PROJECT / UNIT JOB No.

Khurais Area Facilities Expansion & 032184


Satellite GOSP Project
PLANT LOCATION Sheet DOC. No.
Khurais - SAUDI ARABIA 1 of 20 000-ZA-E-M09406
TITLE: Revision: DATE:
METHOD STATEMENT FOR BROWN / GREEN FIELD B 07/28/2019
INSTALLATION, TESTING OF LIGHTING AND
POWER OUTLET SYSTEM

METHOD STATEMENT FOR BROWN / GREEN FIELD INSTALLATION, TESTING


OF LIGHTING AND POWER OUTLET SYSTEM

1: Approved
CONTRACTOR review result by 2: Approved with comments
3: Rejected

Department Date Name Signature

Technical Discipline 1 2 3

Field Engineering Dept. 1 2 3

HSE Dept. 1 2 3

QA/QC Dept. 1 2 3

1: Approved
2: Approved with comments
3: Rejected
COMPANY
review result by Date Name Signature
1 2 3

REV DATE Prepared CHK’D APR’D

SIVA
B 07/28/19 SAVAD ALI G.PANDIYAN
SUBRAMANIAN
A 07/03/19 SAVAD ALI G.PANDIYAN FARRUKH RASHEED

Table of Contents
PROJECT / UNIT JOB No.
Khurais Area Facilities Expansion & 032184
Satellite GOSP Project
PLANT LOCATION Sheet DOC. No.
Khurais - SAUDI ARABIA 2 of 20 000-ZA-E-M09406
TITLE: Revision: DATE:
METHOD STATEMENT FOR BROWN / GREEN FIELD B 07/28/2019
INSTALLATION, TESTING OF LIGHTING AND
POWER OUTLET SYSTEM

1. GENERAL.............................................................................................................................................. 3

1.1. Purpose..................................................................................................................................3
1.2. Personnel Duties and Responsibilities...................................................................................3
1.3. Reference Standards and Codes............................................................................................4
1.4. List of Drawings and Documents............................................................................................8
2. SCOPE OF WORK................................................................................................................................. 10

2.1. General Requirements.........................................................................................................10


2.2. Supports and Foundations...................................................................................................11
2.3. Lighting Fixtures...................................................................................................................11
2.4. Power Outlets......................................................................................................................11
2.5. Testing and Pre-commissioning...........................................................................................12
3. GENERAL HSE REQUIREMENTS............................................................................................................ 13

3.1. JSA for Transportation of People inside the KhCPF (000-ZA-E-085899)...............................13


3.2. JSA for Manual Lifting (000-ZA-E-085895)...........................................................................13
3.3. JSA for Loading and Unloading Material (000-ZA-E-085900)...............................................13
3.4. JSA for Work in Elevation (000-ZA-E-085906)......................................................................13
3.5. JSA for Man Lift (000-ZA-E-085905).....................................................................................13
3.6. JSA for Scaffold Erection Modification and Dismantling (000-ZA-E-K09720).......................13
3.7. JSA for Grinding (000-ZA-E-085921).....................................................................................13
3.8. JSA for Cable Sealing (000-ZA-E-K09766).............................................................................13
3.9. JSA for Installation, Testing of Lighting and Power Outlet System (000-ZA-E-K-09717).......13
3.10. Gap Analysis (to decide if any specific JSA required).......................................................13
3.11. Safety Requirements........................................................................................................13
3.12. Safety References and General Instruction......................................................................15
4. QA / QC DOCUMENTATION................................................................................................................. 16

4.1. Applicable SAIC....................................................................................................................16


4.2. Additional Notes..................................................................................................................17
5. RESOURCES........................................................................................................................................ 18

5.1. Tools and Equipment...........................................................................................................18


PROJECT / UNIT JOB No.
Khurais Area Facilities Expansion & 032184
Satellite GOSP Project
PLANT LOCATION Sheet DOC. No.
Khurais - SAUDI ARABIA 3 of 20 000-ZA-E-M09406
TITLE: Revision: DATE:
METHOD STATEMENT FOR BROWN / GREEN FIELD B 07/28/2019
INSTALLATION, TESTING OF LIGHTING AND
POWER OUTLET SYSTEM

5.2. Manpower...........................................................................................................................19

1. GENERAL

1.1.Purpose
The scope of this Method Statement is to establish, detail and explains the plan and
methodologies involved during all operations activities in order to get a satisfactory result.
The contractor reserves his right to adapt his methods for Installation, Testing of Lighting
and Power Outlet System in accordance with the guide line provided by project
Specifications, Saudi Aramco Standards and procedures with enumerate the safety
requirements and work procedure.

1.2.Personnel Duties and Responsibilities

PM - Project Manager – Responsible for organizing the resource to perform construction


activity as per project specification in compliance with Quality, Schedule and HSE
requirement.

CM - Construction Manager – Responsible for execution construction activities according to


the relevant project specification, in compliance with Quality, Schedule and HSE
requirement. Identify potential delays and implement effective rectification plans and
procedures.

DE - Discipline Engineer E/I - will ensure that the works are performed safely as per the latest
approved drawings and specifications.

DF - Discipline Foreman E/I - will ensure that his crew has to follow the safe work procedure
and works are carried out as per the latest approved drawings. Attend Safety Tool Box
Talks with HSE Department and construction crews.

CO - Crane operator – (ARAMCO certified) shall be responsible for the safe as well as efficient
operations of the crane.

R1 - Rigger 1 – (ARAMCO certified) shall be responsible for the all safe lifting and rigging
throughout the critical lift process activities, he will ensure that his crew will perform a
safe work supporting the crane operator during the whole activities.

