant workforce emerged
as a major theme, with many respondents holding negative perceptions of the group and its
associated challenges, such as problems of communication and cultural differences. Training
issues also emerged as an important theme. While all interviewees recognise the importance
of H&S training, there is an assumption that current training is adequate. This is also
emphasised in the next theme—the lack of understanding of the real necessity of these
matters. The next issue of consideration is inefficient safety equipment, signage and
precautions. None of the interviewees have used BIM for modelling, but many acknowledge
its potential value for the H&S of construction workers. Finally, a relationship map of the
seven qualitative themes is presented in the next section to demonstrate the causal direction
of the various factors. For instance, the lack of government regulation is considered to be
cause of inefficiency in four of the other factors.

Current H&S practices

There is a slightly different emphasis given to the background question here and the reason
for this may be that the questionnaire is very specific in asking about the ways in which H&S
issues are seen in the practices of the relevant company. The reason for this could have been

184
Quantitative and Qualitative Data Analysis

that the questionnaire specifically asks about the H&S issues at the outset, with a set of
alternatives to choose from (fully integrated, present but not integrated, ad hoc and none),
while in the interviews the question merely refers to challenges to H&S on construction sites:
Therefore, the interview group tends to interpret the first question on challenges as broadly
based and most answers highlight the lack of regulation in the industry. While this issue is
widely discussed in many different forms by the interviewees, pointing the finger both at
national guidance on H&S and site regulation, in the questionnaire regulation is placed very
low on the list of priorities in H&S practices, ranking lowest, in fact. It might be said that
the questionnaire asks about practice and the interview seeks an opinion. This is often the
nature of quantitative/qualitative data and it is useful for balancing the findings of closed
questions, which seek presumed facts, with attitude and beliefs and opinions. This is the
strength of mixed methods.

An additional advantage of qualitative data collection is that it enables the interviewees to


offer their own helpful suggestions, as it does in this case. This happens mostly in relation
to regulation and how it could be enforced. Interviewee IA suggests encouragement bonuses
for observance of H&S requirements. IB opines that owners be informed that any
infringement of regulations and any accidents would result in a cancellation of insurance,
while IC suggests the use of prevention by design and that there should be regular appraisals:
“Construction workers tend to respect H&S precautions when they are convinced that this is
associated with their appraisal by their supervisor”. ID is interested in seeing observance of
H&S to be included in the initial contract and in the “imposition of fines for every one
including the contractors, because when, as the result of an accident, work stops, the budget
of the project will rise”. All these constructive suggestions as to how to change the current
negligent practices are very useful in moving forward the proposed construction of a
framework for H&S in the industry. In addition, several of the interviewees state a desire for
the KSA construction industry to bring H&S up to international standards, which would
seem to be a very sensible suggestion in the light of globalisation. In fact, one member of a
management team, IH, works for such an organisation, a Chinese company operating in most
countries in the world. His view about H&S and the sense of applying internal rather than
externally imposed regulation is more practical but would only apply to private companies
seeking reputation and profit:

185
Quantitative and Qualitative Data Analysis

‘Indeed, our main motivation is to safeguard the health and safety of our workforce.
They are the fundamental factor in completion of a project according to the timetable.
This issue guarantees the continuation of our operation in the Saudi market and
increases the trust of our clients in the competency of the company. The consequence
would be our success in the region and increased value of our shares as an
international company …. As you know, our company is pursuing profit, therefore
finishing a project without any accidents results in the continuous flow of work without
interruption. This in turn means completion of the project on time. Result: more profit
and more trust building’. IH

A strength of qualitative data is that there is little opportunity to invent or mislead, as it is


difficult and unnecessary to do this in a face-to-face situation. Another of the emergent
themes from the interviews is that of training and the belief that there is too little, generally,
although no examples are given. However, in the questionnaire, there is a series of questions
about training and some very useful and very specific answers. One that develops over
several questions is that over 95% of respondents say that they know of their company’s
H&S practice and how it is operated, but the question of whether training should be held
give rise to a number of contradictions. It is clear that training is restricted to induction
training for new employees, which is used by 68% of companies. 60% state that all of the
workforce should have dedicated H&S training. Yet, regular on-site meetings about H&S
for all staff and safety audits are ranked very low as contributing to H&S welfare on
construction sites and only 13% claim to have regular safety training for all staff. Fewer than
one-quarter of participants think that these types of training are “very important”. In contrast,
the interviewees do not restrict the meaning of “training” to induction training but extend it
to include education and qualifications, with one interviewee claiming that many of those
seeking employment on his company’s site had faked qualifications and training. The
interviewees believe that training failures characterise the industry

Another issue that partially divides the interview group from the questionnaire group is that
the former appears more ready to think of top-down organisation and practical interventions
to improve current practices, while the latter, in reflecting that view to some degree and
claiming that implementation of H&S practices is one of the main problems, tend to name
personal qualities as a solution to any outstanding issues. Good communication is ranked as
one of the most necessary practices, and leadership style and quality are also very important.

186
Quantitative and Qualitative Data Analysis

It could be said that those working on the sites tend to concentrate not only on this issue but
others, too, such as personal qualities in ensuring that H&S measures are observed. There is
an emphasis here on learning by experience from a supervisor that could be respected and
would give time to ensure the workforce is safe. The role of the supervisor, not specifically
the subject of a separate question but present in the responses given, is emphasised as being
a helpful and perhaps mentoring and necessary part of current practices. This distinction
between the rankings in importance of those (the interviewees) elements, who largely
although separately decide on what is important, contrasts with the participants’ experiential
values and knowledge.

A kind of agreement between the two different types of collection and analysis exists in that
while the questionnaire data point out that although H&S policies are known and 85% of
respondents agree that they have experienced some site accidents and problems, the
overriding view of that group is that being aware of H&S policies and implementing them
are two completely different issues. This is the case even if, it could be added, participants
and their construction sites are suffering problems that might have solutions. The interview
group echoes that finding, with interviewees claiming that although H&S rules are known,
the practical interventions to support these are absent. This accords with the view of a
psychologist, who claims (Reason, 2000):

"Deaths, injuries and environmental damage are conspicuous and readily quantifiable
occurrences. Avoiding them as far as possible is the objective of the safety sciences. It
is hardly surprising, therefore, that this darker face has occupied much of the attention
and shaped so many of the beliefs about safety. The positive face, on the other hand,
is far more secretive. It relates to a system’s intrinsic resistance to its operational
hazards. Just as medicine knows more about pathology than health, so also do the
safety sciences understand far more about how bad events happen than about how
human actions and organisational processes also lead to their avoidance, detection and
containment" (p. 3).

This may be one of the challenges facing those who try to implement, through whatever
means, a safety understanding and knowledge that creates a safety culture. The problems
may lie in the application of any rules or regulation that might be understood. However, an
acceptance seems to be present in those who answered the questionnaire that the very large

187
Quantitative and Qualitative Data Analysis

number of accidents and threats to health that occur on construction sites are only to be
expected – from falls and spills to machine handling and structural collapse and heatstroke.
It is hoped that this study goes some way to contesting that belief.

Current H&S challenges

The interview group is also strongly aligned on the challenges facing work on construction
sites. Overwhelmingly important to them, with references made to it in all interviews, is the
challenge posed by the large migrant workforce. Although there is a specific question in the
questionnaire about the role of various factors in the application of H&S practices in the
workplace, multilingual, multicultural and low education were of low ranking
proportionally. This appears to suggest that those working daily on construction sites or
holding managerial positions cannot identify a causal chain leading from the employment of
a workforce that is primarily from a different culture, through a language barrier and low
education, to the incidence of accidents and the failure to establish a safety culture, generally.
It is disappointing that the issue of the migrant workforce is so overlooked by this cohort.

The interviewees, on the other hand, do see the importance of this issue and the fact that it
contributes considerably to the management of possible on-site hazards. IF notes:
“Therefore, when you receive a worker, he lacks the culture to comply with health and safety
regulations”. Interviewee B comments: “Workers come from different countries and their
cultures differ greatly, as the result cooperation between them is very low”. Respondent II
refers to the language barrier: “Some … don’t follow instruction in construction site because
they misunderstand verbal and written site instructions”. Only one interviewee (IA) does not
recognise and/or mention this important issue that is reflected so often in the literature (see
Chapter 2). Salminen (2011), for example, concludes his meta-analysis of research on
construction site accidents internationally with this statement:

"This review showed that on average immigrants were involved in occupational


injuries twice more often than native workers. This result is based on 31 studies from
sixteen different countries. It shows that immigrant workers have a worse work life
situation than the native population" (p. 127).

Another challenge to the weak safety culture is that KSA appears to have little technological
development and workplace use. Online training, for instance, is limited to around 8%, while

188
Quantitative and Qualitative Data Analysis

on-site training is claimed to stand at 80%. This could be said to show both a limitation of
opportunities to allow internet reminders of H&S issues and further qualification that could
be undertaken in the worker’s own time and to the desired level. Workers showing this
degree of interest and continuing development could contribute usefully to the development
and promotion of a safety culture. In addition to that disappointing finding, another occurs
in the context of how useful the employment of BIM would be, in terms of schedule, cost,
on site safety and other issues: when asked whether hand-held technology would be a
positive contribution to on-site safety, 68% agreed. This is the lowest approval rate of any
of the items in that section of the questionnaire.

Generally speaking, therefore, it appears, as evidenced in the literature review, that


technological advancement is not as pronounced in KSA as it might be in other countries in
the developing world. Almost 20 years ago, O’Brien and Al-Biqami (1998) had argued that
this was the case:

"The construction industry in Saudi Arabia has been slow to employ IT. There appear
to be no official statistics or comprehensive studies on IT use in the Saudi construction
industry. To this point, there has only been a limited survey carried out by Shash and
Al-Amir (1997). This survey focussed on the extent of computer use and their
applications in construction contractor firms in Saudi Arabia. The findings indicate
that computers are not widely used by construction contractors, especially in relation
to those who are classified as small and medium-sized contractors. The use of
computers is directly proportional to the size of the contractor firm. While, all large
contractors use computers, only 41% and 62% of small and medium-sized contractors
use them" (pp. 2327-2337).

Therefore, this evidence makes it clear why the indication in this study that BIM is relatively
widely used is surprising, although it is seen in the questionnaire data only. The interview
cohorts actually suggest otherwise and it is useful to examine the issue that produces the
biggest discrepancy between the answers given in the questionnaire and the opinions offered
in the interviews – namely, use of BIM. Therefore, the discussion moves to an examination
of the third research question and possible reasons for the confusing and contradictory
answers given to it.

189
Quantitative and Qualitative Data Analysis

BIM and its use for H&S

It is clear from the title of the thesis that the research study focuses on projected use of BIM
to improve the current practices in H&S for construction sites, therefore this is the crucial
matter in the investigations and explorations of this study. BIM is placed centre stage in this
study and it builds from considering the current state of KSA construction industry, as far as
H&S procedures, understanding and implementations are concerned, to examining the
challenges that may cause shortcomings in H&S. A related area is whether BIM could
facilitate enhancements to any of these issues and produce solutions to many of them.
Another question is whether, given the responses of industry workers, managers and
construction owners, a framework could be designed to enhance current H&S practices.
Therefore, this final research question bears the weight of the entire thesis, given the
evidence produced in questions 1 and 2 and the evidence that direct questioning on this issue
might produce.

First, it is necessary to look at the results from the interviews. The finding is that this
particular cohort has some knowledge but no experience of using BIM, even amongst those
designers one might have thought would be using it habitually. Interviewee IA, while
admitting that he has never used BIM, claims that while it may have an auxiliary effect on
improving the level of H&S, it is not an “important factor”. Interviewee IB, an architect,
gives a very definite and definitive answer, already referenced, to the question about the use
of BIM: “As far as I know, none of the construction companies in KSA have used it within
the construction phase”, although he does admit: “I think we could use augmented reality to
present issues within H&S”. Interviewee IC, another architect, says that he supports the
concept of “prevention by design” and he heard of BIM, but that “we do not intend to utilise
BIM for H&S”. Interviewee ID has never used or come across it in his whole work
experience but would like to. Interviewee IE, an engineer, has never used BIM but thinks it
might be useful for site induction, Interviewee IF, a construction manager, states that he has
heard about it but his company had never used it. Interviewee IG has not heard of BIM.
Interviewee IH, a contractor, says that his company had never used it although he believes
it would surely have a positive impact on H&S. Interviewee II, an architect with a PhD, has
not heard of BIM and IJ, a contractor, could see that it might have some use but has never
used it. In summary, none of the interviewees, many in powerful managerial and
governmental roles, some academics, has ever used BIM and at least one has never heard of

190
Quantitative and Qualitative Data Analysis

it. The most striking comment here, worth repetition, is that of IB, who claims that he has
not heard of any construction company in KSA that has used it.

Attention then turns to the questionnaire responses, as this is where the discrepancy lies. In
response to the question “Is your organisation using BIM?” 61% said yes. Therefore, of this
questionnaire sample, taken from representatives in construction, design, site management,
contractors and subcontractors, with large to micro-sized companies, claim use of something
that the interviewees do not use. Furthermore, one interviewee states specifically that no
construction site in Saudi Arabia uses BIM. Uses claimed of BIM are project planning and
visualisation; yet, although one architect suggests that visualisation might be an excellent
way to overcome the challenge of explaining building procedures in different languages to
a migrant workforce, to his knowledge, it has not been used like this in KSA. Nor have any
of the interviewees experienced its use in project planning, although IF claims that his
company was about to introduce it. In the most bewildering of the questionnaire responses
to the question seeking their knowledge of BIM, 11% claim “advanced knowledge” and 32%
“good understanding”. With only 11% of participants saying that they had no understanding
of it, this represents a serious contrast between the results from each different type of data
collection method. In addition, although some participants skipped the questions on BIM,
ranging from 12-30 missed responses, nevertheless over 150 of the cohort answered every
one of these questions, so it is claimed that these are a representative sample. This group also
appears to have a good understanding of the uses that BIM could be put to, most of them
(80%) agreeing that it is useful for producing visualisation for the migrant workforce and
possessing a clear perception that using BIM would save on costs, eliminate lost man-hours
and accidents, and improve site safety and communication, as discussed in the literature:

"The relative newness of BIM allows contractors the opportunity to increase profits by
improving productivity while using pre-BIM productivity rates. This productivity is
gained by clear visualisation of the component assembly and elimination of conflicts
in the field. Labour does not stand idle waiting to determine how to install material
because it was coordinated in the model. There is little rework done because of
conflicts. Larger, prefabricated building components make it easier to perform more
work in off site where working conditions are more amenable to higher production
rates. These causes contribute to the reduction in the amount of time spent to erect the
structure. Until more contractors are able to manage the coordination process and

191
Quantitative and Qualitative Data Analysis

realise lower costs, there will continue to be an opportunity to gain BIM early adopters’
profits" (Porwal & Hewage, 2013, p. 207).

Some of the participants had already identified the on-site challenges, so their responses
were internally coherent. Also, education and training, and the time and cost they incur, are
considered barriers to the initial implementation of BIM. This data from the questionnaire
responses accords with evidence from the literature review and with the responses from
interviewees. Interviewee IA, for example, claims: ‘I don’t think we can use it now because
it needs educational provisions and facilities which might be costly’, a point made by the
majority of questionnaire participants.

6.5 Summary

This mixed methodology approach has produced what was not totally expected but partially
accepted by those who commentate on research methods. It offers two different views and
each of the methods could be regarded as more useful than the other in several of the research
questions, bearing in mind that the object is to examine the issue of H&S on construction
sites in KSA and whether the use of BIM could enhance current practice in that field.
Therefore, the variation in response, which is due to a difference in methods and sample, has
produced rich evidence to inform the possible construction of a framework for H&S in KSA.
The materials for that framework and suggested use of BIM are explored in the next chapter.

192
Enhancing the H&S Framework

Chapter 7. Enhancing the H&S Framework

7.1 Introduction

The main aim of this study is to develop a framework for enhancing H&S in the public
construction sector in KSA. In this chapter, a rationale for framework development is
presented, one that considers building a supplementary model to help managers in those
Saudi construction companies implement the new technology to improve the H&S process.
More specifically, this chapter reflects on the use of ISM as an effective method for
developing such a model.

