Professional Documents
Culture Documents
S&WCD CSR 2020-21
S&WCD CSR 2020-21
(Rate of Item with GST are as per Joint Plant Committee as on 01/01/2020 Copy Attached Separately)
Sr.
No. Labour Unit Rate in Rs.
Machinery
Sr.No. Machinery Rates Unit Rate 2020-21
1 Excavator:- 0.90 Cum Hour in Rs
1654.00
2 Excavator:- 0.60 Cum Hour 1282.00
3 Excavator:- 0.30 Cum Hour 908.00
4 Dozer 300 HP Hour 3522.00
5 Compressor 510 CFM Hour 981.00
6 Water Tanker Hour 739.00
Tata Hitachi EX 200 with rock breaker & slope
7 compactor Hour 1935.00
Item No 1 : Excavation in all kinds of Soils & Soft murum including boulders up to 0.6
m diameter …….etc.
15 M to 250 M 9.75
15 M to 250 M 11.10
15 M to 250 M 12.45
15 M to 250 M 14.70
Item No 5 : Excavation in Hard Rock of all toughness including boulders above 0.60 m dia…..(by
control blasting methods)…….etc.
Lead in m Rate (Rs/Cum)
15 M to 250 M 18.35
15 M to 250 M 15.65
nery.
EXCAVATION & EMBANKMENT
7 Item No.7 :- Watering the embankment in proper layers Cum. 17.20 ---
by tankers including cost of water, lead of water up
to 1 km and all lifts etc. complete as
directed.
8 Item No.8:- Compaction of bank work with
vibratory Compactor to 95 % of Proctor density with Cum. 9.70 ---
a lead up to 1.00 Km. as directed.
9 Item No.9 A :- Providing cut off trench filling using
selected impervious soil directly available from
material of excavation including cost of all
materials, machinery, labour, all other operations such
as collection of soil, spreading soil in layer of specified
thickness, sorting out, breaking clods, leveling,
sectioning edges / sides, watering, compacting
each layer to density control of not less than 95 percent Cum. 48.80 2.38
or as stipulated using vibratory compactor including
cost of water etc. complete with lead up to1 km
for water and all lifts as
directed.
16.47
22.09
79.72
99.64
39.32
---
---
2.38
2.88
2.57
2.80
3.49
3.14
55.40
73.90
73.90
65.26
97.73
195.85
258.86
258.86
258.86
18.08
86.01
CONCRETE WORK INCLUDING CENTERING, UCR MASONRY, BRICK MASONRY
AND R.C.C. PIPES
CONCRETE WORKS WITH CONCRETE MIXER
DAM & ALLIED WORKS FOUNDATION & BEDDING
(A) M-10 (20 MSA) (Cement 4.4 bags/Cum) Cum 4105.20 537.53
(B) M-10 (40 MSA) (Cement 4.4 bags/Cum) Cum 4105.20 537.53
(C) M-10 (80 MSA) (Cement 4.33 bags/Cum) Cum 3987.55 537.53
23 ITEM NO. 23 :- Providing and laying in situ cement
concrete of grade M-15 of trap / granite / gneiss /
quartzite / graded metal for foundation and
bedding with Concrete Mixer including placing,
compacting, curing with an initial lead of 1 km and
all lifts etc. complete as directed.
(A) M-15 (20 MSA) (Cement 5.64 bags/Cum) Cum 4464.05 537.53
(B) M-15 (40 MSA) (Cement 5.20 bags/Cum) Cum 4301.65 537.53
(C) M-15 (80 MSA) (Cement 4.99 bags/Cum) Cum 4147.25 537.53
24 SUB & SUPER STRUCTURE
ITEM NO. 24:- Providing and laying in situ cement
concrete of grade M-15 of trap / granite / gneiss /
quartzite / graded metal for PCC with or without
surface reinforcement/ RCC concreting requiring
heavy or special type of shuttering for works of gallery,
sluice, spillway crest, spillway downstream face,
energy dissipating structures, intake structures,
training walls, piers, abutments etc. with Concrete Mixer
with shuttering and scaffolding, placing, compacting,
curing with an initial lead of 1
km and all lifts etc. complete as directed.
