Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

C13 Industrial Engine RRA00001-UP(SEBP4130 - 36) - Documentation Стр.

1 из 3

Shutdown SIS

Previous Screen

Product: INDUSTRIAL ENGINE


Model: C13 INDUSTRIAL ENGINE RRA
Configuration: C13 Industrial Engine RRA00001-UP

Disassembly and Assembly


C13 Engine and C13 Industrial Engine
Media Number -KENR8165-01 Publication Date -01/10/2011 Date Updated -04/10/2011

i03554901

Connecting Rod Bearings - Install


SMCS - 1219-012

Installation Procedure
Table 1

Required Tools
Tool Part Number Part Description Qty
A 4C-5590 Anti-Seize Compound -

https://sis.cat.com/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/si... 25.01.2012
C13 Industrial Engine RRA00001-UP(SEBP4130 - 36) - Documentation Стр. 2 из 3

Illustration 1 g01319419

Note: Careful handling is required for fractured connecting rods. Fractured faces for the
connecting rod and connecting rod cap should not be placed on any surface. The connecting
rod and the connecting rod cap should be placed on the sides in order to prevent damage.
When possible, the connecting rod and the connecting rod cap should be bolted together in
order to prevent damage.

1. Install the upper half of connecting rod bearing (2) into connecting rod (1). Ensure that the
bearing tab engages with the slot in connecting rod (1) .

2. Apply clean engine oil on the surface of the upper half of connecting rod bearing (2) .

3. Position connecting rod (1) and connecting rod bearing (2) on the crankshaft.

4. Install the lower half of connecting rod bearing (2) in corresponding connecting rod cap (3).
Ensure that the bearing tab engages with the groove in connecting rod cap (3) .

5. Apply clean engine oil on the surface of the lower half of connecting rod bearing (2) .

6. Install connecting rod cap (3) on the corresponding connecting rod. Ensure that the numbers
are on the same side.

7. Apply Tooling (A) to connecting rod cap bolts (4). Install connecting rod cap bolts (4).
Tighten the connecting rod cap bolts to a torque of 130 ± 7 N·m (95 ± 5 lb ft).

8. Place an index mark on each bolt head. Tighten each bolt for an additional 60 ± 5 degrees (1/6

https://sis.cat.com/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/si... 25.01.2012
C13 Industrial Engine RRA00001-UP(SEBP4130 - 36) - Documentation Стр. 3 из 3

turn).

9. Repeat Steps 1 through 8 in order to install the remaining connecting rod bearings.

10. Install the suction bell assembly.

End By: Install the engine oil pan.

Copyright 1993 - 2012 Caterpillar Inc. Wed Jan 25 23:01:52 UTC+0300 2012
All Rights Reserved.
Private Network For SIS Licensees.

https://sis.cat.com/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/si... 25.01.2012

You might also like