QCI - Quality Control Inspector - will ensure that all the work is executed according to the PQP
and that the requirement of quality dossier is fulfilled. The RFI is issued in advance as
per the QCP. All previous activities related to this is covered with RFI, inspected
PROJECT / UNIT JOB No.
Khurais Area Facilities Expansion & 032184
Satellite GOSP Project
PLANT LOCATION Sheet DOC. No.
Khurais - SAUDI ARABIA 4 of 20 000-ZA-E-M09406
TITLE: Revision: DATE:
METHOD STATEMENT FOR BROWN / GREEN FIELD B 07/28/2019
INSTALLATION, TESTING OF LIGHTING AND
POWER OUTLET SYSTEM

accepted and signed off by all parties. Latest revision of the IFC drawings, lighting,
power outlet layout and copy of approved MOS are available at site.

Scaffold Supervisor (Aramco Certified) - will ensure that all the scaffolding activities
performed as per Aramco standard by his crew and he is also responsible to release the
safe working scaffold to the working team with proper tagging system and record.

HSE Supervision - will ensure that the works are performed safely as per the latest Company
requirements.

Construction Supervision - will ensure that the works are performed as per the latest
approved method statement in a safe and efficient manners.

1.3.Reference Standards and Codes

COMPANY : SAUDI ARAMCO

CONTRACTOR : SNAMPROGETTI SAUDI ARABIA LTD. (PART OF SAIPEM SPA)

MCCL : MANARAH AL-JUBAIL CONT.CO.LTD

WORK : INSTALLATION, TESTING OF LIGHTING AND POWER OUTLET


SYSTEM

QA/QC : QUALITY ASSURANCE I QUALITY CONTROL

HSE : HEALTH SAFETY AND ENVIRONMENT

ITP : INSPECTION AND TEST PLAN

JSA : JOB SAFETY ANALYSIS

PPE : PERSONNEL PROTECTIVE EQUIPMENT

IR : INSULATION RESISTANCE

SAES : SAUDI ARAMCO ENGINEERING STANDARDS

SAES-A-112 : METEOROLOGICAL AND SEISMIC DESIGN DATA

SAES-B-006 : FIREPROOFING IN ONSHORE FACILITIES

SAES-B-008 : RESTRICTIONS TO USE OF CELLARS, PITS AND TRENCHES


PROJECT / UNIT JOB No.
Khurais Area Facilities Expansion & 032184
Satellite GOSP Project
PLANT LOCATION Sheet DOC. No.
Khurais - SAUDI ARABIA 5 of 20 000-ZA-E-M09406
TITLE: Revision: DATE:
METHOD STATEMENT FOR BROWN / GREEN FIELD B 07/28/2019
INSTALLATION, TESTING OF LIGHTING AND
POWER OUTLET SYSTEM

SAES-B-009 : FIRE PROTECTION AND SAFETY REQUIREMENTS FOR OFFSHORE


PRODUCTION FACILITIES

SAES-B-063 : AVIATION OBSTRUCTION MARKING AND LIGHTING

SAES-B-068 : ELECTRICAL AREA CLASSIFICATION

SAES-M-005 : DESIGN AND CONSTRUCTION OF FIXED OFF-SHORE PLATFORMS

SAES-M-100 : SAUDI ARAMCO BUILDING CODE

SAES-O-204 : SECURITY LIGHTING SYSTEM

SAES-O-208 : APPLICATION OF SECURITY DIRECTIVES


SAES-P-100 : BASIC POWER SYSTEM DESIGN CRITERIA

SAES-P-104 : WIRING METHODS AND MATERIALS

SAES-P-111 : GROUNDING

SAES-P-123 : LIGHTING

SATR : SAUDI ARAMCO TEST REPORT

SATR-P-3203 : LOW VOLTAGE POWER AND CONTROL CABLE, CONTINUITY AND


MEGGER INSULATION RESISTANCE TESTING

SATR-P-3603 : RECEPTACLES AND CORDS - PIN-AND-SLEEVE RECEPTACLE / PLUG -


INSTALLATION, FUNCTIONAL AND POLARITY TESTING

SATR-P-3604 : RECEPTACLES AND CORDS - NEMA RECEPTACLE / PLUG -


INSTALLATION, FUNCTIONAL AND POLARITY TEST

SATR-P-3605 : RECEPTACLES AND CORDS - CABLE REELS - INSTALLATION,


FUNCTIONAL AND POLARITY TESTING

SATR-P-3606 : RECEPTACLES AND CORDS - FESTOON SYSTEMS - INSTALLATION,


FUNCTIONAL AND POLARITY TESTING

SATR-P-3610 : AREA & STREET LIGHTING (POINT TO POINT) - ILLUMINATION


LEVEL TESTING

SATR-P-3611 : INTERIOR LIGHTING (ZONE CAVITY) - ILLUMINATION LEVEL TESTING

SATR-P-3613 : SECURITY LIGHTING (FENCE, AREA, AND CHECKPOINT LTG.) -


ILLUMINATION LEVEL TESTING
PROJECT / UNIT JOB No.
Khurais Area Facilities Expansion & 032184
Satellite GOSP Project
PLANT LOCATION Sheet DOC. No.
Khurais - SAUDI ARABIA 6 of 20 000-ZA-E-M09406
TITLE: Revision: DATE:
METHOD STATEMENT FOR BROWN / GREEN FIELD B 07/28/2019
INSTALLATION, TESTING OF LIGHTING AND
POWER OUTLET SYSTEM

SATR-P-3614 : AVIATION / OBSTRUCTION LIGHT FIXTURES - ILLUMINATION LEVEL


TESTING

SAUDI ARAMCO STANDARD DRAWINGS

AB-036398 : DETAILS – STREET LIGHTING

INTERNATIONAL STANDARDS AND CODES

IEC 62471 : PHOTOBIOLOGICAL SAFETY OF LAMPS AND LAMP SYSTEMS

SASO IEC 61347 : PARTICULAR REQUIREMENTS FOR D.C. OR A.C. SUPPLIED


ELECTRONIC CONTROLGEAR FOR LED MODULES

IEC 62504 : GENERAL LIGHTING – LEDS AND LED MODULES – TERMS AND
DEFINITIONS

IEC 62031 : LED MODULES

IEC 62560 : SELF-BALLASTED LED LAMPS (>50V)

