THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO.

NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

7.5.1 Removal and Demolition Works (Refer to Drawing No. HA-110967,


Index R, Sheet No. 023, Rev.00)
ENGG CERT

7.5.1.1 Demolish/remove existing canopy.

7.5.1.2 Remove existing steel pipe guard.

7.5.1.3 Remove existing steel handrails and guardrails.

7.5.1.4 Remove existing crawl space access door and set aside for re-
installation.
DESCRIPTION

7.5.2 New Works: (Refer to Drawing No. HA-110967, Index R, Sheet No. 024,
Rev.00)

7.5.2.1 Erect/install new exterior metal walls, parapet and canopy


framing system.

7.5.2.2 Install new EPDM strips on newly constructed exterior wall


framing system, prior to installation of new fiber cement
JO/EWO

boards.

7.5.2.3 Install new fiber cement board sheathing on walls, parapet and
DATE

canopy walls and ceiling.

7.5.2.4 Install new 12mm thick OSB board roof backing.


NO.
REV

DISCIPLINE
ENGINEER
BOD 7.5.2.5 Install new PVC + Fleece roof waterproofing system inclusive
DATE: 12-10-18 of the required wood cant strip, wood blocking insulation
PROJECT boards, and other installation accessories in accordance with
ENGINEER
manufacturer standards.
JPM
DATE:
12-12-18
CERTIFIED 7.5.2.6 Install new pre-painted gauge 20 aluminum flashing and inside
HAK gutters.
DATE:
12-12-18
CONSTRUCTION 7.5.2.7 Install new roof drains, overflow drains and PVC drainpipes.
AGENCY
ASK
DATE:
12-12-18 7.5.2.8 Install new stainless steel handrails and guardrails.
OPERATIONS

MAI 7.5.2.9 Re-install existing crawl space access door.


DATE:
12-12-18
7.5.2.10 Apply non-skid paint on existing concrete stairs/steps and
CONTROL NUMBER
VERIFICATION

landing.
EDSD

7.5.2.11 Apply/Install new EIFS system on walls, ceilings, parapet and


DATE:

canopy.
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

8 MECHANICAL – FIRE PROTECTION SYSTEM


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. _____________________

8.1 General
18U029-029

SCOPE OF WORK DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

RENOVATE B#3097 & INSTL FPS & FDS DOC 34


H28 A HE-110985
DRILLING & WORKOVER FACILITIES of 00
DHAHRAN SAUDI ARABIA JO/EWO 18U029 521
(BSP-108- CGD, NEH, EGG) ISSUE DATE: 12-23-2018 100%