Calculate the cost of the plastering required for a wall of 4 m long, 3.5 m high and 300 mm thick, if the rate of
1 plastering is Rs. 12 per square meter.
101 168 336
2 What is the actual size (mm) of the standard modular brick as per Indian Standards?
190 x 90 x 90 200 x 90 x 90 200 x 100 x 100
3 Concrete mainly consists of
Cement Aggregates Admixture
6 The process of hardening the concrete by keeping its surface moist is known ………
Placing Wetting Curing
8 Minimum grade of concrete required for Reinforced Cement Concrtete work as per IS
25 20 15
11 Wetting of coarse aggregate shall be carried out for cast in situ concrete
6 Hrs
12 Hrs
18 Hrs
24 Hrs
14 Timber props only used only where height of structure less than
3m
3.5 m
2.4 m
2m
22 Minimum gap …... days shall be maintained between completion of brick masonry and commencement of internal plaste
10 Days
5 Days
7 Days
15 Days
23 Level pads of size not less than ……….. shall be made on the walls and distance between level pads shall not exceed…...
2'' x 2'' , 5'
3'' x 3'' , 5'
2'' x 2'' , 6'
' 4'' x 4'' , 5'
25 internal plaster, average thickness of plaster shall not be less than …... mm and not more than ……..mm
12 mm and 15 mm
10 mm and 15 mm
15 mm and 20 mm
10 mm and 12 mm
27 In external plaster , time gap between application of first coat and second coat not exceeds
2 Days
3 Days
5 Days
7 Days
30 Side cover required for Footing, Column, Beam and Slab respectively
40,45,30,20
50,45,25,20
45,40,25,20
50,40,20,20
31 A days work, brick/block work should not be constructed more than………... height
0.9 m
01 m
1.2 m
1.5 m
423 336
ards?
229 x 114 x 76 190 x 90 x 90
Quenching curing
……
Compacting Curing
M-15 M-15
per IS
30 20
24 to 30 Hrs 16 to 24 Hrs
21 Days
28 Days
24 Hrs
±25
35 Nos.
3.5 m
12 mm
Exceeds 3.6 m
10.66 Kg
25 mm
8%
20%
10 mm
7 Days
60 to 65 Nos
re than ……..mm
12 mm and 15 mm
05 to 10 mm
5 Days
05 mm and 35 mm
IS 456 : 2000
50,40,20,20
1.2 m
Safety Helmet
Safety