Professional Documents
Culture Documents
Malanday Depot (Occ Building) 4F Blockwall Overall Key Plan: Taisei Philippine Construction Inc
Malanday Depot (Occ Building) 4F Blockwall Overall Key Plan: Taisei Philippine Construction Inc
MATCHLINE
A
PS-5
PS-1 PS-2
400-A
STAIR 1-4F
413
OCC DIV. MANAGER ROOM
423 2700 STAIR 2-4F
OCC MALE LOCKER ROOM 414
6000
-50 -50
B
411
STOCK ROOM
422 2700 EPS-4
G
EPS-1
2750 421
-50
4F FEMALE TOILET 2 REFER TO DRAWING NO. REFER TO DRAWING NO. 412
-50
VIEWING AREA
(INSIDE) 402-A
2700 4F CORRIDOR
2700
PS-7
-50
-50 REFER TO DRAWING NO. PS-10
REFERPS-9
TO DRAWING NO. PS-8
D NSCR-CP01-61-ST20-SD-9230 NSCR-CP01-61-ST20-SD-9231
BLOW-UP PLAN (3) BLOW-UP PLAN (4)
429
6000
E
2150
DCS-1
E'
SEPARATE DRAWING:
NSCR-CP01-61-ST20-SD-9221
TO 9225
NOTE:CHB LAYOUT WILL BE ADJUSTED ON SITE ACCORDINGLY
NOTE:
FOR TRAINING ROOM REBAR DRAWING
DETAIL PLEASE REFER TO DRAWING NO.
9225-0
PROJECT NAME:
N 0 14-10-2021
PACKAGE: