The document outlines the requirements for a tenderer's technical proposal for the Indore Metro Rail Project Package IN-02. It states that the technical proposal must comply with the employer's requirements and demonstrate the intended design and construction methodology. It lists 16 items that must be included in the technical proposal, such as the construction methodology, structural materials, geotechnical investigation, foundations, stations structural components, proposed piling methodology, traffic management plan, and more. The proposal must provide details on how the tenderer intends to approach key aspects of the project's design and construction.
The document outlines the requirements for a tenderer's technical proposal for the Indore Metro Rail Project Package IN-02. It states that the technical proposal must comply with the employer's requirements and demonstrate the intended design and construction methodology. It lists 16 items that must be included in the technical proposal, such as the construction methodology, structural materials, geotechnical investigation, foundations, stations structural components, proposed piling methodology, traffic management plan, and more. The proposal must provide details on how the tenderer intends to approach key aspects of the project's design and construction.
The document outlines the requirements for a tenderer's technical proposal for the Indore Metro Rail Project Package IN-02. It states that the technical proposal must comply with the employer's requirements and demonstrate the intended design and construction methodology. It lists 16 items that must be included in the technical proposal, such as the construction methodology, structural materials, geotechnical investigation, foundations, stations structural components, proposed piling methodology, traffic management plan, and more. The proposal must provide details on how the tenderer intends to approach key aspects of the project's design and construction.
Annexure – 1 to ITT: Requirements for Tenderer's Technical Proposals
“Package IN-02” Instructions to Tenderers Annexure – 1 [As per clause 4.2.2 f and 4.6] Requirements for Tenderer's Technical Proposals 1 The Tenderer's attention is drawn to the Employer's Requirements and General Conditions of Contract in which terms are defined. 2 The Tenderer's Technical Proposals shall comply, or subject to reasonable development, be capable of complying with the Employer's Requirements in all respects. The Tenderer's Technical Proposals shall demonstrate compliance. The Tenderer's Technical Proposals shall confirm intended design and construction methodology. 3 The Tenderers Technical Proposal shall include: 3.1 Construction methodology; 3.2 Structural materials to be used; 3.3 Construction plant and equipment to be used; 3.4 Structural Arrangement including clearances and principal dimensions; 3.5 Geotechnical investigation and testing to be undertaken; 3.6 Earthworks, slopes, protective measures and ground drainage; 3.7 Foundations, substructure and superstructure elements for viaduct structures and stations structures. 3.8 Stations structural components, methods for construction, formwork, scaffolding, waterproofing, drainage and corrosion protection; 3.9 Proposed piling methodology; 3.10 Structural and construction interfaces with adjacent contracts; 3.11 Architectural concept drawings and materials specifications for various items of architectural works 3.12 Concept and methodology for procurement, installation, testing and commissioning of Electrical, HVAC, Fire Protection and PHE works 3.13 Traffic management plan including temporary diversions; 3.14 Initial settlement assessment, effect on adjacent structures including utilities and proposed protection works including instrumentation and monitoring; 3.15 Stakeholder interface management; 3.16 Reinstatement works.