Cluster Optimization Report
2/4/2013
Mohammed Shashieh
2/12/2013
Cell Data and Cluster Map
Topic
Cluster DL RSRP
Distribution
Cluster DL SINR
Cluster DL SINR
Distribution
Drive Test Results - Distribution Graphs
SINR
Sample Count %
SINR => 17 30.3
SINR= > 5 75.93
SINR => -3 92.47
Throughput(SINR>0dB)
IRAT Attempt:-
IRAT Success:-
Over Shoot Analysis
2. Similar situation as
abrove. And there is no
domainate cell. LMU0394B
needs tilting up from 8
degrees to 5 degrees.
By launch, there is another
new site LMU0393 at the
2 marked place.
4.LMU0030A_PCI0 is
overshooting all over cluster
08. suggested tilting down
by 4 degrees.
5.LMU0184A_PCI0 is
overshooting all over
cluster 08. suggested
tilting down by 4
degrees.
6.LMU0411A_PCI39 is
overshooting all over
cluster 08. suggested
tilting down by 4
degrees.
6
6.LMU0411A_PCI39 is
overshooting all over
cluster 08. suggested
tilting down by 4
degrees.
7.LMU0018A_PCI45 is
overshooting all over
cluster 08. suggested
tilting down by 4
degrees.
8.LMU0018B_PCI46 is
overshooting all over
cluster 08. suggested
tilting down by 4
degrees.
9.LMU0040A_PCI51 is
overshooting all over
cluster 08. suggested
tilting down by 4
degrees.
9
9
10.LMU0040A_PCI53 is
overshooting all over
cluster 08. suggested
tilting down by 3
degrees.
10
11.LMU0029A_PCI54 is
overshooting all over
cluster 08. suggested
tilting down by 4
degrees.
11
12.LMU0029B_PCI55 is
overshooting all over
cluster 08. suggested
tilting down by 3
degrees.
12
13.LMU0039A_PCI57 is
overshooting all over
cluster 08. suggested
tilting down by 4
degrees.
13.LMU0039A_PCI57 is
overshooting all over
cluster 08. suggested
tilting down by 4
degrees.
13
14.LMU0039C_PCI59 is
overshooting all over
cluster 08. suggested
tilting down by 4
degrees.
14
15.LMU0027C_PCI74 is
overshooting all over
nearby sites. suggested
tilting down by 2
degrees.
15
16.LMU0026A_PCI75 is
overshooting all over
nearby sites. suggested
tilting down by 3
degrees.
16
tilting down by 3
degrees.
16
17.LMU0026B_PCI76 is
overshooting all over
nearby sites. suggested
tilting down by 4
degrees.
17
18.LMU0026C_PCI77 is
overshooting all over
nearby sites. suggested
tilting down by 3
degrees.
18
19.LMU0394A_PCI78 is
overshooting all over
nearby sites. suggested
tilting down by 3
degrees.
19
20.LMU0048C_PCI194 is
overshooting all over
nearby sites. suggested
tilting down by 5
degrees.
20
sis
situation as as analysis
And there is no
e cell. LMU0394B
ing up from 8
o 5 degrees.
h, there is another
LMU0393 at the
lace.
30A_PCI0 is as analysis
ting all over cluster
ested tilting down
ees.
84A_PCI0 is as analysis
ting all over
08. suggested
down by 4
411A_PCI39 is as analysis
ting all over
08. suggested
down by 4
as analysis
018A_PCI45 is as analysis
ting all over
08. suggested
down by 4
018B_PCI46 is as analysis
ting all over
08. suggested
down by 4
040A_PCI51 is as analysis
ting all over
08. suggested
down by 4
040A_PCI53 is as analysis
ting all over
08. suggested
down by 3
029A_PCI54 is as analysis
ting all over
08. suggested
down by 4
029B_PCI55 is as analysis
ting all over
08. suggested
down by 3
039A_PCI57 is as analysis
ting all over
08. suggested
down by 4
as analysis
039C_PCI59 is as analysis
ting all over
08. suggested
down by 4
027C_PCI74 is as analysis
ting all over
ites. suggested
down by 2
026A_PCI75 is as analysis
ting all over
ites. suggested
down by 3
026B_PCI76 is as analysis
ting all over
ites. suggested
down by 4
026C_PCI77 is as analysis
ting all over
ites. suggested
down by 3
394A_PCI78 is as analysis
ting all over
ites. suggested
down by 3
048C_PCI194 is as analysis
ting all over
ites. suggested
down by 5
549217670.xlsx 文档密级
DriveTest KPI
Item Target Value Optimization Result
RRC Connection Establishment
Success Rate
DriveTest KPI
Formula
RRC Connection Establishment Success Rate = Number of RRC Connection
Establishment Success / Number of RRC Connection Establishment Attempt * 100%
Attach failure Rate = 1- Number of LTE Attach Complete/ Number of LTE Attach
Request
Service Request Failure Rate = 1-RRC setup success rate*ERAB setup success
rate(%)
Service Request Delay = T(RRCRecfgComplete)-
T(RRCConnectionRequest);excluded the Service request failure delay
*Exclude the unreasonable latency due to service request not finished but reselect to
other cells
ERAB Establishment Success Rate = Number of ERAB Establishment Success /
Number of ERAB Establishment Attempt * 100%
Call drop rate = Number of E-RAB Abnormal Release / Number of E-RAB Setup
Success * 100%
DT Tool cannot measure this value as it is layer-2 measurement. But this procedure
included in idle to Active and Handover.
Test Setup
Test Type Long call