7.5.1.4 Remove existing crawl space access door and set aside for re-
installation.
DESCRIPTION
7.5.2 New Works: (Refer to Drawing No. HA-110967, Index R, Sheet No. 024,
Rev.00)
boards.
7.5.2.3 Install new fiber cement board sheathing on walls, parapet and
DATE
DISCIPLINE
ENGINEER
BOD 7.5.2.5 Install new PVC + Fleece roof waterproofing system inclusive
DATE: 12-10-18 of the required wood cant strip, wood blocking insulation
PROJECT boards, and other installation accessories in accordance with
ENGINEER
manufacturer standards.
JPM
DATE:
12-12-18
CERTIFIED 7.5.2.6 Install new pre-painted gauge 20 aluminum flashing and inside
HAK gutters.
DATE:
12-12-18
CONSTRUCTION 7.5.2.7 Install new roof drains, overflow drains and PVC drainpipes.
AGENCY
ASK
DATE:
12-12-18 7.5.2.8 Install new stainless steel handrails and guardrails.
OPERATIONS
landing.
EDSD
canopy.
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
8.1 General
18U029-029
SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION