Road : Harkpur-Okhaldhunga Road Sample Description: Subgrade
Contract No : STEP/HO/02 Sample Location/Ch:
Lab Ref/Test. No.: Source: Existing
Date of Sampling: Sampled by: Jointly
Date of testing:
No. of Blows: 56
Mould Diameter 15.014 No. of layer: 5
Height of Mould: 12.75 Weight of rammer: 4.89 kg
Volume of mould: 2258.23 Height of drop: 45cm
Determination of Moisture Content
Can no. 18 3 28 12 6 7 2 10 8 26 11 24
Wt. of wet soil + Can 276.3 278.9 342.1 305.6 312.4 286.3 259.4 272.1 306.7 296.7 256.9 299.6
Wt. of dry soil + Can 270.8 272.1 331.2 293.4 296.3 273.3 244.5 255 285.7 274.4 237 276.5
Wt. of water 5.5 6.8 10.9 12.2 16.1 13 14.9 17.1 21 22.3 19.9 23.1
Wt. of can 72.5 45.4 68.2 41.8 #N/A 74.8 66.8 49.3 65.4 44.8 44.2 65.4
Wt. of dry soil 198.3 226.7 263.0 251.6 #N/A 198.5 177.7 205.7 220.3 229.6 192.8 211.1
Moisture % 2.8 3.0 4.1 4.8 #N/A 6.5 8.4 8.3 9.5 9.7 10.3 10.9
Average moisture % 2.9 4.5 #N/A 8.3 9.6 10.6
Determination of Density
Wt. of Soil + mould 10215 10425 10700 10795 10745 10615
Wt. of mould 5445 5445 5445 5445 5445 5445
Wt. of Soil in mould (gm) 4770 4980 5255 5350 5300 5170
Wet Density, gm/cc 2.112 2.205 2.327 2.369 2.347 2.289
Dry Density, gm/cc 2.053 2.110 #N/A 2.187 2.141 2.069

2.3
Compaction Curve
MDD & OMC Line
2.25

2.2

2.15

2.1

2.05
0 2 4 6 8 10 12

Optimum Moisture Content: 7.70 Maximum Dry Density: 2.198


REMARKS

Contractor Consultant
Tundi Construction Pvt. Ltd. Intercontinental Consultants and Technocrats Pvt.Ltd.,
New Delhi, India
in association with Full Bright Consultancy( Pvt).Ltd.
, Kathmandu, Nepal
Tested by:………………….. Witnessed by:…………………………………………
Lab Technician Lab Technician

Recommended By:………………… Verified by:………………………………………………


Contract Manager Material Engineer
Approved by:…………………………………………….
Resident Engineer
Sub-Regional Transport Enhancement Project
MODIFIED PROCTOR COMPACTION TEST
STEP
Road : Harkpur-Okhaldhunga Road Sample Description: Subgrade
Contract No : STEP/HO/02 Sample Location/Ch:
Lab Ref/Test. No.: Source: Existing
Date of Sampling: Sampled by: Jointly
Date of testing:
No. of Blows: 56
Mould Diameter 15.014 No. of layer: 5
Height of Mould: 12.75 Weight of rammer: 4.89 kg
Volume of mould: 2258.23 Height of drop: 45cm
Determination of Moisture Content
Can no. 28 8 12 26 18 7 10 11 2 26 3 6
Wt. of wet soil + Can 274.8 285.6 280.6 290 310.6 294.8 258.6 270.4 305 296.9 256.8 298.6
Wt. of dry soil + Can 269.6 280.2 270.9 280.1 296.3 281.3 243.4 254.6 286.4 277.8 238.2 278.1
Wt. of water 5.2 5.4 9.7 9.9 14.3 13.5 15.2 15.8 18.6 19.1 18.6 20.5
Wt. of can 68.2 70.4 41.8 44.8 72.5 74.8 49.3 #N/A 66.8 65.4 45.8 62.5
Wt. of dry soil 201.4 209.8 229.1 235.3 223.8 206.5 194.1 #N/A 219.6 212.4 192.4 215.6
Moisture % 2.6 2.6 4.2 4.2 6.4 6.5 7.8 #N/A 8.5 9.0 9.7 9.5
Average moisture % 2.6 4.2 6.5 #N/A 8.7 9.6
Determination of Density
Wt. of Soil + mould 10195 10355 10685 10775 10735 10645
Wt. of mould 5445 5445 5445 5445 5445 5445
Wt. of Soil in mould (gm) 4750 4910 5240 5330 5290 5200
Wet Density, gm/cc 2.103 2.174 2.320 2.360 2.343 2.303
Dry Density, gm/cc 2.051 2.086 2.180 #N/A 2.154 2.101