(A) M-15 (20 MSA) (Cement 5.64 bags/Cum) Cum 5189.45 840.22
(B) M-15 (40 MSA) (Cement 5.20 bags/Cum) Cum 5027.05 840.22
(C) M-15 (80 MSA) (Cement 4.99 bags/Cum) Cum 4875.50 840.22
25 ITEM NO. 25:- Providing and laying in situ cement
concrete of grade M-20 of trap / granite / gneiss /
quartzite / graded metal for RCC works of gallery,
sluice, spillway crest, spillway downstream face,
energy dissipating structures, intake structures,
training walls, piers, abutments, slab etc. with
Concrete Mixer including shuttering and
scaffolding, placing, compacting, curing with an initial
lead of 1 km and all lifts etc. complete as
directed.
(A) M-20 (20 MSA) (Cement 6.60 bags/Cum) Cum 5519.10 840.22
(B) M-20 (40 MSA) (Cement 6.08 bags/Cum) Cum 5329.20 840.22
26 ITEM NO. 26:- Providing and laying in situ cement
concrete of grade M-25 of trap / granite / gneiss /
quartzite / graded metal for RCC works of gallery,
sluice, spillway crest, spillway downstream face,
energy dissipating structures, intake structures,
training walls, piers, abutments, slab etc. with
Concrete Mixer including shuttering and
scaffolding, placing, compacting, curing with an initial
lead of 1 km and all lifts etc. complete as
directed.
(A) M-25 (20 MSA) (Cement 7.62 bags/Cum) Cum 5869.35 840.22
MASONRY
537.53
537.53
537.53
537.53
537.53
537.53
840.22
840.22
840.22
840.22
840.22
840.22
39 CANAL STRUCTURES
ITEM NO. 39 :- Providing and laying in situ cement
concrete of grade M-10 of trap/ granite / quartzite / graded
metal for foundation and bedding with Batching
Plant and Transit Mixer including placing, shuttering,
compacting, curing, etc. complete with
an initial lead of 1 km and all lifts as directed.
(A) M-10 (20 MSA) (Cement 4.4 bags/Cum) Cum 4591.05 876.34
(B) M-10 (40 MSA) (Cement 4.4 bags/Cum) Cum 4591.05 876.34
(C) M-10 (80 MSA) (Cement 4.33 bags/Cum) Cum 4473.40 876.34
40 ITEM NO. 40 :- Providing and laying in situ cement
concrete of grade M-15 of trap / granite / gneiss /
quartzite / graded metal for foundation and bedding by
Batching Plant & Transit Mixer including shuttering,
scaffolding, placing, compacting, curing etc. complete with
an initial lead of 1 km and all lifts as directed.
(A) M-15 (20 MSA) (Cement 5.64 bags/Cum) Cum 4949.95 876.34
(B) M-15 (40 MSA) (Cement 5.20 bags/Cum) Cum 4787.50 876.34
(C) M-15 (80 MSA) (Cement 4.99 bags/Cum) Cum 4633.15 876.34
41 ITEM NO. 41 :- Providing and laying in situ cement
concrete of grade M-15 of rap / granite / gneiss /
quartzite / graded metal for RCC works of retaining walls,
piers, abutments, etc. with Batching Plant and Transit
mixer including shuttering, scaffolding, placing,
compacting, curing etc. complete with an initial lead of 1
km and all lifts as directed.
(A) M-30 (20 MSA) for trough of aqueduct (Cement Cum 9739.80 2051.81
9.20 bags/Cum)
(B) M-30 (20 MSA) for slab (Cement 9.20 bags/Cum) Cum 9094.10 1810.52
45 ITEM NO. 45 :- Providing and laying expansion /
construction joint with 18 SWG copper plate and
shalitex expansion pad below and above the copper plate
including sealing the joint with shalitex sealing compound
including 50 x 50 x 5 mm angle frame with stainless
steel bolts etc. complete as directed. (For all slab thickness
)
47 ITEM NO. 47:- Providing and fixing G.I. sheet 24 gauges Rmt 127.60 36.49
and 22.5 cm. wide for the construction joint in R.C.C. trough
wall including cutting 15 cm. overlap, riveting the joints and
fixing in position etc. complete
as directed.
