LTE Cluster Optimiz

Name of Cluster:
Cluster Test Date:

Test Engineer:

Report Creator:

Submission Date:

Accaptance Date:

Comments:
Cluster Optimization Report

LTE Cluster C08

2/4/2013

Mohammed Shashieh

2/12/2013
Cell Data and Cluster Map

Cluster No Total Planned Sites Sites integrated Sites on-aired


Cluster 08 8 5 5

eNodeB ID Site Name Cluster Cell ID TAC PCI

10026 LMU0026 LTE cluster C08 0 5 75


10026 LMU0026 LTE cluster C08 1 5 76
10026 LMU0026 LTE cluster C08 2 5 77
10027 LMU0027 LTE cluster C08 0 5 72
10027 LMU0027 LTE cluster C08 1 5 73
10027 LMU0027 LTE cluster C08 2 5 74
10037 LMU0037 LTE cluster C08 0 5 66
10037 LMU0037 LTE cluster C08 1 5 67
10037 LMU0037 LTE cluster C08 2 5 68
10394 LMU0394 LTE cluster C08 0 5 78
10394 LMU0394 LTE cluster C08 1 5 79
10394 LMU0394 LTE cluster C08 2 5 80
10731 LMU0731 LTE cluster C08 0 5 219
10731 LMU0731 LTE cluster C08 1 5 220
10731 LMU0731 LTE cluster C08 2 5 221
Data and Cluster Map

Percentage w.r.t total planned sites


62.50

DL EARFCN Bandwidth Azimuth Longitude Latitude Remark

1525 15M 60 23.629 58.501 commissioned


1525 15M 180 23.629 58.501 commissioned
1525 15M 300 23.629 58.501 commissioned
1525 15M 80 23.6236 58.4927 commissioned
1525 15M 160 23.6236 58.4927 commissioned
1525 15M 300 23.6236 58.4927 commissioned
1525 15M 60 23.6198 58.5023 commissioned
1525 15M 180 23.6198 58.5023 commissioned
1525 15M 300 23.6198 58.5023 commissioned
1525 15M 60 23.6279 58.4865 commissioned
1525 15M 180 23.6279 58.4865 commissioned
1525 15M 320 23.6279 58.4865 commissioned
1525 15M 60 23.63094 58.4935 commissioned
1525 15M 180 23.63094 58.4935 commissioned
1525 15M 300 23.63094 58.4935 commissioned
Drive Test Results - Distrib

Topic

Cluster PCI Distribution

Cluster DL RSRP
Distribution

Cluster DL SINR
Cluster DL SINR
Distribution
Drive Test Results - Distribution Graphs

Cluster Test Result


Quality Test

SINR

Sample Count %
SINR => 17 30.3
SINR= > 5 75.93
SINR => -3 92.47

Throughput(SINR>0dB)

Average (aveg) Max (aveg)


36.963 96.773
Inter RAT Redirection
Suc 0 IRAT Statistics:-
Succea

No. Longitude Latitude


1 58.131355 23.674016
2 58.131534 23.673937
3 58.130428 23.674742
4 58.131164 23.674216
5 58.125143 23.672322
6 58.125183 23.672456
7 58.128168 23.674575
8 58.12835 23.674594
9 58.146048 23.658549
10 58.145595 23.658892
11 58.141783 23.636543
12 58.141706 23.635939
13 58.16785 23.654775
14 58.168189 23.655017
15 58.157332 23.667184
16 58.157044 23.667287
17 58.139785 23.679036
18 58.139785 23.679071
19 58.130015 23.677778
20 58.129817 23.677828
21 58.104229 23.682239
22 58.10428 23.682232
23 58.119151 23.649312
24 58.118983 23.649241
25 58.114625 23.636552
26 58.114572 23.636404
27 58.120279 23.637542
28 58.120622 23.637507
29 58.124323 23.640183
30 58.124645 23.640063
31 58.122315 23.645048
32 58.122391 23.645036
33 58.117056 23.646268
34 58.116893 23.646343
35 58.112164 23.645098
36 58.112318 23.645027
37 58.110781 23.645173
38 58.110742 23.645092
39 58.105445 23.658185
40 58.105254 23.658255
41 58.100486 23.657056
42 58.100488 23.657213
43 58.10228 23.654331
44 58.10207 23.654451
45 58.101878 23.643945
46 58.1019 23.643454
47 58.097281 23.664178
48 58.09699 23.664288
49 58.150081 23.66958
50 58.150394 23.669437
LTE Inter RAT Redirection

IRAT Attempt:-

IRAT Success:-
Over Shoot Analysis

Issue Description and


Events distributions
Analysis

1.Here the target area


encouters a weak SINR and
due to that it is jointion of
several cell edges. 2 cells
overshoots here, namely
LMU0041A and
LMU0230A. Need to down
tilt down by 2 degrees and 4
degrees.
And by launch, there will
intergrate a new site
LMU0004, which will
1 improve the SINR.

