Measurement and Documentation CON4110

Week No. 7

「 --- 1 「 一一- -,
250 x250 Column
」 』」 L_

A
ODD盯

h四. .

. 250 x 500 Ground Beam


戶可 「

5000

PLAN
250x500 GR口UND BEAM

150mm conc. bedding


150mm H.C.

¥2f
SECT I口N "A-A"
N口TE :- 1. ALL STRUCTURAL CONCRETE TO BE REFORCED CONCRETE. Gr. 20/20
2. CONCRETE TO BLINDING LAYER & GROUND FLOOR BEDDING
TO BE PLAIN CONCRETE GR. 15/20
3. SAWN FORMWORK TO BE USED

4. l50MM THICK CONCRETE RUBBLE HARDCORE BED LEVEL AND


BLIND SURFACE W汀H FLY ASH AND COVERED W汀H ONE LAYER
OF 0.08MM POLYTHENE SHEET INCL, LAP150MM

Substructure Works with Pad Foundation


Drawing no: 7A
Measurement of Substructure Works with Pad Foundation
﹛Ref: Dwo Nos. l可14.φ.1'. )

Int「oduction: This example involves the taking off of substructure works including pad foundation and
ground beam.
Steel bar reinforcement is also included and is measured from the reinforcement
schedule provided.
Students shall note the application of “measurement ove「all and then deduct wants and

voids in the surface excavation.

Approach: M立也旭 趴削武也


excavation.and backfill excavated materials
- Pit excavation 十

Excavate
Backfill
- Foundation
Blinding Jaye「
Adjustment of backfill occupied by the blinding
Disposal of spoil
Sawn formwork
Reinforcement
Pad foundation
Adjustment of backfill occupied br the pad
Disposal of spoil
- RC. Colum n
Sawn formwork
Reinforcement
Concrete

Adjustment of backfill occupied by the c lumn
Disposal of spoil
- Trench for ground beam
Excavation
Backfill
- RC. beam
Blinding laye「
Adjustment of backfill occupied by the blinding
Disposal of spoil
Sawn formwork
Reinforcement
Concrete
Adjustment of backfill occupied by the beam concrete
Disposal of spoil
- Ground floor bed
Ha吋core
DPM
Concrete
Adjustment of backfill occupied by hardco「e

SMM rules:

1. Su「face excavation not exceeding 200mm average depth shall be given SUPER stating the
ave『age thickness. ( )
2. Excavate ove「site to reduce level exceeding 200mm average depth shall be give門 CUBE.(.

3. 250 mm working space shall be allowed for in the excavation from the face of concrete requiring
formwork where the fa 『mwork does not exceed 600 mm. ( )
4. 600 mm working space shall be allowed fa「in the excavation from the face of conc「ete requi 『ing
。 。
formwork where the formw rk exceeds 600 mm··and the bottom f the formwork exceeds 600 mm
below the starting point of excavation. ( )