Professional Documents
Culture Documents
Bn67 Completion Schematic - Final 4 Apr 16
Bn67 Completion Schematic - Final 4 Apr 16
RN 2.0
5,638 - 5,650 ft MDDF
5663 SEAL UNIT 4.75" (TOP SEAL) 3.500 4.750
4.750 5.550 SEAL BORE EXTENSION 4.75" 5663 5669 SEAL UNIT 4.75" (BOTTOM SEAL)
6.000 8.450 9-5/8" VGH SUMP PACKER 5665
RP 2.1
6,505 - 6,520 ft MDDF
4.750 5.550 SEAL BORE EXTENSION 4.75" 6533 6533 SEAL UNIT 4.75" (TOP SEAL) 3.500 4.750
6.000 8.450 9-5/8" VGH SUMP PACKER 6535 6539 SEAL UNIT 4.75" (BOTTOM SEAL)
HUD @ 7196 ft WLD
Recovered sand/mud mixture
7316 X NIPPLE 2.813 3.960
(2.813" XX Plug - 23 March 16)
5-1/2" Pre-Perforated
Liner
Prepared by :
Helmi Nordin (27th February 2014)
Last Reviewed: Kellen 23/1/17