2.3
Compaction Curve
MDD & OMC Line
2.25

2.2

2.15

2.1

2.05
0 2 4 6 8 10 12

Optimum Moisture Content: 7.40 Maximum Dry Density: 2.202


REMARKS

Contractor Consultant
Tundi Construction Pvt. Ltd. Intercontinental Consultants and Technocrats Pvt.Ltd.,
New Delhi, India
in association with Full Bright Consultancy( Pvt).Ltd.
, Kathmandu, Nepal
Tested by:………………….. Witnessed by:…………………………………………
Lab Technician Lab Technician

Recommended By:………………… Verified by:………………………………………………


Contract Manager Material Engineer
Approved by:…………………………………………….
Resident Engineer
Sub-Regional Transport Enhancement Project
MODIFIED PROCTOR COMPACTION TEST
STEP
Road : Harkpur-Okhaldhunga Road Sample Description: Subgrade
Contract No : STEP/HO/02 Sample Location/Ch:
Lab Ref/Test. No.: Source: Existing
Date of Sampling: Sampled by: Jointly
Date of testing:
No. of Blows: 56
Mould Diameter 15.014 No. of layer: 5
Height of Mould: 12.75 Weight of rammer: 4.89 kg
Volume of mould: 2258.23 Height of drop: 45cm
Determination of Moisture Content
Can no. 28 8 12 26 18 7 10 11 2 26 3 6
Wt. of wet soil + Can 320.8 325.6 290.3 287.8 328 307.2 260 262.3 280.7 284.8 264.4 302.4
Wt. of dry soil + Can 315.5 320.2 280.4 277.9 313.4 293.9 244.7 246.8 264.2 267.6 245.7 280.9
Wt. of water 5.3 5.4 9.9 9.9 14.6 13.3 15.3 15.5 16.5 17.2 18.7 21.5
Wt. of can 68.2 70.4 41.8 44.8 72.5 74.8 49.3 #N/A 66.8 65.4 45.8 62.5
Wt. of dry soil 247.3 249.8 238.6 233.1 240.9 219.1 195.4 #N/A 197.4 202.2 199.9 218.4
Moisture % 2.1 2.2 4.1 4.2 6.1 6.1 7.8 #N/A 8.4 8.5 9.4 9.8
Average moisture % 2.2 4.2 6.1 #N/A 8.4 9.6
Determination of Density
Wt. of Soil + mould 10200 10385 10575 10805 10785 10645
Wt. of mould 5445 5445 5445 5445 5445 5445
Wt. of Soil in mould (gm) 4755 4940 5130 5360 5340 5200
Wet Density, gm/cc 2.106 2.188 2.272 2.374 2.365 2.303
Dry Density, gm/cc 2.061 2.099 2.142 #N/A 2.181 2.101

2.3
Compaction Curve
MDD & OMC Line
2.25

2.2

2.15

2.1

2.05
0 2 4 6 8 10 12

Optimum Moisture Content: 7.90 Maximum Dry Density: 2.212


REMARKS

Contractor Consultant
Tundi Construction Pvt. Ltd. Intercontinental Consultants and Technocrats Pvt.Ltd.,
New Delhi, India
in association with Full Bright Consultancy( Pvt).Ltd.
, Kathmandu, Nepal
Tested by:………………….. Witnessed by:…………………………………………
Lab Technician Lab Technician

