JOB PACKAGE PAGE 1/2

REF # LSI - CAV - 022018 - JP008 DATE: 14-Mar-18

PROJECT: CAVITE UG FOC NETWORK


SCOPE OF WORKS:
HDD ✔ POLE OTHERS (PLS SPECIFY) ✔

MICROTRENCH ✔ FOC WORKS 1.) E/E JOINTING

HH/SB ✔ BRIDGE ATTACHMENT 2.) RESTORATION WORKS

LOCATION: MARAGONDON, CAVITE

QUANTITY: see attached BOM BASELINE TARGET COMPLETION:

ATTACHMENT CHECKLIST:
PARTICULARS AVAILABLE REMARKS CONTACT PERSON

BGY PERMITS ✔ 15 Bgys Analyn - CP # 0917 824 4636

LGU PERMITS ON PROCESS TO BE PROVIDED AT SITE Analyn - CP # 0917 824 4636

PERMITS

DPWH PERMIT ON PROCESS TO BE PROVIDED AT SITE Analyn - CP # 0917 824 4637

OTHER PERMITS ON PROCESS TO BE PROVIDED AT SITE Analyn - CP # 0917 824 4638

area is critical : GPR support can be Leo - CP # 0906 008 3573 /


GPR GPR SCANN REPORT ✔
provided upon request Fiel - Cp # 0926 512 6480

BOQ SPAN TO SPAN PLANNED LENGTH ✔ MT / HDD / RESTORATION / HH / EE Tina - CP # 0915 199 0686

Micro Trenching, HH, EE Jointing,


MATERIALS BOM (BILL OF MATERIALS) ✔ HDD on Bridge Crossing & Restoration Tina - CP # 0915 199 0686
works

GEO PLAN ✔ Melai - CP # 0908 888 4521

ALL 24 WAY HDD MUST BE DONE BY


PLANS SCHEMATIC DRAWING ✔ SHALLOW DRILLING (MAX OF 0.80M NSB
DEPTH ONLY)

DETAILS ✔ HH DETAILS Tina - CP # 0915 199 0686

DOCUMENTATION CHECKLIST ✔ Tina - CP # 0915 199 0686

FORMS &
SITE INSTRUCTION FORM ✔ Tina - CP # 0915 199 0686
GUIDELINES

ACCEPTANCE FORMS (Physical Inspection


✔ MIKE - 0935 089 1035
Defficiency List)

COMPLETE GUIDE TO ACHIVED


MT GUIDELINES ✔ QUALITY MT WORKS AND NSB
OTHERS (PLS RESTORATION
INDICATE AS
REQUIRED)
JOB PACKAGE PAGE 2/2

SPECIAL INSTRUCTION:

ITEMS INSTRUCTION / NOTES

PROVIDE BOLLARDS, WARNINGS SIGNS, BARRICADES, & BLINKERS / EXCESS SOIL MUST BE DISPOSED
SAFETY
ASAP. INSTALL CAVITE TARPS TO ALL TRUCKS & BOARD UPS

COURTESY CALL PRIOR TO


TO ALL BGY CHAIRMAN & DPWH INSPECTOR PRIOR TO START (COORDINATE WITH ROW TEAM)
START

MD TO INSTALL 1 RUN 24 WAY (7/3.5) ALONG TANZA - TRECE RD / 2 RUN 7 WAY (14/10) ALONG ANTERO SORIANO RD.

WORKING HOURS AVOID NOISE ON RESIDENTIAL AREAS DURING NIGHT TIME / TRAFFIC FLOW MUST BE PROPERLY CONTROLL

Locations of HH / EE & Trench reflected on the Plan must be strictly followed, any diviation must be
OTHERS
coordinated to Engg / ROW Teams for proper approval of DPWH.

