1.       Hydro test pressure 2times of working/design pressure for class II vessel. (all Drawings) 1.5 times mentioned in the drawing. Ref. IBR Regulation 601.

2. Pls add CLASS II vessel in all drawings deaign data not mentioned in the drawing. For IBR vessel it should be mentioned.

3. Remove calcualtion pressure from design data table. mentioned in the drawing. Not req.

5. Remove Note no 5, 7 & 17. mentioned in the drawing. Not req.

it’s a first submission for manufacturer to IBR so it


6. Remove rev no from BOM sr no 2, 17 & 25 mentioned 6 in the drawing. should be rev 0.

7. change thk of MH neck to 22mm sr no 3 mentioned 20mm in the drawing. 22mm thk plate available with manufacturer

8. change length of pipe sr no 17 160mm mentioned in the drawing. 160mm is insufficient.

9. change moc to SA 516 Gr. 70 for sr no 3, 4, 26, 27 & 28 SA 515 Gr. 70 mentioned in the drawing. SA 516 Gr. 70 plates available with manufacturer

Space provided for signature is insufficient. To


INTERMITTENT BLOW 10.     Space for signature (All drawings) be increased to accommodate signature of 4 Ref. attached drawing (All drawing).
1 DOWN TANK – F8023/A people.
– KTV EDIBLE OIL it’s a first submission for manufacturer to IBR so it
11.     Drawing Revision number should be zero (All Drawings) 10% was mentioned in the drawing. should be rev 0.

12.     GA Drawing  : normalized should be removed since dish is made of cold process. mentioned in the drawing Ref. Attachement PZZD13QZ04-1

13.   Dish End Drawing : Knuckle radius thinning allowance should be change from 10% Deviation Approval given by Thermax in earlier
10% mentioned in the drawing.
to 15%. supplies.

14.     Dish Drawing : Min. thick shuld be mentioned on knuckle radius. shown in notes. -

15.     Dish Drawing : Least calculation pressure to be removed mentioned in the drawing. -

16.     Dish Drawing : Heat treatment should be removed. mentioned in the drawing. -

17. GATE VALVE : SR NO 32 In Remarks add customer scope. scpoe not mentioned in the drawing. Valves not in our scope of supply.

18. Dish End drawing design data should be as per fab drawing design data. it's not as per fab drawing both should be same.