CONTRACT DEL MONTE (LABOR MATERIALS)

MOBILIZATION --------------3000

ROFFING REPAIR -------------18,500 (LABOR materials)

• ROOF REPAIR

• FLOORING REPAIR

• WATER PROOFING

CARPENTRY WORKS------------30,000 (LABOR materials)

• REPLACE CEILING

• REPAIR CEILING

PAINTING-----------------18000 (LABOR materials)

• INTERIOR WALLS AND CEILING

ADDITIONAL :

MASONRY WORKS-------------22000 (LABOR materials)

• DEMOLISH EXISTING PARTITION

• DOWNSPOUT REPAIR

ELECTRICAL WORKS:---------------------55000 (LABOR materials)

• ELECTRICAL PIPINGS INSTALLATION

• REWIRING OUTLET LIGHTINGS AND SWITCHES

• INTALLATION OUTLET, SWITCHES AND LIGHTING FIXTURES

HAULING -------------------------6000

GRAND TOTAL: 131,000


Not included: (aluminum color white)

ALuminum glass door(full alum glass partition with sliding window) FULL ALLUMINUM GLASS
PARTITION 60,000

ALUMINUM SINGLE DOOR HALF CONCRETE HALF ALUMINUM PARTITION--- 45,000