Completion Report: To: MR. Steven Hotel Morena Jodoh From: PT. Sanindo Multi Tekno

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

PT.

SANINDO MULTI TEKNO


Wisma Buana Indah Blok A No.11
Batam Centre - Batam, Kepri – Indonesia
 : +62 778 480 7760
 : +62 877 6973 2141
 : sales@sanindotekno.com

Completion Report

th
To: MR. Steven date: August. 10 , 2021
Hotel Morena
Jodoh

From: PT. Sanindo Multi Tekno


PT. SANINDO MULTI TEKNO
Wisma Buana Indah Blok A No.11
Batam Centre - Batam, Kepri – Indonesia
 : +62 778 480 7760
 : +62 877 6973 2141
 : sales@sanindotekno.com

A. General Information
Today is Friday the 10th of August 2021, we the undersigned:

We, the Inspector Team for the Installation of Grounding Panels for the Batam State Polytechnic Chemical
Laboratory Building in 2020, have conducted an inspection for the following work:

a. Project : Installation lightning protection Thomas R60 Maximum 5 ohm.


Installation of lift grounding maximum 1 ohm.
Installation of electrical grounding maximum 1 ohm
b. Location : Hotel Morena, Jodoh
c. Price : Rp. 52.000.000,_ (Fifty Two Million Rupiah).
d. Witnessed By : Hotel Morena Inspector Team
e. Execution Date : 21 July 2021
f. Commissioning Date : 24 July 2021

B. Working Process Report

.
PT. SANINDO MULTI TEKNO
Wisma Buana Indah Blok A No.11
Batam Centre - Batam, Kepri – Indonesia
 : +62 778 480 7760
 : +62 877 6973 2141
 : sales@sanindotekno.com

C. Grounding Measuring Result

Lightning Protection Lift Grounding Electrical Grounding

With this document we would like to hand over the application to Hotel Morena Management. Appreciate
with your cooperation.

Hotel Morena Hotel Morena


Project Leader Technician 1

____________________ ____________________
Hiangdy Tjandrasa Junaidi Nasution

Hotel Morena
Technician 2

____________________
Muhammad Helmi

PT Sanindo Multi Tekno


Project Manager

____________________
M. Taufik Hidayatullah