7.2 Existing H&S Frameworks

Ng, et al. (2005) framework of organisational H&S is presented as demonstration of best


practice. This framework includes the need for administrative and management commitment
to H&S (c.f. Baxendale & Jones, 2000; Abudayyeh et al., 2006; Anton, 1989; Ng et al., 2005;
Choudhry et al., 2007), considerations of H&S in selection and control of subcontractors
(c.f. Ng et al., 2005; Pink, 2008; Phau et al., 2010; Al-Khalil & Al-Ghafly, 1999), keeping a
throughout record of all accidents (c.f. Ng et al., 2005; Lin et al., 2014; OSHA, 2002; Lawton
& Parker, 2002), conducting regular and frequent safety reviews (c.f. Lin et al., 2014; Aksorn
& Hadikusumo, 2008; Abudayyeh et al., 2006; Ng et al., 2005); conducting H&S training to
communicate policies (c.f. Kartam et al., 1998; Hallowell, 2010; Sulankivi et al., 2010;
Berger, 2008; Arastoo et al., 2013; Alasmari et al., 2012; Hassanein & Hanna, 2008; Awad,
2013; Abudayyeh et al., 2006; Ng et al., 2005) and, finally, governmental oversight through
legislation, codes and standards (c.f. Ng et al., 2005; Cotton et al., 2005; OSHA, 2002;
Anton, 1989). H&S best practices occur through a top-down approach in which action occurs
at the administrative level. This chapter uses the data presented in Chapters 6, as well as
expert review, to provide a H&S framework more specific to the KSA construction industry.

7.3 ISM

ISM is an effective and well-established means of identifying the different elements and
relationships thereof that define a problem or similar issues. The essential idea is that with
experience, expertise and skill, one can deconstruct a more intricate system into its
fundamental building blocks and then rebuild the system to be a multilevel structured model.

193
Enhancing the H&S Framework

ISM is basically utilised to show “shared mental models”. These shared models of subject
matter experts surveyed and interviewed for the purpose of this study are used to compose a
tentative theoretical framework because they encapsulate how these individuals understand
and explain the particular phenomenon being studied (Warfield, 1974).

The first step of ISM is to identify the various elements underlying the problem, or any
variables related to the issues, and then use a group solving technique to develop these
elements. According to previous literature and evidence and data that have been collected,
18 fundamental challenges have already been determined. Therefore, to develop the basic
understanding, we have use this existing structure and the data collected to be certain that
the structure is in line with the specific difficulties of KSA’s public sector construction
environment. The information was used to form a relationship matrix and the researcher
proceeded to use this to develop an ISM model. The relevant subordinate relation is then
determined. The outcome of this exercise is to be able to rank the challenges so that the
interactions between them may be determined using ISM. It is also important to determine
the various elements from the focus group and to build a structural self-interaction matrix
(SSIM), in order to link the relationships between the components horizontally. This ensures
that the ISM is more effective. A SSIM can be built by comparing the different pairs of
elements once the element set and contextual relations have been decided upon. Following
this, the SSIM can be converted to a reachability matrix (RM) and the transitiveness can be
verified.

7.4 Characteristics of ISM

The procedures used in ISM are interpretive ones. This is due to the fact that the results of
the groups determine whether the components are related or not and also the degree to which
the components differ. It is important to highlight this factor, as it gives the framework in an
interpretation of the awareness of the content and shows the special environment of the
public construction sector in KSA. It is initially built on the foundation of a mutual
relationship and then the structure as a whole is obtained from the complex set of
components. This is an example of a modelling technique: the structure as a whole and the
relationships that fall within it are depicted in a diagraph model. This ensures that the
intricacies of the relationships between the components of the system are efficiently
organised.

194
Enhancing the H&S Framework

7.5 Steps in ISM Methodology

The entire ISM process consists of eight steps:

1. Identify the components related to the problem. This was carried out through a
review of extant literature and data collection from subject matter experts.
2. Draw up the relationship between the components mentioned in the above step, in
relation to which pairs of components will be analysed.
3. Build a SSIM of the various components that will show the pairings of the elements;
verify transitiveness.
4. Create an RM from the SSIM.
5. Organise the RM into different levels.
6. Convert the RM into a conical form.
7. Draw up a digraph from the relationships in the RM and remove the transitive links.
8. Convert the digraph into an ISM model; this is done by replacing the component
nodes with statements.

Following the above eight steps leads us to create and present the relationships that exist
between the determined elements. With the contextual relationship between each of the
determined elements and the presence of a relationship between any two elements (i and j),
the correlative direction of the relationship is questioned. To continue, note the symbols used
and their definitions to represent the direction of the relationship between two factors, i and j.

These symbols indicate the direction between two factors: from factor i to factor j; from
factor j to factor I; bidirectional between the two factors; or that there is not a relationship
between the two.

(a) V for the relation from factor i to factor j (i.e. factor i will influence factor j).

(b) A for the relation from factor j to factor i (i.e. factor i will be influenced by factor j).

(c) X for both direction relations (i.e. factors i and j will influence each other).

(d) O for no relation between the factors (i.e. barriers i and j are unrelated).

195
Enhancing the H&S Framework

Based on the contextual relationships, the factor-to-factor level for each of the 18 factors
was identified and the SSIM developed. To obtain consensus, the SSIM should be further
discussed by a group of experts. On the basis of their responses, the SSIM is finalised.

RM: the next step in the ISM approach is to develop an initial RM from SSIM. For this,
SSIM is converted into the initial RM by substituting the four symbols (i.e. V, A, X or O) of
SSIM by 1s or 0s.

The rules for this substitution, which were used to prepare the initial RM, are as follows:

(a) If the (i, j) entry in the SSIM is V, then the (i, j) entry in the RM becomes 1 and the (j, i)
entry becomes 0.

(b) If the (i, j) entry in the SSIM is A, then the (i, j) entry in the RM becomes 0 and the (j, i)
entry becomes 1.

(c) If the (i, j) entry in the SSIM is X, then the (i, j) entry in the RM becomes 1 and the (j, i)
entry also becomes 1.

(d) If the (i, j) entry in the SSIM is O, then the (i, j) entry in the RM becomes 0 and the (j, i)
entry also becomes 0.

7.5.1 Level partitions

Antecedent sets and reachability sets are obtained for each factor from the final RM. The
reachability set contains the factor and the other element that it may effect. The antecedent
set contains the factor itself and the other factor, which may affect it. Thus, the intersection
of these sets is obtained for all factors and varying levels of different factors are identified.

The union of the factors that are the same for the reachability and the intersection sets are
contained in the top level of the ISM structure. These top-level factors are those that do not
lead the other factors above their own level in the structure. When the top-level factor is
determined, it is no longer contemplated. To find factors in the next levels of the structure,
the process is repeated. This is performed until the level of every factor is determined.

196
Enhancing the H&S Framework

7.5.2 Conical matrix

To create a conical matrix, one groups the factors of the same level across the rows and
columns of the final RM. A factor’s drive power is determined by adding the numbers of 1s
in the rows. Adding up the numbers of 1s in the columns derives the dependence power. To
determine the drive power and dependence power ranking, the highest ranks are given to
those factors that have the most 1s in the rows and columns, respectively.

7.6 ISM Approach and H&S Measures in Construction Industry

The ISM procedure is most commonly used to determine shared mental models. These show
how people generally grasp and explain an event being analysed. The information below
shows the procedures used in this study, where ISM was applied to the measurement of H&S
performance measures.

7.6.1 Model development

The primary goal of this study is to be able to determine and categorise a group of
performance yardsticks using ISM as backing for the H&S measures in KSA’s public sector
construction industry. Having an expert opinion and practising specific management
techniques (brainstorming, for example) are integrated into the ISM procedure for creating
contextual relationships among variables.

The above suggestions that form part of the ISM methodology and add to this research were
created with contributions from construction industry experts in KSA. This provides the
research with the insights and experiences of those who face these challenges daily in that
industry. Six experts were consulted, in order to assist in determining the contextual
relationships and interactions between the measures. They were selected using a positional
approach through which industry leaders were selected based on level of management role
and invited to participate starting. This process started with those holding the highest
position until the participation of six experts was secured.

An interview was conducted with each expert to gather information on the relationships
among the performance measures. Firstly, the researcher identified the study’s main goals
and explained the meaning of each variable. This step was crucial to ensuring that the experts
concentrated on the relationships between the components. Each expert’s account was

197
Enhancing the H&S Framework

written individually to avoid any influences from between them. The answers were
combined at a later stage to facilitate a more complete analysis of the types of relationships
identified. The results were then presented to the experts to produce a final and complete
matrix that showed their consensus.

Construct validity, internal validity, external validity and reliability are important issues in
overall research design and, hence, in the overall effectiveness of a research study (Yin,
2009; Voss et al., 2002). Construct validity is the extent to which a test can measure what it
is trying to measure; internal validity is the degree to which a study tries to eliminate any
bias in the test; external validity is the degree to which the results of the test can apply to
other situations; and reliability measures the consistency of a test.

Based on the results obtained from the various methods adopted (written reviews,
questionnaires and interviews), the framework is comprised of the following 18 key
components. However, the relationships between the components remain to be determined.

 Better enforcement of regulations and laws


 Cost of implementing H&S measures
 3D/4D/5D visualisation/simulation
 Safety measures incorporated into design phase
 Proactive approaches, e.g. hazard assessments and safety planning
 Management of data from all processes, including H&S
 Better communication devices for efficient information sharing
 Strong and clear communication link between all stakeholders
 Safety training programme made available to all staff across the organisation
 Simpler modes of information exchange
 Good safety leadership abilities in site supervisors
 Regular site safety audits
 Regular on-site safety meetings
 Employee education and training (knowledge)
 Personnel’s responsibility
 Safety equipment and gear in hazardous environments
 Changing behaviour of employees towards H&S measures
 H&S incident reporting culture

198
Enhancing the H&S Framework

Step 1: SSIM

To analyse the relationships among the variables considered in the suggested set of
performance measures, a contextual relationship of “A leads to B” was chosen as the focus.
This means that experts were asked to identify the extent to which one variable leads to
another. Keeping in mind the contextual relationship for each variable, the existence of a
relationship between any two variables (i and j) and the associated direction of the relation
was the basis of the questions asked of the expert panel. All possible pairs of performance
measures were selected and the experts were requested to classify the relationship between
two performance measures as (see Table 7-1):

A (measure j will be achieved by measure i);

V (measure i will help achieve measure j);

X (measures i and j will help achieve each other);

O (measures i and j are unrelated).

199
Table 7-1: SSIM
No List of factors for H&S measures 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
1 Regular on-site safety meetings O X X A O X O A V A V O X V X O X X
2 Regular site safety audits O V X A O A O O V A V X A X X O X X
Safety training programme available to all staff across
3 organisation O V X O X O A O V X V O V O X X O O
4 Proactive approaches e.g. hazard assessments and safety planning V V V X A A A X V A V O V V X X X X
5 H&s incident reporting culture A O A A O X A A X A A X A X A O X A
6 Good safety leadership abilities in site supervisors O V A X O O O O V A V O X V A A V X
7 Personnel’s responsibility O V A O O O O O V A X X O X O O X O
8 Employee education and training (knowledge) X V A O A O A O V X X X A V A A A A
9 Better enforcement of regulations and laws O V V X O V V V V X X V V V V X V V
10 Changing behaviour of employees towards H&S measures O X O A O O X O X A A A A X A A A A
11 Simpler modes of information exchange X O X X A X A X O A O O O V X O O V
12 Cost of implementing H&S measures V V V O V V X V X A V O O V V V O O
13 Safety measures incorporated into design phase V V V X A X A X O A O O O X V O V X
14 3D/4D/5D visualisation/simulation O O X X X V A V O O V O O O V X O O
15 Strong and clear communication link between all stakeholders X V X X X X O X V X O O X V X O V V
16 Management of data of all processes, including H&S V O X X X A A X O A V V V V A X X X
17 Safety equipment and gear in hazardous environments O X O A O A A O X A A A A O A A A X
18 Better communication devices for efficient information sharing X O A X O A A X O O X O O V A O O O
Enhancing the H&S Framework

Step 2: RM

The SSIM is transformed into a binary matrix, called the initial RM, by substituting 1 or
0 for the original symbols, V, A, X and O. The rules for the substitution are the
following:

(1) If the (i, j) entry in the SSIM is V, then the (i, j) entry in the RM becomes 1 and the
(j, i) entry becomes 0;

(2) If the (i, j) entry in the SSIM is A, then the (i, j) entry in the RM becomes 0 and the
(j, i) entry becomes 1;

(3) If the (i, j) entry in the SSIM is X, then the (i, j) entry in the RM becomes 1 and the
(j, i) entry becomes 1;

(4) If the (i, j) entry in the SSIM is O, then the (i, j) entry in the RM becomes 0 and the
(j, i) entry also becomes 0.

Following these rules, the initial RM for the variables is shown in Table 7.2. The final
RM is obtained by incorporating the transitivity of the factors as enumerated in step 4 of
the ISM approach. In this table, the driving power and dependence of each variable is
also shown. The driving power of a particular variable is the total number of variables
(including itself) it may help achieve (see final column of Table 7-2). The dependence
power is the total number of variables that may help achieve the measure.

Step 3: Level partitions

The reachability and antecedent set for each variable is found from the final RM
(Warfield, 1974). The “reachability set” for a particular variable consists of the variable
itself and the other variables which it may help achieve (see Table 7-2). The “antecedent
set” consists of the variable itself and the other variables which may help in achieving
it.

201
Table 7-2: Initial RM
Driving
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
No Measure Power
1 Regular on-site safety meetings 0 1 1 0 0 1 0 0 1 0 1 0 1 1 1 0 1 1 10
2 Regular site safety audits 0 1 1 0 0 0 0 0 1 0 1 1 0 1 1 0 1 1 9
3 Safety training programme available to all staff across organisation 0 1 1 0 1 0 0 0 1 1 1 0 1 0 1 1 0 0 9
4 Proactive approaches, e.g. hazard assessments and safety planning 1 1 1 1 0 0 0 1 1 0 1 0 1 1 1 1 1 1 13
5 Good communication 0 0 0 0 0 1 0 0 1 0 0 1 0 1 0 0 1 0 5
6 H&S incident reporting culture 0 1 0 1 0 0 0 0 1 0 1 0 1 1 0 0 1 1 8
7 Good safety leadership abilities in site supervisors 0 1 0 0 0 0 0 0 1 0 1 1 0 1 0 0 1 0 6
8 Personnel’s responsibility 1 1 0 0 0 0 0 0 1 1 1 1 0 1 0 0 0 0 7
9 Employee education and training 0 1 1 1 0 1 0 1 1 1 1 1 1 1 1 1 1 1 15
10 Better enforcement of regulations and laws 0 1 0 0 0 0 1 0 1 0 0 0 0 1 0 0 0 0 4
11 Changing behaviour of employees towards H&S measures 1 0 1 1 0 1 0 1 0 0 0 0 0 1 1 0 0 1 8
12 Simpler modes of information exchange 1 1 1 0 1 1 1 1 1 1 1 0 0 1 1 1 0 0 13
13 Cost of implementing H&S measures 1 1 1 1 0 1 0 1 0 0 0 0 0 1 1 0 1 1 10
14 Safety measures incorporated into design phase 0 0 1 1 1 1 0 1 0 0 1 0 0 0 1 1 0 0 8
15 3D/4D/5D visualisation/simulation 1 1 1 1 1 1 0 1 1 1 0 0 1 1 1 0 1 1 14
16 Strong and clear communication link between all stakeholders 1 0 1 1 1 0 0 1 0 0 1 1 1 1 0 1 1 1 12
17 Management of data of all processes, including H&S 0 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 1 3
18 Safety equipment and gear in hazardous environments 1 0 0 1 0 0 0 1 0 0 1 0 0 1 0 0 0 0 5
Dependence Power 8 13 11 9 5 8 2 9 13 5 12 6 7 15 10 6 10 10
Enhancing the H&S Framework

Subsequently, the intersection of these sets is derived for all variables. The variable for
which the reachability and the intersection sets are the same is given the top-level
position in the ISM hierarchy, as it will not help achieve any other variable above its
own level. After the identification of the top-level element, it is discarded. Tables 7-3 to
7-13 reflect the 12 interactions conducted to develop the level partitions.

