Liberty Mills Limited: Job Card Issuance

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

LIBERTY MILLS LIMITED 11/11/2020 LML/4/002

5:21:17PM Issue No. 1


A/51-A. S.I.T.E.
Manghopir Road.
Karachi. Job Card Issuance Page 1 of 2
Lot No. : 1914039 - A Order No.: 4592 - L - 2019 Order Reference No.: 4870+4871

Customer LHT 2 DUN Order Receive Date 05/03/2020 REMARKS


Design Name/No BRUSHED CHECK Greige Receive Date 10/06/2020 Issue 10,261.00
Matching TEAL Greige Issue Date 11/06/2020 Return 0.00
Version FRONT Greige Width 106" Net 10,261.00
Quantity 10,261 Finish Width 101" Lot Cancel
Const / Quality 022X008/040X036 100% COTTON Fabric Form GREIGE Status Complete
Instruction - H NO==> 0-0

Lot Instructions
WHITNESS AS PER STANDARD

Route-Flow Process Process Shift St. Time F. Time Total Reproc. Batcher/Trolly No Qlty. Status
FFP 589 Date Meters Meters No (OK/Hold)

Batching 10/06/2020 C 03:52:00 03:52:00 10,141 0 P2444, P2464 OK


Desizing 16/06/2020 C 00:00:00 00:10:00 10,090 0 NEW-003, P-2552, P-2575 OK
Sol. Bleach F/W With Softner
16/06/2020 C 06:35:00 07:40:00 10,760 0 K-1008, P-2636 OK
Stretch (Optional) - - 0 0 0 0 -
Raising 20/06/2020 A 08:06:00 11:52:00 10,800 0 P-2068, P-2102, P-2140, OK
P-2468
Stretch (Optical) 20/06/2020 A 13:41:00 14:35:00 10,710 0 P-2044, P-2080, P-2205, OK
P-2445, P-2628
Calander (Optional) - - 0 0 0 0 -
Print Pigment 22/06/2020 B 16:00:00 19:05:00 10,650 0 OT115, OT137, OT259, OK
OT42, R264, S263, ZP208
Curing 22/06/2020 B 20:06:00 23:26:00 10,650 0 KB-100, OT-137, OT-148, OK
OT-259, OT-42, S-263,
ZP-208
Finishing 23/06/2020 C 04:51:00 06:15:00 10,515 0 H-116, P-2167, P-2602, OK
P-2627
Sanforize (Optional) 23/06/2020 A 10:31:00 10:35:00 10,310 0 H-116, K-1000, P-2167, OK
P-2208, P-2508
Calander After (Optional) - - 0 0 0 0 -
Brushing (Optional) - - 0 0 0 0 -
Fold 24/06/2020 C 00:40:59 00:40:59 11,037 0 FR01-A, FR02-U OK

Greige Inspection Report: Finish Inspection Report:


L.Short cm A. 10,331 Mtrs 100.68%
G.S.M. 173 FSP 245 Mtrs 2.39%
Greige Return AA. 0 Mtrs 0.00%
Thans B. 451 Mtrs 4.40%
PKT 0 Mtrs 0.00%
Greige Issued On Trolly: 0 0.00%
C Pcs Mtrs
Quantity Trolly No
Total 11,027 Mtrs 107.47%
10,261 <===Total Greige Issued
End To End 0.00%

Job Card Transfer From Greige Remarks


JobCard/Lot Return JobCard/Lot Transfer Remarks
From Qty To Qty
- -
LIBERTY MILLS LIMITED 11/11/2020 LML/4/002
5:21:19PM Issue No. 1
A/51-A. S.I.T.E.
Manghopir Road.
Karachi. Job Card Issuance Page 2 of 2
Lot No. : 1914039 - A Order No.: 4592 - L - 2019 Order Reference No.: 4870+4871

Customer LHT 2 DUN Order Receive Date 05/03/2020 REMARKS


Design Name/No BRUSHED CHECK Greige Receive Date 10/06/2020 Issue 10,261.00
Matching TEAL Greige Issue Date 11/06/2020 Return 0.00
Version FRONT Greige Width 106" Net 10,261.00
Quantity 10,261 Finish Width 101" Lot Cancel
Const / Quality 022X008/040X036 100% COTTON Fabric Form GREIGE Status Complete
Instruction - H NO==> 0-0