IEC 62384 : PERFORMANCE REQUIREMENTS FOR ELECTRONIC CONTROL GEAR


FOR LED MODULES

IEC 62717 : LED MODULES PERFORMANCE

IEC 61000-3-3 : ELECTROMAGNETIC COMPATIBILITY (EMC) - PART 3-3

IEC 62722-2-1 : LED LUMINAIRES PERFORMANCE

IES/IESNA LM-79-08 : APPROVED METHOD: ELECTRICAL AND PHOTOMETRIC


MEASUREMENTS OF SOLID-STATE LIGHTING PRODUCTS

IES/IESNA LM-80-08 : APPROVED METHOD FOR MEASURING LUMEN MAINTENANCE OF


LED LIGHT SOURCES

IEEE STD 1453 : RECOMMENDED PRACTICE FOR MEASUREMENTS AND LIMITS OF


VOLTAGE FLUCTUATIONS AND ASSOCIATED LIGHT FLICKER ON AC
POWER SYSTEMS

NATIONAL FIRE PROTECTION ASSOCIATION

NFPA 70 : NATIONAL ELECTRICAL CODE (NEC)

NFPA 101 : LIFE SAFETY CODE


PROJECT / UNIT JOB No.
Khurais Area Facilities Expansion & 032184
Satellite GOSP Project
PLANT LOCATION Sheet DOC. No.
Khurais - SAUDI ARABIA 7 of 20 000-ZA-E-M09406
TITLE: Revision: DATE:
METHOD STATEMENT FOR BROWN / GREEN FIELD B 07/28/2019
INSTALLATION, TESTING OF LIGHTING AND
POWER OUTLET SYSTEM

ILLUMINATING ENGINEERING SOCIETY OF NORTH AMERICA

IESNA : LIGHTING HANDBOOK

IESNA LEM-3 : DESIGN CONSIDERATIONS FOR EFFECTIVE BUILDING LIGHTING


ENERGY UTILIZATION

IESNA LM-5 : GUIDE FOR PHOTOMETRIC MEASUREMENTS OF AREA AND SPORTS


LIGHTING INSTALLATIONS

IESNA LM-64 : GUIDE FOR PHOTOMETRIC MEASUREMENTS OF PARKING AREAS

IESNA RP-1 : PRACTICE FOR OFFICE LIGHTING

IESNA RP-7 : PRACTICE FOR INDUSTRIAL LIGHTING

IESNA RP-8 : PRACTICE FOR ROADWAY LIGHTING

IESNA RP-16 : NOMENCLATURE AND DEFINITIONS FOR ILLUMINATING


ENGINEERING

IESNA RP-20 : LIGHTING FOR PARKING FACILITIES

IESNA RP-24 : PRACTICE FOR LIGHTING OFFICES CONTAINING COMPUTER VISUAL


DISPLAY TERMINALS

IESNA RR-96 : LIGHTING READY REFERENCE / ENERGY MANAGEMENT

AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS

AASHTO LTS-2 : STANDARD SPECIFICATIONS FOR STRUCTURAL SUPPORTS FOR


HIGHWAY SIGNS, LUMINAIRES AND TRAFFIC SIGNALS

AASHTO GTB-77 : GUIDE FOR SELECTING, LOCATING, AND DESIGNING TRAFFIC


BARRIERS
PROJECT / UNIT JOB No.
Khurais Area Facilities Expansion & 032184
Satellite GOSP Project
PLANT LOCATION Sheet DOC. No.
Khurais - SAUDI ARABIA 8 of 20 000-ZA-E-M09406
TITLE: Revision: DATE:
METHOD STATEMENT FOR BROWN / GREEN FIELD B 07/28/2019
INSTALLATION, TESTING OF LIGHTING AND
POWER OUTLET SYSTEM