Table 7-3: Partition of RM: interaction 1


Measure

Reachability Set Antecedent Set Intersection

Level
1,2,4,6,9,11,13,15,16,
1 1,2,4,5,6,8,10,13,16,17 1,2,4,6,13,16,17
17
2 1,2,4,5,7,8,10,16,17 1,2,4,5,7,8,10,16,17 3,4,9,14,16
3 3,4,6,8,9,10,14,16,17 3,4,9,12,14,16 3,4,9,12,15,
1,2,3,4,5,6,8,10,11,15,16,
4 1,2,3,4,9,11,12,13,14,15 1,2,3,4,11,15
17,18
1,2,4,5,6,7,8,9,10,11,12,1
5 2,5,7,10,13 2,5,7,10,13 1
3,15,16,18
6 1,2,5,6,8,9,10,15,16,17 1,3,4,6,9,15,16 1,6,15
7 2,5,7,8,10,17 2,5,7,8,9,16 2,5,7,8
1,2,3,4,6,7,8,9,12,14,16,1
8 5,7,8,9,10,17,18 7,8,9,18
8
1,2,3,4,5,6,8,9,10,11,12,1
9 3,7,8,9,15 3,8,9,15
3,15,16,17
1,2,3,4,5,6,7,8,9,10,12,15,
10 5,10,12,17 5,10,12,17 1
17
11 1,4,5,11,13,15,16,18 4,9,11,12,13,14,15,16,18 4,11,13,15,16,18
3,4,5,8,10,11,12,13,14,16,
12 9,10,12 10,12
17,18
13 1,2,4,5,11,13,15,16,17,18 1,5,9,11,12,13,14,15 1,11,13,15
14 3,4,8,11,13,14,15,16 3,12,14,15,16 3,14,15,16
1,2,4,5,6,9,10,11,13,14,15
15 4,6,9,11,13,14,15,16,18 1,2,3,11,14,15,16
,16,17,18
1,2,3,5,6,7,8,11,14,15,16, 1,2,3,4,9,11,12,13,14,15,1
16 1,2,3,11,14,15,16
18 6
1,2,3,4,6,7,8,9,10,12,13,1
17 1,10,17 1,10,17 1
5,17

18 5,8,11,15,18 4,8,11,12,13,15,16,18 8,11,15,18

203
Enhancing the H&S Framework

Table 7-4: Partition of RM: interaction 2


Measure

Reachability Set Antecedent Set Intersection

Level
1 1,2,4,6,8,13,16 1,2,4,6,9,11,13,15,16 1,2,4,6,13,16
2 1,2,4,7,8,16 1,2,4,6,7,9,13,15,16 1,2,4,7,16
3 3,4,6,8,9,14,16 3,4,9,12,14,16 3,4,9,14,16
4 1,2,3,4,6,8,11,15,16,18 1,2,3,4,9,11,12,13,14,15 1,2,3,4,11,15
6 1,2,6,8,15 1,3,4,6,9,15,16 1,6,15
7 2,7,8 2,7,8,9,16 2,7,8 2
8 7,8,9,18 1,2,3,4,6,7,8,9,12,14,16,18 7,8,9,18 2
9 1,2,3,4,6,8,9,11,12,13,15,16 3,7,8,9,15 3,8,9,15
11 1,4,11,13,15,16,18 4,9,11,12,13,14,15,16,18 4,11,13,15,16,18
12 3,4,8,11,12,13,14,16,18 9,12 12
13 1,2,4,11,13,15,16,18 1,9,11,12,13,14,15 1,11,13,15
14 3,4,8,11,13,14,15,16 3,12,14,15,16 3,14,15,16
1,2,4,6,9,11,13,14,15,16, 4,6,9,11,13,14,15,16,
15 4,6,9,11,13,14,15,16,18
18 18
1,2,3,4,9,11,12,13,14,15,
16 1,2,3,6,7,8,11,14,15,16,18 1,2,3,11,14,15,16
16
18 8,11,15,18 4,8,11,12,13,15,16,18 8,11,15,18

Table 7-5: Partition of RM: interaction 3


Measure

Reachability Set Antecedent Set Intersection

1 1,2,4,6,13,16 1,2,4,6,9,11,13,15,16 1,2,4,6,13,16 Level


3
2 1,2,4,16 1,2,4,6,9,13,15,16 1,2,4,16 3
3 3,4,6,9,14,16 3,4,9,12,14,16 3,4,9,14,16
4 1,2,3,4,6,11,15,16,18 1,2,3,4,9,11,12,13,14,15 1,2,3,4,11,15
6 1,2,6,15 1,3,4,6,9,15,16 1,6,15
1,2,3,4,6,9,11,12,13,1
9 3,9,15 3,9,15
5,16
4,9,11,12,13,14,15,16,
11 1,4,11,13,15,16,18 4,11,13,15,16,18
18
12 3,4,11,12,13,14,16,18 9,12 12
13 1,2,4,11,13,15,16,18 1,9,11,12,13,14,15 1,11,13,15
14 3,4,11,13,14,15,16 3,12,14,15,16 3,14,15,16
1,2,4,6,9,11,13,14,15, 1,3,5,10,12,13,15,16,17,1
15 1,3,12,13,15,16,17,
16,18 9
1,2,3,4,9,11,12,13,14,15,
16 1,2,3,6,11,14,15,16,18 1,2,3,11,14,15,16
16
18 11,15,18 4,11,12,13,15,16,18 11,15,18

204
Enhancing the H&S Framework

Table 7-6: Partition of RM: interaction 4


Measure
Reachability Set Antecedent Set Intersection

Level
3 3,4,6,9,14,16 3,4,9,12,14,16 3,4,9,14,16
4 3,4,6,11,15,16,18 3,4,6,9,15,16 3,4,11,15
6 6,15 6,15 4
9 3,4,6,9,11,12,13,15,16 3,9,15 3,9,15
4,9,11,12,13,14,15,16,
11 4,11,13,15,16,18 4,11,13,15,16,18
18
12 3,4,11,12,13,14,16,18 9,12 12
13 4,11,13,15,16,18 9,11,12,14,13,15 11,13,15
14 3,4,11,13,14,15,16 3,12,14,15,16 3,14,15,16
15 4,6,9,11,13,14,15,16,18 4,6,9,11,13,14,15,16,18 4,6,9,11,13,14,15,16,18
16 3,6,11,14,15,16,18 3,4,9,11,12,13,14,15,16 3,11,14,15,16
18 11,15,18 4,11,12,13,15,16,18 11,15,18

Table 7-7: Partition of RM: interaction 5


Measure

Reachability Set Antecedent Set Intersection

Level
3 3,4,9,14,16 3,4,9,12,14,16 3,4,9,14,16 5
4 3,4,11,15,16,18 3,4,9,11,12,13,14,15 3,4,11,15
9 3,4,9,11,12,13,15,16 3,9,15 3,9,15
3,4,5,94,11,13,15,16,18 4,9,11,12,13,14,15,16,
11 4,11,13,15,16,18 5
10,14,16,17 18
12 3,4,11,12,13,14,16,18 9,12 12
13 4,11,13,15,16,18 9,11,12,13,14,15 11,13,15,
14 3,4,11,13,14,15,16 3,12,14,15,16 3,14,15,16
15 4,9,11,13,14,15,16,18 4,9,11,13,14,15,16,18 4,9,11,13,14,15,16,18
16 3,11,14,15,16,18 3,4,9,11,12,13,14,15,16 3,11,14,15,16
18 11,15,18 4,11,12,13,15,16,18 11,15,18

205
Enhancing the H&S Framework

Table 7-8: Partition of RM: interaction 6


Measure

Reachability Set Antecedent Set Intersection

Level
4 4,15,16,18 4,9,12,13,14,15 4,15
9 4,9,12,13,15,16 9,15 9,15
12 4,12,13,14,16,18 9,12 12
13 4,13,15,16,18 9,12,13,14,15 13,15
14 4,13,14,15,16 9,12,13,14,15 14,15,16
15 4,9,13,14,15,16,18 4,9,13,14,15,16,18 4,9,13,14,15,16,18 6
16 14,15,16,18 4,9,12,14,13,15,16 14,15,16
18 15,18 4,12,13,15,16,18 15,18 6

Table 7-9: Partition of RM: interaction 7


Measure

Reachability Set Antecedent Set Intersection

Level
4 4,16 4,9,12,13,14 4
9 4,9,12,13,16 9 9
12 4,12,13,14,16 9,12 12
13 4,13,16 9,12,13,14,15 13,
14 4,13,14,16 12,14,16 14,16
16 14,16 4,9,12,13,14,16 14,16 7

Table 7-10: Partition of RM: interaction 8


Measure

Reachability Set Antecedent Set Intersection


Level

4 4 4,9,12,13,14 4 8
9 4,9,12,13 9 9
12 4,12,13,14 9,12 12
13 4,13 9,12,13,14,15 13,
14 4,13,14 12,14 14

206
Enhancing the H&S Framework

Table 7-11: Partition of RM: interaction 9

Measure
Reachability Set Antecedent Set Intersection

Level
9 9,12,13 9 9
12 12,13,14 9,12 12
13 13 9,12,13,14,15 13, 9
14 13,14 12,14 14

Table 7-12: Partition of RM: interaction 10


Measure

Reachability Set Antecedent Set Intersection

Level
9 9,12 9 9
12 12,14 9,12 12
14 14 12,14 14 10

Table 7-13: Partition of RM: interaction 11


Measure

Reachability Set Antecedent Set Intersection

Level
9 9,12 9 9
12 12, 9,12 12, 11

Table 7-14: Partition of RM: interaction 12


Measure

Reachability Set Antecedent Set Intersection


Level

9 9 9 9 12

207
Enhancing the H&S Framework

7.7 Interpretation of Framework

The main aim of this study was to develop a framework for enhancing H&S in the public
construction sector in KSA (see Figure 7-1). In this section, the rationale of framework
development is examined with reference to the literature review and to the results

H&S incident reporting Changing behaviour of Safety equipment and gear


Level 1 culture employees towards in hazardous environments
H&S measures

Personnel’s responsibility Employee education and training


Level 2
(knowledge)

Level 3 Regular on-site safety meetings Regular site safety audits

Good safety leadership abilities in site supervisors


Level 4

Safety training programme available to all staff Simpler modes of information


Level 5 across the organisation exchange

Better communication devices for efficient Strong and clear communication link
Level 6 information sharing between all stakeholders

Management of data of all processes, including H&S


Level 7

Proactive approaches, e.g. hazard assessments and safety


Level 8 planning

Level 9 Safety measures incorporated into design phase

Level 10 3D/4D/5D visualisation/simulation

Cost of implementing H&S measures


Level 11

Better enforcement of regulations and laws


Level 12

Figure 7-1:H&S framework

208
Enhancing the H&S Framework

obtained from the questionnaire survey and interviews. Therefore, the details of the
framework construction are provided, but it is important at this point to give meaning to
‘framework’. Determining the extent to which the identified factors contribute to
effective H&S management is, as presented here, a complicated yet meaningful task.
The framework, while specific to the environment of KSA, aligns with that indicated by
Ng et al (2005). The reader’s attention is now directed to the model of risk management
(Hinze & Russell, 1995) for considering factors for implementation:

 Knowing what the risks are and what in general should be done about them
 Planning, prioritising and implementing risk controls
 Ensuring that risk controls are effective and sustained
 Reviewing and learning

Therefore, a mixed method approach to identifying the risks and specific challenges of
the KSA construction sector in terms of H&S has been taken. The proposed framework
presents a hierarchical framework for planning, prioritising and implementing risk
controls. The challenge now to practitioners and academics is to ensure that these tasks
are implemented. Moreover, this study demonstrates that the tasks must be a priority for
government regulation, as well as corporate administration. Thus, a top-down approach
is emphasised for implementation of the framework.

The objective of this particular exercise was to collate opinions from a range of experts
regarding the evidence supporting features associated with effective H&S management.
Most of these key elements are very similar to those required for good quality, finance
and general business management. The principles of good and effective management
provide a sound basis for the improvement of H&S performance.

Following the interviews held individually with six construction experts, who were
asked about the relation between 18 factors and which one has an impact upon which
other one, the scope of the work was generated consisting of 12 different levels that all
are related to each other (see Figure 7-1). Thus, some of the factors, when developed
into a framework, were found to function at the same level. That was the result of the
experts’ intervention, as all of them agreed on better enforcement of regulations and

209
Enhancing the H&S Framework

laws. Since this factor was the most important of all, it should have assured adherence
to a decisive system of H&S within the any company and to the H&S regulations enacted
by the government. It is important here to note that Ng et al. (2005) also identify this
factor as the most important in the framework. Moreover, this assertion is supported by
the extant literature (Baxendale & Jones, 2000; Toole, 2002; Abudayyeh et al., 2006;
Anton, 1989; Ng et al., 2005; Choudhry et al., 2007).

The second most important factor is the cost of implementing H&S measures. There
should be a sum assigned within the project budget for execution of all H&S measures.

What comes next is the 3D/4D/5D simulation/visualisation. At this stage, the 3D and 4D
designs of the project are prepared to show every stage of construction with the
scheduling. Next to that is design whereby dangerous locations in the project are located
and eliminated. If any dangerous locations remain and cannot be eliminated, they should
be avoided and evaluated in scheduling, so that, at every stage, an alert should be given.
At the sixth stage, the S&H and method of its implementation will be designed; this will
be a preventive stage for safety and protection of employees from accidents.

The next step is management of data of all processes, including H&S. The project
intelligence and operating office that has safe implementation of BIM as part of its duty
must ensure that all of previous stages have been executed properly. Recording and
managing this information is an important issue. That is one of the advantages of BIM.
In KSA, since projects are from different countries, communication between workers is
a great challenge in the construction sector. Therefore, at level seven, it is assured that
communication between all of the participants in the project, including management,
employees and designers, is strong, that modern and fast communication devices are
provided and that communication between participants is based on a joint relationship
where each should have an impact on the other. Also, the connection between providing
modern communication devices and management of information is a bilateral
relationship.

There are two important factors at the eighth level – a safety training programme
available to all staff across the organisation and simpler techniques of information
exchange. The relation between them is bilateral, has an impact on each other, makes
the transfer of information easy and provides courses for all personnel to understand

210
Enhancing the H&S Framework

signs and 3D plans. All of the experts agreed that conducting courses to elevate the
knowledge of engineers and site personnel is an essential and basic issue. By doing so,
their abilities and capability to understand instructions and information given by
management is elevated.

At the tenth level, there are two important factors that depend on each other – regular
site safety audits and regular on-site safety meetings. The first of these involves
conducting meetings with employees, elaborating desired responsibilities and
determining the duties of each one. Also, any dangerous locations should be introduced
to employees and 3D images used to make understanding easy.

The other important factor at this level is monitoring activities through the daily watch
and following up on all levels of project reporting, as well as reporting to management
in case of encountering any hazardous item that was not predicted in the design but
shows up during construction. In such a case, the designer will solve the problem and
eliminate the hazard. This factor has an impact on the level of education and knowledge,
since the level of education indicates the level of vigilance and follow-up. Therefore, if
it is lacking in any way, it will be necessary to conduct courses to elevate the level of
H&S. At this next level, personnel’s responsibility preserves its effect and elevates its
level. Periodic meetings will escalate knowledge and understanding of, and
responsibility and obligation to the H&S rules and regulations.

In the final level consists of three factors:

1. Safety equipment and gear in hazardous environments.


2. Changing behaviour of employees towards H&S measures.
3. H&S incident reporting culture.

Knowledge and training are the most effective factors to keep up with the obligation to
provide safety gear and protection, since they escalate the level of understanding of
employees and management and ensure that H&S equipment is provided. These also
changes the behaviour of employees, particularly those who have little experiences and
are from those countries that do not pay much attention to H&S, who need to change
their behaviour. This factor is related to reporting incidents in the context of the culture

211
Enhancing the H&S Framework

of employees and also individual responsibilities, since these have an impact on each
other.

Step 5: MICMAC analysis – classification of performance measures

All performance measures have been classified into four categories, based on their
driving power and dependence (Table 7-15). Figure 7-2 sums up the number of 1s in the
rows and its dependence power by summing up the 1s in the columns (c.f. Raj, Attri, &
Jain, 2012; Attri, Grover, Dev, & Kumar, 2012). Thus, the final row of the table

Table 7-15: Driving power and dependent power for elements

Factors Driving Power Dependent Power

RegSafMeet 1 10 10

RegSafAudit 2 9 10

SafTrainProg 3 9 6

Proactive 4 13 10

HSIncidRep 5 5 15

SafLead 6 8 7

PerResp 7 6 6

Knowledge 8 7 12

BetEnfor 9 15 5

ChangeBeh 10 4 13

InfoExch 11 8 9

Cost 12 13 2

SafMeas 13 10 8

DVis 14 8 5

StakeCom 15 14 9

DataMan 16 12 11

Equip 17 3 13

GoodCom 18 5 8

212
Enhancing the H&S Framework

represents the dependence power and the final column of the table represents the
summing power. The four categories are: (1) autonomous measures; (2) dependent
measures; (3) linkage measures; and (4) independent measures. These categories are now
determined by their position in the H&S framework.

16
IV
15 9
III
14 15
13 12
12 16
11
10 13 1 4
Driving power

9 3 2
8 14 6 11
7
6 7 8
5 18 5
4 10
3 17
2
I II
1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Dependent Power
Figure 7-2: Classification factors

This classification of measures is similar to that used by Mandal and Deshmukh (1994).
The driving power and dependence diagram for the suggested performance measures is
shown in Figure 7-2.