ENDORSEMENT & NOTES

ROW: ANN AGUILLON ENGINEERING: BODGY DANGA GPR: MIKE ALCORIZA

QUALITY: PREPARED BY: APPROVED BY:


(1.) MT DEPTH ON EARTH MUST BE AT MAX.
OF 450 MM;
(2.) SPECIFICATIONS OF CONCRETE =
3,500PSI @ 3 DAYS; TINA YUMUL
(3.) THICKNESS OF CHECKED BY:
RESTORATION = TO EXISTING THICKNESS OF
GUTTER OR ROAD PAVEMENT

NSBONGON D. VOIGT

RECEIVED BY:

PMO 2 NAME SIGNATURE DATE:

PROCUREMENT NAME SIGNATURE DATE:

NMC NAME SIGNATURE DATE:

NAME SIGNATURE DATE:

NAME SIGNATURE DATE:


IMPLEMENTATION
TEAM
NAME SIGNATURE DATE:

NAME SIGNATURE DATE:


MARAGONDON, CAVITE

MICRO TRENCH ON SOIL (METERS) TRENCHLESS / HDD (METERS)


MT /
ALONG FROM TO
HDD 1 RUN 24 1 RUN 7 1 RUN - 24 2 RUN - 7 1 - RUN 7
TOTAL MT TOTAL HDD
WAY WAY WAY WAY WAY
MT ALFONSO-MARAGONDON RD HH1 HH2 507.00 507.00 0.00
MT ALFONSO-MARAGONDON RD HH2 HH3 494.00 494.00 0.00
MT ALFONSO-MARAGONDON RD HH3 HH4 500.00 500.00 0.00
MT ALFONSO-MARAGONDON RD HH4 HH5 497.00 497.00 0.00
MT ALFONSO-MARAGONDON RD HH5 HH6 500.00 500.00 0.00
MT ALFONSO-MARAGONDON RD HH6 HH7 500.00 500.00 0.00
MT ALFONSO-MARAGONDON RD HH7 HH8 500.00 500.00 0.00
MT ALFONSO-MARAGONDON RD HH8 HH9 518.00 518.00 0.00
MT ALFONSO-MARAGONDON RD HH9 HH10 282.00 282.00 0.00
MT ALFONSO-MARAGONDON RD HH10 HH11 494.00 494.00 0.00
MT ALFONSO-MARAGONDON RD HH11 HH12 500.00 500.00 0.00
MT ALFONSO-MARAGONDON RD HH12 HH13 500.00 500.00 0.00
MT ALFONSO-MARAGONDON RD HH13 HH14 518.00 518.00 0.00
MT ALFONSO-MARAGONDON RD HH14 HH15 500.00 500.00 0.00
MT ALFONSO-MARAGONDON RD HH15 HH16 480.00 480.00 0.00
MT ALFONSO-MARAGONDON RD HH16 HH17 500.00 500.00 0.00
MT ALFONSO-MARAGONDON RD HH17 HH18 500.00 500.00 0.00
MT ALFONSO-MARAGONDON RD HH18 HH19 492.00 492.00 0.00
MT ALFONSO-MARAGONDON RD HH19 HH20 500.00 500.00 0.00
MT ALFONSO-MARAGONDON RD HH20 HH21 500.00 500.00 0.00
MT ALFONSO-MARAGONDON RD HH21 HH22 500.00 500.00 0.00
HDD ALFONSO-MARAGONDON RD HH22 EE 0.00 190.00 190.00
HDD ALFONSO-MARAGONDON RD EE EE 0.00 107.00 107.00
HDD ALFONSO-MARAGONDON RD EE HH23 0.00 203.00 203.00
MT RIEGO DELOS SANTOS RD HH23 HH24 500.00 500.00 0.00
HDD RIEGO DELOS SANTOS RD HH24 EE 0.00 250.00 250.00
HDD RIEGO DELOS SANTOS RD EE HH25 0.00 250.00 250.00
HDD RIEGO DELOS SANTOS RD HH25 HH26 0.00 250.00 250.00
HDD GOVERNOR'S DRIVE EE(TERNATE) HH27 0.00 250.00 250.00
HDD GOVERNOR'S DRIVE HH27 EE 0.00 250.00 250.00
HDD GOVERNOR'S DRIVE EE HH28 0.00 250.00 250.00
HDD GOVERNOR'S DRIVE HH28 EE 0.00 245.00 245.00
HDD GOVERNOR'S DRIVE EE HH29 0.00 260.00 260.00
HDD GOVERNOR'S DRIVE HH29 EE 0.00 252.00 252.00
HDD GOVERNOR'S DRIVE EE HH30 0.00 250.00 250.00
HDD GOVERNOR'S DRIVE HH30 EE 0.00 250.00 250.00
HDD GOVERNOR'S DRIVE EE HH31 0.00 250.00 250.00
HDD GOVERNOR'S DRIVE HH31 EE 0.00 250.00 250.00
HDD GOVERNOR'S DRIVE EE HH32 0.00 215.00 215.00
HDD GOVERNOR'S DRIVE HH32 EE 0.00 245.00 245.00