49 CENTERING ITEMS
ITEM NO.49:- Providing, erecting and laying steel
shuttering formwork and making surface suitable for
concreting including dismantling etc. complete as directed.
(A) For abutments, piers, wings, returns, etc. Sqm 420.50 175.48
(B) For RCC Solid/Deck slab/Box Cells/ Trough of Sqm 469.60 175.48
Aqueduct etc.
(C) For curved surface Sqm 504.65 210.58
50 ITEM NO.50:- Providing and erecting steel props centering
2444.15 496.86
(B) Walls of water retaining structures thinner than Cum 2472.60 401.22
1.0 m. and walls of structures thicker than 1.0 m. other
than dams and water retaining structures. (35% mortar).
(C) Dms and water retaining structures (45% mortar) Cum 2737.35 421.28
54 ITEM NO. 54 :- Providing khandki facing to the face of
masonry with pointing in C.M. 1:2 including finishing
to the required shape & slope with necessary
scaffolding, curing etc. complete with lead of 50 m. as
directed.(It is assumed that the Khandkis are of the size 20
cm x 20 cm. No mortar for jointing is taken into account,
only face pointing of joint is considered).
58 ITEM NO. 58:- Cutting rectangular grooves of size 10 cm. x Rmt 1356.95 1356.95
10 cm. in stone masonry including clearing pointing etc. to
facilitate smooth working of needles
etc. complete as directed.
59 ITEM NO. 59:- Providing and laying rough dressed cut stone Cum 6296.70 2908.33
coping 23 cm. thick in C.M. 1:5 excluding cement pointing
but including watering with lead 50
m. and all lifts etc. complete as directed.
60 ITEM NO. 60 :- Providing coal grout U.C.R. masonry in C.M. Cum 3505.20 391.87
1:3 (43% mortar) proper packing rubble and of the required
shape and quality with the coal grout at required pressure
with 50 m. lead and all lifts including scaffolding, watering
etc. complete as
directed. (Excluding formwork and staging)
61 ITEM NO. 61:- Providing and construction of a
gabion structure for retaining earth with segments of wire
crates each divided into 1.5 m compartments by cross
netting, made form 4 mm gallivanted steel wire @ 32kg per
10 sqm having minimum tensile strength of 300Mpa
conforming to IS:280 and galvanizing coating conforming
to IS:4826 woven into mesh with double twist, mesh size
not exceeding 100x100mm, filled with boulders with least
dimension of 200mm, all loose ends to be tied with 4mm
galvanized steel
wire etc. complete.
ITEM NO. 62B:- Providing B.B. masonry with Cum 697.60 76.30
conventional I.S. type bricks in Cement Mortar 1:5 in
super structure up to floor level including mild steel
reinforcement of 2 bars of 6 mm dia. placed by every 3rd
course properly bent, bounded at ends,
scaffolding, watering with lead up to 50 m. and all
lifts including cost of materials etc. complete as
directed.
63 PIPE LAYING
ITEM NO. 63 :- Laying and jointing R.C.C. pipe of NP2
class or IRC standard in C.M. 1:2, proportion by
volume including cost of all materials (excluding pipes and
collars), labour, aligning pipes, batching and mixing
mortar, packing joints with hemp and mortar, finishing,
curing with lead up to 50 m and all lifts etc. complete as
directed.
66 Item No. 66 :- Providing and laying in situ cement Cum 8744.25 2165.86
concrete of grade M-20 of trap / granite / gneiss /
quartzite / graded metal for Staunch wall with
Batching Plant and Transit Mixer considering lead of
5 kms from batching plant, including shuttering,
scaffolding, placing, compacting, curing etc. complete
as directed.