Autonomous factors (weak driving power and weak dependence power) in the
classification include: good safety leadership abilities in site supervisors (factor 6),
personnel’s responsibility (factor 7), better communication devices for efficient
information sharing (factor 18) and 3D/4D/5D visualisation/simulation (factor 14). This
means that they have little driving power and little dependence, and are relatively
disconnected from the system. Dependent factors have weak driving power, but four
factors indicate a strong dependence power: H&S incident reporting culture (factor 5),
employee education and training (knowledge) (factor 8), changing behaviour of
employees towards H&S measures (factor 10), simpler modes of information exchange
(factor 11) and safety equipment and gear in hazardous environments (factor 17). The
third cluster, consisting of independent factors (strong driving power but weak

213
Enhancing the H&S Framework

dependence power), has safety training programme made available to all staff across the
organisation (factor 3), better enforcement of regulations and laws (factor 9), cost of
implementing H&S measures (factor 12) and safety measures incorporated into design
phase (factor 13). The fourth cluster consists of linkage measures that have strong
driving power and high dependence linkage factors (those with strong driving power and
strong dependence power), including regular on-site safety meetings (factor 1), regular
site safety audits (factor 2), proactive approaches (e.g. hazards assessments and safety
planning) (factor 4), strong and clear communication link between all stakeholders
(factor 15) and management of data of all processes, including H&S (factor 16). Any
action on these measures will have an effect on the other measures and also create a
feedback effect on that measure itself.

7.8 Validation of Framework

The framework presented here has been validated in three ways. First, the methods used
to obtain the framework are systematically outlined to allow for replication of the
framework. In providing great detail on the research method and steps taken within it,
the researcher provides transparency. Second, the framework is validated by its
contextualisation into the existing discourse. As this based on the intersection of the
literature provided in Chapters 2 and 3, the factors that were subjected to both qualitative
and quantitative analysis are first identified through the research. Hence, the framework
relates directly back to the research from which it was formulated. Furthermore, experts
contributed to model development, providing it with face and content validity. Third, in
using mixed methods and comparing the findings of the two approaches.

7.9 Summary

This chapter has presented the development of the framework to enhance H&S within
BIM in KSA. This process began by highlighting some key findings of the literature
review, followed by data collection to identify 18 factors. First, the ISM methodology
was developed using the knowledge of experts in the construction industry to derive
relationships among the suggested performance measures, which represents an element
of bias. Also, as the research focuses on one specific industrial context, the findings are
not universally applicable across different sectors or in different countries. There is also
the possibility that different sectors might have different product and process

214
Enhancing the H&S Framework

characteristics, which could influence the type, ranking and relationships among the
factors, leading to different results from using the ISM methodology.

215
Discussion, Conclusion and Recommendation

Chapter 8. Discussion, Conclusion and Recommendation

8.1 Introduction

The previous chapters have introduced this study, provided an overview of the literature
addressing the issue to be investigated, outlined the methodology employed to
accomplish this, provided both quantitative and qualitative findings, and used these to
develop a H&S framework that incorporates BIM. This dissertation brings the study full
circle by relating these steps back to the five specific objectives listed in Chapter One.

The need to address these five aims has been demonstrated by the statistics surrounding
the H&S of construction industry workers in KSA. To assess this issue and the potential
of BIM for improving associated outcomes, this research began with an assessment of
the extant literature addressing the KSA construction industry, including its
organisation, challenges, H&S standards, regulations, safety culture and working
practices. Next, the relevance of BIM for enhancing H&S outcomes was reviewed,
focusing on communication and technology, BIM for safety, pre-construction
considerations and the value of visualisation for a migrant workforce. Finally, an
overview of the factors associated with existing H&S frameworks was provided. The
overarching purpose of these five aims is to understand the applicability of existing H&S
frameworks to the public sector construction industry in KSA.

8.2 Achievement of Research Aims and Objectives

To address the aims of this study, a mixed method approach utilising questionnaires
(n=189) and interviews (n=10) has been employed. The survey data was analysed using
descriptive statistics, cross-sectional statistics, factor analysis, OLS regression and
ANOVA to develop a broad understanding of the conditions and perceptions in KSA
public sector construction industry. Interview data were analysed using qualitative
content analysis to develop a deep understanding of the relevant environment. The data
from these two approaches was analysed to understand the existing H&S safety practices
in the public construction sector in KSA, to investigate the relationship between BIM
and H&S in construction, to develop an integrated framework for using BIM in
construction to address H&S issues, to assess the framework developed through expert
opinion and to provide concluding recommendations based on best practice, as well as

216
Discussion, Conclusion and Recommendation

provide direction for further research on this subject. The following sections note how
these steps have met the first four aims of the study in turn. There follows a discussion
of the contribution this research makes both theoretically and practically. Next, the
limitations of the research and suggestions for future research are provided. Finally, to
fulfil the fifth aim, the study concludes by making recommendations.

8.2.1 Objective 1: Explore existing practice of H&S

This research has assessed KSA construction sector H&S practices and how these
compare to established best practice. The survey and interview data both indicate that
the current practices in KSA are often haphazard and can be attributed to the high number
of safety incidents in the country. The results reveal that 85% of survey respondents have
experienced H&S issues in their construction projects. The literature suggests that high
rates of occurrence are largely due to the lack of adherence to best practice by
management (Arastoo et al., 2013; Alasmari et al., 2012; Hassanein and Hanna, 2008;
Awad, 2013). Of the factors provided as best practice, respondents overwhelmingly do
not recognise their value in improving H&S outcomes. Thus, if their value is not
recognised, it is highly unlikely that they will be rigorously implemented to improve
outcomes.

Interviewees indicate that working with a largely migrant workforce is one of the
greatest challenges associated with H&S performance management in KSA. This finding
aligns with that of Alsehaimi (2011), who identifies KSA construction sector’s heavy
dependence on multicultural, multilingual, low and semi-skilled labour as one of the
main factors impacting its H&S performance. De Bel-Air (2013) confirms that the
construction industry in KSA is heavily reliant on migrants from South Asia and that
these workers often only have basic education, many barely literate.

8.2.2 Objective 2: Identify relationship between BIM and H&S

BIM, it is found, stands to improve H&S outcomes uniquely through addressing the
challenges expressed by the study respondents. As it is clear that communication is an
issue, visualisation through BIM cuts across barriers of language. Not only does BIM
allow for visualisation and translation in H&S training materials, but also for safety
measures to be incorporated in the design phase of a construction project and

217
Discussion, Conclusion and Recommendation

opportunities for 3D/4D/5D visualisation and simulation. Therefore, the findings reveal
that BIM improves opportunities for strong and clear communication links between all
stakeholders.

Currently, one-third of KSA construction companies are taking advantage of BIM and
related technologies. However, it is important to note that the current use and
implementation of BIM is sporadic and far from meeting its potential. Khosravi et al.
(2014) note that it is an approach, not just a software tool. Over three-quarters of the
study sample agree that BIM will positively impact on-site construction safety. This
study finds that there is a significant and direct positive impact of investment on H&S
on construction projects in KSA construction sector. This has been established by the
responses received and studies have shown that investment in H&S can impact
construction projects greatly.

The study also finds that most construction companies in KSA do not use the BIM tool
for all of their construction needs because they lack the technical know-how. Despite
lack of widespread usage, most construction companies note a desire to increase usage,
yet are stifled by this ignorance of the functionality of the tool. Thus, the findings reveal
that the greatest challenge and obstacle to the successful and effective implementation
of BIM as a tool for the management of H&S in firms is education and training, followed
by behavioural change and improving communication.

8.2.3 Objective 3: Develop integrated framework

This study is motivated by the empirical need to develop a framework for enhancing
H&S outcomes in KSA public sector construction industry. Two factors have been
identified and used in an existing framework (Ng et al., 2005) and risk management
model (Hinze & Russell, 1995). Subject experts were surveyed and interviewed, and the
potential to improve these outcomes using BIM was assessed. Overall, the findings
reveal that in consideration of the 1) dramatic gap between H&S best practice and current
KSA practices, 2) the identification of the migrant workforce as a key challenge in
improving H&S outcomes and 3) the current lack of usage of BIM, implementation of
BIM approaches is an appropriate response for improving H&S outcomes in KSA public
sector construction industry. Thus, the framework developed in this study was built

218
Discussion, Conclusion and Recommendation

using ISM to support the evaluation of H&S measures and the relationships they share.
Eighteen key elements of H&S were identified:

1. Better enforcement of regulations and laws.


2. Cost of implementing H&S measures.
3. 3D/4D/5D visualisation/simulation.
4. Safety measures incorporated into design phase.
5. Proactive approaches e.g. hazard assessments and safety planning.
6. Management of data of all processes, including H&S.
7. Better communication devices for efficient information sharing.
8. Strong and clear communication link between all stakeholders.
9. Safety training programme me made available to all staff across the organisation.
10. Simpler modes of information exchange.
11. Good safety leadership abilities in site supervisors.
12. Regular site safety audits.
13. Regular on-site safety meetings.
14. Employee education and training (knowledge).
15. Personnel’s responsibility.
16. Safety equipment and gear in hazardous environments.
17. Changing behaviour of employees towards H&S measures.
18. H&S incident reporting culture.

8.2.4 Objective 4: Test, evaluate and validate framework

This study draws synthesis between the qualitative and quantitative findings through
ISM, which it uses to identify and rank a set of performance measures to support the
evaluation of H&S factors in the construction industry. Relying on experts from the H&S
construction industry, ISM and associated H&S framework was developed. The
interview and survey data were used to assess the relationship between these 18 factors
and differentiate them at 12 different levels, as well as determine the relationship
between them. Moreover, expert review by industry leaders was used to provide face
and content validity for the proposed framework. The framework was also deriver, in
part, from the established literature, as presented in Chapters 3 and 4. In classifying these
outcomes using the methods of Mandal and Deshmukh (1994), the factors were

219
Discussion, Conclusion and Recommendation

determined as driving measures, linking measures, autonomous measures or dependent


measures. Although the following framework and suggested cluster of performance
measures were provided in Chapter 7.

The framework indicates that, like in the qualitative analysis causal framework, a key
concern is the lack of enforcement of laws and regulations. This also aligns with the
framework presented by Ng et al. (2005). It takes into consideration established best
practice, the challenges identified by respondents in this research and the application of
BIM for improving H&S outcomes. As technological advances, most notably the use of
BIM, stand to address the primary challenge indicated in this research—communication
with the migrant workforce—the addition of 3D/4D/5D visualisation is the major
deviation from previous models of H&S.

8.3 Contribution to Knowledge

This research has made a contribution in three areas. First, factors that affect H&S
performance in KSA public sector construction industry are identified. Second, a deeper
understanding of utilising BIM to support the H&S outcomes of this sector is developed.
Third, contributions are made to a framework for enhancing H&S practice through new
and available ICT technologies. In its efforts to mitigate future H&S incidents, this study
can improve the conditions for a number of people. To this effect, the researcher has
proposed and assessed the use of new technologies and best practices to address the
problems identified. As these areas have not been studied in the Saudi context, these
contributions have both academic and practical applications. Academically, the findings
of this study provide a baseline for knowledge of H&S in the Saudi construction
industry, an area in which gaps have previously been identified in the literature.
Practically, the findings of this study can be used to identify areas of improvement with
actionable outcomes. For instance, the findings reveal that lack of government regulation
is a contributory factor to the high rate of H&S incidents and that BIM is a potential tool
for addressing these issues. Thus, the final recommendation of this study is for both
government and firms to consider the findings of this study when developing policies to
implement change and improve outcomes.

Although this study has identified the challenges faced and reconceptualised the H&S
model for the environment assessed, the task of making substantive changes remains.

220
Discussion, Conclusion and Recommendation

The old adage “you can lead a horse to water, but you can’t make it drink” is fitting from
a practical application standpoint, as this knowledge is only useful insofar as it has the
capability to result in change. Just as there are many noted benefits for the use of BIM,
as has been highlighted through this study, there are notable challenges (Kiviniemi et
al., 2011; Hartmann & Fischer, 2007). Two scenarios are seen that would act as catalysts
for change to improve the likelihood of measures for better H&S outcomes in the KSA
public sector construction industry. First, it is noted that until there is widespread
education relating to how BIM works, how it can provide a visual, immediate and
sequenced insight into how a building can be perceived and projected, and how those
who work in it can be protected, the unique safety features availability through BIM may
not be recognised and implemented. Second, through a literature review and analysis of
the perceptions of subject experts, this research acknowledges the lack of government
oversight in the form of regulations, codes and policies. This is a factor that is
consistently emphasised across H&S frameworks, yet has not been realised in this
context. Greater government action is needed, such as that demonstrated by OSHA in
the USA or the Health and Safety at Work Act in the UK. This would force the hand of
construction firms and make them pay greater attention to factors and practices,
including BIM, that would likely improve H&S outcomes.

Although this research has studied the case of the construction industry in KSA, many
of the challenges that were revealed align with the literature and are likely present across
other industries and countries. This research has been conducted to improve the human
condition through identifying systematic, independent factors impacting H&S outcomes
so that this knowledge can be used to improve conditions. Currently, more than half of
all workplace injuries in KSA occur within the construction industry (Hamalainen,
Takala, & Saarela, 2006), yet little has been done to improve these outcomes.

8.4 Limitations

As no study is without limitations, it is important to acknowledge these here. Three


limitations are identified, all of which are used to develop and present suggestions for
future research. The first limitation is the generalisability of the proposed framework.
Although rigorous scientific methods have been adhered to in developing the proposed
framework, it is based on data collected for a single case—the KSA public sector

221
Discussion, Conclusion and Recommendation

construction industry. Thus, the researcher recommends future research on the


applicability of this model to: 1) the construction industry in similar countries; and 2)
similar industries in KSA. Next, while the proposed framework has presented the
relationship between performance measures and the classification of each through the
proposed framework, it is not within the scope of this study to provide an in-depth
explanation of the manner in which each of these 18 factors can be implemented to
improve outcomes. Therefore, further research is needed to provide a deeper
understanding of how these findings can be implemented and their practical applications.
Finally, this study has assessed the use of BIM at one period in time and compared it to
measures of H&S. A limitation of this approach is that it is not able to assess the impact
that the implementation of BIM has had on firm H&S outcomes. This limitation provides
the final recommendation for future research: a longitudinal study of the adoption of
H&S measures is recommended, including BIM approaches, to assess the impact on
outcomes through a comparison of H&S rates before and after adoption and/or policy
changes.

8.5 Recommendations for KSA Construction Industry

Although this research has studied the case of the construction industry in KSA, many
of the challenges that were revealed align with the literature and are likely present across
other industries and countries. This study has been conducted to improve the human
condition through systematic, independent factors impacting H&S outcomes, so that this
knowledge can be used to improve conditions. Currently, more than half of all workplace
injuries in KSA occur within the construction industry (Hamalainen et al., 2006), yet
little has been done to improve these outcomes. Based on the findings presented
throughout this study, recommendations for KSA construction Industry can be drawn
from the framework and addressed by implementing the framework into policy. As a
key H&S concern, as demonstrated in the framework presented here and in that of Ng et
al. (2005), is the lack of enforcement of laws and regulations, the first recommendation
is to implement and enforce policies that ensure that best practices are adopted in the
KSA construction industry. The second overarching recommendation is to incorporate
the use of BIM into H&S policies, as this is essential for addressing one of the key
challenges expressed by respondents in this study—language and communication

222
Discussion, Conclusion and Recommendation

barriers. This recommendation hinges on the addition of 3D/4D/5D visualisation, which


is the main deviation in this framework when it is compared to previous H&S models.

223
References

References

Abdelhamid, T. S. & Everett, J. G. (2000). Identifying root causes of construction accidents.


Journal of Construction Engineering and Management, 126(1), 52-60.
Abudayyeh, O., Fredericks, T. K., Butt, S. E., & Shaar, A. (2006). An investigation of
management’s commitment to construction safety. International Journal of Project
Management, 24(2), 167-174.
Abdulai, R. T. (2007). The Operation of Urban Traditional Landholding Institutions in Sub-
Saharan Africa: A Ghana Study. (Unpublished doctoral dissertation). University of
Wolverhampton, UK.
Al Farsy, F. (1990). Modernity and tradition: The Saudi equation. London: Routledge.
Aguilar, G. E. & Hewage, K. N. (2013). IT based system for construction safety management
and monitoring: C-RTICS 2. Automation in Construction, 35, 217-228.
Aksorn, T. & Hadikusumo, B. H. W. (2008). Critical success factors influencing safety program
performance in Thai construction projects. Safety Science, 46(4), 709-727.
Alarcon, L. (1997). Lean construction. New York, NY: CRC Press.
Alasamri, H., Chrisp, M. T., & Bowles, G. (2012, September). A framework for enhancing and
improving the safety culture on Saudi construction sites. In Procs 28th Annual ARCOM
Conference, Association of Researchers in Construction Management (pp. 3-5).
Albogamy, A., Scott, D., & Dawood, N. (2012). Addressing construction delays in the Kingdom
of Saudi Arabia. In D. Chen (Ed.), international proceedings of economics development and
research. 45 (pp. 142-147). Singapore: IACSIT Press.
Ali, H. A. E. M., Al-Sulaihi, I. A., & Al-Gahtani, K. S. (2013). Indicators for measuring
performance of building construction companies in the Kingdom of Saudi Arabia. Journal of
King Saud University-Engineering Sciences, 25(2), 125-134.
Alsehaimi, A. (2011). Improving Construction Planning Practice in Saudi Arabia by Means of
Lean Construction Principles and Techniques. (Unpublished doctoral dissertation).
University of Salford, UK.
Alsuliman, J., Bowles, G., Chen, Z., & Smith, S.D (Ed.) (2012). Current practice of variation
order management in the Saudi construction industry. In Proceedings of the 29th Annual
Association of Researchers in Construction Management (ARCOM) Conference: 3-5
September 2012 (pp. 1003-12), Reading, UK., Edinburgh, UK.
Al Haadir, S. &Panuwatwanich, K. (2011). Critical success factors for safety program
implementation among construction companies in Saudi Arabia. Procedia Engineering, 14,
148-155. doi: 10.1016/j.proeng.2011.07.017
Al Khalil, M. I. & Al-Ghafly, M. A. (1999). Important causes of delay in public utility projects
in Saudi Arabia. Construction Management & Economics,17(5), 647-655.
Al Kharashi, A. & Skitmore, M. (2009). Causes of delays in Saudi Arabian public sector
construction projects. Construction Management and Economics, 27(1), 3-23.

224
References

Al Surf, S., Trigunarsyah, M., & Susilawati, C. (2013). Saudi Arabia's sustainable housing
limitations: the experts’ views. Smart and Sustainable Built Environment, 2(3), 251-271.
Amnesty International UK, (2013). Dark Side of Megration. From
https://www.amnesty.org.uk/sites/default/files/the_dark_side_of_migration_-
_spotlight_on_qatars_construction_sector_ahead_of_the_world_cup.pdf
Anton, T. J. (1989). Occupational safety and health management (2nd ed.). New York, NY:
McGraw-Hill.
Anumba, C., Marino, B., Gottfried, A., & Egbu, C. O. (2004). Health and safety in refurbishment
involving demolition and structural instability. HSE Research Report 204, HMSO, February
2004 (ISBN 0 7176 2820 5).
Arastoo, H., Hakimovich, A. P., & Esfandiarpour, S. (2015). Assessment of barriers to establish
OSH: a country report. Industrial Health, 53(4), 378.
Arndt, J.; Cox, C. R.; Goldenberg, J. L.; Vess, M.; Routledge, C.; Cooper, D. P.; Cohen, F.
(2009). "Blowing in the (social) wind: Implications of extrinsic esteem contingencies for
terror management and health". Journal of Personality and Social Psychology. 96 (6): 1191–
1205. doi:10.1037/a0015182
Arslan, M., Riaz, Z., Kiani, A. K., & Azhar, S. (2014). Real-time environmental monitoring,
visualization and notification system for construction H&S management. ITcon, 19, 72-91.
Assaf, S. A. & Al-Hejji, S. (2006). Causes of delay in large construction projects. International
Journal of Project Management, 24(4), 349-357.
Autodesk (2012). Unit 7: Extending BIM Beyond Design. Retrieved from
http://bimcurriculum.autodesk.com/unit/unit-7-%E2%80%93-extending-bim-beyond-
design
Awad, A. J. (2013). Construction Safety in the Kingdom of Saudi Arabia. (Unpublished doctoral
dissertation). Eastern Mediterranean University (EMU)-Doğu Akdeniz Üniversitesi (DAÜ)),
Cyprus.
Bandura, A. (1986). Social foundations of thought and action: A social cognitive theory. NJ, US.
Prentice-Hall, Inc.
Bashir, A. (2013). A Framework for Utilising Lean Construction Strategies to Promote Safety
on Construction. (Unpublished doctoral dissertation). University of Wolverhampton, UK.
Barnard, M. (1995). Safety is the engineer’s responsibility: Facts or fiction. A paper given by the
Director of Health and Safety for Travers Morgan Ltd at the Institute of Civil Engineers on
construction site safety and the CDM Regulations. 6th February, Pub: School of Business
and Industrial Management.
Baxendale, T. & Jones, O. (2000) Construction design and construction management safety
regulations in practice – Progress and implementation. International Journal of Project
Management, 18(1), 33-40.
Bell, E. & Bryman, A. (2007). The ethics of management research: an exploratory content
analysis. British Journal of Management, 18(1), 63-77.
Benjaoran, V. & Bhokha, S. (2010). An integrated safety management with construction
management using 4D CAD model. Safety Science, 48(3), 395-403.

225
References

Bennett, L. & Mahdjoubi, L. (2013). Construction health and safety, BIM and cloud technology:
Proper integration can drive benefits for all stakeholders. In Cloud Computing Technology
and Science (CloudCom), 2013 IEEE 5th International Conference on (vol. 2, pp. 215-218).
London: IEEE.
Berger, H. (2008). Study finds safety poor on KSA sites. Retrieved from
http://www.arabianbusiness.com/507489-study-finds-safety-poor-on-ksa-sites
Bowden, S. L., Dorr, A., Thorpe, A., & Anumba, C. J. (2005). Making the case for mobile IT.
Proceedings of the International Conference on Computing in Civil Engineering, Cancun,
Mexico. 12-15 July, 2005.
Brewer, J. & Hunter, A. (2006). Foundations of multimethod research: Synthesizing styles.
London: Sage Publications Inc.
Bringardner, B. & Dasher, G. (2011). Tablets! Gain an edge by connecting to project information
and BIM models in the field or on the go. In Proceedings of the Autodesk University, pp. 1-
14.
Bryman, A. & Bell, E. (2007). Business research methods (2nd ed.). Oxford: Oxford University
Press. http://www2.uwstout.edu/content/lib/thesis/2005/2005mallett-hamerb.
Bovee, C. L., Thill, J. V., & Cross, A. (2005). Excellence in business communication. Prentice
Hall.
Bubshait, A. A. & Al-Musaid, A. A. (1992). Owner involvement in construction projects in
Saudi Arabia. Journal of Management in Engineering, 8(2), 176-185.
Bureau of Labor Statistics (n.d.). Injuries, Illnesses and Fatalities. Retrieved from
http://www.bls.gov/iif/
Burrell, G. & Morgan, G. (1979). Sociological paradigms and organizational analysis (vol.
248). London: Heinemann.
Bust, P. D., Gibb, A. G. F., & Pink, S. (2008). Managing construction health and safety: Migrant
workers and communicating safety messages. Safety Science, 46(4), 585-602. Retrieved from
http://linkinghub.elsevier.com/retrieve/pii/S0925753507001075
Cabinet Office (2011). Government construction strategy. London: Construction Industry
Council.
Central Intelligence Agency(2015). Retrieved from
https://www.cia.gov/library/publications/the-world-factbook/geos/sa.html
Chan, A. P. (2004). Key performance indicators for measuring construction success.
Benchmarking: An International Journal, 11(2), 203-221. doi:10.1108/14635770410532624
Chelson, D. E. (2010). The effects of building information modeling on construction site
productivity. Uiversity of Maryland, Collage park.
Chen, Y. (2008). Using Mobile Computing for Construction Site Information Management.
(Unpublished doctoral dissertation). University of Newcastle, UK.
Chen, Y. & Kamara, M. (2011). A framework for using mobile computing for information
management on construction sites. Automation in Construction, 20, 776-788.
doi:10.1016/j.autcon.2011.01.002

226
References

Cheng, T. & Teizer, J. (2013). Real-time resource location data collection and visualization
technology for construction safety and activity monitoring applications. Automation in
Construction, 34, 3-15.
Chiu, C. Y. & Russell, A. D. (2011). Design of a construction management data visualization
environment: A top-down approach. Automation in Construction, 20(4), 399-417.
Cohen, D. & Crabtree, B. (2006). Qualitative research guidelines project. from:

http://www.sswm.info/sites/default/files/reference_attachments/COHEN%202006%20
Semistructured%20Interview.pdf
Choudhry, R. M., Fang, D., & Mohamed, S. (2007). The nature of safety culture: A survey of
the state-of-the-art. Safety Science, 45(10), 993-1012.
Clarke, S. (1999). Perceptions of organizational safety: implications for the development of
safety culture. Journal of Organizational Behavior, 20(2), 185-198.
Coble, R. J. & Haupt, T. C. (1999). Construction safety in developing countries. In 2nd
International Conference of CIB on W (vol. 99, pp. 903-908).
Cooper, M. D. (2009). Behavioral safety interventions: A review of process design factors.
Professional Safety, 54(2), 36.
Cotton, A. P., Sohail, M., & Scott, R. E. (2005). Towards improved labour standards for
construction of minor works in low income countries. Engineering, Construction and
Architectural Management, 12(6), 617-632.
Coulmas, F. (2013). Sociolinguistics: The study of speakers' choices. Cambridge: Cambridge
University Press.
Cox, R. F., Issa, R. R., & Ahrens, D. (2003). Management’s perception of key performance
indicators of construction. Engineering Management, 129(2), 142-151.
doi:0.1061/(ASCE)0733-9364(2003)129:2(142)
Creswell, J. W. (2013). Research design: Qualitative, quantitative and mixed methods
approaches. London: Sage Publications.
Datta, S. (2000). Nanoscale device modeling: The Green’s function method. Superlattices and
Microstructures, 28(4), 253-278.
Dave, B., Boddy, S., & Koskela, L. (2010). Improving information flow within the production
management system with web services, In Proceedings of the 18th Annual Conference of the
International Group for Lean Construction:14-16 July 2010 (pp. 445-55). Haifa, Israel.
Davies, V. J., & Tomasin, K. (1996). Construction safety handbook. Thomas Telford.
Denscombe, M. (2007). The good research guide.for small scale social research project. Open
University press. Berkshire.
Department of Labor (2016). Creating a Safety Culture. Retrieved from
https://www.osha.gov/SLTC/etools/safetyhealth/mod4_factsheets_culture.html
de Bel-Air, F. (2014). Demography, migration and labour market in Saudi Arabia. Gulf Labour
Markets and Migration. European University Institute.

227
References

De Vaus, D. (2002). Analyzing social science data: 50 key problems in data analysis. London:
Sage.
Dillman, D. A. (2011). Mail and Internet surveys: The tailored design method--2007 Update
with new Internet, visual, and mixed-mode guide. John Wiley & Sons.
Donaghy, M. (Ed.). (2009). Brain's diseases of the nervous system. New York: Oxford
University Press.
Eadie, R., Browne, M., Odeyinka, H., McKeown, C., & McNiff, S. (2013). BIM implementation
throughout the UK construction project lifecycle: An analysis. Automation in Construction,
36, 145-151.
Easterby-Smith, M., Thorpe, R., & Jackson, P. (2012). Management research. (4th ed.). London:
SAGE Publications.
Fang, D. P., Huang, X. Y., & Hinze, J. (2004). Benchmarking studies on construction safety
management in China. Journal of Construction Engineering and Management, 130(3), 424-
432.
Fellows, R., Liu, A., & Storey, C. (2004). Ethics in construction project briefing. Science and
engineering ethics, 10(2), 289-301.
Fellows, R. F. & Liu, A. M. (2015). Research methods for construction. London: John Wiley &
Sons.
Fidh (2003). Migrant workers in Saudi Arabia. Report presented by the FIDH and the Egyptian
Organization for Human Rights 62nd session
of Committee on the Elimination of Racial
Discrimination, March 2003.
Fowler, M. (2009). Refactoring: improving the design of existing code. Addison-Wesley
Longman, Amsterdam .
Fullerton, R. R., & Wempe, W. F. (2009). Lean manufacturing, non-financial performance
measures, and financial performance. International Journal of Operations & Production
Management, 29(3), 214-240.
Friend, M. A. & Kohn, J. P. (2014). Fundamentals of occupational safety and health. (pp.303-
319) Lanham: Bernan Press[*https://rowman.com/ISBN/9780865871717]
Furnham, A. & Henderson, M. (1982). The good, the bad and the mad: Response bias in self-
report measures. Personality and Individual Differences, 3(3), 311-320.
Gabriel, D. (2013). Inductive and Deductive Approaches to Research. Retrieved from
http://deborahgabriel.com/2013/03/17/inductive-and-deductive-approaches-to-research/
Gambatese, J. A., Behm, M., & Hinze, J. W. (2005). Viability of designing for construction
worker safety. Journal of Construction Engineering and Management, 131(9), 1029-1036.
Ganah, A., & John, G. A. (2015). Integrating building information modeling and health and
safety for onsite construction. Safety and Health at Work, 6(1), 39-45.
Garza, J. M. & Howitt, I. (1998). Wireless communication and computing at the construction
jobsite. Automation in Construction, 7(4), 327-347.

228
References

GCC Powers of Construction (2013). Retrieved from:


http://www2.deloitte.com/ae/en/pages/real-estate/articles/gcc-powers-of-construction-
2013.html
Gibbs, H. K., Ruesch, A. S., Achard, M. K., Clayton, M. K., Holmgren, P., Ramankutty, N., …
& Johnson, P. (2010). Research methods for managers (4th ed.). London: Sage.
Gill, J., & Johnson, P. (2010). Research methods for managers. Sage.
Girden, E. R & Kabacoff, R. I. (2010). Evaluating research articles from start to finish (3rd ed.).
New York: Sage Publications.
Giretti, A., Carbonari, A., Naticchia, B., & De Grassi, M. (2009). Design and first development
of an automated real-time safety management system for construction sites. Journal of Civil
Engineering and Management, 15(4), 325-336. doi:10.3846/1392-3730.2009.15.325-336
GOSI (2013). Annual Statistical Report 2012. Retrieved from
http://www.gosi.gov.sa/portal/c/document_library/get_file?uuid=77aaea9b-396d-4710-
9dbd-ae42608be30d&groupId=16
Groucutt, H. S., White, T. S., Clark-Balzan, L., Parton, A., Crassard, R., Shipton, C., ... &
Alsharekh, A. (2015). Human occupation of the Arabian Empty Quarter during MIS 5:
evidence from Mundafan Al-Buhayrah, Saudi Arabia. Quaternary Science Reviews, 119,
116-135.
GSMAK (2013). Mobile for development: a diverse stakeholder mix. Retrieved from
https://d2sjbwdjcc5vgl.cloudfront.net/M4D_stakeholders_-_Mar13_publish.pdf
GSMAK & Kearney, A. T. (2013). The Mobile Economy. Retrieved from
http://www.atkearney.com/documents/10192/760890/The_Mobile_Economy_2013.pdf
Hadikusumo, B. H. W. & Rowlinson, S. (2002). Integration of virtually real construction model
and design-for-safety-process database. Automation in Construction, 11(5), 501-509.
Hair Jr, J. F., A. H. Money, P. Samouel, and M. Page (2007). Research Methods for Business.
West Sussex: John Wiley & Sons, Ltd
Hadikusumo, B. H. W. & Rowlinson, S. (2004). Capturing safety knowledge using design-for-
safety-process tool. Journal of Construction Engineering and Management, 130(2), 281-289.
Hallowell, I. A. (2010). The Ojibwa self and its behavioral environment. A Reader in Medical
Anthropology: Theoretical Trajectories, Emergent Realities, 15, 38.
Hamalaninen, P., Takala, J., & Saarela, K L. (2006). Global estimates of occupational accidents.
Safety Science, 44, 137-156. Retrieved from http://hw2012.healthy-
workplaces.eu/fop/slovenia/sl/publications/occupational_acc_article_final.pdf
Hanna, R. F., Kased, N., Kwan, S. W., Gamst, A. C., Santosa, A. C., Hassanein, T., & Sirlin, C.
B. (2008). Double-contrast MRI for accurate staging of hepatocellular carcinoma in patients
with cirrhosis. American Journal of Roentgenology, 190(1), 47-57.
Hassanein, A. A., & Hanna, R. S. (2008). Safety performance in the Egyptian construction
industry. Journal of Construction Engineering and Management, 134(6), 451-455.
Hare, J. M., Fishman, J. E., Gerstenblith, G., Velazquez, D. L. D., Zambrano, J. P., Suncion, V.
Y., ... & Breton, E. (2012). Comparison of allogeneic vs autologous bone marrow-derived