1.4. List of Drawings and Documents

Document Client
Name Number Title
B39-EC-A- BA-
047853 668716.001 B39-USI-LP-003- AREA LIGHTING PANEL SOUTH UTILITIES
B39-EC-A- BA-
047854 668716.010 B39-USI-LP-003- AREA LIGHTING PANEL SOUTH UTILITIES
B39-EC-A- BA-
047855 670528.FS1 B39-USI-LP-003- AREA LIGHTING PANEL SOUTH UTILITIES
B39-EC-A- BA-
047856 670528.003 B39-USI-LP-006- NORMAL AREA LIGHTING PANEL SOUTH UTILITIES
B39-EC-A- BA-
047857 670529.FS1 B39-USI-LP-006- NORMAL AREA LIGHTING PANEL SOUTH UTILITIES
B39-EC-A- BA-
047858 670529.003 B39-USI-LP-007- NORMAL AREA LIGHTING PANEL SOUTH UTILITIES
B39-EC-A- BA-
047859 670530.FS1 B39-USI-LP-008- NORMAL AREA LIGHTING PANEL SOUTH UTILITIES
B39-EC-A- BA-
047860 670530.004 B39-USI-LP-008- NORMAL AREA LIGHTING PANEL SOUTH UTILITIES
B39-EC-A- BA-
047862 670531.002 B39-USI-LP-009- EMERGENCY LIGHT PANEL SOUTH UTILITIES
B39-EC-A- BA-
047863 670531.003 B39-USI-LP-009- EMERGENCY LIGHT PANEL SOUTH UTILITIES
B39-EC-A- BA-
047864 670533.001 B39-USI-LP-011- EMERGENCY LIGHT PANEL SOUTH UTILITIES
B39-EC-A- BA-
047865 670534.004 B39-USI-PP-004- SMALL POWER PANEL SOUTH UTILITIES
B39-EC-A- BA-
047866 289586.001 B39-ROS-LP-001- NORMAL LIGHT PANEL SOUTH UTILITIES
B39-EC-A- BA-
047867 289587.001 B39-ROS-LP-003 - EMERGENCY LIGHT PANEL SOUTH UTILITIES
B39-EC-A- BA-
047868 289596.001 B39-ROS-LP-003 - EMERGENCY LIGHT PANEL SOUTH UTILITIES
B39-EC-A- BA-
047869 289597.001 B39-ROS-LP-002 - AREA LIGHT PANEL SOUTH UTILITIES
B39-EC-A- BA-
047872 809780.001 B39-USI-LP-020 - EMERGENCY LIGHT PANEL SOUTH UTILITIES
B39-EC-A- BA-
047873 670808.001 B39-USI-LP-018 - EMERGENCY LIGHT PANEL SOUTH UTILITIES
B39-EC-A- BA-
047874 670808.004 B39-USI-LP-018 - EMERGENCY LIGHT PANEL SOUTH UTILITIES
B39-EC-A- BA-
047875 809780.004 B39-USI-LP-020- NORMAL LIGHT PANEL SOUTH UTILITIES
B39-EC-A- BA-
047876 809778.001 B39-USI-LP-019- EMERGENCY LIGHT PANEL SOUTH UTILITIES
B39-EC-A- BA-
047877 809778.004 B39-USI-LP-019- EMERGENCY LIGHT PANEL SOUTH UTILITIES
B39-EC-A- BA- B39-USI-LP-021- NORMAL LIGHT PANEL SOUTH UTILITIES
PROJECT / UNIT JOB No.
Khurais Area Facilities Expansion & 032184
Satellite GOSP Project
PLANT LOCATION Sheet DOC. No.
Khurais - SAUDI ARABIA 9 of 20 000-ZA-E-M09406
TITLE: Revision: DATE:
METHOD STATEMENT FOR BROWN / GREEN FIELD B 07/28/2019
INSTALLATION, TESTING OF LIGHTING AND
POWER OUTLET SYSTEM

047878 809781.004
B40-EC-A- BA-
041774 668721.007 B40-WS2-LP-016- AREA LIGHTING WIP STATION & NORTH UTILITIES
B40-EC-A- BA-
042416 668764.002 B40-WS1-LP-011- EMERGENCY LIGHT. WIP STATION & NORTH UTILITIES
B40-EC-A- BA-
042417 668764.005 B40-WS1-LP-011- EMERGENCY LIGHT. WIP STATION & NORTH UTILITIES
B40-EC-A- BA-
042418 668796.005 B40-WS1-LP-012- NORMAL LIGHT.PANEL WIP STATION & NORTH UTILITIES
B40-EC-A- BA-
042419 668796.006 B40-WS2-LP-012- NORMAL LIGHT.WATER INJECTION PUMP STATION & NORTH
B40-EC-A- BA-
042420 668766.FS1 B40-WS2-PP-033- SMALL POWER PANEL WIP STATION & NORTH UTILITIES
B40-EC-A- BA-
042421 668766.005 B40-WS2-PP-033- SMALL POWER PANEL WIP STATION & NORTH UTILITIES
B40-EC-A- BA-
042422 669129.004 B40-WS2-LP-013- NORMAL LIGHTING PNL WIP STATION & NORTH UTILITIES
B40-EC-A- BA-
042423 669129.005 B40-WS2-LP-013- NORMAL LIGHTING PNL WIP STATION & NORTH UTILITIES
B40-EC-A- BA-
042424 289613.FS1 B40-WS1-NLP-101- NORMAL LIGHTING PNL WIP STATION & NORTH UTILITIES
B40-EC-A- BA-
042425 289613.001 B40-WS1-ELP-101- EMERG LIGHTING PNL WIP STATION & NORTH UTILITIES
B40-EC-A- BA-
042426 289613.002 B40-WS1-ELP-101- EMERG LIGHTING PNL WIP STATION & NORTH UTILITIES
B40-EC-A- BA-
042427 289613.003 B40-WS1-ELP-101- EMERG LIGHTING PNL WIP STATION & NORTH UTILITIES
B40-EC-A- BA- B40-WS1-ELP-101- EMERG LIGHTING PNL WATER INJECTION PUMP STATION &
042428 289613.004 NORTH
B40-EC-A- BA-
042429 289614.FS1 B40-WS1-NPL-101- NORMAL LIGHTING PNL WIP STATION & NORTH UTILITIES
B40-EC-A- BA-
042430 289614.001 B40-WS1-NPL-101- NORMAL LIGHTING PNL WIP STATION & NORTH UTILITIES
B40-EC-A- BA-
042431 289614.002 B40-WS1-NPL-101- NORMAL LIGHTING PNL WIP STATION & NORTH UTILITIES
B40-EC-A- BA- DISINVEST B40-WS2-LP-012- NORMAL LIGHTING PNL WIP STATION & NORTH
042636 668796.003 UTILITIES
B40-EC-A- BA- DISINVEST B40-WS2-LP-012- NORMAL LIGHTING PNL WIP STATION & NORTH
043283 668796.001 UTILITIES
B40-EC-A- BA- DISINVEST B40-WS2-LP-012- NORMAL LIGHTING PNL WIP STATION & NORTH
043284 668796.005 UTILITIES
B40-EC-A- BA-
043287 668766.001 DISINVEST B40-WS2-PP-033- SMALL POWER PNL WIP STATION & NORTH UTILITIES
B40-EC-A- BA- DISINVEST B40-WS1-LP-011- EMERGENCY LIGHT PNL WIP STATION & NORTH
043289 668764.001 UTILITIES
B40-EC-A- BA- B40-WS1-LP-011- EMERGENCY LIGHT.PNL-DISINVEST WIP STATION & NORTH
043317 668764.002 UTILITIES
B40-EC-A- BA- B40-WS1-LP-011- EMERGENCY LIGHT.PNL-DISINVEST WIP STATION & NORTH
043318 668764.003 UTILITIES
B40-EC-A- BA-
043319 668796.002 B40-WS2-LP-012- NORMAL LIGHT PNL DISINVEST
B40-EC-A- BA- B40-WS2-LP-013- NORMAL LIGHTING PNL DISINVEST WIP STATION & NORTH
043342 669129.FS1 UTILITIES
B40-EC-A- BA- B40-WS1-NLP-101- NORMAL LIGHTING PNL DISINVEST WIP STATION & NORTH
PROJECT / UNIT JOB No.
Khurais Area Facilities Expansion & 032184
Satellite GOSP Project
PLANT LOCATION Sheet DOC. No.
Khurais - SAUDI ARABIA 10 of 20 000-ZA-E-M09406
TITLE: Revision: DATE:
METHOD STATEMENT FOR BROWN / GREEN FIELD B 07/28/2019
INSTALLATION, TESTING OF LIGHTING AND
POWER OUTLET SYSTEM

