1 General ............................................................................................................... 3
2 Nominal pressure PN for pipe classes, flanges and valves .......................... 5
3 Materials and material certificates ................................................................... 6
4 Dimensions ........................................................................................................ 6
5 Selection of piping materials and valves ........................................................ 9
6 Connections ....................................................................................................... 9
7 Erection ............................................................................................................ 11
8 Marking of pipelines ........................................................................................ 13
9 Documents ....................................................................................................... 14
10 Inspections and testing ................................................................................ 14
1 General
1.1 Purpose
All piping shall follow the laws, rules, regulations and standards given by the
authorities of Czech Republic.
Other standards may be used after separate agreement with the Purchaser.
The Contractor must not change materials, dimensions etc. without permission in
writing from the Purchaser.
Detailed piping specifications, materials and dimensions of the pipes and pipe fittings
are presented in Piping Standards 13, Parts 13.02 and 13.03.
Nominal pipe Carbon and Stainless Steel PE, PVC Piping GRP Piping
and Piping
flange size D = Outer diameter dn = Outer diameter dn = Inner diameter
DN DN/ D DN=dn DN=di
6 10.2
8 13.5
10 17.2 16 (10)
15 21.3 20 (15)
20 26.9 25 (20)
25 33.7 32 (25)
32 (42.4) 40 (32)
40 48.3 50 (40)
50 60.3 63 50
65 (76.1) 75 (65)
80 88.9 90 80
100 114.3 110 100
(125)
125 (139.7) 140 (125)
150 168.3 160 150
(180)
200 219.1 200 200
(225)
250 273 250 250
(280)
300 323.9 315 300
350 355.6 355 350
400 406.4 400 400
450 (457)
500 508 (450) 500
500
600 610 (560) 600
630
700 711 710 700
800 813 800 800
900 914 900 900
1000 1016 1000 1000
1200 1220 1200 1200
Note: Diameters given in parenthesis should be avoided
The applied wall thickness for each pipe class is given in Piping Standards 13,
Parts 13.02 and 13.03.
1.6 Nominal sizes of carbon steel, stainless steel, PE, PVC, precision and
glass reinforced plastic (GRP) piping
The nominal size DN of carbon steel, stainless steel, PE, PVC and precision piping is
relating to the outside diameter of the piping.
Nominal pressures to be used in pipe class designations are PN 0, 6, 10, 16, 25, 40,
63, 100, 160 and 250.
Nominal pressure classes to be used for pipe flanges are PN 10, 16, 25, 40, 63, 100,
160 and 250 according to EN 1092-1.
For all flange connections the minimum dimension (e.g. drilling pattern) shall be
according to EN 1092-1 PN 10.
Nominal pressures for valves are PN 6, 10, 16, 25, 63, 100 and 250.
Note:
The valves may be for lower pressure (e.g. slide valves for 400 kPa) but the flange
drilling must be at least according to PN 10 or it can be assembled between PN 10
flanges as wafer.
The selection of materials for different flow substances shall be according to Piping
Standard 13.01.01 Technical Specifications for Flow Substances, Piping and Valve
Type Selection.
All materials shall be certified. The Contractor shall furnish material inspection
certificates to prove conformity to specifications.
Material inspection certificates for nuts and bolts shall be according to EN 10204 2.2
when temperature < 300 ºC. At higher temperatures and when nominal pressure of
pipe class is PN 63 or over the material inspection certificates shall be according to
EN 10204 3.1.
4 Dimensions
The carbon and stainless steel pipes shall be according to ISO dimension series.
Pipes
- P235GH (1.0345) according to EN 10216-2, EN 10217-2 + A1 and
EN10217-5 + A1
Pipe fittings
- P235GH (1.0345) EN 10253-2
Dimensions for each piping component in the pipe classes are presented in Piping
Standard 13.03 Carbon Steel Piping.
The primary piping materials for austenitic steel piping are 1.4307 and 1.4404
according to EN 10217-7.
The pipes shall be according to EN 10217-7 and the pipe fittings shall be according
to EN 10253-4.
Wall thickness shall be according to ISO series 1.6, 2.0, 2.6, 3.2, 4.0, 5.0, 6.3, 8.0,
10.0 12.5 etc.
DN Wall thickness, mm
Stainless steel pipes and piping components are specified in Piping Standard 13.02
Stainless Steel Piping.