67 ITEM NO. 67A :- Providing and fixing anchor bar of 25 mm No 1897.90 168.78
diameter 2.50 m length with resin bond cement capsule
anchorage including drilling holes, inserting grout capsule,
driving anchor, cost of all materials, machinery, labour
and other ancillary operations etc complete with lead up to
1 Km and all lifts. Total
weight of 25 mm steel = 2.50x3.85x10=96.25 kg
ITEM NO. 67B :- Providing and fixing anchor bar of 32 mm No 2227.75 169.06
diameter 2.50 m length with resin bond cement capsule
anchorage including drilling holes, inserting grout capsule,
driving anchor, cost of all materials, machinery, labour,
ventilation, lighting, drainage and other ancillary operations
etc complete with lead up to 1 Km and all lifts.Total
weight of 32 mm steel =
2.50x6.32x10=213.30 kg
68 ITEM NO. 68A:- Providing and fixing RCC Boundary / Guard / No 826.10 138.42
Chain age blocks of size 75 x 20 x 20 cm including
excavation and fixing in a block of 45 x 45 x
45 cm in M-15 Concrete with oil painting of two coats,
lettering etc. complete as directed.
(height of stone above GL 40 cm.)
69 ITEM NO. 69 :- Providing and fixing canal information board No 5686.50 2073.54
of 1.2 x 0.75 m prepared on 16 gauge M.S. sheet with
angle iron frame of size 35 x 35 x 3 mm with cross
bracing of size 25 x 25 x 3 mm including painting with
one coat of zinc chromate storing primer and two
coats each of green/white back ground and back side
grey store enameled bonded with red retro reflective
sheet Engineering grade, border / letters / numeral / arrows
coated with non peal able crystal clear protective
transparent coat retaining 100% reflection including two
angle iron post of size 50x50x5 mm of 3.65 m long
inflated at bottom drilled on top and painted in white and
black bonds of 30 cm with four numbers high strength
of
G.I. bolts and nuts of size 10 mm dia. and 20 mm long sheet
and angle iron post in one piece without joints including all
taxes, conveying, fixing in ground with cement concrete
in M-15 block of size 60 x 60 x 75
cm as directed by Engineer-in-Charge.
70 ITEM NO. 70:- Providing and laying rubble soling below Cum 1200.10 501.40
foundation in layers including filling with
rubble chips, murum etc. complete as directed.
71 ITEM NO. 71:- Back filling up to ground level behind the Cum 57.55 57.55
canal structures etc. complete with suitable material of
approved quality in layers not exceeding 20 cm without
disturbing the structure etc. complete
as directed.
72 ITEM NO. 72:- Providing and constructing contraction joints Rmt 1861.70 168.97
by fixing 310 mm wide central bulb type approved
quality PVC water stop in two lines with 8 mm dia. Steel
dowel rods on either side at 1 m interval, forming 125 x
125 size groove in between 2 water stops for filling asphalt,
fixing 15 mm dia. two legged G.I. pipe with U-bend at bottom
for circulating steam at interval and forming 150 mm dia.
Formed drain behind water seals including cost of all
materials, machinery, labour, filling asphalt in groove,
circulation of steam at intervals, vulcanizing water seal
joints with all leads and lifts etc. complete as
directed.
876.34
876.34
876.34
876.34
876.34
876.34
998.96
1056.00
998.96
1056.00
998.96
1056.00
998.96
1056.00
1854.40
1810.52
1727.17
1481.51
2051.81
428.68
998.96
1056.00
1854.40
1810.52
1727.17
1485.51
2051.81
428.68
2051.81
1810.52
496.36
749.17
181.00
36.49
8714.28
175.48
175.48
210.58
109.81
54.91
496.86
401.22
401.22
496.86
401.22
401.22
521.70
421.28
421.28
110.10
110.10
291.00
37.72
38.08
825.00
1356.95
2908.33
391.87
195.86
195.86
555.41
76.30
318.29
238.69
238.69
238.69
198.90
159.11
159.11
413.78
310.31
310.31
2165.86
168.78
169.06
138.42
199.95
2073.54
501.40
57.55
168.97
SURVEYING AND INVESTIGATION
Sr Item Unit Rate for 2020-21
No. (Rate in Rs.)
