Document title: PROCEDURE FOR RESISTANCE WELDING

Vidar Jenssen
Author(s):

Prod No. Orig. Disc. Type Seq. no.


Page: 1 of 8
Roxar doc. No.: 656 - 16959 - R - PY - 0071

Client doc. No.: Client rev. No.: Attachment: NA

Tag No.:

P.O. No. (contract No.): Roxar Ref. No.: System code: SDRL code: Area/Location:

Clients approval: q Not accepted, revise and resubmit Sign.:


¨ Not for client approval q Issued for information
q Accepted with comments. Interface frozen. Date:
q Accepted
q Accepted with comments
Internal Rev.: Date: Made by: Checked by: Approved by:
approval: 01 2008-12-03 Vidar Jenssen Erling holten Viken Inge Hagedal

Reason for issue: Issued for use


Roxar ASA
Document title: Procedure for Resistance Welding Rev.: 01
Our doc. No.: 656- 16959 - R - PY - 0071 Page: 2 of 8
Client doc. No.: Date: 2008-12-03

Table of contents:

1 SCOPE 3
2 REFERENCES 3
3 RESPONSIBILITY 3
4 SAFETY 3
5 PROCEDURE FOR WELDING WITH SPOT WELDER TO CURRENT FEEDING CABLE 4
5.1 Purpose 4
5.2 Validity 4
6 METHOD 4
6.1 Purpose 4
6.2 Validity 4
6.3 Welding Description 4
6.4 Operation Qualification Test 6
7 LOCATION OF ELECTRODES 7
Roxar ASA
Document title: Procedure for Resistance Welding Rev.: 01
Our doc. No.: 656- 16959 - R - PY - 0071 Page: 3 of 8
Client doc. No.: Date: 2008-12-03

1 SCOPE

This procedure describes the resistance welds that are performed as part of the FSM
corrosion monitoring system installation. The objective for this procedure is to ensure that the
welds are performed correctly to ensure a sound weld between the current feeding cables
and the current feeding points.

The current feeding points are 6mm studs that are welded to the monitored structure. This is
described in a separate welding procedure specification [3].

Resistance welding is considered to be a special process, ref. NS ISO 9001.

The welding specification as described is defined in the standard EN ISO 15609-5:2004 [1].

Note: The current feeding points are not load bearing welds, hence no WPS or WPQR
as specified in the standard is produced.

2 REFERENCES

[1] EN ISO 15609-5:2004 - Specification and Qualification of Welding Procedures


for Metallic Materials, Welding Procedure Specification, Part 5: Resistance
Welding
[2] User manual Spot Welder type SIP Professional Spotmatic P2PT
[3] 650-16959-R-PY-0010 Procedure for Stud Welding
[4] B-1340 Procedure for Personell Safety
[5] F641-16959-V-XG-1063 6mm Stud Machining
[6] F641-16959-V-XG-1064 Ferrule Machining
[7] F641-16959-V-XG-1065 Ferrule and Cable Assembly
[8] F641-16959-V-XG-1042, Ref. Plate and Matrix Assembly FSM-IT/LOG

3 RESPONSIBILITY

The responsibility for execution of all work regarding this procedure lies with Roxar ASA.

Roxar ASA will keep complete records of qualifications and test forms related to procedures
for FSM installations. These documents will be part of the “as built” documentation.

4 SAFETY

Only personell trained and/or qualified by Roxar ASA shall perform the welding as described
in this procedure.

Records of such training and qualification shall be maintained by Roxar ASA.


Roxar ASA
Document title: Procedure for Resistance Welding Rev.: 01
Our doc. No.: 656- 16959 - R - PY - 0071 Page: 4 of 8
Client doc. No.: Date: 2008-12-03

For general safety guidelines, see Roxar HES procedure B-1340 [4].

5 PROCEDURE FOR WELDING WITH SPOT WELDER TO


CURRENT FEEDING CABLE

5.1 Purpose

The purpose of this procedure is to ensure that the equipment used for resistance welding
(SIP Professional Spotmatic P2PT) is used in such a way that the weld is good and solid.

The weld is performed between a ferrule [6] that is soldered to the cable ends [7] and a
Ø6mm split stud [5]. The weld must ensure good and lasting electrical connection.

5.2 Validity

This procedure is valid for all qualified personell using the spot welder for welding where this
procedure is specified. Spot welder to be used is SIP Professional Spotmatic P2PT.

6 METHOD
6.1 Purpose

The purpose of this section is to describe welds to be performed between the current
excitation and the current excitation studs on the FSM system. The purpose of the welds is to
ensure good and lasting electrical contact between these items.

The procedure shall secure that the spot-welder is used in such a way that good welds are
achieved between the Ø6mm machined stud and the cable soldered ferrule.

6.2 Validity

This procedure is valid for all qualified persons using the spot-welder for welding where this
procedure is specified. Spot-welder to be used is type M22.

6.3 Welding Description

• Check the function of the welder and make sure electrodes are completely clean.
• Place the Ferrule into the slot in the stud according to figure 5. Note that cable ferrule
shall be horizontal and not vertical as it is shown.
• Adjust the welder with the pieces to be welded as shown in figure 2. The distance D
shall be 40mm.
• Adjust the welding time to 0,7 seconds.
Roxar ASA
Document title: Procedure for Resistance Welding Rev.: 01
Our doc. No.: 656- 16959 - R - PY - 0071 Page: 5 of 8
Client doc. No.: Date: 2008-12-03

• Connect the welder to main power.


• Each stud are welded 2 times, first weld in center of stud, second weld near top of
stud.
• Weld by pressing down the handle and keep it pressed down for 1 second after the
welding has ended. See figure 3.
• Check the weld visually against figure 4. Note that ferrule shall be horizontal and
have to welding spots towards one stud. The weld shall show good adhesive with
little or no deformation of the ferrule and stud.
Roxar ASA
Document title: Procedure for Resistance Welding Rev.: 01
Our doc. No.: 656- 16959 - R - PY - 0071 Page: 6 of 8
Client doc. No.: Date: 2008-12-03

Figure 2

6.4 Operation Qualification Test

The quality of the concrete weld is verified manually by bending the ferule 10 degrees in two
directions.
All welds are subjected to resistance measurements in accordance with procedure F656-
16959-I-PF-0070 FSMLog Installation Procedure.
Roxar ASA
Document title: Procedure for Resistance Welding Rev.: 01
Our doc. No.: 656- 16959 - R - PY - 0071 Page: 7 of 8
Client doc. No.: Date: 2008-12-03

7 LOCATION OF ELECTRODES

Figure 3
Roxar ASA
Document title: Procedure for Resistance Welding Rev.: 01
Our doc. No.: 656- 16959 - R - PY - 0071 Page: 8 of 8
Client doc. No.: Date: 2008-12-03

Figure 4

Figure 5