Recommended By:………………… Verified by:………………………………………………


Contract Manager Material Engineer
Approved by:…………………………………………….
Resident Engineer
Sub-Regional Transport Enhancement Project
MODIFIED PROCTOR COMPACTION TEST
STEP
Road : Harkpur-Okhaldhunga Road Sample Description: Subgrade
Contract No : STEP/HO/02 Sample Location/Ch:
Lab Ref/Test. No.: Source: Existing
Date of Sampling: Sampled by: Jointly
Date of testing:
No. of Blows: 56
Mould Diameter 15.014 No. of layer: 5
Height of Mould: 12.75 Weight of rammer: 4.89 kg
Volume of mould: 2258.23 Height of drop: 45cm
Determination of Moisture Content
Can no. 12 26 10 11 28 2 16 8 18 7 3 6
Wt. of wet soil + Can 170.9 168.6 208.5 209.6 292.2 295.5 240.6 266.2 310.8 316.4 264.4 302.4
Wt. of dry soil + Can 167.7 165.8 201.8 202.2 278.7 281.9 228.8 252.8 291.5 296.6 244.1 280.9
Wt. of water 3.2 2.8 6.7 7.4 13.5 13.6 11.8 13.4 19.3 19.8 20.3 21.5
Wt. of can 41.8 44.8 49.3 #N/A 68.2 66.8 65.2 70.4 66.8 72.7 45.8 62.5
Wt. of dry soil 125.9 121.0 152.5 #N/A 210.5 215.1 163.6 182.4 224.7 223.9 198.3 218.4
Moisture % 2.5 2.3 4.4 #N/A 6.4 6.3 7.2 7.3 8.6 8.8 10.2 9.8
Average moisture % 2.4 #N/A 6.4 7.3 8.7 10.0
Determination of Density
Wt. of Soil + mould 10212 10420 10630 10735 10690 10688
Wt. of mould 5445 5445 5445 5445 5445 5445
Wt. of Soil in mould (gm) 4767 4975 5185 5290 5245 5243
Wet Density, gm/cc 2.111 2.203 2.296 2.343 2.323 2.322
Dry Density, gm/cc 2.061 #N/A 2.159 2.184 2.136 2.110

2.25

2.2 Compaction
Curve
MDD & OMC
Line

2.15

2.1

2.05
0 2 4 6 8 10 12

Optimum Moisture Content: 7.40 Maximum Dry Density: 2.189


REMARKS

Contractor Consultant
Tundi Construction Pvt. Ltd. Intercontinental Consultants and Technocrats Pvt.Ltd.,
New Delhi, India
in association with Full Bright Consultancy( Pvt).Ltd.
, Kathmandu, Nepal
Tested by:………………….. Witnessed by:…………………………………………
Lab Technician Lab Technician

Recommended By:………………… Verified by:………………………………………………


Contract Manager Material Engineer
Approved by:…………………………………………….
Resident Engineer
Sub-Regional Transport Enhancement Project
MODIFIED PROCTOR COMPACTION TEST
STEP
Road : Harkpur-Okhaldhunga Road Sample Description: Subgrade
Contract No : STEP/HO/02 Sample Location/Ch: 16+300
Lab Ref/Test. No.: 625/22 Source: Existing
Date of Sampling: 31-Dec-13 Sampled by: Jointly
Date of testing: 31-Dec-13
No. of Blows: 56
Mould Diameter 15.014 No. of layer: 5
Height of Mould: 12.75 Weight of rammer: 4.89 kg
Volume of mould: 2258.23 Height of drop: 45cm
Determination of Moisture Content
Can no. T-22 P-3 D-11 B-21 P-9 B-9 X-2 B-18 P-11 X-6
Wt. of wet soil + Can 74.1 66.1 58.3 61 60.7 59.1 57 60.8 64.1 67
Wt. of dry soil + Can 71.9 63.4 54.6 57.2 55.9 54.9 52.3 55.2 57.5 59
Wt. of water 2.2 2.7 3.7 3.8 4.8 4.2 4.7 5.6 6.6 8
Wt. of can 8.4 9.4 8.8 8.6 10.03 10 8.9 9.6 9.7 9.6
Wt. of dry soil 63.5 54.0 45.8 48.6 45.9 44.9 43.4 45.6 47.8 49.4
Moisture % 3.5 5.0 8.1 7.8 10.5 9.4 10.8 12.3 13.8 16.2
Average moisture % 4.2 7.9 9.9 11.6 15.0
Determination of Density
Wt. of Soil + mould 10596 10940 11096 11090 11000
Wt. of mould 5945 5945 5945 5945 5945
Wt. of Soil in mould (gm) 4651 4995 5151 5145 5055
Wet Density, gm/cc 2.060 2.212 2.281 2.278 2.238
Dry Density, gm/cc 1.976 2.049 2.075 2.042 1.946