2. Similar situation as
abrove. And there is no
domainate cell. LMU0394B
needs tilting up from 8
degrees to 5 degrees.
By launch, there is another
new site LMU0393 at the
2 marked place.

3.LMU0039A needs tilting


down by 3 degrees and
LMU0048C tilting down by
4 degrees.
LMU0037 needs tilting up
by 2 degrees.
3.LMU0039A needs tilting
down by 3 degrees and
LMU0048C tilting down by
4 degrees.
LMU0037 needs tilting up
by 2 degrees.

4.LMU0030A_PCI0 is
overshooting all over cluster
08. suggested tilting down
by 4 degrees.

5.LMU0184A_PCI0 is
overshooting all over
cluster 08. suggested
tilting down by 4
degrees.

6.LMU0411A_PCI39 is
overshooting all over
cluster 08. suggested
tilting down by 4
degrees.

6
6.LMU0411A_PCI39 is
overshooting all over
cluster 08. suggested
tilting down by 4
degrees.

7.LMU0018A_PCI45 is
overshooting all over
cluster 08. suggested
tilting down by 4
degrees.

8.LMU0018B_PCI46 is
overshooting all over
cluster 08. suggested
tilting down by 4
degrees.

9.LMU0040A_PCI51 is
overshooting all over
cluster 08. suggested
tilting down by 4
degrees.

9
9

10.LMU0040A_PCI53 is
overshooting all over
cluster 08. suggested
tilting down by 3
degrees.

10

11.LMU0029A_PCI54 is
overshooting all over
cluster 08. suggested
tilting down by 4
degrees.

11

12.LMU0029B_PCI55 is
overshooting all over
cluster 08. suggested
tilting down by 3
degrees.

12

13.LMU0039A_PCI57 is
overshooting all over
cluster 08. suggested
tilting down by 4
degrees.
13.LMU0039A_PCI57 is
overshooting all over
cluster 08. suggested
tilting down by 4
degrees.

13

14.LMU0039C_PCI59 is
overshooting all over
cluster 08. suggested
tilting down by 4
degrees.

14

15.LMU0027C_PCI74 is
overshooting all over
nearby sites. suggested
tilting down by 2
degrees.

15

16.LMU0026A_PCI75 is
overshooting all over
nearby sites. suggested
tilting down by 3
degrees.

16
tilting down by 3
degrees.

16

17.LMU0026B_PCI76 is
overshooting all over
nearby sites. suggested
tilting down by 4
degrees.

17

18.LMU0026C_PCI77 is
overshooting all over
nearby sites. suggested
tilting down by 3
degrees.

18

19.LMU0394A_PCI78 is
overshooting all over
nearby sites. suggested
tilting down by 3
degrees.

19
20.LMU0048C_PCI194 is
overshooting all over
nearby sites. suggested
tilting down by 5
degrees.

20
sis

Description and Suggesti Remark


Analysis ons

e target area as analysis


s a weak SINR and
at it is jointion of
ell edges. 2 cells
ts here, namely
1A and
0A. Need to down
by 2 degrees and 4

unch, there will


e a new site
4, which will
he SINR.

situation as as analysis
And there is no
e cell. LMU0394B
ing up from 8
o 5 degrees.
h, there is another
LMU0393 at the
lace.

9A needs tilting as analysis


3 degrees and
tilting down by
s.
needs tilting up
rees.
as analysis

30A_PCI0 is as analysis
ting all over cluster
ested tilting down
ees.

