Skill Advancement

Month
No Description 1 2 3 4 5 6 7 8 9
Phase 1
1 Mapping potential candidate to be improved
2 Refresh & Evaluate Technician Trainer Skil

Phase 2
3 Conduct Training

Phase 3
4 Adding responsibility to technician
5 General evaluation
6 Repeat

Utilities Equipment Maintenance Improvement


Month
No Description 1 2 3 4 5 6 7

1 Mapping all JPM


Mapping Utilities Equipment Requirement for all
2 production facilities

3 Trial to implemented the schedule

4 Evaluate
Create Fixed schedule to become the guidance of
5 operator
Skill Advancement
Month
No Description 1 2 3 4 5 6 7 8 9

Phase 1

1 Collect & digitalize all available data


Create trend data and analyze daily (and monthly)
2 usage
Create communication to Any user whose usage is
3 morethan average

4 Repeat and Evaluate

Phase 2

5 Adding More Item


10 11 12 1

Current Condition Asset

Good Database:
Jadwal Produksi
ON – OFF Utilities Equipment based on
Mingguan (JPM)
personnel initiative
already provided by
email

Good Culture:
Prevnt. Maintenance Activity only Preventive
covers whats written, not incl. Maintenance
surrounding area (personnel sensibility) scheduled obeyed by
Engineering
10 11 12 1

Current
Asset
Condition

Available Smart
Metering Device:
Smart Metering Device not yet -Power Meter
maximum utilize -Pure Water Meter
-HVAC Monitoring
System (EMS)
How to deal the
Improvement Plan Challenge Benefit
challenge?

-Reduce human
Create Matrix and Schedule of error
Data Confirmation To
Utilities equipment vs Manuf. Data conformity -Become guidance
Production
Equipment of equipment
scheduling

Improve personnel sensibility by -Improve Prev.


Communication &
daily coaching dan briefing + Ignorance Maintenane service
Encouragement
daily patrol by MGR & SPV area
How to deal
Improvement Plan Challenge Benefit
the challenge?

1. Alongside with
1. Daily Analyze any company
Increasement (or 1.Cost 1. Communication & direction:
Reducement) any usage Industry 4.0 (&
Pharma 4.0)

2. Technician will 2. More allocated


lose the time to skill
2. Adding Raw Water Meter obligation to Encouragement improvement +
Digital check around the troubleshoot
plant. handling
2. Adding technician
3. Adding Steam Meter job to check
Digital surround equipment
on PM schedule

4. Adding Diesel oil Meter