The pipes shall be according to EN 10217-7 and the pipe fittings according to EN
10253-4.
Wall thickness series and minimum wall thicknesses in point 5.2 shall be used.
Austenitic-ferritic stainless steel pipes and pipe fittings are specified in Piping
Standard 13.02 Stainless Steel Piping.
Material for stainless steel piping shall be 1.4404 according to EN 10272 or equal.
Steel tubes suitable for welding and threading are according to standard EN 10255 +
A1:2007, medium series.
Tubes shall be according to EN 10305, material S235G2T, electro zinc plated except
in wet areas where hydraulic piping must be of stainless steel grade 1.4404.
Outside diameter series shall be 6, 8, 10, 12, 14, 15, 16, 18, 20, 22, 25, 28, 30, 32,
35, 38, 40 and 42.
The piping materials and valves shall be selected according to Piping Standard
13.01.01 Technical Specifications for Flow Substances, Piping and Valve Type
Selection.
6 Connections
6.1 General
Valves with weld ends shall not to be welded straight together. An intermediate pipe
shall be used.
Branch connections shall be used instead of tee pieces as far as the pressure
strength allow. Special care shall be taken concerning supporting of the pipelines to
avoid fatigue of the branches due to the vibrations of pipelines.
Branches under dynamic loads (especially small bore piping DN 50) shall be
reinforced with plates and or with supporting flat bars to avoid fatigue failures of the
branches.
Tee piece shall be always used when the reinforcing plate of the branch is not
sufficient for the strength. For more details see Piping Standards 13, Parts 13.02 and
13.03.
Bolts, nuts, washers and gaskets to be used for each pipe class are specified in the
Piping Standards 13, Parts 13.02 and 13.03.
Electro zincked carbon steel bolts, nuts and washers shall be used for insulated
steam and condensate piping. The coating shall be about 16 µm.
Hot dip galvanized bolts, nuts and washers shall be used for flanges and supports of
stainless steel process piping. Zinc coating thickness of hot dip galvanized surfaces
shall be about 60 µm.
Strength class for dip galvanised bolts shall be 8.8 and for nuts 8.
For corrosive areas stainless steel bolts and nuts of A4-70 shall be used.
Bolts and nuts shall be according to ISO 4014 and ISO 4032.
6.3 Gaskets
Dimensions of the gaskets shall be according to EN 1514-1 type IBC. High pressure
or high temperature applications spiral wound gaskets according to EN 1514-2.
Gasket material shall be selected according to the flow substance.
See Piping Standard 13.01.01 Technical Specifications for Flow Substances, Piping
and Valve Type Selection.
Hot dip galvanized primary supports (e.g. sliding shoes) shall generally be used for
stainless steel piping. Clamps for stainless steel piping shall be of stainless steel.
Piping shall be supported so that the pipes do not break or move in any temperature
conditions during the water pressure testing and operation.
Lugs on fix points can, however, be welded on the pipe, but the lugs shall be of the
same material as the pipe.
Piping shall be supported so that when valves or other armatures are removed, the
pipes do not have to be supported separately. This means that the piping shall
always be supported on both sides of valves and other corresponding component.
Piping shall be supported so that flanges of pumps and other equipment are not
loaded due to piping.
Piping shall be supported so that bending and/or torsion loads due to piping do not
affect the valves.
7 Erection
7.1 Welding
The Contractor shall be responsible for the welding work performed including the
sub-Contractors. The procedures and equipment shall be of a high standard and the
personnel must be qualified and certified.
Personnel carrying out the pre-fabrication and site welding, shall be subject to
performance qualification testing in order to check their practical ability to make good
welding under the site conditions.
All welding work shall fulfil the CEN and local regulations and the requirements of the
inspection agency. In addition all further requirements stipulated individually must be
followed.
The Contractor shall present records of approved welders with identification marks to
the Purchaser before the welding work may be started.
The Contractor shall hand over the welding procedure specifications (WPS)
according to EN ISO 15609 and qualifications of welding procedure specifications
(WPQR) in accordance with EN ISO 15613 or EN ISO 15614 to the Purchaser for
approval before starting the welding work.
Joint forms in EN 1708-1 shall be used for piping. Recommendations for joint
preparation in EN ISO 9692-1 shall be followed.