84A_PCI0 is as analysis
ting all over
08. suggested
down by 4

411A_PCI39 is as analysis
ting all over
08. suggested
down by 4
as analysis

018A_PCI45 is as analysis
ting all over
08. suggested
down by 4

018B_PCI46 is as analysis
ting all over
08. suggested
down by 4

040A_PCI51 is as analysis
ting all over
08. suggested
down by 4
040A_PCI53 is as analysis
ting all over
08. suggested
down by 3

029A_PCI54 is as analysis
ting all over
08. suggested
down by 4

029B_PCI55 is as analysis
ting all over
08. suggested
down by 3

039A_PCI57 is as analysis
ting all over
08. suggested
down by 4
as analysis

039C_PCI59 is as analysis
ting all over
08. suggested
down by 4

027C_PCI74 is as analysis
ting all over
ites. suggested
down by 2

026A_PCI75 is as analysis
ting all over
ites. suggested
down by 3
026B_PCI76 is as analysis
ting all over
ites. suggested
down by 4

026C_PCI77 is as analysis
ting all over
ites. suggested
down by 3

394A_PCI78 is as analysis
ting all over
ites. suggested
down by 3
048C_PCI194 is as analysis
ting all over
ites. suggested
down by 5
549217670.xlsx 文档密级

Abnormal Events Analysis

No. Cata. Events distributions

Mobiltiy No Issue Found


Accessibilty No Issue Found
Retainability No Issue Found

10/13/2021 华为保密信息,未经授权禁止扩散 第32页,共36页


549217670.xlsx 文档密级

normal Events Analysis

Issue Description and Analysis Suggestions Remark

10/13/2021 华为保密信息,未经授权禁止扩散 第33页,共36页


549217670.xlsx 文档密级

DriveTest KPI
Item Target Value Optimization Result
RRC Connection Establishment
Success Rate

Attach Failure Rate

Service Request Failure Rate

Service Request Delay

ERAB Establishment Success Rate

E-RAB PS Drop Rate

Access RACH Latency


RLC ARQ/HARQ Retransmission
Rate

S1/X2 Handover Failure Rate

S1/X2 Handover Interruption Time,


intra-eNB(C-Plane)

IRAT handover success rate to 3G 95.00% 100.00%

Intra Frequency Handover Success


98.00% 100.00%
Rate

C-Plane Latency Intra frequency HO

C-Plane Latency Intra frequency HO

IRAT handover success rate to 3G(If


Availiable)
DL Single User average Throughput 36.963mbps

10/13/2021 华为保密信息,未经授权禁止扩散 第34页,共36页


549217670.xlsx 文档密级

DriveTest KPI
Formula
RRC Connection Establishment Success Rate = Number of RRC Connection
Establishment Success / Number of RRC Connection Establishment Attempt * 100%

Attach failure Rate = 1- Number of LTE Attach Complete/ Number of LTE Attach
Request
Service Request Failure Rate = 1-RRC setup success rate*ERAB setup success
rate(%)
Service Request Delay = T(RRCRecfgComplete)-
T(RRCConnectionRequest);excluded the Service request failure delay
*Exclude the unreasonable latency due to service request not finished but reselect to
other cells
ERAB Establishment Success Rate = Number of ERAB Establishment Success /
Number of ERAB Establishment Attempt * 100%
Call drop rate = Number of E-RAB Abnormal Release / Number of E-RAB Setup
Success * 100%
DT Tool cannot measure this value as it is layer-2 measurement. But this procedure
included in idle to Active and Handover.

Result evaluation: Average rudimental BLER recorded in Probe and Assistant

Handover Successful Rate = Number of Intra Freq Handover Success / (Number of


Intra Freq Handover Success + Number of Intra Freq HO Failure) * 100%;

C-Plane Latency Intra frequency HO = T(handoff_complete)- T(handoff_command)

IRAT handover Success Rate =LTEInterRATRedirectionSuc Counter/


(LTEInterRATRedirectionSuc Counter+ LTEInterRATRedirectionfail Counter)*100%

Handover Successful Rate = Number of Intra Freq Handover Success / (Number of


Intra Freq Handover Success + Number of Intra Freq HO Failure) * 100%;

C-Plane Latency Intra frequency HO = T(handoff_complete)- T(handoff_command)

C-Plane Latency Intra frequency HO = T(handoff_complete)- T(handoff_command)

IRAT handover Success Rate =LTEInterRATRedirectionSuc Counter/


(LTEInterRATRedirectionSuc Counter+ LTEInterRATRedirectionfail Counter)*100%

10/13/2021 华为保密信息,未经授权禁止扩散 第35页,共36页


Equipment
Test Equipment Type
LTE Terminal Huawei E392u-12
Data Collection Software Genex Probe V3.5
Data Analysis Software Genex Assitant V3.5

Test Setup
Test Type Long call