Dasmarinas Project BOQ
Dasmarinas Project BOQ
Project:
Location: Dasmarinas Cavite
Subject: Partial Estimates
Date: August 2013
Quantity
Item Description Total Qty Units
Road 1 Road 2 Road 3 Road 4 Road 5 Road 6 Road 7
Phase 1
CIVIL/ROAD WORKS
Class A mixture:
A Cement 381.00 423.00 489.00 917.00 610.00 1,142.00 3,962.00 bags
B Sand 21.05 23.41 27.01 50.79 33.75 63.32 219.32 m³
C Gravel 42.09 46.82 54.03 101.57 67.50 126.64 438.64 m³
Forms:(3 uses)
D 2" x 6" x10' 26.00 31.00 35.00 65.00 44.00 57.00 258.00 pcs
E 2" x 4" x10' 11.00 13.00 14.00 26.00 18.00 23.00 105.00 pcs
F 2" x 2" x10' 51.00 61.00 69.00 124.00 87.00 112.00 504.00 pcs
DRAINAGE
L for Sand Bedding 100mm thk 4.46 4.46 4.71 7.25 7.87 10.76 39.50 m³
Manholes:
Phase 2
CIVIL/ROAD WORKS
Class A mixture:
A Cement 480.00 1,007.00 358.00 4,245.00 1,009.00 669.00 585.00 8,353.00 bags
B Sand 26.61 55.84 19.77 235.80 56.01 37.07 32.38 463.49 m³
C Gravel 53.22 111.69 39.53 471.61 112.02 74.15 64.76 926.98 m³
Forms:(3 uses)
D 2" x 6" x10' 19.00 44.00 15.00 108.00 46.00 46.00 33.00 311.00 pcs
E 2" x 4" x10' 10.00 22.00 8.00 54.00 23.00 19.00 14.00 150.00 pcs
F 2" x 2" x10' 47.00 109.00 38.00 270.00 113.00 91.00 66.00 734.00 pcs
DRAINAGE
L for Sand Bedding 100mm thk 4.31 13.49 4.13 23.34 8.93 6.23 4.64 65.07 m³
1 of 2
APT ESTIMATES
Quantity
Item Description Total Qty Units
Road 1 Road 2 Road 3 Road 4 Road 5 Road 6 Road 7
Phase 2 Phase
Cont'd1
for Pipe Collar Class B mixture cont'd:
N Sand 2.09 6.72 2.30 12.72 4.97 3.33 2.40 34.52 m³
Manholes:
Fencing
Total Units
Walls:
To Follow:
Nothing Follows
2 of 2