Welding shall be performed under suitable conditions for the welding method. The
welding equipment in use shall be in good condition to meet quality requirements.
All surfaces to be welded shall be properly cleaned before welding. Foreign materials
such as paint, zinc plating, rust, oil, etc. shall be removed up to a distance of 40 mm
from the welding point. Stainless steel can be cut only with grinding machine.
When stainless and duplex steel pipes shall be welded, purging gas (backing gas)
shall be inside the pipe at the weld root to keep out it from oxidizing.
Each welding joint shall be immediately after welding marked with the individual
identification mark of a welder.
7.2 Cleaning
Welds shall be smooth on the inside surfaces of the piping. Smoothness shall be
inspected and tested visually.
All welding seams of stainless steel piping and the pipe surface near them shall be
pickled and passivated.
This means that the common oxidation surface caused by the welding heat shall be
removed by brushing with a brush made of a material equal to the piping material,
e.g. stainless steel wire. The cleaned surface shall then be treated with pickling and
passivating agent, which forms a chromium oxide surface to protect the surface
against corrosion.
If not otherwise agreed or if the authorities do not require more, the welded seams on
steel piping shall be of X-ray acceptance level 2 of EN ISO 10675-1 without root
defect.
The quality of welds in piping shall comply with EN ISO 5817, Quality level C.
However, the quality of welds in high pressure (pressure higher than 40 bar, e.g.
Steam and Condensate 9.4 MPa (g) and 2.5 MPa (g)) piping shall comply with EN
ISO 5817, Quality level B.
The quality of welds in secondary supports shall fulfil EN ISO 5817, Quality level D.
The Contractor shall provide the Purchaser with quality control instructions regarding
the manufacturing and welding of piping, which the Purchaser has a right to
supervise to the extent regarded necessary.
The Purchaser will verify the quality of seams by non-destructive or destructive spot-
examination. For destructive examination, the Purchaser can remove some welds at
the Purchaser's expense. It is the duty of the Contractor to replace these welds.
If faults are found in welds, the Contractor shall correct them. In addition to every
faulty weld that has been detected, the Contractor shall at his own expense make
radiographic examination of two other similar welds chosen by Purchaser.
If one of these welds is rejected, four new welds shall be examined. Should one of
these welds be rejected, all the actual welder's welds shall be examined, and the
welder himself be subject to renewed performance qualification.
If any weld is rejected, and the welder's identification mark cannot be found, the
examination shall be extended to 4 additional welds.
All extended examination, repairs and re-examination shall be carried out at the
expense of the Contractor.
8 Marking of pipelines
Pressure vessel piping and other piping subject to the approval from the authorities
shall be marked according to the authorities' requirements, and they shall at least be
marked with the following data:
All other piping shall be marked with at least material quality and identification for
traceability to material certificates when needed.
The stainless steel piping shall also be marked over the whole length of the pipe. The
marking shall be made by the Contractor / manufacturer prior to shipment.
Marking of the piping with flow indications and flow substance marking etc. shall be
done according to Piping Standard 13.01.04 Marking of Equipment and Pipelines.
The insulated pipes shall be marked on the cladding by the insulation contractor.
9 Documents
The Contractor is responsible for taking care that the piping fulfils the prevailing laws
in Czech Republic. The Contractor shall also make all calculations, design and
necessary manufacturing drawings and submit them to the authorities for approval.
Piping drawings, piping specifications and erection instructions shall fulfil the
Purchaser's requirements.
10.1 General
The Purchaser reserves the right to perform any tests and inspections to the piping at
his own expense and on request, to check results of inspections made by the
Contractor.
The Purchaser's representative shall have the right for free access to the Contractor's
workshop and pre-fabrication and erection site to inspect the progress of the work
and the quality.
The above-mentioned measures do not free the Contractor from the responsibility
concerning quality and timing of the work.
The Contractor's responsibility is to repair all faults found in the inspections at his
own expense. In case the inspection has required the dismantling of completed work
and the fault has been found, the Contractor is responsible for all expenses due to
these measures.
10.2 Authorities
The Contractor is responsible for taking care of all licences, inspections, non-
destructive testing for welds and all documents needed.
The Contractor shall take care of all material certificates needed for the inspection
made by the authorities and when required certify all delivered materials by material
certificates.