Jumlah 25,217,500.00
D PEKERJAAN PASANGAN & PLESTERAN
2
1 Pasangan dinding batu bata 1 PC : 5 PS m 225.75 150,000.00 33,862,500.00
2 Plesteran dinding halus 1 PC : 5 PS m2 405.13 65,000.00 26,333,125.00
3 Acian dinding m2 405.13 38,000.00 15,394,750.00
4 Benangan m¹ 50.00 23,000.00 1,150,000.00
Jumlah 76,740,375.00
E PEKERJAAN LANTAI
3
1 Urugan sirtu padat t 0.10 cm m 5.40 300,000.00 1,620,000.00
2 Rabat, beton K-100 / f'c 8,30 Mpa m3 2.70 800,000.00 2,160,000.00
3 Keramik lantai 60x60 cm Warna/motif m2 46.30 200,000.00 9,260,000.00
4 Keramik lantai 20x20 cm Km/wc 2 unit m2 2.30 150,000.00 345,000.00
5 Keramik Dinding 25x25 cm Km/wc 2 unit m2 4.60 150,000.00 690,000.00
6 Keramik Dinding Dapur 25x25 cm m2 3.00 150,000.00 450,000.00
Jumlah 14,525,000.00
F PEKERJAAN ATAP
1 Penutup Atap + Galvalhum + Wuwung m2 60.00 250,000.00 15,000,000.00
Jumlah 15,000,000.00
G PEKERJAAN PLAFON
1 Pekerjaan Plafoud kalsiboard tebal: 4,5 mm, m² 48.60 120,000.00 5,832,000.00
Jumlah 5,832,000.00
H PEKERJAAN PENGECATAN
2
1 Cat Interior m 405.13 35,000.00 14,179,375.00
2 Cat Plafound m2 48.60 35,000.00 1,701,000.00
Jumlah 15,880,375.00
I PEKERJAAN KUSEN
1 Pintu Tipe PJ1 unit 2.00 1,500,000.00 3,000,000.00
2 Pintu Tipe PJ2 unit 1.00 2,000,000.00 2,000,000.00
3 Pintu Kamar mandi unit 1.00 450,000.00 450,000.00
4 Jendela Tipe J2 unit 3.00 1,800,000.00 5,400,000.00
Jumlah 10,850,000.00
J PEKERJAAN ELEKTRIKAL
1 Pemasangan saklar ganda buah 2.00 90,000.00 180,000.00
2 Pemasangan titik stop kontak 200 W titik 6.00 75,000.00 450,000.00
3 Pemasangan instalasi titik lampu + Fitting Lampu titik 7.00 182,955.00 1,280,685.00
4 Kabel dari saluran induk, kabel NYY 4x4 mm bh 2.00 600,000.00 1,200,000.00
Jumlah 3,110,685.00
K PEKERJAAN LAIN-LAIN
1 Floor Drain bh 1.00 30,000.00 30,000.00
2 Pipa PVC 3/4' ljr 4.00 50,000.00 200,000.00
3 Pipa PVC 4' ljr 3.00 90,000.00 270,000.00
4 Kran dinding bh 2.00 18,000.00 36,000.00
5 Bak Air bh 1.00 400,000.00 400,000.00
6 Clooset Duduk bh 1.00 2,400,000.00 2,400,000.00
7 Pekerjaan Paving m2 19.80 120,000.00 2,376,000.00
8 Bouvenlist bh 1.00 350,000.00 350,000.00
9 Bouvenlist Depan ls 1.00 1,500,000.00 1,500,000.00
10 Pekerjaan Sumur Resapan ls 1.00 2,500,000.00 2,500,000.00
11 Pekerjaan Taman m2 3.00 450,000.00 1,350,000.00
12 Pembersihan akhir ls 1.00 2,000,000.00 2,000,000.00
Jumlah 13,412,000.00
Total 209,540,435.00