ROOF LOADS

DEAD LOAD:
 PURLIN: 0.3 KPa of roof surface
 SUSPENDED STEEL CHANNEL SYSTEM: 0.10 KPa
 INSULATION, PLYWOOD(25/4mm thk): 0.0060KPa(25/4)= 0.035 KPa of the roof surface
 UTILITIES: 0.3 KPa
 Span= 9.6m
 Spacing of trusses: 0.95m

COMPUTATION:
W=35.93+11.78L= 35.93+11.78(9.6)=149.018=0.149 KPa
DEAD LOAD OF TRUSS 1=(0.30KPa+0.10KPa+ 0.035 KPa + 0.3 KPa)(2.4m x 5.13m x 2) + 0.149KPa (9.6m x
2.4m)=21.5316 KN
PD = 21.5316/10 = 2.1532 KN

DEAD LOAD OF TRUSS 2=(0.30 KPa + 0.10 KPa + 0.035 KPa + 0.3 KPa)(3.85m x 5.13m x 2) + 0.149KPa
(9.6m x 3.85m)= 34.5403 KN
PD= 34.5403/10= 3.4540 KN

DEAD LOAD OF TRUSS 3 =(0.30 KPa + 0.10 KPa + 0.035 KPa + 0.3 KPa)(3.6m x 5.13m x 2) + 0.149KPa
(9.6m x 3.6m) =32.2974KN
PD= 32.2974/10 =3.2297KN

DEAD LOAD OF TRUSS 4 = (0.30 KPa + 0.10 KPa + 0.035 KPa + 0.3 KPa)(2.15m x 5.13m x 2) + 0.149KPa
(9.6m x 2.15m) = 19.2887KN
PD=21.5316/10= 2.1532 KN

2.1532 KN

2.1532 KN 2.1532 KN
2.1532 KN
2.1532 KN
2.1532 KN
KN 2.1532
2.1532KN
KN
2.1532
2.1532 KN 2.1532 KN

TRUSS 1
Live Load:
Roof live load = 0.60 kpa
Tributary Area ( Roof live load and weight of truss)
Area = 9.6m x 1.80m = 17.28 ; since symmetrical
Panel Point load due to live load
Live load per truss = 0.60 kpa x 17.28m2 = 10.368 Kn
PL= 10.368 Kn÷ 10=1.037 Kn

Reactions due to Live Load:

∑ Ma=0CW+
1.037 kn(1m) + 1.037kn(1.95m) + 1.037kn(2.9m) + 1.037kn(3.85m) + 1.037kn(4.8m) +
1.037kn(5.75m) + 1.037kn(6.7) + 1.037kn(7.65m) + 1.037kn (8.6m) + 0.5185kn(9.6m)
- Bv(9.6m) = 0
Bv = 5.185 Kn

∑ Fv=0 +
Av + 5.185kn - 0.5185kn(2) - 1.037kn(9) = 0

Av = 5.185 kn