043353 289614.003 UTILITIES


B42-EC-A- BA-
041151 291460.001 B42-GCU-LP-010- NORMAL LIGHTING PANEL
B42-EC-A- BA-
041153 291460.002 B42-GCU-LP-010- NORMAL LIGHTING PANEL
B42-EC-A- BA-
041154 291460.003 B42-GCU-LP-010- NORMAL LIGHTING PANEL
B42-EC-A- BA-
041156 291460.003 B42-GCU-LP-010- NORMAL LIGHTING PANEL
B42-EC-A- BA-
041158 291461.001 B42-GCU-LP-012- EMERGENCY LIGHTING PANEL
B42-EC-A- BA-
041164 291461.002 B42-GCU-LP-012- EMERGENCY LIGHTING PANEL
B42-EC-A- BA-
041331 291601.001 B42-GCU-LP-010- NORMAL LIGHTING PANEL
B42-EC-A- BA-
041332 291601.002 B42-GCU-LP-010- NORMAL LIGHTING PANEL
B42-EC-A- BA-
041333 291601.003 B42-GCU-LP-010- NORMAL LIGHTING PANEL
B42-EC-A- BA-
041334 291601.004 B42-GCU-LP-011- NORMAL LIGHTING PANEL
B42-EC-A- BA-
041335 291601.005 B42-GCU-LP-011- NORMAL LIGHTING PANEL
B42-EC-A- BA-
041341 291603.001 B42-GCU-LP-012- EMERGENCY LIGHTING PANEL
B42-EC-A- BA-
041342 291603.002 B42-GCU-LP-013- EMERGENCY LIGHTING PANEL
B42-EC-A- BA-
041346 291604.001 B42-GCU-PP-011- SMALL POWER PANEL
B42-EC-A- BA-
041351 291605.001 B42-GCU-PP-010- SMALL POWER PANEL
B42-EC-A- BA-
041352 291605.002 B42-GCU-PP-011- SMALL POWER PANEL
B42-EC-A- BA-
041353 291605.003 B42-GCU-PP-010- SMALL POWER PANEL
B42-EC-A- BA-
041354 291605.004 B42-GCU-PP-010- SMALL POWER PANEL
B42-EC-A- BA-
041366 291611.001 B42-GCU-LP-002- ZONE 1 – FLOOD LIGHTING PANEL
B42-EC-A- BA-
041367 291611.002 B42-GCU-LP-002- ZONE 1 – FLOOD LIGHTING PANEL
B42-EC-A- BA-
042607 291461.003 B42-GCU-LP-012- EMERGENCY LIGHTING PANEL
B40-EC-A- BA-
042623 291462.003 B42-GCU-PP-010- SMALL POWER PANEL
PROJECT / UNIT JOB No.
Khurais Area Facilities Expansion & 032184
Satellite GOSP Project
PLANT LOCATION Sheet DOC. No.
Khurais - SAUDI ARABIA 11 of 20 000-ZA-E-M09406
TITLE: Revision: DATE:
METHOD STATEMENT FOR BROWN / GREEN FIELD B 07/28/2019
INSTALLATION, TESTING OF LIGHTING AND
POWER OUTLET SYSTEM

2. SCOPE OF WORK
2.1.General Requirements

1. Confirm correct circuit connections and configurations for all lighting and power branch
circuits.

2. Mounting method of fixtures shall be based on the best arrangement for illuminance, as well
as easy and safe access during installation and maintenance.

3. Lighting illumination levels stated in this specification refer to minimum maintained


illuminance.

4. SAES-J-902 minimum separation requirements between Electrical and Instrument cables shall
be complied.

5. Wires and cables identification at termination for lighting and power outlet systems shall
follow SAES-P-104 Section 6.11.

6. The lighting fixture and power outlets will be identified with suitable approved label provision
and checked against the data sheet for classification.

7. Where fixtures are to be installed in hazardous areas, particular attention shall be paid to the
certification to ensure they are suitable for installation in the classified area.

8. Where industrial or vapor-proof fittings are specified, their NEMA/IP rating will be checked to
confirm the correct protection degree is being applied.

9. Equipment such as floodlight columns, which are supplied in sections, or have accessories
supplied loose, will be checked against the particular inventory.

10. Unless otherwise stated, all tests shall be conducted by the Electrical Testing Engineer and pre-
commissioning department.

11. Lighting fixtures installation shall follow the IFC drawing and typical installation standards.

2.2.Supports and Foundations

1. Support brackets, posts and stanchions will be checked against the detailed drawings and
located in accordance with the layout drawings.
PROJECT / UNIT JOB No.
Khurais Area Facilities Expansion & 032184
Satellite GOSP Project
PLANT LOCATION Sheet DOC. No.
Khurais - SAUDI ARABIA 12 of 20 000-ZA-E-M09406
TITLE: Revision: DATE:
METHOD STATEMENT FOR BROWN / GREEN FIELD B 07/28/2019
INSTALLATION, TESTING OF LIGHTING AND
POWER OUTLET SYSTEM

2. Particular attention will be paid to interference with access ways, handrails and possible
sources of vibration.

3. Accessibility for maintenance will be checked and it will be ensured that fixtures are not
installed above equipment with moving parts.