Lot Instructions
WHITNESS AS PER STANDARD

Route-Flow Process Process Shift St. Time F. Time Total Reproc. Batcher/Trolly No Qlty. Status
FFP 589 Date Meters Meters No (OK/Hold)
Job Card Production History
Date/Time User Option Remarks
Aug 22 2020 6:10PM Lot Process Complete Utility Job Card No : 1914039-A, Change Lot Process Status, Using option: Lot Process Complete Utility,Change
by m.rashid Dated:22/08/2020 6:10:43 PM
Aug 22 2020 6:10PM Lot Process Complete Utility Job Card No : 1914039-A, Change Lot Process Status, Using option: Lot Process Complete Utility,Change
by m.rashid Dated:22/08/2020 6:10:43 PM
Aug 22 2020 6:10PM Lot Process Complete Utility Job Card No : 1914039-A, Change Lot Process Status, Using option: Lot Process Complete Utility,Change
by m.rashid Dated:22/08/2020 6:10:43 PM
Aug 22 2020 6:10PM Lot Process Complete Utility Job Card No : 1914039-A, Change Lot Process Status, Using option: Lot Process Complete Utility,Change
by m.rashid Dated:22/08/2020 6:10:43 PM
Aug 22 2020 6:10PM Lot Process Complete Utility Job Card No : 1914039-A, Change Lot Process Status, Using option: Lot Process Complete Utility,Change
by m.rashid Dated:22/08/2020 6:10:43 PM
Aug 22 2020 6:10PM Lot Process Complete Utility Job Card No : 1914039-A, Change Lot Process Status, Using option: Lot Process Complete Utility,Change
by m.rashid Dated:22/08/2020 6:10:43 PM
Aug 22 2020 6:10PM Lot Process Complete Utility Job Card No : 1914039-A, Change Lot Process Status, Using option: Lot Process Complete Utility,Change
by m.rashid Dated:22/08/2020 6:10:43 PM
Aug 22 2020 6:10PM Lot Process Complete Utility Job Card No : 1914039-A, Change Lot Process Status, Using option: Lot Process Complete Utility,Change
by m.rashid Dated:22/08/2020 6:10:43 PM
Aug 22 2020 6:10PM Lot Process Complete Utility Job Card No : 1914039-A, Change Lot Process Status, Using option: Lot Process Complete Utility,Change
by m.rashid Dated:22/08/2020 6:10:43 PM
Jun 9 2020 11:37PM Change Lot Quantity Lot Quantity Changed In Lot No.: 1914039-A From 12825 To 10261, Updated By M.WAQAS, on
date:09/06/2020
Jun 13 2020 10:03AM Multiple Job Card / Lot Remarks Assigning
Job Card No 1914039-A in Order No.: 4592-L-2019/14, JC Remarks has been updated, Using option:
Multiple Job Card / Lot Remarks Assigning
Jun 16 2020 1:50AM Change Memo Process Route Changed Memo Process From: Batching to Desizing, Using Option: Change Memo Process Route, User
ID: M.RIZWAN; Reason of Change: rr, IP Address:
Jun 18 2020 7:16PM Change Memo Process Route Changed Memo Process From: Desizing to Raising, Using Option: Change Memo Process Route, User ID:
M.RIZWAN; Reason of Change: asd, IP Address:
Jun 19 2020 4:47AM Change Memo Process Route Changed Memo Process From: Calander (Optional) to Print Pigment, Using Option: Change Memo Process
Route, User ID: M.SUNNY; Reason of Change: A, IP Address:
Jun 20 2020 4:22PM Change Memo Process Route Changed Memo Process From: Calander (Optional) to Print Pigment, Using Option: Change Memo Process
Route, User ID: ISMAIL.SAGAR; Reason of Change: D, IP Address:
Jun 20 2020 12:43AM Change Memo Process Route Changed Memo Process From: Calander (Optional) to Print Pigment, Using Option: Change Memo Process
Route, User ID: M.SUNNY; Reason of Change: S, IP Address:
Jun 23 2020 12:06PM Change Memo Process Route Changed Memo Process From: Calander After (Optional) to Fold, Using Option: Change Memo Process
Route, User ID: ISMAIL.SAGAR; Reason of Change: y, IP Address:

Job Card Remarks: -


Return Date Return Qty. Greige Return Remarks
0.00 -
Greige Transfer

PRODUCTION REMARKS
Machine Process Name Remarks Entry Date Time
DESIZE-01 Desizing 171MTR SHORT 16/06/2020 2:06:08AM
REGGIANI-03 Print Pigment FABRIC SHOT FOR SETTING 60 MTR INFOM TO SHOIL 22/06/2020 7:54:05PM
GENERAL Stretch (Optional) Process skip 27/08/2020 4:18:59PM
GENERAL Calander (Optional) Process skip 27/08/2020 4:18:59PM
GENERAL Calander After (Optional) Process skip 27/08/2020 4:18:59PM
GENERAL Brushing (Optional) Process skip 27/08/2020 4:18:59PM

You might also like