I
f you’re a compliance engineer like me, I’ll bet you
spend an inordinate amount of time looking up at Dave Lorusso, Lorusso Technologies, LLC
power and phone lines. Well, I do anyway. I’ve
always found it fascinating how power and
telecommunications lines are distributed. The Elements
Many parts of the world are subject to lightning, but
However, being way up there and so exposed does telephone poles are just begging to be hit by a jolt
have its problems. The Regional Bell Operating from the blue. A direct hit to a telecommunications
Companies (RBOCs) require network equipment line will cause significant damage as energy is
vendors to pass a set of rigorous surge tests in GR- transferred down the line. If not hit directly, voltage
1089-CORE Electromagnetic Compatibility and could couple to the phone lines also transferring
Electrical Safety - Generic Criteria for Network energy down the line. Either situation is not good.
Telecommunications Equipment. Passing these tests is
a primary reason why you’ll have dial tone the next Lightning or an earthquake could knock down a tele-
time you pick up a phone. phone pole. Other natural disasters like hurricanes and
tornados can also wreak havoc on telephone poles.
GR-1089-CORE covers lightning and AC power fault The upper wires are carrying high voltage, while the
issues in 49 of its 195 pages, or more than 25% of the lower wires are for telephone service. When an
standard. From this alone you can see that the RBOCs exposed power line comes into contact with an
take this subject very seriously. The latest revision exposed telephone line, high energy is transferred.
extensively changed this section. This is known as an AC power fault in GR-1089-CORE,
or more commonly known as a power cross.

By the way, buried telecommunications and power


lines are not immune from lightning. When lightning
strikes an area where lines are buried, energy transfer
still takes place and protection is needed.

Man Made Disasters


I remember when I was working at Alcatel in
Petaluma, California (no, this is not an earthquake
story, although heavy impact is involved). Early one
Monday morning, a pick-up truck smashed into a
high-tension line tower. This accident caused about 50
kV to come into contact with about 10 kV. This event
caused the 120 VAC outlets in our building to rise to
about 600 VAC just long enough to take out half of
everything plugged in. The point here is that power
lines can also fall through man-made events. Incidents
Figure 1: Power Lines (photo by Kathy Jane King) in which vehicles hit telephone poles are quite

32 CONFORMITY ®: SEPTEMBER 2003


FEATURE

common. Sooner or later, a power line This is due primarily to economics, forming a spark gap with two pieces of
will contact a phone line and protection since it makes sense to run these lines carbon in close (3 to 6 mils) proximity.
is required. in parallel when sharing common This gap will conduct at around 600 V.
rights-of-way. Magnetic fields are One side is tied to earth and the other to
A hunter could be trying to bag a bird created by the current in power lines the circuit being protected. Impress a
on the wire and end up hitting the wire. and are significant in fault conditions. A voltage approximately greater than
Not too bright I know, but a power line phase-to-ground fault can produce large 600 V and the gap conducts, shunting
could be taken out this way and come voltages that are coupled into the the energy to earth. The major problem
into contact with a telecommunication telecommunications lines. with carbon blocks is that they degrade
line. In fact, GR-487-CORE has a with each use, and the only indication
section on firearms resistance. (See Primary Protection that they are not working is
Conformity, December 2002, for an GR-1089-CORE addresses these equipment damage.
article on this subject.) situations by presenting tests designed
to ensure network equipment remains Next comes gas tubes. These devices
A backhoe or a shovel could functional and/or safe. A first line of are sealed and rely on electrodes and a
inadvertently short out buried defense is required to minimize mixture of noble gases (argon, neon,
telecommunication lines. The transients entering network equipment. etc.). They can handle large transient
equipment has to be designed to handle This first line of defense is called currents, are inexpensive, and have a
this event without causing a fire or primary protection. GR-1089-CORE small shunt capacitance. Drawbacks
electrical hazard. Section 4 of GR- assumes that primary protection is include slow time to conduct,
1089-CORE tests for short circuits on present at a facility’s entrance. Let’s difficulty turning them off at the
telecommunications ports. take a quick look at primary end of a transient, and a high dI/dt
overvoltage protection. when switching from an insulating
Fault Conditions to a conducting state. Still, the benefits
As we’ve noted above, power lines and Carbon blocks are the oldest device outweigh the drawbacks so gas tubes
telecommunications lines are often used to protect against overvoltage in are still widely used for primary
found in close proximity of each other. telephone installations. They work by protection.