4. Upon installation, the support will be checked to ensure rigidly and fixture-fixing points are
available.

5. Concrete foundations shall be installed as required.

6. Prior to installing the supports, the fixing points and foundations will be checked to ensure
their line and level is correct. Cable entries will be checked to ensure they are clear of debris.

2.3.Lighting Fixtures

1. Lighting fixture will be inspected to ensure they are installed in the manner shown on the
detailed drawings, all accessories are installed and where applicable, protection guards have
been fitted.

2. The fixture and support assembly will be checked to ensure stability.

3. The orientation will be checked to ensure the correction area is illuminated and not obscured
by pipes and/or structures.

4. All exposed conduits for lighting system shall be rigid steel conduits.

5. For cables/wiring termination refer to panel board schedule. Ensure that continuity and
megger value is recorded.

2.4.Power Outlets

1. Receptacles will be checked against the Project data sheets prior to installing.

2. Receptacles installed in Hazardous areas will be checked to ensure their suitability and rating
for that area.

3. Receptacles shall be mechanically sound and correctly mounted.

4. Power sockets installed at outdoor areas shall be checked to ensure the correct NEMA/IP and
protection degree.
PROJECT / UNIT JOB No.
Khurais Area Facilities Expansion & 032184
Satellite GOSP Project
PLANT LOCATION Sheet DOC. No.
Khurais - SAUDI ARABIA 13 of 20 000-ZA-E-M09406
TITLE: Revision: DATE:
METHOD STATEMENT FOR BROWN / GREEN FIELD B 07/28/2019
INSTALLATION, TESTING OF LIGHTING AND
POWER OUTLET SYSTEM

5. Polarity testing for power outlets shall be performed at energization time to verify right
installation, connection and phasing. Polarity test to be done with approved polarity tester.

2.5.Testing and Pre-commissioning

1. The emergency lighting system shall be verified and functionally tested with minimum
duration of one-and-one-half hours in the event of normal power failure.

2. Ensure that fixtures required for exit illumination/emergency egress lighting shall be supplied
from separate sources of power for Control Rooms, Process Areas, Switchgear Rooms and
where required by SAES-M-100.

3. Ensure that prior to connection to fixture and energization, the insulation resistance of lighting
cables shall be tested, using an adequate Megger equipment, to ensure no leakage between
phases and to earth.

4. Before energization the correct lighting system shall be checked to ensure the right installation
as per IFC drawing, all conduits shall be secured and rigid and all support correctly fixed and
tighten.

5. Ensure that the lighting system will be energized and the illumination levels checked against
those specified, using a Lumens or Lux meter. The initial field measurement after installation
shall be no less than the specified illuminance divides~ by the light loss factor (LLF) from Table
1 of SAES-P-123 and other factors utilized in the design. The illumination levels outlined in
Table 4 of SAES-P-123 are the required maintained minimum lighting levels at the specified
work plane for each location.

6. The test will be conducted and recorded on S. Aramco Pre-Commissioning Form for process
and Plant Areas and for Open and Indoor Areas.
PROJECT / UNIT JOB No.
Khurais Area Facilities Expansion & 032184
Satellite GOSP Project
PLANT LOCATION Sheet DOC. No.
Khurais - SAUDI ARABIA 14 of 20 000-ZA-E-M09406
TITLE: Revision: DATE:
METHOD STATEMENT FOR BROWN / GREEN FIELD B 07/28/2019
INSTALLATION, TESTING OF LIGHTING AND
POWER OUTLET SYSTEM

3. GENERAL HSE REQUIREMENTS


3.1. JSA for Transportation of People inside the KhCPF (000-ZA-E-085899)

3.2. JSA for Manual Lifting (000-ZA-E-085895)

3.3. JSA for Loading and Unloading Material (000-ZA-E-085900)

3.4. JSA for Work in Elevation (000-ZA-E-085906)

3.5. JSA for Man Lift (000-ZA-E-085905)

3.6. JSA for Scaffold Erection Modification and Dismantling (000-ZA-E-K09720)

3.7. JSA for Grinding (000-ZA-E-085921)

3.8. JSA for Cable Sealing (000-ZA-E-K09766)

3.9. JSA for Installation, Testing of Lighting and Power Outlet System (000-ZA-E-K-09717)

3.10. Gap Analysis (to decide if any specific JSA required)

3.11. Safety Requirements

1. All the work force shall have completed their Saipem and Aramco safety induction
training before commencement of work.

2. All personnel shall wear the correct and appropriate and approved PPE at all times
when engaged at the job site location.

3. Perimeter of work area(s) will be safety taped or barricaded and appropriate signage
displayed, (e i: Authorized Person Only) other signage appropriate to the task being
undertaken shall also be displayed, flashing lights shall be provided at night at trench
locations.

4. Aramco certified Work Permit Receivers shall be engaged for permit work
requirements and will be present at the job site location for the duration of activities.

5. Aramco certificated Crane/Fork Lift Operator and Riggers will be used, at all times for
the duration of the work activities.

6. All lifting tools shall be load tested and certificated prior to start any activities.

7. Original Permit to Work, Method Statement and Risk Assessment and/ or JSA shall be
displayed at worksite in visible locations.
PROJECT / UNIT JOB No.
Khurais Area Facilities Expansion & 032184
Satellite GOSP Project
PLANT LOCATION Sheet DOC. No.
Khurais - SAUDI ARABIA 15 of 20 000-ZA-E-M09406
TITLE: Revision: DATE:
METHOD STATEMENT FOR BROWN / GREEN FIELD B 07/28/2019
INSTALLATION, TESTING OF LIGHTING AND
POWER OUTLET SYSTEM

8. Job Specific Tool Box Meetings shall be conducted before starting any activity.
9. Gas testing shall be done before starting the work and at interval recommended or
required by Saudi ARAMCO for the complete duration of associated work.

