• First aircraft for flight and strength tests are in production at the plant in
the Irkutsk city
• An extensive program of aerodynamic, strength and endurance test confirm
design solutions
• An extensive upgrading program of Russian enterprises resulted with
radically new technological environment
• A system of technical and financial customers support is developed
• The total number of orders for MC-21-300 and MC-21-200 aircraft is
273–175 of them are firm
AIRCRAFT ASSEMBLY
Irkut Corporation plant is manufacturing fuselage sections and carries
out its assembly
!
AIRCRAFT ASSEMBLY
Flight deck
assembly
!
AIRCRAFT ASSEMBLY
Fuselage panel
production line
!
AIRCRAFT ASSEMBLY
Fuselage panels
section on
the AGV
automated trolley
!
AIRCRAFT ASSEMBLY
Fuselage panel
on the assembly line
!
AIRCRAFT ASSEMBLY
Center section
getting ready
for transportation
!
AIRCRAFT ASSEMBLY
Penetrant
inspection
!
WING PRODUCTION
High aspect ratio wing made of polymer composites provide MC-21 with high
aerodynamic performance and fuel consumption reduction
New AeroComposit-Ulyanovsk plant is assembling the wing for the first aircraft
Spars, panels and other components of the wing are made of polymer
composite materials using the infusion technology at the new AeroComposite-
Ulyanovsk plant
Wing box prototypes were successfully tested on static and fatigue strength
WING PRODUCTION
Automatic
spar layup
!
WING PRODUCTION
Leading-edge
assembly
!
WING PRODUCTION
Automatic stringer
layup
!
WING PRODUCTION
Supersonic testing
!
WING PRODUCTION
Tooling
of wing panel
!
EMPENNAGE ASSEMBLY
The assembly of the fuselage section with empennage, made of composite
materials, is conducted at the Aviastar-SP plant
Tail fin leading edge was successfully tested on bird strike resistance
EMPENNAGE ASSEMBLY
Fin box
!
EMPENNAGE ASSEMBLY
Rear fuselage
assembly
!
POWER PLANT
At the customer's demand MC-21 aircraft is equipped with two types of new
generation power plants:
Both options provide reduction of fuel consumption, noise, emissions and life
cycle cost
PW1400G-JM ENGINE
The first MC-21 aircraft, to be
built in 2015, will be equipped
with PW1400G-JM engine
(Pratt & Whitney)
Certification application to
the FAA for PW1400G-JM
engine has been made
PD-14 ENGINE
6 test engines manufactured
Preparations of IL-76LL
flying laboratory for engine
testing is underway
!
Application for the Type
Certification to the Aviation
Register of Interstate
Aviation Committee has
been made
LANDING GEAR PRODUCTION
For the first MC-21-300 aircraft and for ground-based testing, Hydromash
plant produced landing gear kits
Nose
gear
!
AVIONICS
Avionics software development and integration for the maiden flight is in progress
Software and the on-board equipment testing on the first stage stands is underway
Completion of equipment deliveries for the full cycle of bench tests of the first
aircraft
AVIONICS
Aircraft
control and
navigational
equipment
development
stand
!
TRAINING FACILITIES
A complex of technical training means is created for training of all categories
of MC-21 aircraft personnel
!
THANK YOU FOR YOUR ATTENTION!