2.2
2.18
2.16
Compaction
2.14 Curve
2.12 MDD & OMC
2.1 Line
2.08
2.06
2.04
2.02
2
1.98
1.96
1.94
1.92
1.9
0 2 4 6 8 10 12 14 16

Optimum Moisture Content: 9.80 Maximum Dry Density: 2.078


REMARKS

Contractor Consultant
Tundi Construction Pvt. Ltd. Intercontinental Consultants and Technocrats Pvt.Ltd.,
New Delhi, India
in association with Full Bright Consultancy( Pvt).Ltd.
, Kathmandu, Nepal
Tested by:………………….. Witnessed by:…………………………………………
Lab Technician Lab Technician

Recommended By:………………… Verified by:………………………………………………


Contract Manager Material Engineer
Approved by:…………………………………………….
Resident Engineer
Sub-Regional Transport Enhancement Project
STEP
MODIFIED PROCTOR COMPACTION TEST
Road : Harkpur-Okhaldhunga Road Sample Description: Subgrade
Contract No : STEP/HO/02 Sample Location/Ch: 9+850
Lab Ref/Test. No.: Source: Existing
Date of Sampling: 8-May-13 Sampled by: Jointly
Date of testing: 13-May-13
No. of Blows: 56
Mould Diameter 15.014 No. of layer: 5
Height of Mould: 12.75 Weight of rammer: 4.89 kg
Volume of mould: 2258.23 Height of drop: 45cm
Determination of Moisture Content
Can no. K-12 A-11 P-2 P-1 A-2 T-8 K-8 K-3 P-3 D-1
Wt. of wet soil + Can 49.7 64.9 41.4 47.4 29.3 38 62.1 46.7 45.6 39.5
Wt. of dry soil + Can 47.4 61.9 38.8 44.6 27.5 35.4 57.5 43.6 41.9 36.4
Wt. of water 2.3 3 2.6 2.8 1.8 2.6 4.6 3.1 3.7 3.1
Wt. of can 9.9 14.3 8.9 10.2 8.3 7.6 12.7 13.1 9.4 8.9
Wt. of dry soil 37.5 47.6 29.9 34.4 19.2 27.8 44.8 30.5 32.5 27.5
Moisture % 6.1 6.3 8.7 8.1 9.4 9.4 10.3 10.2 11.4 11.3
Average moisture % 6.2 8.4 9.4 10.2 11.3
Determination of Density
Wt. of Soil + mould 10325 10717 10860 10785 10745
Wt. of mould 5945 5945 5945 5945 5945
Wt. of Soil in mould (gm) 4380 4772 4915 4840 4800
Wet Density, gm/cc 1.940 2.113 2.176 2.143 2.126
Dry Density, gm/cc 1.826 1.949 1.990 1.945 1.909

1.95

Compaction Curve
MDD & OMC Line

1.9

1.85

1.8
4 5 6 7 8 9 10 11 12

Optimum Moisture Content: 9.40 Maximum Dry Density: 1.992


REMARKS

Contractor Consultant
Tundi Construction Pvt. Ltd. Intercontinental Consultants and Technocrats Pvt.Ltd.,
New Delhi, India
in association with Full Bright Consultancy( Pvt).Ltd.
, Kathmandu, Nepal
Tested by:………………….. Witnessed by:…………………………………………
Lab Technician Lab Technician

