ZXA10 C300M (V3.1) Network Management Commissioning Configuration Guide Interna
l Use Only▲
LEGAL INFORMATION
By accepting this certain document of ZTE CORPORATION you agree to the following terms. If you do
not agree to the following terms, please notice that you are not allowed to use this document.
Copyright © 2014 ZTE CORPORATION. Any rights not expressly granted herein are reserved. This
document contains proprietary information of ZTE CORPORATION. Any reproduction, transfer,
distribution, use or disclosure of this document or any portion of this document, in any form by any
means, without the prior written consent of ZTE CORPORATION is prohibited.
and are registered trademarks of ZTE CORPORATION. ZTE’s company name, logo
and product names referenced herein are either trademarks or registered trademarks of ZTE
CORPORATION. Other product and company names mentioned herein may be trademarks or trade
names of their respective owners. Without the prior written consent of ZTE CORPORATION or the
third party owner thereof, anyone’s access to this document should not be construed as granting, by
implication, estopped or otherwise, any license or right to use any marks appearing in the document.
The design of this product complies with requirements of environmental protection and personal
security. This product shall be stored, used or discarded in accordance with product manual, relevant
contract or laws and regulations in relevant country (countries).
This document is provided “as is” and “as available”. Information contained in this document is subject
to continuous update without further notice due to improvement and update of ZTE CORPORATION’s
products and technologies.
ZTE CORPORATION
Address: NO. 55
Hi-tech Road South
ShenZhen
P.R.China
518057
Website: http://dms.zte.com.cn(TSM-Technical Support)
Email: TSM.Aftersales@zte.com.cn
Revision History
Author
Prepared
Date Document Version Reviewed by Approved by
by
2013-06 R1.0 Yan Xiaohui Wang Jun
Proposal: Before reading this document, you had better have the following knowledge and skills.
SEQ Knowledge and skills Reference material
ZXA10 C300M(V3.1) Multi-Service Access
1 Equipment commissioning
Equipment Configuration Manual
Follow-up document: After reading this document, you may need the following information
SEQ Reference material Information
ZTE Confidential Proprietary © 2014 ZTE CORPORATION. All rights reserved. III
ZXA10 C300M (V3.1) Network Management Commissioning Configuration Guide Interna
l Use Only▲
Summary
Chapter Description
1 Overview
2 Overall Description of Procedure
3 Description of Each Step
TABLE OF CONTENTS
1 Overview ......................................................................................................... 1
1.1 Usage Scale ..................................................................................................... 1
1.2 Objective .......................................................................................................... 1
1.3 Usage Method .................................................................................................. 1
1.4 Term Definition ................................................................................................. 2
FIGURES
TABLES
Table 3-1 Community parameter description ......................... Error! Bookmark not defined.
1 Overview
This document defines the standard operation procedure (SOP) of ZXA10 C300M
network management commissioning configuration.
1.2 Objective
This SOP is applicable to the debugging personnel engaged in fixed network ZXA10
C300M products.
SOP documents of fixed network products adopt the “SOP + operation guide + reference”
architecture.
1. SOP explains what needs to be done in which sequence in order to achieve a goal.
2. Operation guide explains how to perform the operation procedure, that is, how to do
in detail.
Wrong
Checking configuration
Correct
Saving data
Ending configuration
As to hardware preparations, please refer to system debugging SOP. This step requires
the preparation of each data for network management commissioning. The required data
are as follows.
VLAN planning: Plan the VLAN data for network management service.
Personnel
Procedure
1. Enter global configuration mode and create VLAN of network management by using
the command vlan x.
ZXAN(config)#vlan 100
ZXAN(config-vlan)#exit
ZXAN(config)#
2. Enter the uplink port mode, and add VLAN of network management with tag.
ZXAN(config)#interface gei_1/21/1
Personnel
Procedure
Personnel
Procedure
Personnel
Procedure
Personnel
Procedure
gei_1/19/2
port(tagged):
ZXAN(config-if)#
2. Check in-band network management address by using the command show interface
vlan.
ZXAN(config-if)#show inter vlan100
vlan100 is up, line protocol is down
Description is none
Keepalive set:10 sec
MAC address is 00d0.d021.2ac3
ARP Timeout:00:05:00
Internet address is 10.63.184.213/24
MTU 1500 bytes
MRU 1500 bytes BW 1000000 Kbits
ZXAN(config-if)#
4. Check snmp parameter configuration by using the command show snmp config.
ZXAN(config-if)#show snmp config
snmp-server location No.889 BiBo Rd. PuDong District, ShangHai, China
snmp-server contact +86-021-68895000
snmp-server packetSize 5000
snmp-server engine-id 830900020300010289d64401
snmp-server community private view allview rw
snmp-server community public view allview rw
snmp-server view allview internet included
snmp-server view DefaultView system included
Personnel
Procedure
Save the current working data to the configuration file of enabling data by the command
write.
ZXAN# #write