Special Task Date: 16/10/2021

S No. Task Description Date Resource Action By Priority Status Completion Date

1 Crusher 8/27/2021 Inhouse Nadeem/Abdul basit P1 Completed 10/13/2021

2 Air Compressor 10/8/2012 Out source Imran P1 Inprocess


4 EDM Repairment 9/6/2021 Out source Jabar P1 Inprocess
6 Install Tool Box of all machine in hall A 10/11/2012 Inhouse Abdul Basit P2 Inprocess
7 Chillar No#. 4 Tank Change 10/12/2021 Inhouse Abdul Basit P1 Inprocess
9 Grinder bearing change 10/13/2021 Out source Nadeem P1 Completed 10/14/2021
10 Shaper Machine Maintenance 10/4/2021 Inhouse Shafeeq P2 Completed 10/14/2021

12 Ice Jar 750 ml Change insert (Material Required) 10/13/2021 Out source Mansor Sb P1 Completed 10/14/2021

13 Nestle Spoon 11.2 ml Remaining plats 9/4/2021 Out source Junaid P1 Completed 10/14/2021
14 Seco heater front electrod 10/1/2021 Out source Amir Raheem P1 Completed 10/13/2021
15 New Molds number sheet maintain 10/1/2021 Inhouse AB P2 Completed 10/16/2021
17 Seco heater Back CNC rework 10/13/2021 Out source Amir Raheem P1 Completed 10/17/2021
19 Change convyers motor 10/14/2021 Inhouse Nadeem P1 Inprocess
21 Lath machine Belt 10/14/2021 Out source Qadeer P1 Inprocess
22 Alleson plate send to irfan 10/14/2021 Inhouse Qadeer P1 Completed 10/15/2021
Remarks

Not okay
Special Task Date: 13/10/2021
S No. Task Description Date Action By Priority Status Completion Date
1 Air Compressor 10/8/2012 Imran Inprocess
2 Construction work for chillar issue. 9/6/2021 Nadeem Inprocess
3 EDM Repairment 9/6/2021 Jabbar Inprocess
4 Electric Chain Lifter 10/4/2021 Mansoor Inprocess
5 Install Tool Box of all machine in hall A 10/11/2012 Abdul basit Pending
6 Chillar No#.4 Tank Change 10/12/2021
7 Air Compressor Filter & oil Change 13/10/1021
8
9
10
11
12
13
14
15
16
17
18
CEO Meeting Special Task
S No. Task Description Date Action By Priority Status Completion Date

1 Sun heater Grill one Plat is work ready and other plat work in 8/24/2021 Mansoor/Iqbal Completed
process P1 8/26/2021
2 Purchase Registor of workshop Hand over to Amjad sb 8/24/2021 Amjad P1 Completed 8/25/2021
3 Convayor Motor Purchase 8/24/2021 Sajjid/Qadeer P1 Completed 8/24/2021
4 Omore tub maitenance Bush sent for new made 8/24/2021 Sajjid/Waqas P1 Completed

5 Lifter required for workshop 8/24/2021 Inprocess


Abdul Basit/Qadeer P1
6 Chain lifter required for workshop 8/24/2021 Qadeer P1 Completed 8/28/2021
7 EDM Maintenance Card required from Fayaz 8/24/2021 Qadeer P1 Completed 8/28/2021
8 28 Cavity new insert design for mould base replace. 8/24/2021 Arsalan/Abdul Basit Completed 8/28/2021
P1
9 Crusher shifting 8/24/2021 Qadeer P1 Completed 8/27/2021
10 Make a machine estimate maitenance cost report for A5 Appolo 8/24/2021 Completed
200 t Abdul Basit P2 8/26/2021
11 Make a machine estimate maitenance cost report for B4 NIIGATA 8/24/2021 Completed
50 t Abdul Basit P2 8/27/2021
12 Make a machine estimate maitenance cost report for B2 Hatian 8/24/2021 Completed
170 t Abdul Basit P2 8/27/2021
13 New Packing machine required 8/24/2021 Sajid P2 Completed

14 Compressor Room Roof Shift Required Jack 8/24/2021 Saleem/Shafeeq/Qad Completed


eer P2 8/27/2021
15 Sampling will do with new punch of 9.6 ml blue 8/24/2021 Sajid P2 Completed 8/30/2021
16 Data of Old blue spoon to be collect from iqbal CNC. 8/10/2021 Mansoor/Iqbal P1 Completed 8/30/2021
17 Change the water of chiller. 8/26/2021 Nadeem/Abdul Basit P2 Completed 8/31/2021
18 Preventive Maintenance of Hall A 8/28/2021 Abdul Basit/Shafiq P1 Completed 8/31/2021
19 B and C hall water leakage issue 9/6/2021 Qadeer Completed 10/4/2021
20 Air Dryer 9/6/2021 Completed 10/4/2021
21 Air tank paint 9/6/2021 Sajid Completed 9/28/2021
22 Air Compressor 10/8/2012 Imran Inprocess
23 Construction work for chillar issue. 9/6/2021 Nadeem Inprocess
24 EDM Repairment 9/6/2021 Jabbar Inprocess
25 Electric Chain Lifter 10/4/2021 Mansoor Inprocess
26 Tool Box of all machine in hall A 10/11/2012 Abdul basit Pending
Inhouse Job List
S No. New Molds Name Operations Date Action By Priority
1 Teet care Mold EDM work

2 TR purple 8.5 ml 12 cavity Polish


Numbring
EDM work
Tr Brown 11.2 ml 6 cavity
3 Shaper
Suporting Plats
Grinding
Three Rod Heater front
Punch Rips EDM work
Three Rod Heater Back
Punch Ribs EDM work
6 Sun Heater Frame 1 Complete Fitting
Punch side
7 Polish
Seco Heater Front
EDM work
Polish
Seco Heater Back EDM work
9 Complete Fitting
Juicer Mold 2 Complete Fitting
Complete Fitting
Juicer Mold 3 & Suporting
10 Shaper
Plats
Grinding
Sun Heater Grill Complete Fitting

S No. New Molds Name Operations Date Action By Priority


Status Completion Date
Pending

Inprocess

Pending
Inprocess

Pending

Pending

Inprocess

Inprocess

Pending
Pending

Pending

Pending
Pending
Pending