10. All electrical equipment, lifting tools and tackles, etc., shall be inspected and tagged the
monthly color code every month.

11. Crane shall be inspected and certified in accord with the ARAMCO standard
requirements.

12. Trailer shall be inspected and certified in accord with the ARAMCO standard
requirements.

13. Boom truck shall be inspected and certified in accord with the ARAMCO standard
requirements.

14. Fork Lift shall be inspected and certified in accord with the ARAMCO standard
requirements.

15. All Permit to Work will be closed after the completion of the activities, or the end of
each shift unless otherwise extend by special consent of foreman. Work Permit will
automatically close during any accident happens in the plant and a new permit will be
applying for the same activities when the area is cleared.

16. Closure of associated permits shall be ensured for works such as de-isolations, box-up
of confined spaces etc.,

17. Maintain the necessary standards of cleanliness and tidiness within the workplace, at
all times for the duration of the work activities.

18. Contractor Site Safety Officer shall be present at the job site at all times while workers
are performing, their work activities and associated responsibilities.

19. Contractor Safety Officers shall be assigned to monitor safety condition of the work
area, and are authorized to stop any activities if the conditions at the site changed to
such an extent that continuing of working would be determined to be unsafe.

20. Heat stress protection.

 Rest shelter shall be provided in designated area.

 A plentiful allocation of cooling water shall be provided in the cooling water cans.

 Cooling water cans shall be placed in the easy accessible location to all.
PROJECT / UNIT JOB No.
Khurais Area Facilities Expansion & 032184
Satellite GOSP Project
PLANT LOCATION Sheet DOC. No.
Khurais - SAUDI ARABIA 16 of 20 000-ZA-E-M09406
TITLE: Revision: DATE:
METHOD STATEMENT FOR BROWN / GREEN FIELD B 07/28/2019
INSTALLATION, TESTING OF LIGHTING AND
POWER OUTLET SYSTEM

 Heat stress protection shall be inducted in the tool box meeting regularly

 Heat index shall be displaced visible area to understand the requirement of


precaution measure as per Aramco standard.

3.12. Safety References and General Instruction

SA SAFETY HAND BOOK

SA SCAFFOLD HAND BOOK

CONSTRUCTION SAFETY MANUAL

GI 2.705 : CERTIFICATION OF HIGH VOLTAGE CABLE SPLICERS (FORMERLY GL-


0401.082)

G.I. 2.100 : WORK PERMIT SYSTEM

G.I. 2.709 : GAS TESTING PROCEDURE

GI 2.714 : ENVIRONMENTAL PROTECTION POLICY IMPLEMENTATION


G.I. 6.001 : INCIDENT NOTIFICATION

GI 6.003 : INCIDENT INVESTIGATION


G.I. 6.004 : NEAR MISSED REPORTING PROCESS

G.I. 6.005 : INCIDENT REPORTING

G.I. 6.007 : REPORTING OF CONTRACTOR ON-JOB INJURIES-UPDATED

GI 6.008 : RESTRICTION OF PORTABLE ELECTRICAL ELECTRONIC DEVICE


G.I. 6.012 : ISOLATION, LOCKOUT AND USE OF HOLD TAGS

G.I. 6.025 : CONTROL OF REMOTE AREA TRAVEL AND SEARCH RESCUE

G.I. 6.029 : REPORTING OF MVA

G.I. 6.030 : TRAFFIC AND VEHICLE SAFETY

G.I. 7.025 : HEAVY EQUIPMENT OPERATOR TESTING AND CERTIFICATION

G.I. 7.026 : CRANES AND HEAVY EQUIPMENT ACCIDENT

G.I. 7.028 : CRANE LIFT TYPES AND PROCEDURES


PROJECT / UNIT JOB No.
Khurais Area Facilities Expansion & 032184
Satellite GOSP Project
PLANT LOCATION Sheet DOC. No.
Khurais - SAUDI ARABIA 17 of 20 000-ZA-E-M09406
TITLE: Revision: DATE:
METHOD STATEMENT FOR BROWN / GREEN FIELD B 07/28/2019
INSTALLATION, TESTING OF LIGHTING AND
POWER OUTLET SYSTEM

