Project
Location City of San Fernando, Pampanga
Subject FIRE PROTECTION WORKS
Ref. No.: S.A.V.E.R.S.-003-014-R0
BILL OF MATERIALS
General Requirements
I Mobilization/Demobilization 60,000.00
II Construction drawings & Plans 45,000.00
for Permit -
III Tempacil/House Rental 65,000.00
Sub-total 170,000.00
2 FITTINGS B.I. - - -
3 TEE: - - -
32 x 25 36.00 pcs 12,744.00 5,097.60 17,841.60
40 x 40 1.00 pcs 378.00 151.20 529.20
25 x 25 18.00 pcs 5,400.00 2,160.00 7,560.00
50 x 25 24.00 pcs 11,376.00 4,550.40 15,926.40
40 x 25 45.00 pcs 17,010.00 6,804.00 23,814.00
4 Reducer Bushing: - -
50 x 40 12.00 pcs 4,630.05 1,852.02 6,482.06
40 x 32 18.00 pcs 4,913.33 1,965.33 6,878.66
40 x 25 1.00 pcs 272.96 109.19 382.15
32 x 25 18.00 pcs 3,810.50 1,524.20 5,334.70
5 Elbow:90⁰ - -
50ɸ 2.00 pcs 586.33 234.53 820.86
40ɸ 6.00 pcs 1,166.08 466.43 1,632.51
25ɸ 80.00 pcs 7,773.84 3,109.54 10,883.38
6 Globe valve: -
32ɸ 2.00 pcs 9,684.36 3,873.74 13,558.10
25ɸ 4.00 pcs 13,759.70 5,503.88 19,263.58
-
7 Flange 50ɸ 16.00 pcs 8,432.64 3,373.06 11,805.70
-
8 Teflon 5,000.00 pcs 120,000.00 48,000.00 168,000.00
Sub-total 310,712.90
Page 1 of 2
Item Particulars Qty. Units Material Cost Labor Cost Amount
General Requirements
Other Accessories -
9 Sprinkler heads: -
Upright 143.00 pcs 88,374.00 35,349.60 123,723.60
Pendent 19.00 pcs 15,020.64 6,008.26 21,028.90
15 Consumables - - 72,093.51
17 Miscellaneous - - 100,000.00