HDD GOVERNOR'S DRIVE EE BOUNDARY 0.00 248.00 248.00

0.00 10,782.00 10,782.00 0.00 3,215.00 1,250.00 4,465.00

DIMENSION (M) QTY AREA (SQ. M)


HH / EE ON ON EARTH ON
WIDTH LENGTH ON EARTH
CONCRETE SHOULDER CONCRETE
HANDHOLES 1.4 1.4 29 3 56.84 5.88
E/E 1 1 7 1 7.00 1.00

VOLUME
CONCRETE RESTORATION WORKS UNIT QTY REMARKS
(CU.M)
HANDHOLES SET 3 0.9 3,500 PSI , 3 DAYS
E/E SET 1 0.3 3,500 PSI , 3 DAYS
TRENCH PROTECTION METERS 10,782.00 75.474 JOB MIX

BOM-008
PLANT UNIT SUMMARY

AREA MARAGONDON, CAVITE

ITEM SCOPE OF WORKS

1 DUCT LAYING

1.1 HORIZONTAL DIRECTIONAL DRILLING 1 RUN 24w (SHALLOW DRIL

1.2 HORIZONTAL DIRECTIONAL DRILLING 1- 7w

1.3 HORIZONTAL DIRECTIONAL DRILLING 2 - 7w

1.4 MICRO TRENCHING 1 RUN 24W

1.5 MICRO TRENCHING 1 RUN 7W

2 HANDHOLE WORKS

2.1 FABRICATION

2.2 INSTALLATION ON SOIL

2.3 INSTALLATION ON CONCRETE

2.3 RESTORATION

ON CONCRETE (1.5X 1.5 x 0.30) - 3500 PSI

3 EE WORKS

3.1 DUCT JOINTING

3.2 BACKFILLING ON SOIL

3.3 BACKFILLING & RESTORATION ON CONCRETE - 3500 PSI

4 POI

4.1 HDD / DUCT LAYING

4.2 TRENCHING / DUCT LAYING

4.3 INSERTION TO HH

4.4 SERVICE BOX


4.5 POLE ERECTION

4.6 RISER PIPE & U - GUARD

5 CABLE WORKS

5.1 MANDRELL TESTING

14/10 TUBES - AIR, FOAM & BALL BEARING

3/7.5 TUBES - AIR ONLY

5.2 CABLE BLOWING

5.3 FOC SPLICING

6 RESTORATION OF MT

6.1 RESTORATION ON SOIL

SOIL BACKFILL

CONCRETE PROTECTION (0.06 X 0.10 X L) - JOB MIX

6.2 RESTORATION ON CONCRETE

SAND BACKFILL

CONCRETE - 3500 PSI


UNIT PLANNED QTY

meters 0.00

meters 1,250.00

meters 3,215.00

meters 0.00

meters 10,782.00

sets 32.00

sets 29.00

sets 3.00

cu. M 2.03

loc 9.00

loc 7.00

cu. M 0.30

meters

meters

SET

SET
PCS

SETS

TUBE - meters 129,234.00

TUBE - meters 0.00

TUBE - meters 15,247.00

core

meters 10,782.00

CU. M 64.69

meters 0.00

CU.M 0.00