Recommended By:………………… Verified by:………………………………………………


Contract Manager Material Engineer
Approved by:…………………………………………….
Resident Engineer
Sub-Regional Transport Enhancement Project
MODIFIED PROCTOR COMPACTION TEST
STEP
Road : Harkpur-Okhaldhunga Road Sample Description: Subgrade
Contract No : STEP/HO/02 Sample Location/Ch: 11+120
Lab Ref. No.: Source: Existing
Date of Sampling: 8-May-13 Sampled by: Jointly
Date of testing: 10-May-13
No. of Blows: 56
Mould Diameter 15.014 No. of layer: 5
Height of Mould: 12.75 Weight of rammer: 4.89 kg
Volume of mould: 2258.23 Height of drop: 45cm
Determination of Moisture Content
Can no. A-11 K-8 16 20 K-10 K-3
Wt. of wet soil + Can 44.5 40.7 99.2 137.9 51.8 52.9
Wt. of dry soil + Can 42.1 38.4 96.2 133.7 47.7 48.9
Wt. of water 2.4 2.3 3 4.2 4.1 4
Wt. of can 14.3 12.7 65.2 92 10.4 13.1
Wt. of dry soil 27.8 25.7 31.0 41.7 37.3 35.8
Moisture % 8.6 8.9 9.7 10.1 11.0 11.2
Average moisture % 8.8 9.9 11.1
Determination of Density
Wt. of Soil + mould 10795 10880 10880
Wt. of mould 5945 5945 5945
Wt. of Soil in mould (gm) 4850 4935 4935
Wet Density, gm/cc 2.148 2.185 2.185
Dry Density, gm/cc 1.974 1.989 1.967

2
Compaction
curve
1.995 MDD and OMC
line
1.99

1.985

1.98

1.975

1.97

1.965

1.96
0 2 4 6 8 10 12

Optimum Moisture Content: 9.80 Maximum Dry Density: 1.989


REMARKS

Contractor Consultant
Tundi Construction Pvt. Ltd. Intercontinental Consultants and Technocrats Pvt.Ltd.,
New Delhi, India
in association with Full Bright Consultancy( Pvt).Ltd.
, Kathmandu, Nepal
Tested by:………………….. Witnessed by:…………………………………………
Lab Technician Lab Technician

Recommended By:………………… Verified by:………………………………………………


Contract Manager Material Engineer
No. of Blows: 56
Mould Diameter 15.014 No. of layer: 5
Height of Mould: 12.75 Weight of rammer: 4.89 kg
Approved by:…………………………………………….
Resident Engineer
Sub-Regional Transport Enhancement Project
MODIFIED PROCTOR COMPACTION TEST
STEP
Road : Harkpur-Okhaldhunga Road Sample Description: Subgrade
Contract No : STEP/HO/02 Sample Location/Ch: 10+450
Lab Ref. No.: Source: Existing
Date of Sampling: 8-May-13 Sampled by: Jointly
Date of testing: 10-May-13
No. of Blows: 56
Mould Diameter 15.014 No. of layer: 5
Height of Mould: 12.75 Weight of rammer: 4.89 kg
Volume of mould: 2258.23 Height of drop: 45cm
Determination of Moisture Content
Can no. B-25 B-9 N-15 N-30 1 10 9 12 4 42
Wt. of wet soil + Can 68.5 86.5 87.5 84.3 68.5 86.5 87.5 84.3 96.6 72.6
Wt. of dry soil + Can 64.5 81 81.6 78.3 64.4 83.1 83 79.8 91 68
Wt. of water 4 5.5 5.9 6 4.1 3.4 4.5 4.5 5.6 4.6
Wt. of can 9.5 10 9.2 8.9 24.1 49.3 44.2 41.8 50 34.1
Wt. of dry soil 55.0 71.0 72.4 69.4 40.3 33.8 38.8 38.0 41.0 33.9
Moisture % 7.3 7.7 8.1 8.6 10.2 10.1 11.6 11.8 13.7 13.6
Average moisture % 7.5 8.4 10.1 11.7 13.6
Determination of Density
Wt. of Soil + mould 10112 10348 10840 10900 10850
Wt. of mould 5945 5945 5945 5945 5945
Wt. of Soil in mould (gm) 4167 4403 4895 4955 4905
Wet Density, gm/cc 1.845 1.950 2.168 2.194 2.172
Dry Density, gm/cc 1.716 1.799 1.968 1.964 1.912