229
References

mesenchymal stem cells delivered by transendocardial injection in patients with ischemic


cardiomyopathy: the POSEIDON randomized trial. Jama, 308(22), 2369-2379.
Hartmann, T. & Fischer, M. (2007). Supporting the constructability review with 3D/4D models.
Building Research & Information, 35(1), 70-80.
Harty, C. (2010). Implementing innovation: designers, users and actor-networks. Technology
Analysis & Strategic Management, 22(3), 297-315.
Haupt, T. & Smallwood, J. (1999) Health and safety practices on community projects: The South
African experience. In A. Singh, J. Hinze, & R. Coble (Eds.), Implementation of safety and
health on construction sites (pp. 47-54). Rotterdam, A.A Balkema.
HSE (2014). About HSE. Retrieved from http://www.hse.gov.uk/aboutus/index.htm
Hecker, S. & Goldenhar, L. (2014). Understanding safety culture and safety climate in
construction: Existing evidence and a path forward. Silver Spring, MD: CPWR—The Center
for Construction Research and Training.
Hertog, S. (2014). Arab Gulf states: an assessment of nationalisation policies. European
University Institute (EUI) and Gulf Research Center (GRC).
Hergunsel, M. F. (2011). Benefits of building information modeling for construction managers
and BIM based scheduling. (Unpublished doctoral dissertation). Worcester Polytechnic
Institute, UK.
Hines Jr, J. R. (1999). Lessons from behavioral responses to international taxation. National Tax
Journal,52(2), (305-322).
Hinze, J. & Russell, D. B. (1995). Analysis of fatalities recorded by OSHA. Journal of
Construction Engineering and Management, 121(2), 209-214.
Horta, I. M., Camanho, A. S., & Da Costa, J. M. (2009). Performance assessment of construction
companies integrating key performance indicators and data envelopment analysis. Journal of
Construction Engineering and Management, 136(5), 581-594. Retrieved from
http://ascelibrary.org/doi/abs/10.1061/%28ASCE%29CO.1943-7862.0000145
Huang, X. & Hinze, J. (2003). Analysis of construction worker fall accidents. Journal of
Construction Engineering and Management, 129(3), 262-271.
Hughes, P. & Ferrett, E. (2004). Introduction to health and safety in construction. Butterworth-
Heinemann, Oxford.
Human Rights Watch (2015). Human Rights Watch defends the rights of people in 90 countries
worldwide, spotlighting abuses and bringing perpetrators to justice. Retrieved from
https://www.hrw.org/report/2015/05/10/detained-beaten-deported/saudi-abuses-against-
migrants-during-mass-expulsions
Jannadi, M. O. & Assaf, S. (1998). Safety assessment in the built environment of Saudi Arabia.
Safety Science, 29(1), 15-24. doi:10.1016/S0925-7535(98)00018-6
Jaselskis, E. J., & Ashley, D. B. (1991). Optimal allocation of project management resources for
achieving success. Journal of Construction Engineering and Management, 117(2), 321-340.
Jaselskis, E. J. anderson, S. D., & Russell, J. S. (1996). Strategies for achieving excellence in
construction safety performance. Journal of Construction Engineering and Management,
122(1), 61-70.

230
References

Jannadi, O. A., & Bu-Khamsin, M. S. (2002). Safety factors considered by industrial contractors
in Saudi Arabia. Building and Environment, 37(5), 539-547.
John, G. A. & Ganah, A. (2011). Integrating BIM and Planning Software for Health and Safety
Site Induction. University of Central Lancashire, Preston, UK
Johnson, R. B. & Onwuegbuzie, A. J. (2004). Mixed methods research: A research paradigm
whose time has come. Educational Researcher, 33(7), 14-26.
doi:10.3102/0013189X033007014
Jongeling, R. & Olofsson, T. (2007). A method for planning of work-flow by combined use of
location-based scheduling and 4D CAD. Automation in Construction, 16(2), 189-198.
Jos, P. H., Tompkins, M. E., & Hays, S. W. (1989). In praise of difficult people: A portrait of
the committed. Public Administration Review, 49(6), 552-61.
Kagioglou, M., Cooper, R., & Aouad, G. (2001). Performance management in construction: A
conceptual framework. Construction Management and Economics, 19(1), 85-95.
doi:10.1080/01446190010003425
Karim, K. & Marosszeky, M. (1999). Process monitoring for process re-engineering-using key
performance indicators. In International conference on construction process reengineering,
CPR (vol. 99).
Kartam, N. A. & Bouz, R. G. (1998). Fatalities and injuries in the Kuwaiti construction industry.
Accident Analysis & Prevention, 30(6), 805-814.
Keegan, A. & Turner, J. R. (2002). The management of innovation in project-based firms. Long
Range Planning, 35(4), 367-388. Retrieved from
http://linkinghub.elsevier.com/Retrieved/pii/S0024630102000699
Kenrick, V. (2012). PPE and Construction Safety in the Middle East. Retrieved from
http://ehstoday.com/ppe/construction-safety-in-the-middle-east-0131
Khan, A. & Harroff-Tavel, H. (2011). Reforming the kafala: Challenges and opportunities in
moving forward. Asian and Pacific Migration Journal, 20(3-4), 293-313.
Khosravi, Y., Asilian-Mahabadi, H., Hajizadeh, E., Hassanzadeh-Rangi, N., Bastani, H., &
Behzadan, A.H. (2014). Factors influencing unsafe behaviors and accidents on construction
sites: a review. International Journal of Occupational Safety and Ergonomics, 20(1), 111-
125.
Kim, C., Park, T., Lim, H., & Kim, H. (2013). On-site construction management using mobile
computing technology. Automation in Construction, 35, 415-423.
doi:dx.doi.org/10.1016/j.autcon.2013.05.027
Kim, N., Park, M., Lee, H. S., & Roh, S. (2007). Performance Management Method for
Construction Companies. Madras: Construction Automation Group. Retrieved from.
http://www.iaarc.org/publications/fulltext/isarc2007-5.1_7_124.pdf
Kiviniemi, M. T., Bennett, A., Zaiter, M., & Marshall, J. R. (2011). Individual‐level factors in
colorectal cancer screening: a review of the literature on the relation of individual‐level health
behavior constructs and screening behavior. Psycho‐Oncology, 20(10), 1023-1033.
Kletz, T. A. (2001). Learning from accidents. Routledge.

231
References

Ku, K. and Mills, T. (2010). Research needs for Building Information Modeling for Construction
Safety. International Proceedings of Associated Schools of Construction 45th Annual
Conference, Boston, MA. Retrieved from
https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/16323/file16
441.pdf
Kohler, N., & Hassler, U. (2002). The building stock as a research object. Building Research &
Information, 30(4), 226-236.
Kumar, P. S. & Kumar, M. L. (2012). Viability of safety and labor conditions in construction
sites. International Journal of Engineering and Innovative Technology, 2(6), 328-332.
Kymmell, W. (2008). Building Information Modeling. Planning and managing construction
projects with 4D CAD and simulations. New York: McGrawHill.
Larcher, P. & Sohail, M. (1999). Review of safety in construction and operation for the WS &
S sector. Report summary of well task (166, part 1).
Lawton, R. & Parker, D. (2002). Barriers to incident reporting in a healthcare system. Quality
and Safety in Health Care, 11(1), 15-18.
Lee, G. & Eastman, C. (2007). Case Studies in BIM implementation for programing of
healthcare facilities. ITcon, 13, 446-457.
Lee, G., & Wrench, J. (1980). " Accident-Prone Immigrants": An Assumption Challenged.
Sociology, 14(4), 551-566.
Liang, Z. (2015). The power of informal labor: construction workers' struggle in post-socialist
China. (Unpublished doctoral dissertation). The Hong Kong Polytechnic University, Hong
Kong.
Liao, L., Lin, Y. C., Bao, M., Cheng, R., Bai, J., Liu, Y., ... & Duan, X. (2010). High-speed
graphene transistors with a self-aligned nanowire gate. Nature, 467(7313), 305-308.
Li, N., Calis, G., & Becerik-Gerber, B. (2012). Measuring and monitoring occupancy with an
RFID based system for demand-driven HVAC operations. Automation in Construction, 24,
89-99.
Lin, J. & Mills, A. (2001). Measuring the occupational health and safety performance of
construction companies in Australia. Facilities, 19(3/4), 131-139.
Lin, S. H., Tang, W. J., Miao, J. Y., Wang, Z. M., & Wang, P. X. (2014). Safety climate
measurement at workplace in China: A validity and reliability assessment. Safety Science,
46(7), 1037-1046.
Ling, F. Y. Y., Liu, M., & Woo, Y. C. (2009). Construction fatalities in Singapore. International
Journal of Project Management, 27(7), 717-726.
Lingard, H. & Rowlinson, S. (2005). Occupational health and safety in construction project
management. New York: Spon Press.
Littlewood, R. & Dein, S. (2013). Did Christianity lead to schizophrenia? Psychosis, psychology
and self reference. Transcultural Psychiatry.
Loosemore, M. & Andonakis, N. (2007). Barriers to implementing OHS reforms – The
experiences of small subcontractors in the Australian construction industry. International
Journal of Project Management, 25(6), 579-588.

232
References

Loosemore, M., Phua, F., Dunn, K., & Ozguc, U. (2010). Operatives’ experiences of cultural
diversity on Australian construction sites. Construction Management and Economics, 28(2),
177-188.
Lunt, J., Bates, S., Bennett, V., & Hopkinson, J. (2008). Behaviour change and worker
engagement practices within the construction sector. Retrieved from
http://www.hse.gov.uk/research/rrpdf/rr660.pdf
Luszczynska, A., & Schwarzer, R. (2005). Social cognitive theory. In M. Conner & P. Norman
(Eds.), Predicting health behaviour (2nd ed. rev., pp. 127-169). Buckingham, England: Open
University Press.
McClay, R. E. (1989). Toward a more universal model of loss incident causation. Professional
Safety, 34(1), 15-20.
Maloney, W. & Cameron, I. (2004). Lessons Learned for the US from the UK’s CDM
Regulations. In Designing for Safety and Health in Construction: Proceedings from a
Research and Practice Symposium, September (pp. 15-16).
Mandal, A. & Deshmukh, S. G. (1994). Vendor selection using interpretive structural modelling
(ISM). International Journal of Operations & Production Management, 14(6), pp. 52-59.
Mattila, M., Hyttinen, M., & Rantanen, E. (1994). Effective supervisory behaviour and safety at
the building site. International Journal of Industrial Ergonomics, 13(2), 85-93.
Naoum, F., Kasiotis, K. M., Magiatis, P., & Haroutounian, S. A. (2007). Synthesis of novel nitro-
substituted triaryl pyrazole derivatives as potential estrogen receptor ligands. Molecules,
12(7), 1259-1273.
Marczyk, G., DeMatteo, D., & Festinger, D. (2005). Essentials of research design and
methodology. John Wiley & Sons Inc.
Mearns, K. & Yule, S. (2009). The role of national culture in determining safety performance:
Challenges for the global oil and gas industry. Safety Science, 47(6), 777-785.
Melzner, J., Hollermann, S., Kirchner, S., & Bargstadt, H. J. (2013). Model-based construction
work analysis considering process-related hazards. In Simulation Conference (WSC), 2013
Winter (pp. 3203-3214).
Melzner, J., Zhang, S., Teizer, J., & Bargstädt, H. J. (2013). A case study on automated safety
compliance checking to assist fall protection design and planning in building information
models. Construction Management and Economics, 31(6), 661-674.
Mingers, J. (1997). Multi-methodology: Towards a framework for mixing methodologies.
Omega, 25(1), 489-509. Retrieved from
http://www.markd.nl/content/references/1997Mingers.pdf
Mingers, J. (2001). Combining IS research methods: Towards a pluralist methodology.
Information Systems Research, 12(3),240-259.
MOMRA (2014). Contractors Classification. Retrieved from www.contractors.momra.gov.sa
Molenaar, A. A. A., Scarpas, A., Liu, X., & Erkens, S. M. J. G. (2002). Semi-circular bending
test; simple but useful?. Journal of the Association of Asphalt Paving Technologists, 71.

233
References

Morgan, D. L. (2007). Paradigms lost and pragmatism regained: methodological implications of


combining qualitative and quantitative methods. Journal of Mixed Methods Research, 1(1),
48-76.
Muto, N. (2012). Basic Smartphone Workshop. Sault Community Career Center. Retrieved from
http://www.saultcareercentre.ca/wp-content/uploads/2012/09/PREVIEW-
SMARTPHONE.pdf
Navon, R. (2005). Automated project performance control of construction projects. Automation
in Construction, 14(4), 467-476. doi:10.1016/j.autcon.2004.09.006
Ng, S. T., Cheng, K. P., & Skitmore, R. M. (2005). A framework for evaluating the safety
performance of construction contractors. Building and Environment, 40(10), 1347-1355.
Ndekugri, I., & Corbett, P. (2004, September). Supply chain integration in construction by prime
contracting: some research issues. In Proceedings COBRA (Vol. 7, p. 267).
MFNE (1985) Kingdom of Saudi Arabia Statistical YearBook. Ministry of Finance and
National Economy
Nourbakhsh, M., Zin, R. M., Irizarry, J., Zolfagharian, S., & Gheisari, M. (2012). Mobile
application prototype for on-site information management in construction industry. Journal
of Construction Engineering and Management, 19(5), 474-494
O’Brien, M. J. & Al-Biqami, N. M. (1999). Survey of information technology and the structure
of the Saudi Arabian construction industry. In 8th International Conference on Durability of
Building Materials and Components (vol. 4, pp. 2327-2337).
Ofori, G. (2000). Challenges of construction industries in developing countries: Lessons from
various countries. In 2nd International Conference on Construction in Developing Countries:
Challenges Facing the Construction Industry in Developing Countries, Gaborone, November
(pp. 15-17).
Organization of the Petroleum Exporting Countries (2013). Saudi Arabia facts and figures.
Retrieved from http://www.opec.org/opec_web/en/about_us/169.htm
Osifo, O. D., Iribhogbe, P., & Idiodi-Thomas, H. (2010). Falls from heights: Epidemiology and
pattern of injury at the accident and emergency centre of the University of Benin Teaching
Hospital. Injury, 41(5), 544-547.
Oxford English Dictionary (2013). Smartphones. Retrieved from
http://www.oxforddictionaries.com/definition/english/smartphone?q=smartphones
Park, C. S. & Kim, H. J. (2013). A framework for construction safety management and
visualization system. Automation in Construction, 33, 95-103.
Parmenter, D. (2007). Key performance indicators developing, implementing and using winning
KPIs. New Jersey. John Wiley & Sons, Inc.
Patton, M. Q. (1990). Qualitative evaluation and research methods (2nd ed.). Newbury Park, CA:
Sage Publications, Inc.
Phillips, R. (2005). Occupational health and safety in construction project management:
behavior safety management. New York,US.
Phua, C., Lee, V., Smith, K., & Gayler, R. (2010). A comprehensive survey of data mining-
based fraud detection research. arXiv preprint arXiv:1009.6119.

234
References

Pransky, G., Snyder, T., Dembe, A., & Himmelstein, J. (1999). Under-reporting of work-related
disorders in the workplace: a case study and review of the literature. Ergonomics, 42(1), 171-
182.
Porwal, A. & Hewage, K. N. (2013). Building Information Modeling (BIM) partnering
framework for public construction projects. Automation in Construction, 31, 204-214.
Qi, J., Issa, R. R., Olbina, S., & Hinze, J. (2013). Use of building information modeling in design
to prevent construction worker falls. Journal of Computing in Civil Engineering, 28(5),
A4014008.
Rajendran, S. & Clarke, B. (2011). Building Information Modeling: Safety benefits &
opportunities. Professional Safety, 56(10), 44-51.
Reason, J. (2000). Human error: models and management. Bmj, 320(7237), 768-770.
Remenyi, D. & Williams, B. (1998). Doing research in business and management: an
introduction to process and method. London: Sage.
Rockart, J. F. (1979). Chief executives define their own data needs. Harvard Business Review,
57(2), 81-93.
Rockart, J. F. (1982). The changing role of the information systems executive: A critical success
factors perspective. Sloan Management Review, 24(1), 3-13.
Root, G. N.(nd) The Best Practices for Construction Safety. Chron Small Business. Retrieved
from http://smallbusiness.chron.com/practices-construction-safety-2621.html
Saidani, M., Shibani, A. & Alhajeri, M. (2013). Health and safety influence on the construction
project performance in United Arab Emirates (UAE). Prime Research on Education (PRE),
3(2), 10.
Salleh, N. A. B., Nordin, N. B. M., & Rashid, A. K. B. A. (2012). The language problem issue
among foreign workers in the Malaysian construction industry. International Journal of
Business and Social Science, 3(11).
Salminen, S. (2011). Are Immigrants at Increased Risk of Occupational Injury? A Literature.
The Ergonomics Open Journal, 4, 125-130.
Sanvido, V., Grobler, F., Pariff, K., Guvents, M., & Coyle, M. (1992). Critical success factors
for construction projects. Journal of Construction Engineering and Management, 118(1), 94
-111.
Satty, T. (1986). How to make a decision: The analytical hierarchy process. Management
Science, 32(7), 841-855.
Saudi Embassy (2016). Saudi History Retrieved from www.saudiembassy.net/about/country-
information/history.aspx
Saunders, M., Lewis, P., &Thornhill, A. (2003). Research methods for business students (3rd
ed.). New York: Prentice Hall.
Saunders, M., Lewis, P., & Thornhill, A. (2012). Research methods for business students (6th
ed.). New York: Prentice Hall.
Saunders, M., Lewis, P., Thornhill, A., & Wilson, J. (2009). Business research methods. London:
Financial Times, Prentice Hall.