Circle Reader Service #20 or go to www.conformity.com/INFODIRECT


CONFORMITY ®: SEPTEMBER 2003 33
FEATURE www.conformity.com

Solid-state crowbar devices are used to state crowbar devices, gas discharge Number Of Samples
clamp transient voltages. They have a tubes, and metal oxide varistors. Three ports of the equipment under test
fast response time, low capacitance, and Overcurrent devices are used to (EUT) in each operating state are
high reliability. They are an excellent interrupt harmful currents, or to provide tested. This means that the battery of
choice in protecting telecommunication a high impedance to the protected tests is carried out on each of three
lines. circuits. Examples are fuses, PTCs, samples, and not that you can spread
power/line feed resistors, or flameproof the tests out once over three different
The three devices mentioned above take resistors. samples. This area of GR-1089-CORE
care of overvoltage conditions. can consume the most time. Proper test
Overcurrent conditions are sometimes How far do you go with protection? planning at this point really pays off.
handled by fuse links. Fuse links are The line has to be drawn somewhere to Try to use a lab with multiple surge
coordinated with the current carrying ensure product integrity. Telcordia generators that can perform testing
capability of primary protectors. A fuse handles this with the terms first-level around the clock.
link may be a section of 24 or 26 AWG and second-level.
wire. Fuse links are not intended to First-Level Lightning Surge And
provide a current limiting function for ● First-level - the equipment must AC Power Fault Tests
network equipment. That’s the job of survive and be functional after the
secondary protection. test. The EUT is set up to operate normally.
Proper operation is verified with
● Second-level - the equipment can be
Secondary Protection monitoring equipment. The port under
destroyed, however, prevention of fire
test is checked before and after surges.
Even with primary protection, some and electrical hazards are the goal.
Manual intervention or power cycling is
energy is going to sneak by. Section 4 not allowed when verifying the port.
of GR-1089-CORE specifically Let’s take a basic look at each level. I
Longitudinal and metallic surges are
addresses secondary protection. am not going to go into the specific
applied per the respective tables in
Secondary protection involves the use voltage and current requirements, as
Section 4 of the standard. All EUT
of overvoltage and overcurrent devices. this would be a repetition of the
operating states are verified.
An overvoltage device is used to shunt standard. I’d like to just touch on the
harmful transients away from the intent of each test. Please refer to the
Network equipment will be subject to
protected circuit. Examples are solid- standard for greater detail.
ongoing transient events. Without
primary and secondary protection, there
would be no telecommunications
network. Bellcore (now Telcordia)
developed a series of tests that go
beyond the upper voltage and current
limits equipment will normally see.
This adds margin to the test requiring a
robust piece of network equipment. The
idea is that, if a piece of network
equipment can survive the Telcordia
tests, it will survive in the field for
many years.

First-Level Intra-Building
Lightning Surge
Network equipment not connected to
outside plant does not get a waiver
when it comes to surge testing. There
are indirect effects of lightning and AC
power faults to contend with. Keep in
mind that testing is applied to all types
of telecommunications ports. It doesn’t
matter what function these paired-
conductor ports perform. 10BaseT and
100BaseT Ethernet and similar ports
must be tested. There is no second-level
intra-building lightning surge test. The
destructive forces of lightning are found
in outside plant.
Figure 2: Application of Lightning and AC Power Fault Test Voltages (Figure 4-2 from GR-1089-CORE)
Copyright  2002, Telcordia Technologies, Reprinted with Permission.

