NORTH-SOUTH COMMUTER RAILWAY PROJECT (CP01)

Elevated Structures 6 Stations and Depot


Boom Truck, Mobile & Crawler Crane Commissioning Checklist

Project Site: Site No.: 30 Emergency Stops Buttons/Levers.


Subcontractor: JV: IV. Operation Inspection
Equipment: Site Equipment No.: 31 All Lights and Indicators working
Model No.: Date Commissioned: Hazard & Beacon Warning Lights
32
working
Responsible Person: Contact No.:
33 Horns
S. Compliance Remarks 34 Backup/Reverse Alarm working
No Items to be Checked 35 Brakes in 100% working Condition
Y N N/A Comments Gears / Forward & Reverse
. 36
working
I. Documentation
All Hydraulic Systems working
1 Driver/Operator Certificate Validity: 37
appropriate
2 Equipment Registration Validity:
Rotating Parts appropriate
Equipment 3rd Party Certificate 38
3 Validity: greased/protected
(Load Test)
39 Limit Switch working
4 Equipment Manual
40 Out Riggers fully working
II. Equipment Walkaround Inspection
41 Load Moment Indicator
5 Equipment Cleanliness
6 Safety Guards
7 Access Ladders and Handrails
V. Road Emergency Kits
Decals and Labels (SWL 42 Fire Extinguisher valid
8 43 Spare Tire
markings)
9 Anemometer 44 Triangle
10 Anti-Two Block Device
11 Boom/Jibs 45 First Aid Kits
12 Wire Ropes 46 Tire Chocks
13 Hooks (main and headache ball) 47 Basic Tool Kits
14 Safety Latch for hooks VI. Others
15 Counter Weights Rigger Equipped with basic
48
16 Tire/Wheel/Track Conditions signaling tools?
17 Leaks (fuel, oil, lubes, water) VII. General Notes
Levels (engine, hydraulic oils,
18
coolant & brake fluids)
Base Plates/Pads Available and in
19
Safe condition.
220 Holding Pins
III. Operator Cabin
21 Equipment Load Chart
22 Gauges
23 Operator Visibility (No curtains,
Windows not broken & clean)
24 Cockpit Warning and Indicator
Lights
25 Controls (Visible defects) Contractor Name Signature
26 Seatbelts working In-charge:
27 Doors working properly
28 Side & Rear Mirrors in Good Condition TDJV Name Signature
29 Safety Devices (Latches etc.) HSE Advisor: