Dear Sir,

For proper coal stock management at coal yard, the following measures are to be taken:

1. Old coal lying at coal yard which is not suitable for boiler firing due to Low GCV & high ash
content, to be used as coal bed in coal stacking area for SR.
2. The following machinery required for coal stacking, Compaction, and reclamation:

Sl. No Particulars Quantity Used for Hire charges Fuel


consumption
1 Poclains 2 no. Stacking of coal Rs. 1.9 Lakh 11 lts per Hour
For entire length of per month.
600m in trapezoidal
shape( One in left
side and one in Right
side)
2 D-50 Dozer 1 No Layered compaction Rs. 1.5 lakh 8 Lts per Hour
of coal per month.
3 JCB 1 No Pushing thin layer of Rs. 1.1 Lakh 5 lts per Hour
coal to reclaimer Per month.
/feeding diesel to
LOCO and
machinery.
4 Pay Loader 1 NO. Sizing the slopes of Rs. 1.5 lakh 6 lt per Hour
coal stack, pushing per month
coal to emergency
bunkers and loading
of trucks
5 Tata Haiwa 3 no Emergency Rs. 1.1 lakh 3km per litre
transport of coal in per month
case of SR/ Belt
failure.
6 Fire Tender 1 No Fire safety Available 10 lts per Hour

Note:
1. Sprinkles arrangement must be fitted urgently along the SR and coal stacking side.
2. Management may consider procurement of machinery/ Hiring basis.