Work Breakdown Structure: Project Name: Department: Focus Area: Product/Process

You might also like

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 4

Work Breakdown Structure

Project Name:
Department:
Focus Area:
Product/Process:

Prepared By

Document Owner(s) Project/Organization Role

Project Closure Report Version Control

Version Date Author Change Description


Created document.

Confidential
550484574.doc
Last printed 4/6/2004 4:07:00 PM
Work Breakdown Structure

Work Breakdown Structure Purpose and Limitations

[Replace this text with a statement of the purpose and limitations of this worksheet, or use the
following sample.]

The purpose of this worksheet is to:


 Identify the work to be done.
 Identify the types of resources required for the work.
 Develop estimates for each work element.
 Identify storage locations.
This worksheet does not address:
 Who will perform the work.
 When the work will be completed.

Confidential Page 2 10/18/2021


Work Breakdown Structure

Work Breakdown Structure Organization Chart

1.0
Automated
Software System

1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8


Prime Mission Platform Systems Eng/ System Test Training Data Peculiar Common
Product Integration Program Mgt & Evaluation Support Equip Support Equip

1.1.1 1.1.2 1.1.3 1.5.1 1.5.2 1.5.3 1.8.1 1.8.2


Subsystem 1… PMP Application PMP System Equipment Services Facilities Test & Measure Support &
(Specify Names) Software Software Equip Handling Equip

Confidential Page 3 10/18/2021


Work Breakdown Structure

Work Breakdown Structure Worksheet

Include
Work (Completion Asset Estimated Skill
ID Work Name Description Criteria) Customer Type Complexity Effort Required Dependency Hand Off To Storage/Location
1.0
1.1
1.1.1
1.1.2
1.1.3
2.0
2.1
2.1.1
2.1.2

Confidential Page 4 10/18/2021

You might also like