235
References

Sawacha, E., Naoum, S., & Fong, D. (1999). Factors affecting safety performance on
construction sites. International Journal of Project Management, 17(5), 309-315.
Schmitt, N. (1994). Method bias: The importance of theory and measurement. Journal of
Organizational Behavior, 15, 393-398.
Schwandt, T. & Halpren, E. (1988). Linking auditing and metaevalution: Enhancing quality in
applied research. Newbury Park: Sage Publications.
Sexton, M. (2003). A supple approach to exposing and challenging assumptions and PhD path
dependencies in research, Key note speech of the 3rd International Postgraduate Research
Conference, Lisbon.
Shahin, A. & Mahbod, M. A. (2007). Prioritization of key performance indicators: An
integration of analytical hierarchy. Journal of Productivity and Performance, 22(5), 78-85.
Shash, A. A., & Al-Amir, M. (1997). Information technology in contractors’ firms in Saudi
Arabia. Construction Management and Economics, 15(2), 187-200.
Shash, A. A., & Abdul-Hadi, N. H. (1992). Factors affecting a contractor's mark-up size decision
in Saudi Arabia. Construction Management and Economics, 10(5), 415-429.
Sidawi, B. (2012)., Remote Construction Projects’ Problems and Solutions: The Case of SEC.
48th ASC Annual International Conference Proceedings, Birmingham, UK, April 11-14.
Skibriewski, M. & Ghosh, S. (2009). Determination of key performance indicators with
enterprise resource planning in engineering construction firms. Journal of Construction
Engineering Management, 135(10), 965-978. doi:10.1061/(ASCE)0733-
9364(2009)135:10(965)
Song, S., Yang, J., & Kim, N. (2012). Development of a BIM-based structural framework
optimization and simulation system for building construction. Computers in Industry, 63(9),
895-912.
Strauss, A. & Corbin, J. (1990). Basics of qualitative research: Grounded theory procedures
and techniques. Newbury Park, CA: Sage Publications.
Strauss, A. & Corbin, J. (1998). Basics of qualitative research: Techniques and procedures for
developing grounded theory. Thousand Oaks, California: Sage Publications.
Succar, B. (2009). Building information modelling framework: A research and delivery
foundation for industry stakeholders. Automation in Construction,18(3), 357-375.
Sulankivi, K., Kähkönen, K., Mäkelä, T., & Kiviniemi, M. (2010). 4D-BIM for construction
safety planning. In Proceedings of W099-Special Track 18th CIB World Building Congress
(pp. 117-128).
Surf, A., Saied, M., Susilawati, C., & Trigunarsyah, B. (2014). The role of the Saudi government
and the Saudi building code in implementing sustainable housing construction in Saudi
Arabia. In Bond, Sandy (Ed.) 20th Annual Pacific-Rim Real Estate Society Conference, 19-
22 Janurary 2014, Christchurch, New Zealand.
Taiebat, M. & Ku, K. (2011). Tuning Up the Core of Hazard Identification: How to Improve
Stimulated Thinking for Safety in Design. In 47th ASC Annual International Conference
Proceedings.

236
References

Tajfel, H. (1981). Human groups and social categories: Studies in social psychology. CUP
Archive. the press syndicate of the University of Combridge.
Tam, C. M., Zeng, S. X., & Deng, Z. M. (2004). Identifying elements of poor construction safety
management in China. Safety Science, 42(7), 569-586.
Tashakkori, C. & Teddlie , A. (2003). Major issues and controversies in the use of mixed
methods in the social and behavioral sciences. In Handbook of mixed methods in social &
behavioral research, (pp. 3-50). Thousand Oaks, CA. Sage.
Thomas, H. R. (2002). Construction practices in developing countries. Journal of Construction
Engineering and Management, 128(1), 1-7.
Tiong, R. L. K., Yeo, K-T., & McCarthy, S. C. (1992). Critical success factors in winning BOT
contracts. Journal of Construction Engineering and Management, 118(2), 217-228.
TNS (2012). Mobile life 2012 Portugal (Vol.2012). TNS.
Toor, S. R. & Ogunlana, S. O. (2010). Beyond the iron triangle: Stakeholder perception of key
performance indicators (KPIs) for large scale public sector development projects.
International Journal of Project Management, 28(3), 228-236.
doi:10.1016/j.ijproman.2009.05.005
Tuma, M. A., Acerra, J. R., El-Menyar, A., Al-Thani, H., Al-Hassani, A., Recicar, J.F., … &
Maull, K.I. (2013). Epidemiology of workplace-related fall from height and cost of trauma
care in Qatar. International Journal of Critical Illness and Injury Science, 3(1), 3.
Turner,R (2002). Project success criteria. Magazine of the Association for Project Management,
14(10), 32-33.
Turner III, D. W. (2010). Qualitative interview design: A practical guide for novice
investigators. The qualitative report, 15(3), 754.
Ugwu, O. O., & Haupt, T. C. (2007). Key performance indicators and assessment methods for
infrastructure sustainability—a South African construction industry perspective. Building
and Environment, 42(2), 665-680.
Vinodkumar, M. N., & Bhasi, M. (2010). Safety management practices and safety behaviour:
Assessing the mediating role of safety knowledge and motivation. Accident Analysis &
Prevention, 42(6), 2082-2093.
Voss, C., Tsikriktsis, N., & Frohlich, M. (2002). Case research in operations management.
International journal of operations & production management, 22(2), 195-219.
Wan, A., Platten, A., & Briggs, T. (2013). Study of safety auditors’ views on the use of BIM for
safety in Hong Kong. International Journal of 3-D Information Modeling (IJ3DIM), 2(1),
11-16.
Warfield, J. N. (1974), Developing interconnected matrices in structural modelling. IEEE
Transactions on Systems, Man and Cybernetics, 4(1), 51-81.
Watson, A. (2010). BIM-a driver for change. In Proceedings of the International Conference on
Computing in Civil and Building Engineering (pp. 30-32). Nottingham: Nottingham
University Press.
Wolf, A. T. & Brick, A. W. (1996). Health and safety on construction sites a comparison of the
UK and Germany. Directorate of Professional Services, Chartered Institute of Building.

237
References

Wong, A., Wong, F., & Nadeem, A. (2009). Comparative Roles of Major Stakeholders for the
Implementation of BIM in Various Countries. In Proceedings of the Changing Roles: New
Roles; New Challenges: 5-9 October 2009 (pp. 1-10).
Xianhai, M. (2007). Key performance indicators - Up to date project performance measurement
system. Construction Economy, 18(4), 45-52.
Yalcinkaya, M. & Arditi, D. (2013). Building information modeling (BIM) and the construction
management body of knowledge. In IFIP International Conference on Product Lifecycle
Management (pp. 619-629). Springer Berlin Heidelberg..
Yin, R. K. (2009). Case study research: Design and methods (4th ed.). In United States: Library
of Congress Cataloguing-in-Publication Data.
Zhang, C., Hammad, A., Soltani, M. M., Setayeshgar, S., & Motamedi, A. (2012). Dynamic
virtual fences for improving workers safety using BIM and RTLS. In Proceedings of the 14th
International Conference on Computing in Civil and Building Engineering.
Zhang, H., Wiegmann, D. A., Von Thaden, T. L., Sharma, G., & Mitchell, A. A. (2002,
September). Safety culture: a concept in chaos? In Proceedings of the Human Factors and
Ergonomics Society Annual Meeting (Vol. 46, No. 15, pp. 1404-1408). SAGE Publications
Zhang, J. P. & Hu, Z. Z. (2011). BIM-and 4D-based integrated solution of analysis and
management for conflicts and structural safety problems during construction: 1. Principles
and methodologies. Automation in Construction, 20(2), 155-166.
Zhang, S., Lee, J., Venugopal, M., Teizer, J., & Eastman, C. M. (201z). A framework for
automatic safety checking of building information models. In Construction Research
Congress (pp. 574-581).
doi: 10.1061/9780784412329.058

Zhang, S., Teizer, J., Lee, J. K., Eastman, C. M., & Venugopal, M. (2013). Building
information modeling (BIM) and safety: Automatic safety checking of construction models
and schedules. Automation in Construction, 29, 183-195.

238
Appendices

Appendices

Appendix 1: Ethical Approval

239
Appendices

Appendix 2: Preliminary Survey – Online Questionnaire 2015

Enhancing Existing Health and Safety Processes in Public Sector Construction Projects
within Saudi Arabia using Virtual Design and Construction Approaches

Top of Form

Respondent Demographics

What is the size of your construction company?

Micro Sized (1 to 9 Employees)

Small Sized (10 to 50 Employees)

Medium Sized Firm (51 - 250 Employees)

Large Firm ( 250 or more employees)


What is the nature of your business??

General contracting

Designing

Consulting

Specialist sub-contracting

Other:
What sort of projects you are involved in ?

Specify % of type of projects you have been involved in.

Public Sector Projects 100%

Private Sector Projects 100%

Combination of Public and Private Sector Projects


How many years of experience have you had in construction?

0-5 years

5-10 years

240
Appendices

10 - 15 years

15 years +
Have you experienced health and safety issue in construction projects you have been
part of?

Yes

No
If you have experienced H&S issues on your projects, how often does it occur?

Always

Sometimes

Rarely

Frequently

Never
What are the common health and safety hazards to workers on your projects?

Please tick all those that apply

Hazardous substance

Heat Exhaustion

Plants and Equipment

Slips, trips and falls

Structural collapse and accident in excavation

Fire outbreak

Fall from height

Crane collapse and falling off load

Electrical hazard

Noise and vibration

Asbestos and chemicals exposur

241
Appendices

Manual handling

Other:
Is your orgainsations using Building Information Modelling?

Yes

No
If BIM is used within your organisation, what purposes it is being used for?

Project planning

Visualisation

Design

Site Planning

Clash detection

Estimating

Sustainability

Facility management

Pre Fabrication or Off-site manufacture

Other:
How will you describe your current understanding of BIM?

Advanced understanding

Good understanding

Basic understanding

No understanding
Which of these BIM software packages are you familiar with?

Revit

Tekla

ArchiCAD

242
Appendices

VectorWorks

Microstation

Other:
Is your orgainsations involved in projects regularly involving
prefabrication/modularisation?

Yes

No

Other:
Understanding of Existing Practices

This Section asks questions related to prevailing Health and Safety Management
Practices

Use of Construction Safety Policies and Practices within your firm?

Fully integrated and widely observed construction safety programme

Construction safety programme exists but is not fully integrated

Adhoc approaches to construction safety - no formal policy however, occasional


conduct of construction safety review

No construction safety programme


Please check Health and Safety Practices currently used by your firm?

Construction site workers undertake induction training

There is a due process in place to investigate all reported Health and Safety incidents
are investigated

We maintain an on-site register to record any hazards reported by workers

We analyse site safety hazards in pre-construction stage

We have a designated project safety personnel to manage on-site safety

We have regular training programme for our site staff and sub-contractors

243
Appendices

We have clearly defined Safety Key Performance Indicators

We follow "safety by design" process by analysing safety hazards in pre


construction stage
Please rate importance of the following factors for the safety programme?

1. 5.
Extremely 2. 3. 4. Extremely
Low High

Regular On-
Site Safety
Meetings

Regular Site
Safety Audits

Safety Training
Programme
available to all
staff across
organisation

Proactive
approaches e.g.
Hazards
assessments
and safety
planning

Good
Communication

244
Appendices

1. 5.
Extremely 2. 3. 4. Extremely
Low High

H&S Incident
Reporting
Culture

Good Safety
leadership
abilities in Site
Supervisors

Personnel’s
Responsibility

Better
enforcement of
regulations and
laws

Changing
behaviour of
employees
towards
H&S
measures

245
Appendices

Simpler modes
of information
exchange

Cost of
implementing
H&S measures

Safety
measures
incorporated in
designing phase

3D/4D/5D
visualization/si
mulation

Strong and
clear
communication
link between all
stakeholders

Management of
data of all
processes
including H&S

Safety
equipment and
gear in

246
Appendices

hazardous
environments

Better
communication
devices for
efficient
information
sharing

Which of these do you consider responsible for health and safety issues on construction
site? (Please rank them 5= most and 1 = least)

1. Least 2. 3. 4. 5. Most

Lack of effective
communications

Lack of effective site


planning

Poor implementation
of H&S
implementation
procedures

Lack of Regulations

247
Appendices

1. Least 2. 3. 4. 5. Most

Human Errors

Lack of H&S
reporting culture

Lack of
consideration of
H&S in planning and
design stages

Multi culture

Low Education

Multilingual

Understanding Construction Health and Safety Attitudes and Perceptions

This Section focuses on set of questions to better understand construction Health and
Safety attitudes.

Do you prepare formal risk assessment and method statement for any of your projects?

Yes

No
For safety training, what is the most effective method?

Onsite Safety Training and Education

Online training

248
Appendices

Certification Programme for site safety


How will investment in safety programme impact project schedule?

Positive Impact

Negative Impact
How will investment in safety programme impact project budget?

Positive Impact

Negative Impact
How will investment in safety programme impact company‘s profitability?

Positive Impact

Negative Impact
How will investment in safety programme impact project quality?

Positive Impact

Negative Impact
How will investment in safety programme impact safety KPIs (e.g. injuries)?

Positive Impact

Negative Impact
What impact earlier involvement of contractors in design and construction stage can
make on construction projects?

Positive Impact

Negative Impact
How can BIM Impact on-site construction safety?

Positive Impact

Negative Impact

No impact

249
Appendices

How does use of off-site construction techniques and processes impact construction
safety?

Positive Impact

Negative Impact

No impact
How does use of mobile tools (e.g. phones, tablets) could impact construction safety?

Please specify type of mobile device (e.g. Smart Phone, iPAD, iphone, other) that could
have a greatest impact on improving site safety

Positive Impact

Negative Impact

No impact

Other:
Understanding of Potential of BIM applications for Enhancing Construction Health and
Safety

According to statistics, UK construction industry consist of workers of different


nationalities with different languages. Do you consider BIM an important tool for site
induction? (Please tick one) *

Strongly agree

Agree

Neither agree not disagree

Disagree

Strongly Disagree

Other:
BIM has the potential to check for compliance to regulation on health and safety risk.
Do you consider the integration of BIM into building regulation (BIM4regs) a positive
development to the management of health and safety?

250
Appendices

Strongly agree

Agree

Neither agree not disagree

Disagree

Strongly Disagree

Other:
How would you describe the benefits derive from the implementation of BIM in the
management of health and safety within your organisation? (Please tick as many as
applicable to your organisation)

Eliminates lost MANHOURS

Eliminates accidents

Improves communication

Improves construction safety

Reduce Cost

Other:
Which of these do you consider as barriers to the full implementation of BIM in the
management of health and safety within your organisation? (Please tick as many as
applicable to your organisation)

Behavioural change

Education and training

Information Exchange

Cost of Implementation

Time required to train staff

Other:

251
Appendices

Appendix 3: Pilot Study

Section 1: The Organisation.

What is the size of your construction company?

Micro Sized (1 to 9 Employees) 2 13%

Small Sized (10 to 50 Employees) 7 44%

Medium Sized Firm (51 - 250 Employees) 3 19%

Large Firm (250 or more employees) 4 25%

Other 0 0%

Is your orgainsations using Building Information Modelling?

Is your orgainsations involved in projects regularly involving


prefabrication/modularisation?

252
Appendices

Section 3: The current Health and Safety practices.

Use of Construction Safety Policies and Practices within your firm?

Fully integrated and widely observed construction safety programme 4

Construction safety programme exists but is not fully integrated 8

Adhoc approaches to construction safety - no formal policy however, occasional conduct


of construction safety 1

No construction safety programme 3

Please check the Health and Safety Practices currently used by your firm?

253
Appendices

Table1; The Health and Safety Practices currently used

Construction site workers undertake There is a due process in place to


induction training investigate all reported Health and Safety
8 incidents are investigated
9

We maintain an on-site register to record We analyse site safety hazards in pre-


any hazards reported by workers 9 construction stage
4

We have a designated project safety We have regular training programme for


personnel to manage on-site safety our site staff and sub-contractors
7 5

We have clearly defined Safety Key We follow "safety by design" process by


Performance Indicators analysing safety hazards in pre-
7 construction Stage 4.

254
Appendices

Regular On-Site Safety Meetings [Please rate importance of the following factors for the
safety programme?