Complete Labour
d Item
1 2 3 4 5
84 Item No. 84 :- Double leveling using Auto level to
connect Geodetic Trigonometrically survey, bench mark
and establishing permanent bench mark at Dam site
at place along the canal alignment, submergence and Km. 1256.45 1193.87
in command area etc complete, as directed. (Excluding
cost of B.M. structure)
100 Item No. 100:- Excavation for taking trial pits on final
alignment of dam and canal at specified interval and
in Nalla-bed of size 2.00 x 2.00 x 2.50mtr. in length,
breadth and depth respectively or size as may be
directed by Engineer In charge including backfilling Cum 146.30 21.50
trial pits etc complete, as directed.
or 2020-21
te in Rs.)
Labour
1193.87
763.03
182.84
518.78
124.33
or 2020-21
te in Rs.)
Labour
389.14
93.25
267.03
63.99
137.34
32.91
61.04
14.63
763.03
763.03
736.02
321.73
366.82
37.12
1131.20
280.00
323.00
682.10
341.87
21.50
MAINTAINANCE & REPAIRS
Item. Rates CSR 2020-21
No. Completed Labour
Description of item Unit
Rate
1 2 3 4 5
101 Item No.101:- Dismantling the Stone Cum 225.35 225.35
Masonry in cement mortar including stacking the
material with 15 m. lead and all lifts etc. complete
as directed.
102 Item No.102 A: - Dismantling dry rubble Sqm 51.20 51.20
stone pitching including stacking all materials with
15 m lead and all lifts etc complete as
directed.
Item No.102 B:- Dismantling the old lime Cum 271.50 271.50
117 Item No.117:- Applying geru wash and white wash No 62.85 51.88
to canal road side Km stones/Boundary stones /
Ch. stones / bottom of trees, etc.
complete.
118 Item No.118A:- Straight Needle K.T.Weir Gate-
A Manufacturing- Manufacturing with QAP &
fabrication of KT weir needle gates - straight type size
2.15 x 0.5M- 94 Kg. weight as per relevant Indian
Standards with all material, Mild steel confirming to
IS 2062, Rubber seal confirming to IS 4623 & Welding
electrodes AWS E6013 for general weld joints. It
includes all materials, Labour charges, machinery
charges, 1km lead
charges of transportation, loading and unloading
M.T. 111672.0 9146.66
5
225.35
51.20
271.50
407.25
2.30
207.56
269.30
517.88
787.18
1305.06
9.51
61.10
90.25
40.75
134.70
264.56
180.26
44.40
44.41
57.31
15.09
51.88
9146.66
11838.41
9146.66
3060.80
17681.00
17941.00
153.73
44.55
116.23
150.97
1413.80
1555.18
1696.56
1767.25
107.44
69.36
113.08
490.86
653.83
818.75
3964.80
352.59
17.70
17.70
1062.00
531.00
191.16
1770.00
0.00
885.00
30.09
26.55
88.50
70.80
106200.00
115050.00
53.10
35.40
44.25
8.85
88.50
70.80
1770.00
442.50
26550.00
26.55
0.00
0.00
0.00
0.00
0.00
0.00
0.00
70800.00
70800.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
70800.00
70800.00
153.09
690.18
1596.57
SOIL & WATER CONSERVATION DEPARTMENT
Lead Charges Statement for 2020-21 (Excluding Loading and Unloading)
Statement II
Carrying capacity
of truck 4.70 m3 5.75 m3 6.00 m3 7.00 m3
Note:-
1) For calculations of carrying capacity a truck of 10 Tone capacity is considered.
2) For loading & unloading of material on site, 6 minutes of ideal time i.e. 0.10 hr is considered for working out no. o
3) The transportation charges beyond 15 Km to 50 Km are with 5 Km interval, 50 Km to 100 km are with 10 km inter
with 25 km interval and 200 km to 500 km are with 50 km interval. The transportation charges for intermediate Km
be worked out by linearly interpolating between rates of lower and upper values in the range.
NT
and Unloading)
Rs / Unit
Steel, Cement, Water Bricks
Stone Block