2.05
Compaction
2 curve
MDD and
OMC line
1.95

1.9

1.85

1.8

1.75

1.7
5 6 7 8 9 10 11 12 13 14 15

Optimum Moisture Content: 10.50 Maximum Dry Density: 1.98


REMARKS

Contractor Consultant
Tundi Construction Pvt. Ltd. Intercontinental Consultants and Technocrats Pvt.Ltd.,
New Delhi, India
in association with Full Bright Consultancy( Pvt).Ltd.
, Kathmandu, Nepal
Tested by:………………….. Witnessed by:…………………………………………
Lab Technician Lab Technician

Recommended By:………………… Verified by:………………………………………………


Contract Manager Material Engineer
No. of Blows: 56
Mould Diameter 15.014 No. of layer: 5
Height of Mould: 12.75 Weight of rammer: 4.89 kg
Approved by:…………………………………………….
Resident Engineer
Sub-Regional Transport Enhancement Project
MODIFIED PROCTOR COMPACTION TEST
STEP
Road : Harkpur-Okhaldhunga Road Sample Description: Subgrade
Contract No : STEP/HO/02 Sample Location/Ch: 10+140
Lab Ref. No.: Source: Existing
Date of Sampling: 8-May-13 Sampled by: Jointly
Date of testing: 10-May-13
No. of Blows: 56
Mould Diameter 15.014 No. of layer: 5
Height of Mould: 12.75 Weight of rammer: 4.89 kg
Volume of mould: 2258.23 Height of drop: 45cm
Determination of Moisture Content
Can no. 38 15 34 26 A-22 30 32 31
Wt. of wet soil + Can 66.6 72.2 67.7 79.4 86.4 91.4 94 82.3
Wt. of dry soil + Can 65.6 71.2 66 77.6 83.5 87.6 89.6 78.8
Wt. of water 1 1 1.7 1.8 2.9 3.8 4.4 3.5
Wt. of can 35 42.1 35.7 44.8 38.8 31.2 33.2 32.7
Wt. of dry soil 30.6 29.1 30.3 32.8 44.7 56.4 56.4 46.1
Moisture % 3.3 3.4 5.6 5.5 6.5 6.7 7.8 7.6
Average moisture % 3.4 5.5 6.6 7.7
Determination of Density
Wt. of Soil + mould 10915 11120 11125 11070
Wt. of mould 5945 5945 5945 5945
Wt. of Soil in mould (gm) 4970 5175 5180 5125
Wet Density, gm/cc 2.201 2.292 2.294 2.269
Dry Density, gm/cc 2.129 2.171 2.152 2.107

2.2

Compaction curve
2.18 MDD and OMC
line

2.16

2.14

2.12

2.1
0 1 2 3 4 5 6 7 8 9

Optimum Moisture Content: 5.60 Maximum Dry Density: 2.172


REMARKS

Contractor Consultant
Tundi Construction Pvt. Ltd. Intercontinental Consultants and Technocrats Pvt.Ltd.,
New Delhi, India
in association with Full Bright Consultancy( Pvt).Ltd.
, Kathmandu, Nepal
Tested by:………………….. Witnessed by:…………………………………………
Lab Technician Lab Technician

