Professional Documents
Culture Documents
Site Status
Site Status
winding temperature high (> 120°C), during part load operation, operator has throttled inlet valve
resulting low cooling water flow and high winding temperature. Awaiting for Trip Report and RCA
from site
NCL – Plant running normal, Plant tripped on dtd 09 Oct, 6:30pm due to external fault voltage
fluctuation, TG synchronized on 10 Oct , 1:00am