34 CONFORMITY ®: SEPTEMBER 2003


FEATURE www.conformity.com

Second-Level Intra-Building AC Power Conclusion References


Fault Tests For Customer Premises The RBOCs and interexchange carriers 1. Telcordia GR-1089-CORE
Telecommunication lines are often (IXCs) maintain their reliable networks Electromagnetic Compatibility and
found next to power lines on customer by requiring robust equipment from Electrical Safety—Generic Criteria for
premises. For this reason, the second- network equipment vendors. Section 4 Network Telecommunications Equipment
level intra-building AC power fault test of GR-1089-CORE goes a long way 2. Roland B. Standler, Protection of
is set to 120 VAC. The idea here is that towards that objective. The elements, Electronic Circuits From Overvoltages, J.
120 VAC is present through a person’s man-made disasters, and fault Wiley & Sons, 1989
home and may come into contact with conditions are anticipated and dealt 3. Dave Lorusso, “NEBS Certification –
telecommunication lines. This test with by rigorous tests. A quarter of the Design With The Customer In Mind,”
ensures that there is no fire, standard addresses lightning, short- Conformity, October 2002, pp. 12-19.
fragmentation, or electrical safety circuits, and power cross events for a
hazard. reason – these are real world events. Resources
The next time you’re looking up at
Second-Level Lightning Surge And those telephone poles, think about how 1. www.lorusso.com (Home page of
AC Power Fault Tests the telecommunication network is Lorusso Technologies, LLC,
protected.  “Your NEBS, Product Safety and
The EUT does not have to function EMC Solution”)
after this test. It must not, however,
About The Author 2. www.nebs-faq.com (Resource for
become a fire, fragmentation, or
NEBS compliance information)
electrical safety hazard. This is verified Dave Lorusso is a specialist in NEBS
by using cheesecloth as a fire indicator. design and testing. He can be reached 3. www.creepage.com (Creepage and
There is a “current-limiting protector by phone at 512-695-5871, or by e-mail clearance calculators)
test” identified in GR-1089-CORE. at dave@lorusso.com. 4. www.telcordia.com (The creator and
This test can be grouped with second- keeper of NEBS documents)
level tests because the object is the 5. www.teccor.com (Teccor Electronics,
same, no fire, fragmentation, or manufacturer of transient voltage
electrical safety hazard. suppression devices)

NEWSBREAKS
(continued from page 10) consultation period in 2002 during and users of chemicals. According to a
which interested parties were invited to recent report in electroindustry5
A New Approach To “New complete an interactive questionnaire Magazine, the Commission’s proposal
Approach” Directives? that probed for information on the will, if approved, require previously
strengths and weaknesses of the New approved chemicals to be recertified and
Approach. place “onerous” new cataloging
The Commission of the European Union requirements on downstream users of
(EU) has issued a report detailing its Further extensive consultation with both chemicals. A copy of the EU’s draft
recommendations for strengthening its the European Parliament and the EU chemical policy is available at
so-call New Approach in the formulation Council is anticipated in advance of any http://europa.eu.int/comm/enterprise/
and implementation of EU directives. legislative proposals or significant chemicals/chempol/whitepaper/reach.htm.
changes regarding the New Approach.
The Commission’s Communication Report Claiming Unfair EU
Enhancing the Implementation of the Readers who would like to view the
New Approach Directives provides an complete text of the Commission’s Trade Barriers Now On-Line
extensive analysis of the success of the Communication on its plans for
New Approach to date in facilitating the enhancing the New Approach regime As we previously reported (see
free movement of goods throughout the can do so at Conformity, August 2003), the National
EU, and provides a number of www.conformity-update.com/ Foreign Trade Council (NFTC), a
recommendations for improvements to eu-newapproach-030621.pdf. coalition of large U.S. exporting
the New Approach that would strengthen companies, has released a report
it as a legislative tool. EU Releases Draft Of Tough claiming that the European Union’s
(EU’s) regulatory system is increasingly
The New Approach Communication is New Chemicals Policy becoming an unfair barrier to trade
based on the Commission’s experience between the U.S. and the EU.
in dealing with the implementation of The Commission of the European Union
New Approach directives, consultation has released a draft of a new EU-wide (continued on page 46)
with officials involved in standardization policy on chemicals that could place
and conformity assessment, and an open The URLs in Conformity’s NewsBreaks
significant burdens on both producers expire 60 days after publication.

36 CONFORMITY ®: SEPTEMBER 2003

You might also like