Regular Site Safety Audits [Please rate importance of the following factors for the safety
programme?

Safety Training Programme available to all staff across organisation [Please rate
importance of the following factors for the safety programme?

255
Appendices

Proactive approaches e.g. Hazards assessments and safety planning [Please rate
importance of the following factors for the safety programme?

Good Communication [Please rate importance of the following factors for the safety
programme?

256
Appendices

H&S Incident Reporting Culture [Please rate importance of the following factors for the
safety programme?

Good Safety leadership abilities in Site Supervisors [Please rate importance of the
following factors for the safety programme?

257
Appendices

Section 4 Understanding Construction Health and Safety Attitudes and Perceptions

For safety training, what is the most effective method?

Onsite Safety Training and Education 12 75%

Online training 3 19%

Certification Programme for site safety 1 6%

How will investment in safety programme impact project schedule?

Positive Impact 11 69%

Negative Impact 5 31%

258
Appendices

Other 0 0%

How will investment in safety programme impact project budget?

Positive Impact 11 69%

Negative Impact 4 25%

Other 0 0%

How will investment in safety programme impact company‘s profitability?

Positive Impact 11 69%

Negative Impact 5 31%

Other 0 0%

259
Appendices

How will investment in safety programme impact project quality?

Positive Impact 11 69%

Negative Impact 5 31%

Other 0 0%

How will investment in safety programme impact safety KPIs (e.g. injuries)?

Positive Impact 11 69%

Negative Impact 5 31%

Other 0 0%

How will investment in safety programme impact project quality?

260
Appendices

Positive Impact 9 56%

Negative Impact 7 44%

Other 0 0%

What impact earlier involvement of contractors in design and construction stage can
make on construction projects?

Positive Impact1 3 81%

Negative Impact 3 19%

Other 0 0%

How can BIM Impact on-site construction safety?

261
Appendices

Positive Impact 11 69%

Negative Impact319%

No impact 2 13%

Other 0 0%

How does use of off-site construction techniques and processes impact construction
safety?

Positive Impact 9 56%

Negative Impact 4 25%

No impact 2 13%

Other 0 0%

How does use of mobile tools (e.g. phones, tablets) could impact construction safety?

262
Appendices

Positive Impact 9 56%

Negative Impact 2 13%

No impact 5 31%

Other 0

263
Appendices

Appendix 4: Interview Questions

Semi-structured interview Guide: for business owners and managers

Introduction / Preliminaries

Thank you for agreeing to be interviewed.

My name is (Yahya Balgheeth) and as you may be aware the purpose of the study is to
explore the views of business owners and managers about BIM and health and safety in
Saudi Arabia.

It is hoped that the research will improve health and safety in Saudi Arabia.

You are being asked to participate because you are a business owner or manager in Saudi
Arabia.

There is no obligation to take part - it is entirely voluntary. If you decide to participate you are still free to withdraw at any time.

This interview will last around (give an estimated time – e.g. 30-45 minutes).

The confidentiality of your responses is guaranteed by the researchers and your identity
will not be revealed at any time. When the research is presented in a report it will not be
possible for anyone to tell whether you participated in the research or what your views
were.

Any data you provide in this interview will be stored securely.

Section A: Information about the participant

Your area of work:


Public sector.
Consultants.
Contractor.
Other, specify:

Your area of specialisation:


Engineering

264
Appendices

Architecture
Management
Other, specify:

Your highest educational level:


Bachelor
Higher Diploma
Master
PHD

Section B: Health and Safety in the private sector

I would like to start by asking you some questions regarding Health and safety in the
private construction sector in Saudi Arabia generally. I will then move onto more
specific questions about you and your organisation

What are the greatest challenges in construction health and safety for private sector
construction contractors in KSA?

Do you think that having a multicultural and multilingual workforce in Saudi Arabia has
any implications for the management of health and safety?
- If YES, please say what these are

- Please say how these implications can best be managed so that health and safety
is not compromised in any way

Do you feel that engineers working on construction sites in Saudi Arabia have an
adequate level of qualification and experience in engineering?
If No – what other training, qualification or experience do you think is necessary?

265
Appendices

Section C: Your organisation and Health and Safety in KSA

How would you describe the legal requirements for health and safety on construction /
building sites in Saudi Arabia?

How do you manage the health and safety aspects of your works?

What are the major challenges, which your business faces, in enforcing health and safety
standards on construction sites in KSA?

What are the critical successes factors in Health and Safety practice for your company?

Would you say that you have a multicultural and multilingual workforce?
(if Yes:)

How many nationalities are working in the organisation?


How many formal languages are used in within the organisation?
Are there any people in your workforce that are not fluent in Arabic?

(For those who do have a multicultural / multilingual workforce):

Does having a multicultural or multilingual workforce have implications for internal or


external communications in your organisation?

266
Appendices

What do you think are the most important ways to ensure health and safety on
construction / building sites?

Are you familiar with the principles of health and safety legislation in Saudi Arabia?
If “yes”, please say what you think the main principles of the legislation are

Do you have a Director of Health & Safety or someone leading on health and safety at
senior management / Board level?

Do you train your workers in health and safety?


If yes, please describe the health and safety training which you provide – what topics
does it cover, how long does it take to deliver, how do you deliver it (e.g. e-learning or
face to face); do you test workers on their health and safety skills/knowledge; are their
inspections on site to assess the extent to which health and safety procedures are carried
out?

What are your company’s motivations for promoting/enforcing health and safety?

Can you please describe your accident statistics over the last five years?

Number of injuries / fatalities


Trend – increasing or decreasing
Why do they think stats are increasing / decreasing / staying the same

What are the drivers for your organization to improve health and safety on construction
sites which your company works on?

267
Appendices

Does it give reduction in costs? Decreased insurance premiums? Give better chances in
tendering? Reduce staff turnover?

What lessons, if any, have you learnt about improving their health and safety on
construction sites, which your company works on?
Section D: Awareness of BIM and whether it can enhance Health and Safety on
construction site?

Explain briefly about BIM, then Ask :

Have you heard about BIM?

Prior to this interview, has your organisation used BIM?


If YES – ask them to name particular programmes and their general impression of BIM,
how they have used it, has BIM been used in relation to health and safety

Do you think BIM could be used by your organisation or (if already used) used more
frequently?

BIM has the potential to check for compliance to regulation on health and safety risk.
Do you consider the integration of BIM into building regulation a positive development
to the management of health and safety?

Do you consider BIM an important tool for site induction?

268
Appendices

Do you consider BIM an important tool for site induction with particular regard to
linguistic or cultural diversity in the workforce?

Do you think BIM will enhance Health and Safety in your organization?

Why?

Section E: Safety management practices - implemented and perceptions by Saudi


Contractors?

In your view, Are safety management practices being implemented by Saudi


Contractors?
If YES, is this being done in full / in part, slowly / rapidly, what are the problems in
implementation in their view

In your view, how are safety management practices perceived by Saudi Contractors?

Section F: Closing the interview

Thank you so much for your co-operation. Before we finish, is there anything else that
you would like to say or anything, which you would like to ask me?

(If not – thank you).

269
Appendices

270
Appendices

Appendix 5: Manual Coding by Colour

Section A: Information about the participant

Your area of work:


Public sector.
Consultants.
Contractor.
Other, specify:

Your area of specialisation:


Engineering
Architecture
Management
Other, specify:

Your highest educational level:


Bachelor
Higher Diploma
Master
PHD

What are the greatest challenges in construction health and safety for construction sector
in KSA?
The Construction Market in Saudi Arabia is a huge flourishing market and the
government with the aim to encourage progress spends $100 billions in this sector. These
incentives attract large, medium and small companies to this sector. These companies
are mainly concerned about the profit of the projects rather than the quality of the tasks.

271
Appendices

This leads them to look for cheap and unqualified workforce from poor countries where
there is no concern about the wellbeing of their workforce. Consequently these workers
are distanced from the culture of health and safety regulations.

Also the other important issue which affects the health of the workers is the weather
condition of the country. The companies ask the workers to work at temperatures above
50 degrees centigrade, despite the fact that the government has prohibited work at these
temperatures. Regrettably the companies force their workforce to do so.

Do you think that having a multicultural and multilingual workforce in Saudi Arabia has
any implications for the management of health and safety?
- If YES, please say what these are

- Please say how these implications can best be managed so that health and safety
is not compromised in any way

The differences in culture and language work as a barrier for the workers to communicate
with each other and have a negative impact on observance of health and safety
regulations on the project site. The workers come from various countries such as India,
Pakistan, Seri Lanka, Yemen and Egypt. Unfortunately cooperation between them is
poor and this issue results in the increase of accident rates.

In particular, the number of accidents was very high this year and all of the victims were
from countries that I mentioned Therefore we need to elevate the level of their
knowledge by implementing training courses so that they learn to prioritize health and
safety enabling them to save their own lives in the workplace.

Do you feel that engineers working on construction sites in Saudi Arabia have an
adequate level of qualification and experience in engineering?
If No – what other training, qualification or experience do you think is necessary?

The engineers working in the construction sector are mainly from outside Saudi Arabia.
Some of them are qualified and experienced in their profession and have passed various
training course in the field of health and safety. Regretfully there are some who possess

272
Appendices

fake educational certificates. Therefore they have no experience what so ever in health
and safety matters. Naturally this issue escalates the rate of accidents and results in delay
and cancelation of projects.

It is essential to check the authenticity of the documents provided by the engineers. Also
conducting periodical training courses for engineers will help to elevate their expertise
and quality of work at the project sites.

4. How would you describe the legal requirements for health and safety on construction
/ building sites in Saudi Arabia?

The government has implemented health and safety indicators for all companies to
conform. Unfortunately there is a serious concern on how to make sure that companies
are bounded to implement these regulations. We come across companies which pay no
attention to health and safety issues. There are many examples such as the collapse of
the dome of Ghasim University and the downfall of the crane during the pilgrimage last
year. All of these are due to negligence of safety regulations by the companies.

5. How do you manage the health and safety aspects of your works?

We have stringent procedures in our company to safeguard health and safety. The project
manager is the first person responsible for this matter. At the event of any accident first
he would be held accountable. As the result we witness that he is very strict in ensuring
that every one implements the regulations. As we are a Chinese company, most of our
workers come from China and countries where they speak English; therefore we can not
render the difficulty of communication as a problem.

What are the major challenges, which your business faces, in enforcing health and safety
standards on construction sites in KSA?
The only challenge that our company faces is to adapt our workers with the climate here
in Saudi Arabia. The high temperature is the cause of many serious accidents because
our workers are not used to work in such a climate. Wearing a special suit, safety hat
and boots in temperatures above 50 degree that sometimes 60 is very demanding.

273
Appendices

Which of these do you consider responsible for health and safety issues on construction
site?

Would you say that you have a multicultural and multilingual workforce?
(If Yes :)

How many nationalities are working in the organisation?


How many formal languages are used in within the organisation?
Are there any people in your workforce that are not fluent in Arabic?
We are a Chinese company that has worked in Saudi Arabia for a long time and we have
been involved in building canals and bridges. 65% of our workers come from China and
the rest are from East Asia, Middle East and India.

Three different languages are spoken in our project sites. But the main language used is
English.

Does having a multicultural or multilingual workforce have implications for internal or


external communications in your organisation?
Despite the importance of the variety of languages in the workplace this is not considered
as a problem in our company. Since we are an international company and engaged in
different countries, it has been our policy to lower the variety of nationality in our
workforce.

By this policy we have decreased the negative impacts created by the diversity of
languages and cultures causing discord between the workers.

274
Appendices

What do you think are the most important ways to ensure health and safety on
construction / building sites?
The most important issue to ensure the implementation of health and safety is to compile
a weekly report in regards to each of the workers. This report is an assessment of the
worker’s compliance with the safety regulations. The report will give marks from 1 to
10 and if a worker obtains 6 he will be called for a disciplinary meeting and if this
continuous, part of his wage will be deducted as a fine.

Are you familiar with the principles of health and safety legislation in Saudi Arabia?
If “yes”, please say what you think the main principles of the legislation are

Yes, I am aware of the principles and regulations of health and safety in the country. The
most important of all is the company’s responsibility towards the workers” livelihood.
In the occurrence of an accident or death of a worker or any other problem, the company
will compensate worker’s family.

Do you have a Director of Health & Safety or someone leading on health and safety at
senior management / Board level?
We have a safety officer who will supervise the workers and ensures that they comply
with the safety regulations. He would report his observations to the project manager who
is the first person responsible for health and safety.

Do you train your workers in health and safety?


In fact we do train our workers. We publish books, bulletins and erect educational
billboards to highlight the importance of health and safety.

What are your company’s motivations for promoting/enforcing health and safety?
Indeed, our main motivation is to safeguard the health and safety of our workforce. They
are the fundamental factor in completion of a project according to the timetable. This
issue guarantees the continuation of our operation in the Saudi market and increases the
trust of our clients in the competency of the company. The consequence would be our

275
Appendices

success in the region and increase value of our shares as an international company.

Can you please describe your accident statistics over the last five years?
In our company like others, accidents do happen. However I don”t have precise statistics
of deaths and injuries, but the numbers are not high. The losses of lives were not more
than fifteen and the number of injuries may reach about 125 during the past 5 years.

What are the drivers for your organization to improve health and safety on construction
sites which your company works on?

Does it give reduction in costs? Decreased insurance premiums? Give better chances in
tendering? Reduce staff turnover?
In fact, our company looks at health and safety as an important issue in any project.
Therefore we make great effort to prioritize safety like other international companies in
the developed countries such as the USA or UK which have great concern about safety.

Hence we are in constant contact with our partners in other countries and with our mother
company in China in order to acquire the latest measures to ensure safety in the
workplace. As you know, our company is pursuing profit, therefore finishing a project
without any accidents results in the continuous flow of work without interruption, this
in turn means completion of the project on time. Result: more profit and more trust
building.

Section D: Awareness of BIM and whether it can enhance Health and Safety on
construction site?

Have you heard about BIM?


BIM, yes; I have heard about it but my knowledge on it is very limited.

Prior to this interview, has your organisation used BIM?

So far it has not been used but we will consider it seriously since it has a direct impact

on progress of the job, reduction of time and lowering the number of mistakes. It will
also connect the company to a system that would make the execution of the job easier

276
Appendices

and ensures the progress of the project.

Do you think BIM could be used by your organisation or (if already used) used more
frequently?

Yes, it will be brought to use soon.

BIM has the potential to check for compliance to regulation on health and safety risk.
Do you consider the integration of BIM into building regulation (BIM4regs) a positive
development to the management of health and safety?

Surly that would have positive impact on health and safety, so despite my limited
knowledge I am in favour of implementing it. However I have seen a number of video
clips on U-tube which show that using this system reduces the number of accidents prior
to the start of the project because it specifies the accident sensitive areas, and enables
the workforce to be informed before –hand.

Do you consider BIM an important tool for site induction?


Yes, it is an important tool despite the fact that I have limited knowledge about it.

Do you consider BIM an important tool for site induction with particular regard to
linguistic or cultural diversity in the workforce?
Yes, what I mean is that it will help to ease communication with everyone, in particular
in regards to delivery of the daily instructions to the workers in their own language. Also
it offers you to see all the stages of the project beforehand. This will give a clear
overview to the entire workforce about the project from start up to finish.

Do you think BIM will enhance Health and Safety in your organization?

277
Appendices

Yes, it will enhance health and safety and I will give it the score of 4 out of 5.
Because it diagnoses the problems and attempts to solve them in later stages in a way
that it would result in development of health and safety.

278
Appendices

Appendix 6: Publications from the PhD Study

Proceedings of the Global Conference on Engineering and Technology Management


2014 Istanbul, Turkey, June 23–26, 2014

Enhancing Health & Safety Management in Construction


Sites by Using Mobile Computing in Saudi Arabia
Yahya Balgheeth and Naif Alaboud
Ph.D Students
School of Built Environment
University of Salford
Salford, Greater Manchester M5 4WT, UK
Dr. Aziz Zeeshan
Programme Director MSc Construction Management
School of Built Environment
University of Salford
Salford, Greater Manchester M5 4WT, UK
Abstract
This paper investigates the relevance of mobile computing to improve Health and Safety ( H&S) in onsite
construction projects. Even though the construction sector in Saudi Arabia has been rapidly expanding,
the health and safety record of this industry remains considerably poor given the rising figures of injuries
and mortalities.The literature review identifies and highlights the current status of H&S practice in Saudi
construction projects and the reasons behind it. Moreover, the review also indicates and discusses the
proposed scenario of using mobile computing technology to improve H&S. From this, the paper discusses
the relevance of mobile computing for better information provisioning, information flow and decision
making. Conclusions are drawn about the future impact of emerging mobile computing technologies to
enhance H&S in construction site.
Keywords
Health and Safety, Construction Management, Communication, Mobile computing.

279