ATCN SITE ID: 401036 ; CUSTOMER SITE ID: BYB01 _

CUSTOMER ACCEPTANCE PACK


ATCN Site ID : 40 1036

ATCN Site Name : BYB01


City/State :
BAYELSA /
Collocation ☐ ; New Build BTS ☐ ; New Build BTF ☐
Project Description : Upgrade ☐

Site Coordinates : Latitude (N): ˚


Longitude (E): ˚

Customer Name :
Customer Site ID :
Customer Site Name :
Existing Tower Height : m

Tower Type: ☐ Self-Support ☐ Guyed ☐ Rooftop


☐ 3 Legged ☐ 4 Legged ☐ Angular
☐ Tubular ☐ Stanchion
Water

Sector Height (m) Azimuth (degrees)


RF Antenna Mount Height (metres) A.
B.
C.

MW Details 0.3m 0.6m 0.9m 1.2m 1.5m 1.8m 2.4m 3.0m Total
Quantity of MW Antennas

MW Mount Height (metres)

DOCUMENT CONTENT
1. RFI (Ready for Inspection) Notice
2. Infrastructure Checklist
3. GA Drawings
4. Infrastructure Pictures
Warning: All printed copies are uncontrolled (Except the Master Copy)
Document Number: ATCN-CPS-PMO-CRFI-0006 Confidential Rev 1.1
Document Title: Customer RFI Acceptance Checklist Page 1 of 4
ATCN SITE ID: 401036 ; CUSTOMER SITE ID: BYB01

INFRASTRUCTURE CHECK LIST

Please verify that the infrastructure Items are accepted by completing the “verified by ” column
during the joint site inspection and return this document to ATCN Representative or your nominated ATCN
Key Account Manager.

The purpose of this check is to verify that works carried out on sites that are accepted by for
installation of its active equipment, and have been completed in accordance with the approved site design
drawings and specifications. This document is subject to change as and when necessary.

This procedure shall be used each time ATCN declares a site is Ready for Installation (RFI)
Tick “✓” if correct. Cross “x” if not. N/A if not applicable.

Checked By Verified By
Item Ref. Infrastructure Items
ATCN Customer

A: TOWER ASSESMENT
Bending radius of feeder cable trays according to N/A
A1 technical specifications?
A2 Cable trays levelled and properly fixed? N/A
A3 Cable tray bonding and earthing done on tower N/A
A4 General workmanship acceptable? N/A
B: ANTENNA MOUNT AND FEEDER CABLE
RUNWAY
Antenna bracket mounting secured properly on N/A
B1 tower?
B2 Booms/mounting poles secured and stabilized N/A
B3 Are antennae mounting poles installed vertically? N/A
Are all antenna brackets fitted with galvanized or N/A
B4 stainless steel bolts with double lock nuts &
washers?
Antenna support installation orientation N/A
B5 (azimuth) and height for GSM and transmission
are as per customer requirements?
Confirm space provision at correct orientation N/A
B6
(azimuth) and height for Remote Radio Unit (RRU)
Is space provided for the running of cables from N/A
B7 the tower to cable tray
B8 General workmanship acceptable? N/A

Warning: All printed copies are uncontrolled (Except the Master Copy)
Document Number: ATCN-CPS-PMO-CRFI-0006 Confidential Rev 1.1
Document Title: Customer RFI Acceptance Checklist Page 2 of 4
ATCN SITE ID: 401036 ; CUSTOMER SITE ID: BYB01

C: EQUIPMENT SLAB/PLINTH N/A

C1 Outdoor BTS slab/plinth is plain and levelled and N/A


dimensions as per specifications?
N/A
C2 General workmanship acceptable?
D: ELECTRICAL INSTALLATIONS
Is the installed circuit breaker same rating as per N/A
D1
the co-location contract?
Are the installed/provided circuit breakers N/A
D2
labelled for customer? (“Transmission”)
Are the installed/provided circuit breakers N/A
D3
labelled for customer? (“RBS”)
Is power solution on site of adequate capacity as N/A
D4
per contract?
D5 General workmanship acceptable? N/A

E: EARTHING
E1 Is the earth reading less than 2Ω N/A
E2 What is the measured earth resistance value (Ω) N/A
E3 Is lightening arrestor installed on tower? N/A
E4 General workmanship acceptable? N/A
F: ROOFTOP SAFETY (applicable to rooftop sites
only – N/A if not applicable)
N/A
F1 Are safety handrails installed where required?
Rooftop safety anchor points installed and fitted N/A
F2
for use
N/A
F3 Warning signs present
NO
F4 Is there “landlord consent” for this site?

Customer Comments
1. Please ensure ATCN Site Access Procedure is followed (contact ATCN NOC – Nigeria.NOC@atcnigeria.ng)
2. ATCN site access gate is as built
3. Please park non-essential vehicles outside the site.

Description: Shelter Cap Installation at BYB01_401036

Warning: All printed copies are uncontrolled (Except the Master Copy)
Document Number: ATCN-CPS-PMO-CRFI-0006 Confidential Rev 1.1
Document Title: Customer RFI Acceptance Checklist Page 3 of 4
ATCN SITE ID: 401036 ; CUSTOMER SITE ID: BYB01

RFI ACCEPTANCE TEST SIGN-OFF


This Site has been completed in accordance with the approved design drawings and specifications.

ATCN Representative Customer Representative

Name: Amadi Emenike Name: Amapakabo T. Emmanuel

Position: SDS Position: Operation Manager

Signature: Signature: Amapakabo.t

Date: 21/08/2020 Date: 18TH JUNE, 2020

Warning: All printed copies are uncontrolled (Except the Master Copy)
Document Number: ATCN-CPS-PMO-CRFI-0006 Confidential Rev 1.1
Document Title: Customer RFI Acceptance Checklist Page 4 of 4

You might also like