Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 1

Mobile Plant BACKHOE ‫ رقم األلية‬:

Issue No.: 1

Prestart Checklist Date:


Statement of Operator Competence – Required
Supplier Verification & Plant Details Verify Check ‫مقصورة القيادة‬ Verify Check WARNING DEVICES
‫النظافة‬ ‫هورن‬
Plant driver: ‫المقعد‬ ‫الفتة االنذار‬
Operator Restraint ‫هورن بك‬
Address:
Instruments & Labelling WARNING SIGNS (In Cabin)
Levers / Controls Verify Check
Phone:
Pedals‫سات‬J‫لدوا‬JJ‫ا‬ SEAT BELTS MUST BE WORN
Plant Make: Windows / Wipers / Washers Verify Check
Verify Check
Rear View Mirrors DANGER – BEWARE OVERHEAD WIRES
Plant Model: SWL & UNDERGROUND SERVICES
Crane Chart
Serial No.:
Verify Check Verify Check
Signature:
Exhaust
‫محور الدوران‬
Verify Check
Date: ‫قضبان التوصيل‬
‫غطاء المحرك‬
‫دبوس االمان‬
Phone: (‫غطية‬J‫ا‬ ‫ وجود‬J‫جبعدم‬JJ‫)ي‬
Verify Check
Verify Check
SWL
‫مفصل الدوران‬
 Plant to conform to manufacturer’s specifications and RoK Regs. ‫دبوس االمان‬ SWL Verify Check
 Plant Operator is to provide daily checksheets to Plant Group on (where applicable)
a weekly basis ‫قضبان التوصيل‬
 Where applicable, Personal Protective Equipment must be worn.
&‫مان‬
‫أل‬JJ‫دبوسا‬
 Plant Log Book Detailing service history in accordance with Verify Check Hydraulics
Manufacturer’s specifications should be written legibly in
English. ‫المطارق الهيدروليكية‬
 Contractor must produce proof of competence of operator, e.g., Verify Check
Certificate of Competence, Licence, Detailed Log Book Hoses
Connections Travelling Hitch
(check for excessive
wear, leaks and creep)

NOTE: Sign only when all items have been checked Verify Check
KEEP CLEAR Verify Check

Plant Check By: (Signs on both sides of vehicle)


‫مساند الصعود‬
‫الدرجات‬
Position:
Verify Check
Instructions:
Date: / / Stabilisers ‫لمثبتات‬JJ‫ا‬
( Verify Box to be ticked by Owner / Supplier / Operator prior to arrival onsite.
Check Box to be ticked after visual inspection by HSE Department

You might also like