Recommended By:………………… Verified by:………………………………………………


Contract Manager Material Engineer
No. of Blows: 56
Mould Diameter 15.014 No. of layer: 5
Height of Mould: 12.75 Weight of rammer: 4.89 kg
Approved by:…………………………………………….
Resident Engineer
Sub-Regional Transport Enhancement Project
STEP
MODIFIED PROCTOR COMPACTION TEST
Road : Harkapur-Okhaldhunga Road Sample Description: Subgrade
Contract No : STEP/HO/02 Sample Location/Ch: 9+550
Lab Ref. No.: Source: Existing
Date of Sampling: 8-May-13 Sampled by: Jointly
Date of testing: 10-May-13
No. of Blows: 56
Mould Diameter 15.014 No. of layer: 5
Height of Mould: 12.75 Weight of rammer: 4.89 kg
Volume of mould: 2258.23 Height of drop: 45cm
Determination of Moisture Content
Can no. B-25 B-22 B-21 B-2 B-15 N-30 K-7 K-12 K-5 K-1
Wt. of wet soil + Can 33.9 32.2 29.7 34.7 42.9 45.8 48.8 40.2 53.7 61.9
Wt. of dry soil + Can 32.9 31.2 28.4 33.2 40.5 43.2 46 37.8 49.9 57.4
Wt. of water 1 1 1.3 1.5 2.4 2.6 2.8 2.4 3.8 4.5
Wt. of can 9.5 9.3 8.6 9.8 8.9 8.9 13.8 9.9 13.1 13.4
Wt. of dry soil 23.4 21.9 19.8 23.4 31.6 34.3 32.2 27.9 36.8 44.0
Moisture % 4.3 4.6 6.6 6.4 7.6 7.6 8.7 8.6 10.3 10.2
Average moisture % 4.4 6.5 7.6 8.6 10.3
Determination of Density
Wt. of Soil + mould 10383 10927 11027 10953 10924
Wt. of mould 5945 5945 5945 5945 5945
Wt. of Soil in mould (gm) 4438 4982 5082 5008 4979
Wet Density, gm/cc 1.965 2.206 2.250 2.218 2.205
Dry Density, gm/cc 1.882 2.072 2.092 2.041 1.999

2.3

2.25
Compaction curve
2.2 MDD and OMC
line
2.15

2.1

2.05

1.95

1.9

1.85

1.8
0 2 4 6 8 10 12

Optimum Moisture Content 7.00 Maximum Dry Density: 2.096


REMARKS

Contractor Consultant
Tundi Construction Pvt. Ltd. Intercontinental Consultants and Technocrats Pvt.Ltd.,
New Delhi, India
in association with Full Bright Consultancy( Pvt).Ltd.
, Kathmandu, Nepal
Tested by:………………….. Witnessed by:…………………………………………
Lab Technician Lab Technician

Recommended By:………………… Verified by:………………………………………………


Contract Manager Material Engineer
Approved by:…………………………………………….
Resident Engineer
Moisture can No Can wt.
1 24.1
2 66.8
3 45.4
4 50
5 73.9
7 74.8
8 70.4
9 44.2
12 41.8
15 42.1
16 65.2
18 72.5
19 26.3
20 92
21 23.4
22 27.7
26 44.8
28 68.2
29 44.2
35 30.3
36 31.6
37 30.9
38 35
41 90.8
43 38.8
44 33.4 12
46 92
48 38.1
A-10 59.2
A-2 8.3
A-34 97.3
A-36 45.5
B-10 9.4
K-7 13.8
K-12 9.9
K-5 13.1
K-1 13.4
B-21 8.6
34 35.7
32 33.2
42 34.1
10 49.3
31 32.7
A-22 38.8
K-10 10.4
K-3 13.1
K-2 12.8
K-9 13.8
P-2 8.9 P-3 D-1
P-3 9.4
D-1 8.9
T-22 8.4
D-11 8.8
P-9 10.03
X-2 8.9
B-18 9.6
P-11 9.7
X-6 9.6
P-1 10.2
T-8 7.6
K-6 13.2
K-11 12.8
A-11 14.3
K-8 12.7
A-4 12.8
T-18 8.3
B-9 10
N-15 9.2

30 31.2
B-11 9.2
B-14 10
B-15 8.9
B-16 9.3
B-19 9.3
B-2 9.8
B-22 9.3
B-23 9.7
B-24 9.3
B-25 9.5
B-3 9.7
B-4 9.5
B-7 9.9
N-30 8.9