G.I. 7.029 : RIGGING HARDWARE REQUIREMENTS

G.I. 7.030 : INSPECTION AND TESTING REQUIREMENTS FOR ELEVATION


LIFTING EQUIPMENT

G.I. 8.001 : SAFETY REQUIREMENTS FOR SCAFFOLDS

G.I. 8.002 : SAFETY SPECTACLES

G.I. 8.005 : PROTECTIVE (SAFETY) FOOTWEAR

G.I. 430.001 : WASTE MANAGEMENT

G.I. 1021.000 : STREET AND ROAD CLOSURE: EXCAVATION, REINSTATEMENT AND


TRAFFIC CONTROLS

4. QA / QC DOCUMENTATION

4.1. Applicable SAIC

SAIC-P-3207 : LOW VOLTAGE POWER AND CONTROL CABLE, INSTALLATION AND


PRE-COMMISSIONING
SAIC-P-3209 : HAZARDOUS LOCATION CONDUIT / CABLE SEAL FITTING
INSTALLATION AND SEALING
SAIC-P-3617 : LIGHT POLE ASSEMBLY AND INSTALLATION
SAIC-P-3618 : HUNG CEILING, SURFACE / FLUSH MOUNTED LIGHT FIXTURES -
ASSEMBLY, INSTALLATION, AND PRE-COMMISSIONING
SAIC-P-3621 : HID - LOW / HIGH-BAY LIGHT FIXTURES - ASSEMBLY,
INSTALLATION, AND PRE- COMMISSIONING
SAIC-P-3623 : LIGHTING CONTROL SYSTEM - INSTALLATION AND PRE-
COMMISSIONING
SAIC-P-3624 : POLE-MOUNTED LIGHT FIXTURES - ASSEMBLY, INSTALLATION, AND
PRE-COMMISSIONING
SAIC-P-3625 : SECURITY LIGHT FIXTURES (FENCE, AREA, AND CHECKPOINT LTG.) -
ASSEMBLY, INSTALLATION, AND PRE-COMMISSIONING
PROJECT / UNIT JOB No.
Khurais Area Facilities Expansion & 032184
Satellite GOSP Project
PLANT LOCATION Sheet DOC. No.
Khurais - SAUDI ARABIA 18 of 20 000-ZA-E-M09406
TITLE: Revision: DATE:
METHOD STATEMENT FOR BROWN / GREEN FIELD B 07/28/2019
INSTALLATION, TESTING OF LIGHTING AND
POWER OUTLET SYSTEM

4.2. Additional Notes

 QC inspector shall be ensuring all Lighting and Power outlet conform to the
applicable Projects Standards and material receiving inspection has been
conducted, covered with RFI and accepted.
 The QC inspector shall use the relevant SAIC checklist to record his inspection
findings. Any deficiencies noted shall be logged into the Logbook (QEIL System)
and issued to Construction and ensure the comments are rectified before issuing
RFI.
 Prior to installation on site, the lighting fixtures will be identified and checked
against the data sheet.
 Where fixtures are to be installed in hazardous areas, particular attention shall
be paid to the certification to ensure they are suitable for installation in the
classified area.
 Where industrial or vapor-proof fittings are specified, their I.P. rating will be
checked for suitability.
 Equipment such as floodlight columns, which are supplied in sections, or have
accessories supplied loose, will be checked against the particular inventory.
 Unless otherwise stated, all tests shall be conducted by the Electrical Testing
Engineering.
 Support brackets, posts and stanchions will be checked against the detailed
drawings and located in accordance with the layout drawings.
 Particular attention will be paid interference with access ways, handrails and
possible sources of vibration.
 Accessibility for maintenance will be checked and it will be ensured that fixtures
are not installed above equipment with moving parts.
 Upon installation, the support will be checked to ensure rigidly and fixture-fixing
points are available.
 Concrete foundations shall be installed as required.
 Prior to installing the supports, the fixing points and bases will be checked to
ensure their line and level is correct. Cable entries will be checked to ensure they
are clear of debris.
 Lighting fixture will be inspected to ensure they are installed in the manner
shown on the detailed drawings, all accessories are installed and where
applicable, protection guards have been fitted.
 The fixture and support assembly will be checked to ensure stability.
 The orientation will be checked to ensure the correction area is illuminated and
not obscured by pipes and/or structures.
 All exposed conduits for lighting system shall be rigid steel conduits.
PROJECT / UNIT JOB No.
Khurais Area Facilities Expansion & 032184
Satellite GOSP Project
PLANT LOCATION Sheet DOC. No.
Khurais - SAUDI ARABIA 19 of 20 000-ZA-E-M09406
TITLE: Revision: DATE:
METHOD STATEMENT FOR BROWN / GREEN FIELD B 07/28/2019
INSTALLATION, TESTING OF LIGHTING AND
POWER OUTLET SYSTEM

 For cables/wiring termination refer to panel board schedule. Ensure that


continuity and megger value is recorded.
 Sockets will be checked against the Project data sheets prior to installing.
 Sockets installed in Hazardous areas will be checked to ensure their suitability
and rating for that area.
 Sockets mechanically sound and correctly mounted.
 Socket boxes have been installed correctly and spare holes plugged.
 Earthing has been installed as per NEC-250 and SAES-P-111.
 Energize circuit and verify phasing, polarity and voltage at each socket/
equipment.
 Verify circuit description / identification is correct.

5. RESOURCES

5.1. Tools and Equipment

Item Qty
Crane As required
Fork Lift As required
Trailer Truck As required
Man Lift As required
Boom Truck As required
Lifting Gears As required
Rigging Material As required
Electrical Tool Box with complete tools As required
Fire Extinguisher As required
Fire Blanket As required
Electrical Hammer As required
Drilling Machine(120V) As required
Grinding Machine(120V) As required
Welding Machine(120V) As required
Cutting Machine As required
Measuring tape As required
Wrenches As required
Galvanized Spray As required
Bending Machine(120V) As required
Threading Machine(120V) As required
Bench Vise As required
PROJECT / UNIT JOB No.
Khurais Area Facilities Expansion & 032184
Satellite GOSP Project
PLANT LOCATION Sheet DOC. No.
Khurais - SAUDI ARABIA 20 of 20 000-ZA-E-M09406
TITLE: Revision: DATE:
METHOD STATEMENT FOR BROWN / GREEN FIELD B 07/28/2019
INSTALLATION, TESTING OF LIGHTING AND
POWER OUTLET SYSTEM

Tripod Stand As required


Round Files As required
Leveling Tool As required
Multi-tester As required
Earth Tester As required
Micro Ohm Meter As required
Illumination Meter As required
Phase Sequence Meter As required

5.2. Manpower

Item Qty

HSE Officer 2
Crane Operator 1
Fork Lift Operator 1
Trailer Truck Operator 1
Man Lift Operator 1
Boom Truck Operator 1
Rigger 2
Fitters 4
Scaffolders 8
Helpers 8
Flagmen 4
Fire Watchers 2
Scaffolder Foremen 2
Scaffolder Supervisor 1
Scaffolder Inspector 1
Electrical Supervisor 1
Electrical Foremen 2
Electrical Skilled Technician 10
E/I Superintendent 1