Project Title Drawing Title Sub Contractor Chainage General Notes Depth Colour Legend Drawing No.

Drawn By
ASM-CJ-SRV-DWG-001-21 RMD

PT. ANUGERAH SAMUDERA MADANINDO 1. Surface positioning by Ashtec ABX-800 RTK Glonass GPS Horizontal Scale Checked By
Central Java IPP Project 2. Sounding acquired by Knudsen 320M Singlebeam ES
1:500 CNK

Cross Section Intake Contractor


CH1410-1420
3. Depth are referenced to Mean Sea Level (MSL)
4. Coastline detail are indicative only
Pre-Survey
Vertical Scale Approved By
2x1000 MW Coal Fired 5. All measurement are in metres and decimeters below MSL Design

Area 6. Coordinates are in DGN95


Pro-Survey
1:200 FMA

Power Plant WAKACHIKU Survey Date Surveyed By

7 May 2021 ASM


Project Title Drawing Title Sub Contractor Chainage General Notes Depth Colour Legend Drawing No. Drawn By
ASM-CJ-SRV-DWG-001-21 RMD

PT. ANUGERAH SAMUDERA MADANINDO 1. Surface positioning by Ashtec ABX-800 RTK Glonass GPS Horizontal Scale Checked By
Central Java IPP Project 2. Sounding acquired by Knudsen 320M Singlebeam ES
1:500 CNK

Cross Section Intake Contractor


CH1430-1440
3. Depth are referenced to Mean Sea Level (MSL)
4. Coastline detail are indicative only
Pre-Survey
Vertical Scale Approved By
2x1000 MW Coal Fired 5. All measurement are in metres and decimeters below MSL Design

Area 6. Coordinates are in DGN95


Pro-Survey
1:200 FMA

Power Plant WAKACHIKU Survey Date Surveyed By

7 May 2021 ASM


Project Title Drawing Title Sub Contractor Chainage General Notes Depth Colour Legend Drawing No. Drawn By
ASM-CJ-SRV-DWG-001-21 RMD

PT. ANUGERAH SAMUDERA MADANINDO 1. Surface positioning by Ashtec ABX-800 RTK Glonass GPS Horizontal Scale Checked By
Central Java IPP Project 2. Sounding acquired by Knudsen 320M Singlebeam ES
1:500 CNK

Cross Section Intake Contractor


CH1450-1460
3. Depth are referenced to Mean Sea Level (MSL)
4. Coastline detail are indicative only
Pre-Survey
Vertical Scale Approved By
2x1000 MW Coal Fired 5. All measurement are in metres and decimeters below MSL Design

Area 6. Coordinates are in DGN95


Pro-Survey
1:200 FMA

Power Plant WAKACHIKU Survey Date Surveyed By

7 May 2021 ASM


Project Title Drawing Title Sub Contractor Chainage General Notes Depth Colour Legend Drawing No. Drawn By
ASM-CJ-SRV-DWG-001-21 RMD

PT. ANUGERAH SAMUDERA MADANINDO 1. Surface positioning by Ashtec ABX-800 RTK Glonass GPS Horizontal Scale Checked By
Central Java IPP Project 2. Sounding acquired by Knudsen 320M Singlebeam ES
1:500 CNK

Cross Section Intake Contractor


CH1470-1480
3. Depth are referenced to Mean Sea Level (MSL)
4. Coastline detail are indicative only
Pre-Survey
Vertical Scale Approved By
2x1000 MW Coal Fired 5. All measurement are in metres and decimeters below MSL Design

Area 6. Coordinates are in DGN95


Pro-Survey
1:200 FMA

Power Plant WAKACHIKU Survey Date Surveyed By

7 May 2021 ASM


Project Title Drawing Title Sub Contractor Chainage General Notes Depth Colour Legend Drawing No. Drawn By
ASM-CJ-SRV-DWG-001-21 RMD

