This document contains a hole fill calculation for the AKAMIGAS-01 well. It includes tables with calculations of hole volume, steel volume, theoretical volume, total active volume, surface loss, transfer volume, true measured depth, and cumulative volume over time from 10:00 to 19:17 hours. The purpose is to track drilling fluid volumes during the well construction process.
Original Description:
Original Title
210621 Lampiran 01 Soal Tugas Hole Fill Calculation
This document contains a hole fill calculation for the AKAMIGAS-01 well. It includes tables with calculations of hole volume, steel volume, theoretical volume, total active volume, surface loss, transfer volume, true measured depth, and cumulative volume over time from 10:00 to 19:17 hours. The purpose is to track drilling fluid volumes during the well construction process.
This document contains a hole fill calculation for the AKAMIGAS-01 well. It includes tables with calculations of hole volume, steel volume, theoretical volume, total active volume, surface loss, transfer volume, true measured depth, and cumulative volume over time from 10:00 to 19:17 hours. The purpose is to track drilling fluid volumes during the well construction process.