Q1. How well is Bayonne utilizing its Current Capacity?
Ans:
Standa Standa
rd Numb Sheets/ Orde rd
Times1 er Pcs rs Hours
Capacit
Tot Tot y
Schedul Sche Total al al Utilizati
Setup Run Mach. ed d. Setup Run Hrs on
Machine Per
or Work Hou mac
Centre Hours rs h.
Composit
ion
(plates)2 40 2 1 1,438 310 207 48 255 73%
Jagenburg
sheeter 0.00 31,85,0
(sheets) 20 33 1 32 310 103 175 279 80%
Heidelber
g press 0.00 31,62,7
(sheets) 50 83 2 37 310 258 438 348 100%
Bobst
die-cut 0.00 31,08,9
(sheets)3 30 75 2 71 310 155 389 272 78%
Int.
Royal/Qu
een F&G 0.00 62,09,3
(pieces)4 180 23 3 29 77 231 238 156 45%
Int.
Staude
F&G 0.01 22,42,0
(pieces) 40 5 4 39 233 155 561 179 52%
Int. 3A
window/
patch 0.01 7,82,27
(pieces)5 100 1 2 4 88 147 143 145 42%
Finishing 6,87,60 1,14
(pieces)6 30 0.1 N/A 1 28 14 6 N/A
The current capacity utilization is low. Heidelberg press has the lowest capacity and it is the
bottleneck process.
Q2. What size of orders would you route to the Royal/Queen work center, and what to the
Staude work center?
Ans:
To calculate the breakeven point for both the machines, we need to equate the total time
required by both the machines.
The total time required is= 180 Royal/queen setup + 0.0023X
The total time required is = 40 Staude setup + 0.015X
180 Royal/queen setup + 0.0023X = 40 Staude setup + 0.015X
By equating both the equations the value of X turns out to be 11024.
Therefore, any order greater than 11024 should be processed by Royal/Queen setup.