PT. ANUGERAH SAMUDERA MADANINDO 1. Surface positioning by Ashtec ABX-800 RTK Glonass GPS Horizontal Scale Checked By
Central Java IPP Project 2. Sounding acquired by Knudsen 320M Singlebeam ES
1:500 CNK

Cross Section Intake Contractor


CH1490-1500
3. Depth are referenced to Mean Sea Level (MSL)
4. Coastline detail are indicative only
Pre-Survey
Vertical Scale Approved By
2x1000 MW Coal Fired 5. All measurement are in metres and decimeters below MSL Design

Area 6. Coordinates are in DGN95


Pro-Survey
1:200 FMA

Power Plant WAKACHIKU Survey Date Surveyed By

7 May 2021 ASM


Project Title Drawing Title Sub Contractor Chainage General Notes Depth Colour Legend Drawing No. Drawn By
ASM-CJ-SRV-DWG-001-21 RMD

PT. ANUGERAH SAMUDERA MADANINDO 1. Surface positioning by Ashtec ABX-800 RTK Glonass GPS Horizontal Scale Checked By
Central Java IPP Project 2. Sounding acquired by Knudsen 320M Singlebeam ES
1:500 CNK

Cross Section Intake Contractor


CH1510-1520
3. Depth are referenced to Mean Sea Level (MSL)
4. Coastline detail are indicative only
Pre-Survey
Vertical Scale Approved By
2x1000 MW Coal Fired 5. All measurement are in metres and decimeters below MSL Design

Area 6. Coordinates are in DGN95


Pro-Survey
1:200 FMA

Power Plant WAKACHIKU Survey Date Surveyed By

7 May 2021 ASM


Project Title Drawing Title Sub Contractor Chainage General Notes Depth Colour Legend Drawing No. Drawn By
ASM-CJ-SRV-DWG-001-21 RMD

PT. ANUGERAH SAMUDERA MADANINDO 1. Surface positioning by Ashtec ABX-800 RTK Glonass GPS Horizontal Scale Checked By
Central Java IPP Project 2. Sounding acquired by Knudsen 320M Singlebeam ES
1:500 CNK

Cross Section Intake Contractor


CH1530-1540
3. Depth are referenced to Mean Sea Level (MSL)
4. Coastline detail are indicative only
Pre-Survey
Vertical Scale Approved By
2x1000 MW Coal Fired 5. All measurement are in metres and decimeters below MSL Design

Area 6. Coordinates are in DGN95


Pro-Survey
1:200 FMA

Power Plant WAKACHIKU Survey Date Surveyed By

7 May 2021 ASM


Project Title Drawing Title Sub Contractor Chainage General Notes Depth Colour Legend Drawing No. Drawn By
ASM-CJ-SRV-DWG-001-21 RMD

PT. ANUGERAH SAMUDERA MADANINDO 1. Surface positioning by Ashtec ABX-800 RTK Glonass GPS Horizontal Scale Checked By
Central Java IPP Project 2. Sounding acquired by Knudsen 320M Singlebeam ES
1:500 CNK

Cross Section Intake Contractor


CH1550-1560
3. Depth are referenced to Mean Sea Level (MSL)
4. Coastline detail are indicative only
Pre-Survey
Vertical Scale Approved By
2x1000 MW Coal Fired 5. All measurement are in metres and decimeters below MSL Design

Area 6. Coordinates are in DGN95


Pro-Survey
1:200 FMA

Power Plant WAKACHIKU Survey Date Surveyed By

7 May 2021 ASM


Project Title Drawing Title Sub Contractor Chainage General Notes Depth Colour Legend Drawing No. Drawn By
ASM-CJ-SRV-DWG-001-21 RMD

PT. ANUGERAH SAMUDERA MADANINDO 1. Surface positioning by Ashtec ABX-800 RTK Glonass GPS Horizontal Scale Checked By
Central Java IPP Project 2. Sounding acquired by Knudsen 320M Singlebeam ES
1:500 CNK

Cross Section Intake Contractor


CH1570-1580
3. Depth are referenced to Mean Sea Level (MSL)
4. Coastline detail are indicative only
Pre-Survey
Vertical Scale Approved By
2x1000 MW Coal Fired 5. All measurement are in metres and decimeters below MSL Design

