Field Office 1
TARGET
PROJECT TITLE PROJECT DESCRIPTION BUDGET
COMPLETION
Improvement of Old wall partitions at DSWD FO1 2nd floor Offices 1,000,000.00 31-Dec-22
Repainting of Walls and Ceiling of DSWD FO1 Building and Offices 500,000.00 31-Dec-22
Replacement of Existing Old Floor Tiles at 1st and 2nd Floor Hallway
and Offices of DSWD FO1 2,000,000.00 31-Dec-22
Improvement of Old wall partitions at DSWD FO1 2nd floor Offices 2,000,000.00 31-Dec-22
Proposed Flag Pole, Guard House, Shaded Waiting Area and walkway
Elevated Stainless Steel Flag Pole, Guard House w/
w/ lights and Light Post along DSWD Perimeter at DSWD Rosales, 2,000,000.00 20-Dec-24
CR; Led Light Posts
Pangasinan
Proposed Concrete Pavement, Drainage System w/ Parking Signs and Drainage System connected to the main drainage
Parking Paintings, Hardscape/ Landscape w/ Electrical (garden lights) System with manholes and steel/ concrete canal 2,000,000.00 20-Dec-24
at Rosales, Pangasinan covers; Landscape with Garden Soil
Proposed Top Guard and Light Post on the Perimeter Fence at DRMD
Steel Top Guard w/ Razor Wire; Led Light Posts 2,000,000.00 20-Dec-23
Warehouse Ilocos Norte
Proposed Guard House w/ CR and Waiting Shed at DRMD Warehouse Elevated One-Storey Guard House w/ Fire Safety
1,500,000.00 20-Oct-23
Ilocos Norte Equipment
Proposed Elevated Water Tank and Rain Water Collector at Ilocos Steel Framed Elevated Water Tank and Rain Water
2,500,000.00 20-Sep-24
Norte Collector w/ Complete Piping and Motor.
SCHEDULE/MILESTONE OF ACTIVITIES
FUND SOURCE
2021 2022 2023 2024 2025
CO X
MOOE X
MOOE X
MOOE X
CO X
MOOE X
MOOE X
MOOE X
CO X
CO X
MOOE X
CO X
MOOE X
CO X
CO X
CO X
MOOE X
CO X
MOOE X
CO X
CO X
CO X
CO X
CO X
CO X
CO X
CO X
CO X
CO X