TIME STUDY SHEET ( COVERALL)

Operations Machine Cycle Time (Second)


Name M/C 1 2 3 4 5
Production of Non Woven 430 427 423 420 425
Printing the design Printer 14 9 10 12 13
Cut the desired shape Cutter 150 143 147 145 146
Ultrasonic Sewing
Sew the edges Machine 200 197 199 198 199
Inspections
Packaging 39 43 45 40 38
Total
Average Average SMV with Standard Minute Value (SMV)
(second) (Minute) Allowance SMV 14.452
425 7.83 SMV with Allowance
11.6 0.193
146.2 2.436

198.6 3.31 Expected Allowances (in seconds)


Personal Allowance
41 0.683 Machine Allowance
822.4 14.452 Process Allowance

Note:
Personal Allowance is with Manual Operation
Machine Allowance is with Machine Operation
Process Allowance is with both Manual & Machine