Professional Documents
Culture Documents
Iron Ore Sales and Purchase Contract: Date XX March 2021
Iron Ore Sales and Purchase Contract: Date XX March 2021
Buyer:
Address :
:
Tel :
Fax :
Represented By
Position : Managing Director
AND
Seller : PHUCHIANGKHARN MINING CO.,LTD.
Address : 252 Moo 5 , Nam marn Sub district , Muang Loei
District , Province of Loei , Thailand
Tel : 091-670-1729
Fax :
Represented By : Mr. Maitri Chantasilp
Position :
Email : P.C.K.mining@gmail.com
We, the SELLER hereby agree to sell and BUYER hereby agrees to purchase the
material in accordance with the terms and conditions as hereinafter set forth.
Article 1 : DEFINITIONS:
In this CONTRACT, the following terms shall, unless otherwise defined, have the
following meanings:
[Type here]
d. References to Ore on a “Natural Basis”: means
Ore in its natural or wet state
Article 2 : COMMODITY
c. Packing : In bulk
Article 3 : Destination
a. Loading port : SICHANG PORT ,
THAILAND .
b. Discharge port : TO BE ADVISED
,
c. Partial Shipment : Allowed
d. Transhipment :Not Allowed
Article 4 : SPECIFICATIONS
A) Specification: Chemical Composition
[Type here]
Chemical Typical Analysis Rejection
Composition
Fe 62.00% Rejection below
60.00%
SiO2 3.5% Rejection above 5.00%
Al2O3 3.5% Rejection above 4.00%
P 0.08% Rejection above 0.10%
S 0.08% Rejection above 0.10%
Moisture 8.00% Rejection above
10.00%
5.1 USD 105.00 per dry metric ton (DMT) FOB Port SICHANG, basis 62% Fe.
INCOTERM2000 applied.
The base price of The Mineral ‘Iron’ shall be adjusted by the following bonuses and
penalties in accordance with Fe content as finally determined pursuant to the
provisions of Sampling & Analysis as follows:
5.2 BONUS: The prices of the Goods stipulated in CLAUSE 5.1 shall be adjusted by
the following bonus: If total Iron (Fe) content is higher than 62%, a bonus of USD
2.00 per Metric Ton per 1.00% on pro rata basis will apply.
5.3 PENALTY: All the cargo shall reject or extra decrease the price, if the content of
Fe is lower than 60.00%
The base price shall be decreased by USD 2.00 per Metric Ton for each
1.00% Fe below 62% to and including Fe 60%, fraction pro-rata.
Seller will return all the funds and pay all the necessary cost caused.
[Type here]
When (SiO2) is above 3.5%, each 1% Penalty is at USD 0.50 per MT of
fraction prorate. Buyer has the right to reject the cargo if excess 5%.
When (P) is above 0.08%, each 0.01% Penalty is at USD 0.10 per MT of
fraction prorate. Buyer has the right to reject the cargo if excess 0.1%.
When (S) is above 0.08%, each 0.01% Penalty is at USD 0.10 per MT of
fraction prorate. Buyer has the right to reject the cargo if excess 0.1%.
When the size of iron ore is less than 10mm. or more than 40mm. have
exceed 10%, the penalty is at USD 0.50 per 1% of exceed.
5.4 Second to twelfth shipment price will be adjusted according to the market price
for per shipment.
[Type here]
The contents of L/C must be agreed by both Buyer and Seller.
L
7.2 LC Terms
Article 8 : DOCUMENTS
a) Commercial invoice in one (1) original and three (3) copies, indicating
the contract number , L/C number, name of carrying vessel.
description of goods, quantity,value。
[Type here]
b) Certificate of weight in one(1) original and three(3) copies, issued by
INTERTEK as the actual surveyed weight of cargo shipped by draft
surveyed at loading port .
d) Certificate of origin in one (1) original and three (3) copies issued by
Chamber of Commerce and Industry, THAILAND PDR
e) Full set (3/3) of “clean on board” shipped Ocean Bills of Lading made
out to order and blank endorsed, marked “Freight payable as per charter
party ”, notifying the applicant.
f) Beneficiary’s certificate certifying that they sent to Buyer by fax one set
of documents including B/L, invoice, certificate of quality, certificate of
weight, and certificate of origin within seven (7) days after B/L date.
Article 9: WEIGHING
[Type here]
Article 10: SAMPLING AND ANALYSIS
For this purpose, Seller should send a written cargo readiness notice to
Buyer at least 15 days before latest date of shipment.
12.1. Monthly shipping schedules, indicating quantities and laydays of 6 days for
each shipment, shall be proposed to Seller by Buyer, no later than 30 days before
the commencement of each month. Seller shall then confirm or comment on each
monthly shipping schedule, no later than 10 days before the commencement of each
respective month. If Seller is unable to confirm the laydays of any shipment, Seller
shall indicate another period in which laydays is subject to further consultation
between Buyer and Seller.
[Type here]
12.2 NOTICES OF ARRIVAL::
On sailing from the port of origin, Master, Shipowners and/or Buyer shall inform to
Seller and to Seller’s Port by facsimile or e-mail, the expected time of arrival (ETA) of
the vessel. Such information shall be updated eight (8) days, four (4) days, two (2)
days and one (1) day before the vessel's expected arrival at Port of Koh Sri Chang,
Thailand
13.1. For a vessel, laytime shall commence immediately after the vessel arriving.
anchorage area .Laytime allowed shall be 6 (six) consecutive days, Saturdays,
Sundays and Holidays included, fractions pro-rata.
. For a vessel, demurrage, if load time is over 6 days, shall be paid by SELLER at
the rate US$ 7,000.00 per running day or pro rata for portions of days at Loading
Port,
Despatch, if loading time is less than 6 days, shall be paid by Buyer at half of the
demurrage rate.
If operation of such circumstances exceeds three months, either Party will have the
right to refuse further performance of the contract in which case neither Party shall
have the right to claim eventual damages. The Party which is unable to fulfil its
obligations under the present contract shall inform the other Party of the existence of
the circumstances preventing the performance of the contract. Certificate issued by
a Chamber of Commerce or any other competent authority connected with the cause
in the country of the Seller or the buyer shall be sufficient proof of the existence of
the above circumstances and their duration. Non-availability of material and/or delay
in transportation shall not constitute Force Majeure for the Sellers for not performing
their obligations under this contract.
Article 14 : ARBITRATION
All disputes or differences whatsoever arising between the parties out of or relating
to the construction, meaning and operation or effect of this contract or the breach
thereof the case shall be submitted to Hong Kong International Arbitration Center
(HKIA) in Hong Kong for arbitration in accordance with the UNCITRAL Arbitration
Rules as at present in force and as may be amended by the rest of this clause. The
appointing authority shall be HKIA and the place of arbitration shall be in Hong Kong.
Any such arbitration shall be administered by HKIA in accordance with HKIA
Procedures for Arbitration in force at the date of this contract including such
additions to the UNCITRAL Arbitration Rules as are therein contained. The arbitral
award is final.
[Type here]
The contract shall be made in English.
In witness whereof this contact is made in duplicate on 9, march 2021 and the duly
authorized representatives of the seller and the buyer having signed and sealed on
this day and retained one copy each. The fax copy of this contract is valid.
SELLER: BUYER :
___________________________ ________________________
Mr. Mr
Managing Director Managing Director
Passport No: Passport No:…………………
WITNESS : WITNESS :
___________________________ ________________________
Mr.
[Type here]