Area 6. Coordinates are in DGN95


Pro-Survey
1:200 FMA

Power Plant WAKACHIKU Survey Date Surveyed By

7 May 2021 ASM


Project Title Drawing Title Sub Contractor Chainage General Notes Depth Colour Legend Drawing No. Drawn By
ASM-CJ-SRV-DWG-001-21 RMD

PT. ANUGERAH SAMUDERA MADANINDO 1. Surface positioning by Ashtec ABX-800 RTK Glonass GPS Horizontal Scale Checked By
Central Java IPP Project 2. Sounding acquired by Knudsen 320M Singlebeam ES
1:500 CNK

Cross Section Intake Contractor


CH1590-1600
3. Depth are referenced to Mean Sea Level (MSL)
4. Coastline detail are indicative only
Pre-Survey
Vertical Scale Approved By
2x1000 MW Coal Fired 5. All measurement are in metres and decimeters below MSL Design

Area 6. Coordinates are in DGN95


Pro-Survey
1:200 FMA

Power Plant WAKACHIKU Survey Date Surveyed By

7 May 2021 ASM


Project Title Drawing Title Sub Contractor Chainage General Notes Depth Colour Legend Drawing No. Drawn By
ASM-CJ-SRV-DWG-001-21 RMD

PT. ANUGERAH SAMUDERA MADANINDO 1. Surface positioning by Ashtec ABX-800 RTK Glonass GPS Horizontal Scale Checked By
Central Java IPP Project 2. Sounding acquired by Knudsen 320M Singlebeam ES
1:500 CNK

Cross Section Intake Contractor


CH1610-1620
3. Depth are referenced to Mean Sea Level (MSL)
4. Coastline detail are indicative only
Pre-Survey
Vertical Scale Approved By
2x1000 MW Coal Fired 5. All measurement are in metres and decimeters below MSL Design

Area 6. Coordinates are in DGN95


Pro-Survey
1:200 FMA

Power Plant WAKACHIKU Survey Date Surveyed By

7 May 2021 ASM


Project Title Drawing Title Sub Contractor Chainage General Notes Depth Colour Legend Drawing No. Drawn By
ASM-CJ-SRV-DWG-001-21 RMD

PT. ANUGERAH SAMUDERA MADANINDO 1. Surface positioning by Ashtec ABX-800 RTK Glonass GPS Horizontal Scale Checked By
Central Java IPP Project 2. Sounding acquired by Knudsen 320M Singlebeam ES
1:500 CNK

Cross Section Intake Contractor


CH1630-1640
3. Depth are referenced to Mean Sea Level (MSL)
4. Coastline detail are indicative only
Pre-Survey
Vertical Scale Approved By
2x1000 MW Coal Fired 5. All measurement are in metres and decimeters below MSL Design

Area 6. Coordinates are in DGN95


Pro-Survey
1:200 FMA

Power Plant WAKACHIKU Survey Date Surveyed By

7 May 2021 ASM


Project Title Drawing Title Sub Contractor Chainage General Notes Depth Colour Legend Drawing No. Drawn By
ASM-CJ-SRV-DWG-001-21 RMD

PT. ANUGERAH SAMUDERA MADANINDO 1. Surface positioning by Ashtec ABX-800 RTK Glonass GPS Horizontal Scale Checked By
Central Java IPP Project 2. Sounding acquired by Knudsen 320M Singlebeam ES
1:500 CNK

Cross Section Intake Contractor


CH1650-1660
3. Depth are referenced to Mean Sea Level (MSL)
4. Coastline detail are indicative only
Pre-Survey
Vertical Scale Approved By
2x1000 MW Coal Fired 5. All measurement are in metres and decimeters below MSL Design

Area 6. Coordinates are in DGN95


Pro-Survey
1:200 FMA

Power Plant WAKACHIKU Survey Date Surveyed By

7 May 2021 ASM