07.02.

2007/Final

CONTRACTOR’S COPY

FINAL CONTRACT PROPOSAL


FOR SUPPLY AND ERECTION OF PRE-ENGINEERED BUILDING
FOR M/S SUPER SCREWS LTD AT AURANGABAD,
DISTT. HODAL, HARYANA

CUSTOMER : M/s Super Screws Limited


Aurangabad, Distt. Hodal
Haryana.

CONTRACTOR : M/s Interarch Building Products Pvt. Ltd


3B/7-A, Bunglow Plot
N.I.T. Faridabad.

PEB ENQ./REF No. : PEBENQ-SEP06/N-372

CONTENTS

Section 1. Scope

Section 2. Building Description

Section 3. Design Loads

Section 4. Standard Supplied Items 6 pages

Section 5. Supply Delivery Period

Section 6. Validity

Section 7. Prices

ANNEXURE-I MATERIAL SPECIFICATION 5 pages

ANNEXURE-II STANDARD TERMS & CONDITIONS OF


SALE 10 pages
M/s Super Screws Ltd, Aurangabad,, Haryana 07.02.2007/Final

Section 1
Scope
Interarch proposes to furnish a pre-engineered steel building (s) as described below.
The building will consist of all components required to construct the primary and
secondary framing (wind bents, wall & roof purlins) plus the wall and roof cladding.
Hardware of the building are included. Interior partition walls, electrical, plumbing,
cooling, heating, foundation, masonary walls, concrete floor or materials not
specifically referenced in this proposal are not included.
Section 2
Building Description
Refer enclosed literature for technical details.

Building Usage : FACTORY


No. of identical buildings : TWO

General Features:
Type : TCCS (Tapered Column Clear Span)
Width : 30.48m C/C of Steel Column
Length : 119.595m C/C of Steel Column
2.0m clear above 9.670 RCC Column (by
Eave height :
others)
Width module : 1 @ 30.48m
Roof slope : 1 in 15
Bay spacing : 17 @ 7.035m c/c
Front End Frame : No frame
Back End Frame : No frame
Type of bracing on roof & wall : Diagonal Rod / Angle Bracing (as per design)
26G thick Tracdek Hi-Rib Bare Galvalume
Roof panel :
550 Mpa steel.
26G thick Tracdek Wall SMP coated
Wall Panel :
Galvalume 550 Mpa steel.
Sidewall girts and endwall girts are mounted
Girts :
on the exterior face of the main column.
Mechanically galvanised Hex-washer head
Fasteners : self-drilling fasteners with integral EPDM
seals.
Accessories : Flashing, trims, eave gutters & downspouts
Day Lighting panel 2 mm thick FRP day lighting panels of size
:
DLP HR GRP3 1.0m x 3.0 m for 3% of roof area.
All primary and secondary members shall be
Paint Finish : supplied with factory applied one coat of zinc
chromate red oxide primer.
All walls except Front end wall & Back end
Special conditions : wall clad to full height above RCC
Column/brick wall (by others).
Building condition : Enclosed.

Section 3

Design Loads (Live / Wind)

The building is designed for the following Live Load and Wind Speed.

Live Load : 0.75 KN/m2


Wind Speed : 47 m/sec (as per IS 875 Part III) 1987
Seismic Zone (Zone (Z) ) : IV (0.24) (as per IS 1893) 2002

Deflections :
Main frame
Vertical : L/180
Lateral : EH/100
Purlins : L/180

Applicable Codes :

Loads are applied in accordance with :


The 1996 Edition of Low Rise Building System Manual
Metal Building Manufactures Association (MBMA)

Hot rolled and Built up sections are designed in accordance with:


Manual of Steel Construction, 9th Edition
American Institute of Steel Construction (AISC)

Cold-formed members are designed in accordance with:


1996 Edition of Cold formed Steel Design Manual
American Iron and Steel Institute (AISI)

Welding is applied in accordance with:


American Welding Society (AWS D1.1.98)
Structural Welding Code – Steel
Section 4
Standard Supplied Items
The following are included to supply :

• Rigid frame structural for columns, rafters with end plates, purlins, girts
• All necessary flashings, trims, eave gutters & downspouts
• Roofing & cladding sheets
• Structural hardware & sheeting fasteners
• End lap sealant
• Bracing
• Anchor bolts and templates
• All structurals shall be supplied with one coat of factory applied primer
• 2 mm thick FRP day light panel

Exclusions
• Interior partitions, doors and fixtures
• Roof fans, pipe flashing, curbs
• Wall vents, fans, doors, windows and louvers
• Civil, mechanical and electrical design and materials
• Concrete embed plates of weld plate of any kind
• Foundation and masonry design / work / materials
• Setting of Anchor Bolt – (Physical setting or fixing) . INTERARCH will
only check dimensional accuracy of anchor bolt set out.
• Grouting - Grouting under column base plates with high strength grout.
• Crane beam, brackets, crane rails and crane
• Electricity & Water required during work at site.

Section 5
Supply / Delivery and Erection Period

All the materials of the building shall be supplied within 6-8 weeks from the
date of receipt of confirmed order with advance and sign off of GA drawings.
Erection can be completed within 4 - 6 weeks thereafter.

Section 6
Validity of offer

This offer is valid till 30 days from the date of issue. Any changes in the prices
of the material, labour, freight, taxes, duties or local levies will be charged
extra after the expiry period of validity. Any change in Sales Tax / VAT / Entry
Tax / Octroi shall be charged extra as prevalent at time of delivery.
Section 7
Prices

Our lumpsum price for the supply and erection of the building described as
above shall be :

SUPPLY +
DESCRIPTION
ERECTION
Building – 2 Nos. Rs.1,40,00,000/-

OPTIONAL
Turbo vent – 600mm dia : Rs.10,000/- per unit

The above price for the building is for Design, Engineering, and Preparation
of erection drawings, manufacture, supply, transportation and erection of the
Pre-Engineered Building. Service tax @ 12.24% shall be charged extra on
full contract value for which full CENVAT credit will be available for you.
VAT/Sales tax on works contract as applicable shall be charged extra on
Supply + Erection including service tax.

Penalty Clause

Penalty of 0.5% per week, to a maximum of 5% will be deducted from the


payment in case the supply/delivery & erection period is not met.

Payment Terms

10% of the total contract value as advance along with order


10% on drawing submission/approval
50% against proforma Invoice- I prior to dispatch of structural materials.
20% against proforma Invoice – II prior to dispatch of sheeting materials.
5% on erection of structures.
5% on completion of sheeting.
Handing Over

Interarch will handover the building in full, or in stages, depending upon


progress and safety considerations, for the customer to carryout further
works related to the building.

The customer will not occupy or put to use the building in whole or in part,
without issuing Interarch a completion certificate in respect thereof.

Entry Tax / Octroi

The price given does not include element of entry tax and octroi as and if
applicable in the state will be extra over and above price given.

We hope you will find our offer in line with your requirement, however if you have any
query, please feel free to call us. We look forward to receive your valuable order.

Agreed & Accepted by

For Interarch Building Products Pvt. Ltd for Super Screws Limited

MANISH GARG Authorised Signatory


GM – MARKETING (TECH)